VSMP/VESCP PERMIT SITE INSPECTION REPORT
Project Name: Soca Field House ProjectlWPO Number: WP0201600085
TMP: 062A30000001A0 DEQ Permit Number(if VAR10L940
applicable :
Project Operator: Momentum Earthworks Operator Telephone#: (540) 564-1986
Project Contact: SOCCER ORGANIZATION OF Contact Telephone#:
CHARLOTTESVILLE-ALBEMARLE INC
Contact E-Mail: Qualified Personnel (QP): Marcus Sanders c/o Momentum
Earthworks
Inspector: Jonney Otto Weather(Wet/Dry/Rain): Clear, hot
Disturbed Acreage: Inspection Date&Time: 7/30/2021 10:00:00 AM
Single-Family:
Stage of Construction: Final Stabilization
Re-Inspection: No
COVERAGE 8� POSTING REQUIREMENTS Compliant? Reviewed during re-inspection?No
Commen ts/Description
� Construction site has permit coverage? (Va. Code§62.1-44.15:34.A)
(9VAC25-870-310)(Alb. Co. Code§17-300, 17-302)
2 A copy of the notice of coverage letter is posted conspicuously near the
main entrance of the construction activity? (CGP Part II.C)
Notice of the location of the SWPPP is posted near the site's entrance, if
3 applicable, and information for public access is provided? (9VAC25-870-
54.G)(CGP Part II D.2 &3)
SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re-inspection?No
Commen ts/Description
4 The SWPPP is on-site or made available during the inspection?(CGP
Part II D.1 &2)(9VAC25-870-54.G)
5 The SWPPP contains a signed copy of the registration statement?
(CGP Part II A.1.a)
6 The SWPPP includes, upon receipt, a copy of the notice of coverage
letter and the CGP? (CGP Part II A.1.b&c)
The SWPPP includes a narrative description of the nature of the
7 construction activity, including the function of the project? (CGP Part II
A.1.d)
The SWPPP includes a legible site plan identifying all appropriate
8 measures and that includes the locations of support activities and the
onsite rain gauge,when applicable? (CGP Part II A.1.e(1-7))
Page 1 of 4
9 The SWPPP contains the name, phone number and qualifications of
"Qualified Personnel"conducting inspections?(CGP Part II A.6)
10 The SWPPP contains an approved erosion and sediment control plan?
(9VAC25-870-54.6)(CGP Part II.A.2)
The SWPPP contains an approved stormwater management plan or an
11 existing construction site has a stormwater management plan that
ensures compliance with the water quality and quantity requirements?
(9VAC25-870-54.C)(CGP Part II.A.3)Technical Criteria lI.B ❑ II.0 ❑
12 The SWPPP contains an adequate pollution prevention plan? (9VAC25-
870-54.D)(CGP Part II.A.4)
The SWPPP identifies impaired water(s),approved TMDL, pollutant(s)of
13 concern,exceptional waters and the additional controls measures
applicable?(9VAC 25-870-54.E)(CGP Part IIA.5(a-b))
14 Delegation of Authority is provided and signed in accordance with Part III
K?(CGP Part II A.7)
15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part
II A.8)
SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection?No
Commen ts/Description
Is the SWPPP being amended whenever there is a change in the design,
16 construction, operation, or maintenance that has a significant effect on the
discharge of pollutants to surface waters?(CGP Part II B(1))(9VAC25-870-
54.G)
Has the SWPPP been amended if inspections or investigations by the
17 operator's qualified personnel, or by local, state or federal officials find that
existing control measures are ineffective in minimizing pollutants in
discharges?(CGP Part II B(2))(9VAC25-870-54.G)
18 Contractor(s)that will implement and maintain each control measure are
identified?(CGP Part II B(3))(9VAC25-870-54.G)
Have there been updates to the SWPPP when any modifications to its
implementation have occurred, including a record of dates when major
19 grading activities occur, construction activities temporarily or permanently
cease on a portion of the site or stabilization measures are initiated? (CGP
Part II B.4(a))(9VAC25-870-54.G)
20 Is there documentation in the SWPPP of replaced or modified controls?
(CGP Part II B.4(b))(9VAC25-870-54.G)
2� Is the SWPPP updated to indicate areas that have reached final
stabilization? (CGP Part II B.4(c))(9VAC25-870-54.G)
Is the SWPPP updated to indicate properties that are no longer under the
22 legal control of the operator and the dates on which the operator no longer
had legal control over each property?(CGP Part II B.4(d))(9VAC25-870-
54.G)
Does the SWPPP identify the date of any prohibited discharges, the
23 olume released, actions taken to minimize the impact of the release and
measures taken to prevent the recurrence of any prohibited discharge?
