Loading...
HomeMy WebLinkAboutSUB202000104 Checklist - Project Closeout (Administrative) 2020-07-08 SUBDIVISION/SITE PLAN FILE CLOSEOUT / IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of finial action,place in folder and forward to CDA FOR QC and sta •• •a el. CDA will forward to the hnaging•Center for digital closeout. SDP UB# gC3P-0-- 0 PROJECT TITLE V & S, CAJ FUL• 1 I OF LEAD REVIEWER ri ,3 Z FINAL ACTION DATE: 7-0P- Coin View IMVAP'plication,Page 2 Data Entered a er sessmen,o &Pies" Hardeopy-File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check'box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document;or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. 'on/documentation ❑ Scan ❑ Save oca i [AAplication(signature copy) ❑ Scan ❑ Saved location o ion recor u Owner correspondence ❑ Scan ❑ Saved location ❑p icant Correspondence'(to/from,memos/entails) ❑ Scan ❑ Saved location Complete.set of printed Review Comments "A ❑ Scan ❑ Saved location. pproved plan/plat(signed,or stamped"Approved"with Planner/Engineer name) El Scan ❑ Saved location IN Action.Letter(Administrative Approval) ❑ Scan ❑ Saved location ❑ Whi ; Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS Action Letter) 12 Scan 0 Saved location ❑ Ground .ter Assessments` ❑ an ❑ Saved location ❑ Other(Please e •lain—i.e. Studies) ❑ Scan ❑ Saved location • ❑ Other(Please explain i.e. Studies) ❑. Scan ❑ Saved location . . ❑ At the planner's discretion, ••pies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minutes and len. clarity-to the review at a later.date. If such plans are included,they should be clearly marked as unapproved i d contain a note clarifying why it was included. • ❑ Scan ❑ Say , location • Additional'Information on this pro •et: • Planning Commission Minutes—may be ob •s ed online or by contacting PC Recording Secretary • Board of Supervisor Minutes—maybe obtain-. , i Me or by contacting the Clerk of BOS • Construction Documents—will be added to this fol s after completion of project. Prior to completion, documents may be obtained by contacting the County ' , '.eer.. . NOTES: SDP/SUB project folders will be accepted by the Imaging Ce er when the following items are complete: 1) Checklist is completed and included in folder; • 2) Folder has a typed status label(Same font&label color as project label)placed under the project label to • ;reflect current project status and date; • 3) Documents are Acco-fastened(except plats/plans),and in chronological.order(latest:documents on top);. 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. ' If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief of. Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012 •