Loading...
HomeMy WebLinkAboutARB202100078 Plan - Approved 2021-07-28OCT STONEFIELD PROPERTY OWNER, LLC STONEFIELD BUILDING A=5 LANDLORD WORK ALBEMARLE COUNTY, VIRGINIA A. PROJECT DESCRIPTION AND COMPATIBILITY WITH SURROUNDING AREA AND ENTRANCE CORRIDOR The proposed work at building A-5 (the former Pier One store) located at Stonefield 1951 Swanson Drive in Albemarle County, Virginia, is to renovate the existing structure to the level of a warm, lit shell for future tenant improvement work. The goal of the proposed alterations is to accommodate smaller retail spaces served with individual utilities as well as new signage and entry for each tenant. B. EXTERIOR CHANGES AND ADDED OR ALTERED MECHANICAL EQUIPMENT Existing mechanical equipment is hidden by existing parapet and screening elements ranging from 4'-10" to 7'-0" high. New roof top units and kitchen exhaust fans will be placed within the existing covered area and will not be visible from the Entrance Corridor. C. LANDSCAPING No proposed changes to landscape D. LIGHTING Existing lighting will remain and no new exterior lighting is proposed E. APPEARANCE OF PROPOSED BUILDING All proposed alterations utilize existing materials, colors, and finishes found throughout the Stonefield development and already previously approved by County ARB. The intention of utilizing the existing, pre -approved materials is to retain the cohesive aesthetic already established, and to minimize the observable revisions to the former single tenant retail space. F. SIGNAGE Building A-5 at Stonefield is intended to be added to the existing Comprehensive Sign Plan already approved for the other buildings within the shopping center. Individual tenants will be submitting sign permits to the Albemarle County Architecture Review Board for approval to ensure compliance with both the existing CSP and the Entrance Corridor Guidelines for signs. IZ 0 1 \W W 0 F—LU Q w > 0:� LL ~ J J Z; Q� �w F- ;o Qry wQ �_ CONTACT: BOB PINEO TEL:434-806-8365 (E):bob@designdevelopllc.com ,RB STAFF REVIEW ORIGINAL PUBLICATION June 24, 2019 LATEST REVISION July 6, 2021 U�J J >O W Q Z Z 0 LJJ V Oo>� >= Q 0 > W Z am Lr 0 Z OQz� �OQO Z�U LU 0 0 V) W J rl- - W O� 0 � W Z J m OW H LL Q W j.. Z UO OV) CS.1 COVER SHEET ISSUE DATE: June 24, 2019 Approved 7/28/2021 mmm SHEET # 1 OF 8 ISWANSON DRIVE \ I I -O- �� z HYDRAULIC ROAD ENTRANCE CORRIDOR r � r � r r 0 i r14) I r 1 � � 4 i i I � I i i i i i i i i SITE PLAN B. l i ,_20' O 4-10" and 7-0" PARAPET WALL (BLUE) O 5-1" PARAPET SCREENING (GREEN) O NEW ROOFTOP UNIT (RED) ® NEW LANDING Zn o 0 1 W W LU 0o CONTACT: BOB PINEO TEL:434-806-8365 (E):bob@designdevelopllc.com ,RB STAFF REVIEW ORIGINAL PUBLICATION June 24, 2019 LATEST REVISION July 6, 2021 V� �O W Z � �O 00 � z �� W 1-0 O ad //< C V z 00 WLLm Co J W ZD Ow Lu z z w CD > 0!