Loading...
HomeMy WebLinkAboutSDP202100019 Correspondence 2021-08-02608 Preston Avenue P 434.295.5624 Suite 200 F 434.295.1800 T I M M O N S GROUP Charlottesville, VA 22903 www.timmoris.com July 29, 2021 Adam J. Moore, PE VDOT c/o: Megan Nedostup & Matt Wentland 1401 East Broad Street Richmond, VA 23219 RE: SUB-2021-00019 — Southwood Redevelopment Village I — Amendment 1, Review 2 — Comment Response Letter Dear Mr. Moore: We have reviewed your comments from June 22, 2021 and made the necessary revisions. Please find our responses to the comments below in bold lettering. 1. The commercial entrances currently under review should be shown on the amendment. Future commercial entrances by Southwood Phase 1— Blocks 9, 10, & 11 project have been added to Horizon Road and future commercial entrance and by Southwood PHA Blocks 11 & 12 project has been added to Hickory Street. 2. Parking spaces within the sight line triangles of Blocks 11 & 12 (currently under review), or any other blocks, should be removed with this amendment. Street parking spaces along Horizon Road and Hickory Street have been restricted with revisions to curb bump -outs and additional "No Parking" signs. Additional sight distance profile sheets C5.08, C5.09, and C5.10 have been added, showing sight distance triangles for the future commercial entrances associated with the Southwood Phase 1— Blocks 9, 10, & 11 and Southwood PHA Blocks 11 & 12 projects. Sign labels and locations are shown on Layout & Utilities Plan sheets and sign locations are shown on Sight Distance Profile sheets. 3. Show "No Parking" signage on all roads without designated parking including the beginning and end signage. Example: beginning area on Horizon appears to be around Sta. 20+00 for parking on one side only. "No Parking" sign labels have been revised to note that signs are MUTCD standard 117-1 with directional arrows as appropriate. 4. No parking signs are required for portion of Horizon Road that are within the sight line triangles for future proposed blocks. Street parking spaces along Horizon Road have been restricted with revisions to curb bump - outs and additional "No Parking" signs. Additional sight distance profile sheets C5.08, C5.09, and C5.10 have been added, showing sight distance triangles for the future commercial entrances associated with the Southwood Phase 1— Blocks 9, 10, & 11 and Southwood PHA ENGINEERING I DESIGN I TECHNOLOGY Blocks 11 & 12 projects. Sign labels and locations are shown on Layout & Utilities Plan sheets and sign locations are shown on Sight Distance Profile sheets. 5. Why does the Hickory Street sidewalk not go to the R/W of Rte. 631 (Old Lynchburg Road) on both sides? Please clarify. Sidewalk extents are unchanged from the approved plan dated 10/26/2020. Sidewalk on south side of Hickory Street is intended to connect to a future trail that is included in the Southwood Phase 1— Blocks 9, 10, & 11 project. Sidewalk on north side of Hickory Street is intended to provide access to the adjacent parallel parking spaces. Note that in the existing condition Old Lynchburg Road does not have a sidewalk along the east side, to which the Hickory Street sidewalks could connect. We have included PDF copies of the plans and calculations for your review. If you have any questions or comments, please feel free to give me a call at 434.295.5624 or email at clint.shifflett@timmons.com . Sincerely, Clint Shifflett, PE Project Manager