(CGP Part II B.4(e-f))(9VAC25-870-54.G)
24 mendments, modifications, or updates to the SWPPP are signed in
accordance with Part III K?(CGP Part II B(5))(9VAC25-870-54.G)
INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection?No
Comments/Description
Inspections required by the SWPPP are conducted at the required
25 frequency, including a modified frequency for impaired water(s), approved
TMDL(s), and exceptional waters when applicable? (CGP Part II F (2))
(CGP Part II A.5.b.3)
26 Inspection reports are completed and signed in accordance with CGP
Part II F (3-4)?(CGP Part II F(3-4))
Page 2 of 4
27 Corrective actions are taken consistent with the requirements of the
CGP?(CGP Part II G(1-2))
ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection?Yes
Comments/Description
28 Have stream buffers and steep slopes been protected as shown on the yes
plan?
Sequencing of the project is implemented in accordance with the yes
29 approved erosion and sediment control plan and stormwater management
plans? (9VAC25-870-54.B and C)
Have all denuded areas requiring temporary or permanent stabilization permanent vegetative cover has been established
been stabilized, and have stabilization requirements for impaired waters,
30 approved TMDL(s), pollutants of concern and exceptional waters,when Yes
applicable, been met?(9VAC 25-840-40.1)(9VAC25-870-54.B)(9VAC25-
880-60)(CGP Part I F.1(a))(CGP Part II A.5.b(1))(CGP Part II A.2.c(8))
(CGP II E(1-2))
Are soil stockpiles adequately stabilized with seeding and/or protected N�q
31 with sediment trapping measures?(9VAC 25-840-40.2) (CGP Part II
A.2(c))(9VAC25-870-54.B)
A permanent vegetative cover has been established that is uniform, N�A
32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3)
(CGP Part II A.2(c))(CGP II E(1-2))(9VAC25-870-54.B)
Have sediment trapping facilities been constructed as the first step in land yes
33 disturbance activities?(9VAC 25-840-40.4)(CGP Part II A.2(c))(CGP II
E(1-2))(9VAC25-870-54.B)
Have earthen structures been stabilized immediately after installation?
34 (9VAC 25-840-40.5)(CGP Part II A.2(c))(CGP II E(1-2))(9VAC25-870- Yes
54.B)
Are sediment traps and basins installed in accordance with MS-6 and the yes
35 approved plan? (9VAC 25-840-40.6)(CGP Part II A.2.c(9))(CGP Part II
A.2(c))(CGP II E(1-2))(9VAC25-870-54.B)
Are finished cut and fill slopes adequately stabilized to prevent or correct N/A
36 excessive erosion?(9VAC 25-840-40.7)(CGP Part II A.2(c))(CGP II E(1-
2))(9VAC25-870-54.B)
Is concentrated runoff down cut or fill slopes contained in an adequate N�A
37 permanent or temporary structure? (9VAC 25-840-40.8)(CGP Part II
A.2(c))(CGP II E(1-2))(9VAC25-870-54.6)
Is adequate drainage or other protection provided for water seeps? N�A
38 (9VAC 25-840-40.9)(CGP Part II A.2(c)) (CGP II E(1-2))(9VAC25-870-
54.B)
Do all operational storm sewer inlets have adequate inlet protection? N�q
39 (9VAC 25-840-40.10)(CGP Part II A.2(c))(CGP II E(1-2))(9VAC25-870-
54.B)
Are stormwater conveyance channels adequately stabilized with channel N�A
40 lining and/or outlet protection? (9VAC 25-840-40.11)(CGP Part II A.2(c))
(CGP II E(1-2)) (9VAC25-870-54.B)
Is in-stream construction conducted using measures to minimize channel N�Q
41 damage? (9VAC 25-840-40.12)(CGP Part II A.2(c))(CGP II E(1-2))
(9VAC25-870-54.B)
Are temporary stream crossings of non-erodible material installed where N�A
42 applicable? (9VAC 25-840-40.13)(CGP Part II A.2(c)) (CGP II E(1-2))
(9VAC25-870-54.B)
43 Is necessary restabilization of in-stream construction complete? (9VAC N/A
25-840-40.15)(CGP II E(1-2)) (9VAC25-870-54.B)
Are utility trench operations conducted and stabilized in accordance with N�A
44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c))(CGP II E(1-2))
(9VAC25-870-54.B)
Are soil and mud kept off paved or public roads to minimize the transport yes
45 of sediment? (9VAC 25-840-40.17)(CGP Part II A.2(c))(CGP II E(1-2))
(9VAC25-870-54.B)
46 Have all temporary control structures that are no longer needed been Yes
removed and disturbed soil resulting from their removal permanently
Page 3 of 4
stabilized? (9VAC 25-840-40.18)(CGP Part II A.2(c))(CGP II E(1-2))
(9VAC25-870-54.B)
Are properties and waterways downstream from development adequately
47 protected from erosion, sediment and damage in accordance with the Yes
standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840-
40.19(a-n))
48 Permanent control measures included in the SWPPP are in place? Yes
(9VAC25-870-54.C)(9VAC25-880-60)(CGP Part II F.1(a))
POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection?No
Comments/Description
Practices are in place to prevent and respond to leaks, spills, and other
releases including (i)procedures for expeditiously stopping, containing,
49 and cleaning up spills, leaks, and other releases; and (ii)procedures for
reporting leaks, spills, and other releases in accordance with Part III G?