� Iry > z� O� zp QU �w Lo Q o" LU r� Q SITE PLAN ISSUE DATE: June 24, 2019 ■ SHEET # 2 OF 8 *NO PROPOSED CHANGES TO LANDSCAPE 1 LANDSCAPE C . l 1=20' Zn oo I LU W LU 0o CONTACT: BOB PINEO TEL:434-806-8365 (E):bob@designdevelopllc.com I I - ARB STAFF REVIEW SWANSON DRIVE t ORIGINAL PUBLICATION June 24, 2019 I LATEST REVISION July 6, 2021 I I � , I HYDRAULIC ROAD I ENTRANCE CORRIDOR � U 0 F Im 0 Vry �O W Z fj:� 3:O 00 � z IxQ W CL L? 0Q am z 00 W J W m ZD 0w L u Z 0 (/) Z LJJ V >0!� ry > Q z� O� Z O >QU > LU Lo Q O" LU r� Q LANDSCAPE ISSUE DATE: June 24, 2019 Col SHEET # 3 OF 8 Z IL oo I �- Q N w w> >�w ~ J ui J_ Z w �W Q o �F- Vo Q� wQ 0_ I �U CONTACT: BOB PINEO TEL:434-806-8365 (E):bob@designdevelopllc.com ARB STAFF REVIEW �, r4 ORIGINAL PUBLICATION _----R-�_ --_--- - 4' 4 U2' g. 8.. _ June 24, 2019 4 O 9 LATEST REVISION OJuly 6, 2021 2 6 g - 3' 4 3/4' 6' 5' J DEMO ELEVATION J � E 3/16"= 1' >O W Q Z 0:� Z 0 w Oo>� >m Q 0 > W 1-0 Z 7� DEMOLISH AND REMOVE amO L 4"1.. O EXISTING DECORATIVE LAP PANEL O < v) DEMOLISH SILL TO SLAB IN LOCATION SHOWN r Z O . O TO PREP FOR NEW DOUBLE DOOR am�/ Q 7 AREA OF STOREFRONT TO BE DEMOLISHED (TO MIDDLE MULLION). PREP FOR NEW DOUBLE c�w � � _ g I DOOR. SALVAGE REMAINING STOREFRONT. J J r DEMOLISH AND REMOVE EXISTING DOOR. W =:) L Q ® PREP FOR REPLACEMENT WITHIN STOREFRONT ULM FRAME. LJJ m DEMOLISH AND REMOVE EXISTING SIGN. Z 0 W _ PATCH AND REPAIR EIFS AS REQUIRED AND J PREP. p LU 1 I DEMOLISH SILL TO SLAB IN LOCATION SHOWN ~ U— TO PREP FOR NEW SINGLE DOOR y w * A 7 9 AREA OF STOREFRONT TO BE DEMOLISHED. ~ z OPREP FOR NEW SINGLE DOOR. SALVAGE V O REMAINING STOREFRONT. 2 6 $ ® TOPROLISH F FORLNEOSLAB IN ON SHOWN W DOUBLE DOOR _ AREA OF STOREFRONT TO BE DEMOLISHED (TO _ _ OMIDDLE MULLION). PREP FOR NEW DOUBLE DOOR. SALVAGE REMAINING STOREFRONT. 