HomeMy WebLinkAboutWPO202100039 Plan - VSMP 2021-08-03MOUNTAIN VSMP PLAN ALBEMARLE COUNTY, VIRGINIA VIEW ELEMENTARY SCOPE OF WORK: THE PROJECT CONSISTS OF THE INSTALLATION OF MODULAR CLASSROOM BUILDING CONTAINING 8 CLASSROOMS. ANCILLARY WORK ITEMS INCLUDE UTILITY CONNECTIONS, ADA ACCESS, AND FIRE TRUCK ACCESS. PROJECT INFORMATION: OWNER: COUNTY OF ALBEMARLE SCHOOL BOARD 401 MCINTIRE ROAD CHARLOTTESVILLE, VA 22902 CONTACT: JOE LETTERI PHONE: 434.975.9340 ENGINEER: LINE+GRADE I CIVIL ENGINEERS 113 4TH STREET NE CHARLOTTESVILLE, VA 22902 CONTACT: DANIEL C. HYER, PE PHONE: 434.262.0169 SURVEYOR: LINCOLN SURVEYING 632 BERKMAR CIR CHARLOTTESVILLE, VA 22901 CONTACT: CHRIS KEAN PHONE: 434.974.1417 PARCEL INFO: PARCEL #: 09100-00-00-01300 1757 AVON STREET EXT. CHARLOTTESVILLE, VA 22902 ZONED:R1 LEGAL AREA: 15.96 AC ADDT'L INFORMATION: DISTURBANCE AREA: 0.40 AC (17,625 SF) PROPOSED IMPERVIOUS AREA: 0.23 AC IMPERVIOUS ADDED STANDARD ABBREVIATIONS UTILITY OWNERS: ELECTRIC: DOMINION VIRGINIA POWER PHONE: VOIP (ACPS INTERNET CONTRACTOR) WATER: ALBEMARLE COUNTY SERVICE AUTHORITY STORM SEWER: ALBEMARLE COUNTY SANITARY SEWER: ALBEMARLE COUNTY SERVICE AUTHORITY ID INSIDE DIAMETER R&D REMOVE AND DISPOSE ABAN ABANDON LA LANDSCAPED AREA R&R REMOVE AND RESET AC ACRES LF LINEAR FEET R&S REMOVE AND STACK ADJ ADJUST LOD LIMITS OF DISTURBANCE SB SOUTHBOUND APPROX APPROXIMATE LT LEFT SF SQUARE FEET ASPH ASPHALT MAX MAXIMUM SSD STOPPING SIGHT DISTANCE Q BASELINE MIN MINIMUM STA STATION BLDG BUILDING ME MATCH EXISTING SW SIDEWALK BM BENCHMARK NIC NOT IN CONTRACT TEMP TEMPORARY (L CENTERLINE N.T.S. NOT TO SCALE TRANS TRANSITION CF CUBIC FEET NB NORTHBOUND TYP TYPICAL CG CURB AND GUTTER OC ON CENTER WB WESTBOUND CONC CONCRETE OD OUTSIDE DIAMETER WSEL WATER SURFACE ELEVATION CONST CONSTRUCTION PRKG PARKING DI DROP INLET PROJ PROJECT DND DO NOT DISTURB PROP PROPOSED EB EASTBOUND PVMT PAVEMENT EL ELEVATION PM PAVEMENT MARKING EX EXISTING REM REMOVE FND FOUNDATION ROW RIGHT-OF-WAY GRVL GRAVEL RT RIGHT HC HANDICAP ALIGNMENT/GRADING ABBREVIATIONS BC BACK OF CURB PCC POINT OF COMPOUND CURVATURE BR BOTTOM OF RAMP PI POINT OF INTERSECTION BVCS BEGIN VERTICAL CURVE STATION PINT POINT BVCE BEGIN VERTICAL CURVE ELEVATION PR PROPOSED ELEVATION BW BOTTOM OF WALL PRC POINT OF REVERSE CURVATURE D OR A DELTA ANGLE PT POINT OF TANGENCY EG EXISTING GRADE PVC POINT OF VERTICAL CURVATURE EP EDGE OF PAVEMENT PVI POINT OF VERTICAL INTERSECTION EVCS END VERTICAL CURVE STATION PVT POINT OF VERTICAL TANGENCY EVCE END VERTICAL CURVE ELEVATION R RADIUS FG FINISHED GRADE TAN TANGENT DISTANCE FL FLOWLINE TC TOP OF CURB HP HIGH POINT THT THROAT INV INVERT TR TOP