Loading...
HomeMy WebLinkAboutSUB202000077 Checklist - Project Closeout (Administrative) 2020-08-06 SUBDIVISION/SITE PLAN FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days,of final action,place in folder and forward to CDA FOR QC and staff.• ab• . CDA will forward to the Imaging Center for digital closeout. SDP UB'# 0O— PROJE T (� . S G i l4 / f�T p FULL • I OF LEAD REVIEWER FINAL ACTION DATE: c7 6 401-0o Coun View IIE-Afplication,Page 2 Data Entered - ❑ St ou- Water ssment,or other documents placed in"Does&Pies" Hardcopy -File.Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). ` Please check each item included in this.folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to-provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document;or,if the document is already in digital format,can be saved to LaserFiche. Please provide the-digital location(path/name)of the document in the space provided. -8 Engineering Folder Information/documentation Q Scan ❑ Saved location pplication attire copy) Scan ❑ Saved location c oti cation records/Abutting Owner correspondence Scan ❑Saved location IIVAiplicant Co pondence(to/from,memos/ethails) • Scan ❑ Saved location [Complete. printed Review Comments ID Scan ❑ Saved location. L proved lat(signed,or stamped"Approved"with Planner/Engineer name) Scan 0 Saved location strative Approval) ❑ Scan ❑ Saved location 'te Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS Action Letter) ■ Scan ❑ Saved location ❑ Ground • er Assessments` ❑ Sc..: ❑ Saved location ❑ Other(Please expl. '.e.Studies) • Q Scan \ Saved location • • ❑ Other(Please explain-i.e.Studies ❑ Scan 0 Saved 1,G: 'on ❑ At the planner's discretion,copies of unappro- • plans/plats may be placed in the file if it is referenced in the . staff report or minutes and lends clarity-to the revie ' • a later.date. If such plans are included,they should be clearly marked as unapproved and contain a note cla i g why it was included. • ❑ Scan ❑ Saved location Additional.Information on this project: • • Planning Commission Minutes-maybe obtained online or by contacting PC Recording Secretary • Board of Supervisor Minutes-may be obtained online or by contacting the Clerk of BOS • • Construction Documents-will.be added to this folder after completion of project. Prior to completion, documents may be obtained by contacting the County Engineer. _._ NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2). Folder has a typed status label.(same font&label color as project label)placed under the project label to ;reflect current project status and date; 3) Documents are:Acco-fastened(except.plats/plans),and in Chronological.order(latest:documents on top); 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item and return folder to the Chief of. Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012