HomeMy WebLinkAboutSUB202000196 Checklist - Project Closeout (Administrative) 2020-12-07 SUBDIVISION/SITE PLAN
FILE CLOSEOUT /IMAGING CENTER INSTRUCTIONS
CHECKLIST
Please co i 'lete this form within 30 days of final action,place in folder and forward to CDA FOR QC
and st/. : la.el. CDA will forward to the Imaging•Center for digital closeout. Au(SD '/SUB'# 2 0? ,!Ice PROJECT TITLE J Sr>~. I.LC 7
FUL 'AME OF LEAD REVIEWER3 yr j)ere _ FINAL ACTION DATE:Coun View—
pplication,Page 2 Data Entered
�.a:copv�-v�..�v-���scvtz-a.7G331IIGIIr'prpQ�GI�pGUIIIGRLS plaCeQ iCs"
Hardcopy File.Folder Closeout: All items listed should be placed in project folder,in reverse
chronological order(latest on top).
Please check each item included in this.folder. To indicate that an item is not applicable to this file,place an"N/A"
next to the check box. The Lead Reviewer has the discretion to include any item deemed necessary to provide
clarity to the file,please indicate that item on the"Other"lines provided.
Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the
document;or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital
location(path/name)of the document in the space provided.
❑ Scan 0 Saved location
Application(signature copy)
❑ Scan ❑ Saved location
•
ion recor /Abutting Owner correspondence
0 Scan ❑ Saved location
❑Applicant Co espondence(to/from,memos/emails)
•
Scan 0 Saved location
Complete. of printed Review Comments
[�� can ❑ Saved location.
0 proved plat(signed,or stamped r n '"Approved"rwi eer name)
Scan 0 Saved location W v
n Action Letter(Administrative-Approval)
❑ Scan 0 Saved location
❑ `I le Envelope-PC/BOS Meeting Package-Staff Report(include plan/plat presented,PC/BOS Action Letter)
❑ Scan 0 Saved location
0 Grouni Water Assessments`
• Scan ❑ Saved location
❑ Other(Pleas,explain—i.e.Studies)
❑ Sc '•• 0 Saved location •
•
❑ Other(Please exp . —i.e. Studies)
❑ Scan 0 Saved location
❑ At the planner's discretion, opies of unapproved plans/plats may be placed in the file if it is referenced in the
staff report or minutes and 1- • ,s clarity-to the review at a later date. If such plans are included,they should be
clearly marked as unapprove :nd contain a note clarifying why it was included. •
❑ Scan 0 Sa ;d location
•
Additional Information on this:pro' 'ct:
♦ Planning Commission Minutes—may be ob '•ed online or by contacting PC Recording Secretary
• Board of Supervisor Minutes—maybe obtaine' nline or by contacting the Clerk of BOS
• Construction Documents—will be added to this fol.er after completion of project. Prior to completion,
documents may be obtained by contacting the County Engineer.
NOTES: SDP/SUB project folders will be accepted by the Imaging Center when the following items are complete:
1) Checklist is completed and included in folder;
2) Folder has a typed status label.(same font&label color as project label)placed under the project label to
;reflect current project status and date;
• 3) Documents are Acco-fastened(except plats/plans),and in chronological.order(latest:documents on top);. -
4) Documents are sufficiently identified as towhich need to be scanned or saved to LaserFiche.
If the above items are not complete,Imaging Center staff will circle the'incomplete item and return folder to the Chief of.
Planning for corrective action.
Issued 2/7/2008,Revised 4/1/2008,Revised 7/1/2009,Revised 2/9/2010,Revised 10-29-2012