OF RAMP L LENGTH TW TOP OF WALL LP LOW POINT STA STATION LVC LENGTH OF VERTICAL CURVATURE SP SADDLE POINT PC POINT OF CURVATURE OFF OFFSET VICINITY MAP SCALE: 1" = 30,000' LOCATION MAP SCALE: 1" = 1,000' SHEET INDEX Sheet Number Sheet Title CO.0 Title Sheet C0.1 General Notes C1.0 Existing Conditions and Demolition Plan C2.0 Erosion and Sediment Control Plan - Phase I C2.1 Erosion and Sediment Control Plan - Phase II C2.2 Erosion and Sediment Control Notes C2.3 Erosion and Sediment Control Details C3.0 Grading and Utility Plan C4.0 Stormwater Management Plan and Details 9 TOTAL SHEETS SUBMITTAL LOG SUBMISSION NO. DESCRIPTION 1 100% RECIPIENT COMMUNITY DEVELOPMENT SUBMITTAL DATE 07/08/2021 APPROVED by the Albemarle County Community DeyelgZpinent Department Date �31 s / Fia WP0202100039 w Q U W z J N� I..L Q cw Z G � J Z > w J Z �Z:) a_ 0 LL] 2 0 LU LU lb ZD J z O 2 Q z cc W Uj z z LU LLI LLJ (n LU TH Op� r 0710812021 'Z DANIEL C. HYER ic. No. 45596. '10NAL B,A APPROVED DCH SUBMISSION NO. 1 PROJECT 1907100 T H E W 0 R K O F - I N E + G R A D E Como GENERAL CONSTRUCTION NOTES: UTILITIES: CONCRETE AND ASPHALT: 1. ALL CONSTRUCTION METHODS AND MATERIALS SHALL BE IN ACCORDANCE WITH THE CURRENT VIRGINIA DEPARTMENT OF TRANSPORTATION ROAD AND BRIDGE STANDARDS AND SPECIFICATIONS (VDOT RBS&S), VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK, THE RULES AND REGULATIONS WATER AND SANITARY SEWER CONSTRUCTION SPECIFICATIONS AND STANDARDS FOR THE PLAN APPROVING AUTHORITY AND ANY OTHER APPLICABLE FEDERAL, STATE, OR LOCAL ORDINANCES, CODES, AND LAWS. 2. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL CONDITIONS, MATERIALS, DIMENSIONS LOCATIONS AND EXISTING ELEMENTS TO REMAIN IN THE FIELD BEFORE PROCEEDINGS WITH ANY WORK. IF CONDITIONS VARY FROM WHAT IS REPRESENTED IN THE DRAWINGS, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER. 3. EXISTING CONSTRUCTION SHOWN IN THESE DRAWINGS SHALL BE USED AS RELATIVE REFERENCES AND ARE TO BE VERIFIED IN THE FIELD BY THE CONTRACTOR IF DEEMED CRITICAL FOR PROPER EXECUTION OF THE WORK. 4. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DUST CONTROL MEASURES. 5. PROVIDE ADEQUATE PROTECTION FOR THE EXISTING BUILDINGS, BUILDING OCCUPANTS, VEHICLES AND PEDESTRIANS AT ALL TIMES IN ACCORDANCE WITH OSHA AND ALL APPLICABLE STATE AND LOCAL CODES. 6. MATERIALS AND EQUIPMENT SHALL BE STORED IN APPROVED AREAS TO PREVENT IMPACTS ON VEHICLES AND PEDESTRIANS. CONTRACTOR SHALL BE FULLY RESPONSIBLE FOR MEASURES TAKEN TO ENSURE VEHICULAR AND PEDESTRIAN SAFETY THROUGH THE ENTIRE DURATION OF THE WORK. SAFETY IS PARAMOUNT. 