HomeMy WebLinkAboutARB202100078 Plan - Approved 2021-07-28OCT STONEFIELD PROPERTY OWNER, LLC
STONEFIELD BUILDING A=5 LANDLORD WORK
ALBEMARLE COUNTY, VIRGINIA
A. PROJECT DESCRIPTION AND COMPATIBILITY WITH SURROUNDING AREA AND
ENTRANCE CORRIDOR
The proposed work at building A-5 (the former Pier One store) located at Stonefield
1951 Swanson Drive in Albemarle County, Virginia, is to renovate the existing structure
to the level of a warm, lit shell for future tenant improvement work. The goal of the
proposed alterations is to accommodate smaller retail spaces served with individual
utilities as well as new signage and entry for each tenant.
B. EXTERIOR CHANGES AND ADDED OR ALTERED MECHANICAL EQUIPMENT
Existing mechanical equipment is hidden by existing parapet and screening elements
ranging from 4'-10" to 7'-0" high. New roof top units and kitchen exhaust fans will be
placed within the existing covered area and will not be visible from the Entrance
Corridor.
C. LANDSCAPING
No proposed changes to landscape
D. LIGHTING
Existing lighting will remain and no new exterior lighting is proposed
E. APPEARANCE OF PROPOSED BUILDING
All proposed alterations utilize existing materials, colors, and finishes found throughout
the Stonefield development and already previously approved by County ARB. The
intention of utilizing the existing, pre -approved materials is to retain the cohesive
aesthetic already established, and to minimize the observable revisions to the former
single tenant retail space.
F. SIGNAGE
Building A-5 at Stonefield is intended to be added to the existing Comprehensive Sign
Plan already approved for the other buildings within the shopping center. Individual
tenants will be submitting sign permits to the Albemarle County Architecture Review
Board for approval to ensure compliance with both the existing CSP and the Entrance
Corridor Guidelines for signs.
IZ
0
1
\W
W
0
F—LU
Q
w >
0:� LL
~ J
J
Z;
Q�
�w
F-
;o
Qry
wQ
�_
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
July 6, 2021
U�J
J >O
W Q
Z Z
0 LJJ V
Oo>�
>= Q 0 >
W Z
am Lr 0 Z
OQz�
�OQO
Z�U
LU
0 0 V)
W J
rl-
-
W O�
0 � W
Z J m
OW
H LL Q
W
j.. Z
UO
OV)
CS.1 COVER SHEET
ISSUE DATE:
June 24, 2019
Approved 7/28/2021
mmm
SHEET # 1 OF 8
ISWANSON DRIVE \
I I
-O-
�� z
HYDRAULIC ROAD
ENTRANCE
CORRIDOR
r �
r
� r
r
0
i r14)
I
r 1
� � 4
i
i I
� I
i
i
i
i
i
i
i
i
SITE PLAN
B. l i ,_20'
O 4-10" and 7-0" PARAPET WALL (BLUE)
O 5-1" PARAPET SCREENING (GREEN)
O NEW ROOFTOP UNIT (RED)
® NEW LANDING
Zn
o 0
1
W
W LU
0o
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
July 6, 2021
V�
�O
W
Z �
�O
00
� z
��
W 1-0
O ad //<
C V
z
00
WLLm Co
J
W
ZD
Ow
Lu
z
z
w CD
> 0!�
Iry >
z�
O�
zp
QU
�w
Lo Q
o"
LU
r�
Q
SITE PLAN
ISSUE DATE:
June 24, 2019
■
SHEET # 2 OF 8
*NO PROPOSED CHANGES TO LANDSCAPE
1 LANDSCAPE
C . l 1=20'
Zn
oo
I
LU
W LU
0o
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
I I - ARB STAFF REVIEW
SWANSON DRIVE t ORIGINAL PUBLICATION
June 24, 2019
I
LATEST REVISION
July 6, 2021
I
I
� , I
HYDRAULIC ROAD
I
ENTRANCE
CORRIDOR
� U
0
F
Im
0
Vry
�O
W
Z fj:�
3:O
00
� z
IxQ
W
CL L?