2 STREET VIEW EXISTING FRONT Nrs ELEVATION ISSUE DATE: June 24, 2019 ■ SHEET # 4 OF 8 z 0- 0 *VISIBILITY OF ALL MECHANICAL EQUIPMENT SHALL BE ELIMINATED FROM THE ENTRANCE CORRIDOR. J F- Q N w w> >�w ~ J J_ ui Z W PATCH AND REPAIR ANY HOLES w IN EIFS FACADE FROM EXISTING SIGN; ! ~ Q� PATCH AND REPAIR ANY HOLES PAINT SHALL MATCH EXISTING COLOR; NEW STOREFRONT SHALL MATCH EXISTING STOREFRONT; Q O FROM EXISTING SIGN. PAINT FACADE. PREVIOUSLY SPECIFIED PAINT AND COLOR: w PPG SHARKSKIN #513-5 PREVIOUSLY SPECIFIED STOREFRONT AND COLOR: ap = OLD CASTLE, MODEL ICR-225 IN BRONZE ANODIZED FINISH , - U CONTACT: BOB PINEO �—R TEL:434-806-8365 (E):bob@designdevelopllc.com � ARB STAFF REVIEW ORIGINAL PUBLICATION June 24, 2019 V SFa LATEST REVISION July 6, 2021 F� Ef 1 SOUTHEAST ELEVATION V E.2 3/16'= 1'-0" �O W Q Z 0:� Z 0 w Oo>ce >m Z � > W 1-0 o z 30" OQv)=) \ 1' Qz/ O LLJ I � W - v - L Q \ W m O� \ p w \ Z J m \ / W \ O H LL w `\ Z 0 3 TWO RISER HANDRAIL O c) E.2 3/4° = r-0° 2 0. 0 FRONT ELEVATION ISSUE DATE: June 24, 2019 2 NEW LANDING PERSPECTIVE 4 ONE RISER HANDRAIL E.2 N.T.S. E.2 3/4" = 1'-0" E02 SHEET # 5 OF 8 Zn o 0 J A B C D E �Q LLi 20' 0" 40'-0" 40'-0" 40'-0" ui W Q . w 77777777777777-777— 0 C) ~C ~ Vo Q w Q �x �U - . - - . - . - . - . . - . - . - . - . - . - . - . - . - . - . - . - . - . i. - . - . - . - . - . - . - . - . - . - . - . - . - . - i - . - . - . - . - ....... N N ch N c+> C Lo �. 0 I I 59' 9 I/2" 56' 10 1/4" 6" I f I I I . 1 I a I I i11 49 6 3/4" I I I C 6" I I I I � I CENTER STEEL STUD ON EXISTING LOAD BEARING JOIST ABOVE. 486'-6" I 486-6' I- - - - - - - - - - - -. Lp �� 1s�4 Ii sees e 60 ,� -4'11. 1/2 k 551/4".. 486-6" I LANDING DIES INTO GRADE *486-6" 36" TALL, 2" DIAMETER STEEL TUBE HANDRAIL, PAINTED TO MATCH OTHER HANDRAILS IN STONEFIELD. 37' 6 A 1 9' 9" 115 3/4" 6" 21' 8 3/4" 37' 11" ALIGN F/ OF NEW TYPE X GYPSUM WALL BOARD WITH EXISTING COLUMN FUR OUT m — NEW CONCRETE LANDING AND STAIRS TO GRADE AT NEW ENTRANCES ------------ s� 486 b, 1 —71Ti5 . =p - ------------ TREAD DIES INTO GRADE 486'-1MA ' 2 ao v NOTE: DIMENSIONS FROM EXISTING F/ WALL TO F/ FRAMING CONTACT: BOB PINEO TEL:434-806-8365 (E):bob@designdevelopllc.com ARB STAFF REVIEW ORIGINAL PUBLICATION IJune 24, 2019 LATEST REVISION July 6, 2021 Vry �O W Q Z fj:� z O W V 00>� � QQ> �J� z CLLr) O z OQz=) �OQO U LLJ W J =D Lr) `Q W � L_I Z L0 m OW J H L.L Q N LU Z VO O� V / FLOOR PLAN ISSUE DATE: June 24, 2019 E03 SHEET # 6 OF 8 NORTH SITE VIEW FROM ENTRANCE CORRIDOR (HYDRAULIC ROAD) SOUTH SITE VIEW FROM ENTRANCE CORRIDOR (HYDRAULIC ROAD) Zn o 0 1 W W LU 0o CONTACT: BOB PINED TEL:434-806-8365 (E) : bob@desig ndevelopllc.com ,RB STAFF REVIEW ORIGINAL PUBLICATION June 24, 2019 LATEST REVISION July 6, 2021 U� �O W Q Z z_ OW V Op/>��� LL H Q Q > Ix J