(CGP Part II A.4.e(1))(9VAC25-870-56)
Practices are in place to prevent the discharge of spilled and leaked fuels
50 and chemicals from vehicle fueling and maintenance activities?(CGP Part II
A.4.e(2))(9VAC25-870-56)
Practices are in place to prevent the discharge of soaps, solvents,
51 detergents, and wash water from construction materials, including the
clean-up of stucco, paint,form release oils, and curing compounds? (CGP
Part II A.4.e(3))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from vehicle
52 and equipment washing,wheel wash water, and other types of washing?
(CGP Part II A.4.e(4))(9VAC25-870-56)
53 Concrete wash water is directed into a leak-proof container or leak-proof
settling basin?(CGP Part II A.4.e(5))(9VAC25-870-56)
Practices are in place to minimize the discharge of pollutants from
54 storage, handling, and disposal of construction products, materials, and
wastes? (CGP Part II A.4.e(6))(9VAC25-870-56)
Practices are in place to prevent the discharge of fuels, oils, and other
55 petroleum products, hazardous or toxic wastes, and sanitary wastes?
(CGP Part II A.4.e(7)(9VAC25-870-56)
Practices are in place to minimize any other discharge from the potential
56 pollutant-generating activities not addressed above,when applicable?
(CGP Part II A.4.e(8))(9VAC25-870-56)
Page 4 of 4
Construction General Permit Site Inspection Report
Request for Correction Action
Check Regulatory Citation/Legal Occur. Observation Recommended Corrective
List# Requirement* ction
30 (9VAC 25-840-40.1) A permanent vegetative cover Permanent vegetative cover
(9VAC25-870-54.B) has been established observed
(9VAC25-880-60)(CGP
Part I F.1(a))(CGP Part
II A.5.b(1))(CGP Part II
A.2.c(8))(CGP II E(1-2))
Recommended
Corrective Action
Deadline:
Targeted Re-
Inspection Date:
Comments:
"Refers to applicable regulation found in the most recent publication of the State Water Control Law(Va.Code§621-442 et seq.),Virginia Erosion and Sediment Control
Regulations(9VAC25-840),the Virginia Stormwater Management Program(VSMP)Regulations(9VAC25-870),or the General Permit for Discharges of Stormwater from
Construction Activities(9VAC25-880).
Construction General Permit Site Inspection Photo Log
Photos for Item 2
Photos for Item 4
Photo Description:
Photos for Item 10
Phota Descriptian:
Photos for Item 30
TimePhoto_20210730_104601.jpg.jpg 224.93KB
- - -- a
._a_�
; . �. ,_ - — =,.
- _�:,: �, ..�. _. �
�
� 'y�
� - h .�� ;:.�,.
- � -
� � � � ; : �.�:
>- �r�� ¢ ^�S^'� ; 4 - e�;.„� .
. . �."�,,,,��ty � .i`hr''e�.��;t•
a :kad��'�.""t.�L$�.w '�..,._ ,._.,..�`� ,
Photo Description: A established grass cover has been established
oF AL COUNTY OF ALBEMARLE
a��`� ����8�y�
° ;��� m Department of Community Development
401 McIntire Road
�'$���'� Charlottesville,Virginia 22902
434 296-5832
X Inspection Date: 7/30/2021
County Inspector