0Q
am
z
00
W J
W m
ZD
0w
L u
Z
0 (/)
Z
LJJ V
>0!�
ry >
Q
z�
O�
Z O
>QU
> LU
Lo Q
O"
LU
r�
Q
LANDSCAPE
ISSUE DATE:
June 24, 2019
Col
SHEET # 3 OF 8
Z IL
oo
I
�- Q
N w w>
>�w
~ J
ui
J_
Z
w �W
Q o �F-
Vo
Q�
wQ
0_
I �U
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
ARB STAFF REVIEW
�, r4
ORIGINAL PUBLICATION
_----R-�_ --_--- - 4' 4 U2' g. 8..
_ June 24, 2019
4 O 9 LATEST REVISION
OJuly 6, 2021
2
6 g -
3' 4 3/4' 6' 5'
J DEMO ELEVATION
J �
E 3/16"= 1' >O
W Q
Z 0:� Z
0 w
Oo>�
>m Q 0 >
W 1-0 Z 7�
DEMOLISH AND REMOVE amO L
4"1.. O EXISTING DECORATIVE LAP PANEL O < v)
DEMOLISH SILL TO SLAB IN LOCATION SHOWN r Z O
. O TO PREP FOR NEW DOUBLE DOOR am�/ Q
7 AREA OF STOREFRONT TO BE DEMOLISHED (TO
MIDDLE MULLION). PREP FOR NEW DOUBLE c�w � �
_ g I DOOR. SALVAGE REMAINING STOREFRONT. J J
r
DEMOLISH AND REMOVE EXISTING DOOR. W =:) L Q
® PREP FOR REPLACEMENT WITHIN STOREFRONT ULM
FRAME.
LJJ m
DEMOLISH AND REMOVE EXISTING SIGN. Z 0 W
_ PATCH AND REPAIR EIFS AS REQUIRED AND J
PREP. p LU
1 I DEMOLISH SILL TO SLAB IN LOCATION SHOWN ~ U—
TO PREP FOR NEW SINGLE DOOR y w
* A 7 9 AREA OF STOREFRONT TO BE DEMOLISHED. ~ z
OPREP FOR NEW SINGLE DOOR. SALVAGE V O
REMAINING STOREFRONT.
2 6 $ ® TOPROLISH F FORLNEOSLAB IN ON SHOWN
W DOUBLE DOOR
_ AREA OF STOREFRONT TO BE DEMOLISHED (TO
_ _ OMIDDLE MULLION). PREP FOR NEW DOUBLE
DOOR. SALVAGE REMAINING STOREFRONT.
2 STREET VIEW
EXISTING FRONT
Nrs ELEVATION
ISSUE DATE:
June 24, 2019
■
SHEET # 4 OF 8
z 0-
0
*VISIBILITY OF ALL MECHANICAL EQUIPMENT SHALL BE ELIMINATED FROM THE ENTRANCE CORRIDOR. J
F- Q
N w w>
>�w
~ J
J_
ui Z
W
PATCH AND REPAIR ANY HOLES w
IN EIFS FACADE FROM EXISTING SIGN; ! ~
Q�
PATCH AND REPAIR ANY HOLES PAINT SHALL MATCH EXISTING COLOR; NEW STOREFRONT SHALL MATCH EXISTING STOREFRONT; Q O
FROM EXISTING SIGN. PAINT FACADE. PREVIOUSLY SPECIFIED PAINT AND COLOR: w
PPG SHARKSKIN #513-5 PREVIOUSLY SPECIFIED STOREFRONT AND COLOR: ap =
OLD CASTLE, MODEL ICR-225 IN BRONZE ANODIZED FINISH , - U
CONTACT: BOB PINEO
�—R TEL:434-806-8365
(E):bob@designdevelopllc.com
� ARB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
V
SFa LATEST REVISION
July 6, 2021
F� Ef
1 SOUTHEAST ELEVATION V
E.2 3/16'= 1'-0"
�O
W Q
Z 0:� Z
0 w
Oo>ce
>m Z � >
W 1-0 o z
30" OQv)=)
\ 1' Qz/ O
LLJ
I �
W -
v - L Q
\ W m O�
\ p w
\ Z
J m
\
/
W
\
O
H LL
w
`\ Z
0
3 TWO RISER HANDRAIL O c)
E.2 3/4° = r-0°
2 0.
