HomeMy WebLinkAboutWPO202000016 Bond Estimates 2021-07-29Project Name: Stonefield Block D-1 VSMP Plan, Albemarle County, Virginia, Amendment to WP02011-00055 VSMPIWP02020-0001 E
WPO file number: WP02020-00016
Tilill 061 WO-03-00-019A2
Date Estimate Completed: 7/9/2021 ; uodated 07129121
Erosion and Sediment Control Bond Estimate
Item Item
Number
1
2
3
4
5
6
7
8
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
stablization (PS, TS)
silt fence (SF)
safety fence (SAF)
tree protection (TIP) (3,14 . DIA; assume 2S MA -TPj 12 trees; sheet #4
diversion (DID, FD, RWD)
temporary slope drain (TSD) pipe length -ft
Sediment Trap 91 / Excavated drop inlet sediment trap #1
earthwork for trap/basin
silt fence inlet protection (IP)
stone inlet protection (IP)
No. Unit Unit Cost Cost
(installed)
oacres $5,000.00 $13,300.00
ft $5.00 $0.00
ft $5.00 $6,830.00
ft $5.00 $4,712.39
ft $13.00 $6,370.00
pipe diameter in $0.00 $0.00
9 9
height of dam at toe 0 ft cut at hi h sideoft
ft
cut at face If
of fill at face Oft
length of dam ft
lopwMh ft
(area above transition
0 si
(total width of dam)
0 ft
(height below transitio
0 ft
(area below transition;
0 sf
(total fill volume)
0.0 cy
length of spillway
�ft
width of spillway
ft
riser height
dirt
riser diameter
0 in
barrel lenth
g
ft
barrel diameter
�in
outlet protection (OP)
length
channel (SCC, matter))
length
check dam
depth in Channel
construction entrance (CE)
wash rack
paved construction entrance
rip -rap, placed
depth
width
survey and layout (price per 0.1 mi.) acres
mobilizabon
length of cut
If
of cut
:ransil
130 at
(total width of cut)
27 ft
(depth below transit
-4.5 ft
(area above transith
-81 at
(total cut volume)
121.6 cy
(TOAL CV estimate
122 cy
(spillway stone tons
3 tons
(riser unit price) $0.00
base plate or Win -
(barrel unit price) $0.00
barrel collars
baffle length ft
width
ft
�ft
wi dth
ft
channel width
it
length
(tons)
■ft
ft
ft
r 0.0 it
- traps and basins _ 1
cY
$13.00
$1,586.00
$50.00
$150.00
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
1
_ . s1.00
$100.00
6
$200.00
$1,200.00
0
$0.00
$0.00
0
$0.00
0
$0.00
$0.00
0
52,500.00
$0.00
1
52,000.00
$2,000.00
1
$3,500.00
$3,500.00
$60.00 $0.00
$1,830.00
$2,500.00
7/29/2021
Project Name: Stonefield Block D-1 VSMP Plan, Albemarle County, Virginia, Amendment to WP02011-00055 VSMPIWP02020-0001E
WPO file number: WP02020-00016
TM P(s): 061 WO-03-00-019A2
Date Estimate Completed: 7/9/2021 ; updated 07129121
Erosion and Sediment Control Bond Estimate
Item Item
Number
40 Temporary Access road - CRS access road
41 Temporary Culvert
1. Anderson 7/9/31 _ re.. 729121
WPO2020-00016 Stonefield block Di_ESC Bond_070921_reW72921
No. Unit Unit Cost Cost
(installed)
$0.00
$0.00
cost sum
$44,078.39
contingency
$4,407.84
Total
$48,490
7/2912021