Loading...
HomeMy WebLinkAboutSUB202000125 Checklist - Project Closeout (Administrative) 2020-07-21 SUBDIVISION/SITE PLAN FILE CLOSEOUT/IMAGING CENTER INSTRUCTIONS CHECKLIST Please complete this form within 30 days of final action,place in folder and forward to CDA FOR QC and sta : •'a; 1. CDA will forward to the Imaging Center for digital dos out. /� l SDP/ UB# �� '.1G— PRO TITLE 44 4,14_11 FULL NAME OF LEAD REVIEWER d S 2— FINAL ACTION DATE: 7— o10 Coun 'ew— pplication,Page 2 Data Entered • "Does&Pics" Hardcopy-File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital location(path/name)of the document in the space provided. ❑leering molder information/documentation ❑ Scan 0 Saved location pplicatio (signature copy) Scan ❑ Saved location • o cation recur u wner correspondence 0 Scan 0 Saved location 0--Afplicant Correspondence(to/from,memos/emails) O�Scan ❑ Saved location Ct mplete.s of printed Review Comments [Scan ❑ Saved location. 9Approved plat(signed,or stamped"Approved"with Planner/Engineer name) Scan 0 Saved location • • - ': . - . Ve •N' . .val) ❑ Scan ❑ Saved location ❑ Whit; Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS Action Letter) II Scan 0 Saved.location 0 Ground ater Assessments" ❑ Scan ❑ Saved location ❑ Other(Plea•- explain—i.e. Studies) 0 an 0 Saved location • • Other(Please e slain—i.e. Studies) 0 Scan 0 Saved location ❑ At the planner's di retion,copies of unapproved plans/plats may be placed in the file if it is referenced in the staff report or minute and lends clarity to the review at a later.date. If such plans are included,they should be clearly marked as una 'roved and contain a note clarifying why it was included. • ❑ Scan 0 Saved location Additional Information on ; 's project: ♦ Planning Commission Minutes— y be obtained online or by contacting PC Recording Secretary • Board of Supervisor Minutes—may be obtained online or by contacting the Clerk of BOS • Construction Documents—will be added to this folder after completion of project. Prior to completion, documents may be obtained by contacting the County Engineer. • NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Folder has a typed status label(Same font&label color as project label)placed under the project label to ' ;reflect current project status and date; • 3) Documents are Acco-fastened(except plats/plans),and in chronological.order(latest:documents on top); 4) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. ' If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief of Planning for corrective action. Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012