0
FRONT ELEVATION
ISSUE DATE:
June 24, 2019
2 NEW LANDING PERSPECTIVE
4 ONE RISER HANDRAIL
E.2 N.T.S. E.2 3/4" = 1'-0"
E02
SHEET # 5 OF 8
Zn
o 0
J
A B C D E
�Q
LLi
20' 0" 40'-0" 40'-0" 40'-0" ui W Q
. w
77777777777777-777— 0 C) ~C ~
Vo
Q
w
Q
�x
�U
- . - - . - . - . - . . - . - . - . - . - . - . - . - . - . - . - . - . - . i. - . - . - . - . - . - . - . - . - . - . - . - . - . - i - . - . - . - . - .......
N
N
ch
N
c+>
C Lo �.
0
I
I
59' 9 I/2" 56' 10 1/4"
6"
I
f
I I
I
. 1
I
a
I
I
i11 49 6 3/4"
I
I
I
C
6" I
I I
I �
I
CENTER STEEL STUD ON EXISTING
LOAD BEARING JOIST ABOVE.
486'-6" I 486-6'
I- - - - - - - - - - - -.
Lp
�� 1s�4
Ii sees e
60 ,� -4'11. 1/2 k 551/4"..
486-6" I LANDING DIES INTO GRADE
*486-6"
36" TALL, 2" DIAMETER
STEEL TUBE HANDRAIL, PAINTED TO MATCH
OTHER HANDRAILS IN STONEFIELD.
37' 6
A
1
9' 9" 115 3/4"
6"
21' 8 3/4"
37' 11"
ALIGN F/ OF NEW TYPE X GYPSUM WALL BOARD
WITH EXISTING COLUMN FUR OUT
m
— NEW CONCRETE LANDING AND STAIRS
TO GRADE AT NEW ENTRANCES
------------
s� 486 b,
1 —71Ti5 . =p -
------------
TREAD DIES INTO GRADE
486'-1MA
' 2 ao
v
NOTE: DIMENSIONS FROM EXISTING F/ WALL TO F/ FRAMING
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
ARB STAFF REVIEW
ORIGINAL PUBLICATION
IJune 24, 2019
LATEST REVISION
July 6, 2021
Vry
�O
W Q
Z fj:� z
O W V
00>�
� QQ>
�J� z
CLLr) O z
OQz=)
�OQO
U
LLJ
W J
=D Lr) `Q
W
� L_I
Z L0 m
OW J
H L.L Q
N LU
Z
VO
O�
V /
FLOOR PLAN
ISSUE DATE:
June 24, 2019
E03
SHEET # 6 OF 8
NORTH SITE VIEW FROM ENTRANCE CORRIDOR (HYDRAULIC ROAD)
SOUTH SITE VIEW FROM ENTRANCE CORRIDOR (HYDRAULIC ROAD)
Zn
o 0
1
W
W LU
0o
CONTACT: BOB PINED
TEL:434-806-8365
(E) : bob@desig ndevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
July 6, 2021
U�
�O
W Q
Z z_
OW V
Op/>���
LL
H Q Q >
Ix J Z �
LU O z
OQz�
wOO
Q
U
LU
W J
=D Lr) Q
LLm `
LUCo O�
LU
Z I m
O LU
H LL Q
LU
Z
UO
O (
SITE PHOTOS
ISSUE DATE:
June 24, 2019
■
SHEET # 7 OF 8
O J
L L 1/4
N
21/2' 6'p" 21/2'
2'21/4r'
21/2
(V
O
�
-
\
N
N
(V
/
\
N
60
b
00
N
L. O J
2 1/2' 6 0"
N
N
b
(V
�
N
N
/
\
O
----------
---------
---------
30"
2 1 /2"
4 J
1, 0,, 21/21' 3, 0„ 21/2"
\I
N
V
J
-
J
�
M
N
D
\
_
\
b
b
0
co
/
J
J
/
1 STOREFRONT ELEVATIONS
3.1 1/2"= 1'-O"
O J
L J I/4
2 1 /2" 6- 0" 2 1 /2"
2' 2 3/4"
2 1 /2'
N
(V
-
N
N
N_
/
\
N
b
b
/
\
b
60
N
-
-
--
- - - - - - - I\--
--7 --------
10'-0'
STOREFRONT
8'-0"
T/ DOOR
EXISTING STOREFRONT TO REMAIN (TYP.)