Z � LU O z OQz� wOO Q U LU W J =D Lr) Q LLm ` LUCo O� LU Z I m O LU H LL Q LU Z UO O ( SITE PHOTOS ISSUE DATE: June 24, 2019 ■ SHEET # 7 OF 8 O J L L 1/4 N 21/2' 6'p" 21/2' 2'21/4r' 21/2 (V O � - \ N N (V / \ N 60 b 00 N L. O J 2 1/2' 6 0" N N b (V � N N / \ O ---------- --------- --------- 30" 2 1 /2" 4 J 1, 0,, 21/21' 3, 0„ 21/2" \I N V J - J � M N D \ _ \ b b 0 co / J J / 1 STOREFRONT ELEVATIONS 3.1 1/2"= 1'-O" O J L J I/4 2 1 /2" 6- 0" 2 1 /2" 2' 2 3/4" 2 1 /2' N (V - N N N_ / \ N b b / \ b 60 N - - -- - - - - - - - I\-- --7 -------- 10'-0' STOREFRONT 8'-0" T/ DOOR EXISTING STOREFRONT TO REMAIN (TYP.) (HATCHED) ------------ WALL BASE 0'-0" FLOOR SLAB 7'-0" -----------------------------------------------------------------------------------------------------------------T/_D_OOR ---------------------------------------------------------------------------------------------------------------FLOOR SLAB 2 DOOR ELEVATIONS 3.1 1/2"= 1'-0" DOORS & HARDWARE NOTES: 1. FIELD VERIFY ALL CONSTRUCTED CONDITIONS, DIMENSIONS, SWINGS, JAMB THICKNESSES AND QUANTITIES PRIOR TO PLACING ORDER. 2. COORDINATE KEYING REQUIREMENTS WITH OWNER. 3. PROVIDE ALL HARDWARE NECESSARY TO PROVIDE A COMPLETE DOOR AND HARDWARE ASSEMBLY AT EACH DOOR. 4. ALL ENTRY DOORS SHALL HAVE CODE COMPLIANT PANIC HARDWARE. 5. IF IMPACT RESISTANT GLAZING SYSTEM IS REQUIRED BY CODE, LANDLORD SHALL PROVIDE SUCH SYSTEM. 6. LANDLORD WILL PROVIDE ALL NECESSARY WEATHERPROOFING TO DOORS AND SOTRFRONT AS REQUIRED. STOREFRONT DESCRIPTION SF1, SF2, SF3, SF4 CLEAR ANODIZED ALUMINUM INSULATED GLAZING SYSTEMS BY KAWNEER OR EQUAL. TO BE MINIMUM 10'-0" TALL WITH CLEAR INSULATED LOW-E GLASS. DOUBLE ENTRY DOORS, DOUBLE GLAZED ACTING DOOR WITH A SMALL FORMAT INTERCHANGABLE CORE, KEYED ON ONE SIDE. DOUBLE GLAZED ACTING DOOR WITH A SMALL FORMAT INTERCHANGABLE CORE, KEYED ON ONE SIDE. SINGLE ENTRY DOORS, DOUBLE GLAZED ACTING DOOR WITH A SMALL FORMAT INTERCHANGABLE CORE, KEYED ON ONE SIDE. DOUBLE GLAZED ACTING DOOR WITH A SMALL FORMAT INTERCHANGABLE CORE, KEYED ON ONE SIDE. DOOR I DESCRIPTION D2 1 3-0" X 7-0" STEEL DOOR IN HOLLOW METAL FRAME WITH LOCKSET. 0 1 W W n CONTACT: BOB PINEO TEL:434-806-8365 (E):bob@designdevelopllc.com ,RB STAFF REVIEW ORIGINAL PUBLICATION June 24, 2019 LATEST REVISION July 6, 2021 V J LU Z poi Imom Ix LU CL 0 am in J LU LL LU Z 0 H H H V 0 0 0 z Q J m 0 I W_ E W Z 0 LU ry n z 0 Z Q 01%, lip • I DOOR AND WINDOW SCHEDULE ISSUE DATE: June 24, 2019 F02 SHEET # 8 OF 8