(HATCHED)
------------
WALL BASE
0'-0"
FLOOR SLAB
7'-0"
-----------------------------------------------------------------------------------------------------------------T/_D_OOR
---------------------------------------------------------------------------------------------------------------FLOOR SLAB
2 DOOR ELEVATIONS
3.1 1/2"= 1'-0"
DOORS & HARDWARE NOTES:
1. FIELD VERIFY ALL CONSTRUCTED CONDITIONS, DIMENSIONS, SWINGS, JAMB THICKNESSES AND QUANTITIES PRIOR TO PLACING ORDER.
2. COORDINATE KEYING REQUIREMENTS WITH OWNER.
3. PROVIDE ALL HARDWARE NECESSARY TO PROVIDE A COMPLETE DOOR AND HARDWARE ASSEMBLY AT EACH DOOR.
4. ALL ENTRY DOORS SHALL HAVE CODE COMPLIANT PANIC HARDWARE.
5. IF IMPACT RESISTANT GLAZING SYSTEM IS REQUIRED BY CODE, LANDLORD SHALL PROVIDE SUCH SYSTEM.
6. LANDLORD WILL PROVIDE ALL NECESSARY WEATHERPROOFING TO DOORS AND SOTRFRONT AS REQUIRED.
STOREFRONT
DESCRIPTION
SF1, SF2, SF3, SF4 CLEAR ANODIZED ALUMINUM INSULATED GLAZING SYSTEMS BY
KAWNEER OR EQUAL. TO BE MINIMUM 10'-0" TALL WITH CLEAR
INSULATED LOW-E GLASS. DOUBLE ENTRY DOORS, DOUBLE GLAZED
ACTING DOOR WITH A SMALL FORMAT INTERCHANGABLE CORE, KEYED
ON ONE SIDE. DOUBLE GLAZED ACTING DOOR WITH A SMALL FORMAT
INTERCHANGABLE CORE, KEYED ON ONE SIDE. SINGLE ENTRY DOORS,
DOUBLE GLAZED ACTING DOOR WITH A SMALL FORMAT
INTERCHANGABLE CORE, KEYED ON ONE SIDE. DOUBLE GLAZED
ACTING DOOR WITH A SMALL FORMAT INTERCHANGABLE CORE, KEYED
ON ONE SIDE.
DOOR I DESCRIPTION
D2 1 3-0" X 7-0" STEEL DOOR IN HOLLOW METAL FRAME WITH LOCKSET.
0
1
W
W
n
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
July 6, 2021
V
J
LU
Z
poi
Imom
Ix
LU
CL
0
am
in
J
LU
LL
LU
Z
0
H
H
H
V
0
0
0
z
Q
J
m
0
I
W_
E
W
Z
0
LU
ry
n
z
0
Z
Q
01%,
lip
•
I
DOOR AND WINDOW
SCHEDULE
ISSUE DATE:
June 24, 2019
F02
SHEET # 8 OF 8