7. EQUIPMENT AND MATERIALS SHALL BE STORED IN DESIGNATED AREAS AND SHALL NOT ENCUMBER THE OWNER'S OPERATIONS, SURROUNDING RIGHT OF WAY, OR ADJOINING GROUNDS. 8. ALL WORK AREAS SHALL BE CLEANED DAILY. 9. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF BUILDINGS ADJACENT TO WORK AREAS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS OF DAMAGES RESULTING FROM CONSTRUCTION ACTIVITIES. 10. SECTION CUTS AND DETAIL CALLOUTS INDICATED IN THE DRAWINGS ARE TYPICAL FOR THE PROJECT. THEY ARE TO BE CONSIDERED TYPICAL FOR SIMILAR CONDITIONS AND HAVE NOT BEEN SHOWN EVERYWHERE THEY APPLY. 11. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR JOB SITE SAFETY. 12. CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF ALL CONSTRUCTION. 13. SYMBOLS IN THE DRAWINGS ARE NOT TO SCALE. 14. ALL WORK SHALL BE LAID -OUT PRIOR TO INSTALLATION OF NEW WORK BASED ON MEASUREMENT OF EXISTING CONSTRUCTION AND EXISTING CONSTRUCTION DESIGNATED TO REMAIN AS PART OF THE PROJECT. DO NOT START INSTALLATION OF WORK UNTIL LAY -OUT IS COMPLETE AND POTENTIAL CONFLICTS HAVE BEEN IDENTIFIED AND ADDRESSED. 15. THE CONTRACTOR SHALL BE HELD RESPONSIBLE FOR ALL DAMAGE TO THE EXISTING BUILDINGS AND ADJACENT GROUNDS AND PROPERTY CAUSE BY THE CARELESSNESS OR NEGLECT OF HIS WORKMEN. DAMAGE TO PORTIONS OF THE PROPERTY NOT SUBJECT TO WORK UNDER THE CONTRACT SHALL BE REPAIRED TO THE FULL SATISFACTION OF THE OWNER AND ENGINEER, AT THE CONTRACTOR'S EXPENSE. 16. PROTECTION OF THE WORK: PROTECT EFFECTIVELY ALL MATERIALS AND EQUIPMENT DURING THE ENTIRE PERIOD OF CONSTRUCTION. REPLACE MATERIALS AND EQUIPMENT DAMAGED, LOST OR STOLEN WITHOUT ADDITIONAL COST TO THE OWNER. 17. PROTECT EXISTING MATERIALS DURING INSTALLATION OF TEMPORARY PROTECTION AND CONSTRUCTION. DO NOT DEFACE OR REMOVE EXISTING MATERIALS IF INTENDED TO STAY. ATTACHMENTS OF TEMPORARY PROTECTION TO EXISTING CONSTRUCTION SHALL BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION. 18. OBTAIN ENGINEER REVIEW AND WRITTEN APPROVAL IN THE FORM OF A CONSTRUCTION CHANGE DIRECTIVE OR SUPPLEMENTAL INSTRUCTION BEFORE MAKING CHANGES OR ADDITIONS TO CONSTRUCTION OR REMOVING MATERIALS THAT WERE INTENDED TO REMAIN. 19. NOTIFY ENGINEER OF VISIBLE CHANGES IN THE INTEGRITY OF MATERIALS OR COMPONENTS WHETHER DUE TO ENVIRONMENTAL CAUSES INCLUDING BIOLOGICAL ATTACK, UV DEGRADATION, FREEZING OR THAWING OR DUE TO STRUCTURAL DEFECTS INCLUDING CRACKS, MOVEMENT OR DISTORTION. DO NOT PROCEED WITH WORK IN QUESTION UNTIL DIRECTED BY THE ENGINEER. 20. WHERE MISSING FEATURES ARE INDICATED TO BE REPAIRED OR REPLACED, PROVIDE FEATURES WHOSE DESIGNS ARE BASED ON ACCURATE DUPLICATIONS RATHER THAN ON CONJECTURAL DESIGNS, SUBJECT TO APPROVAL OF THE ENGINEER. 21. WHERE WORK REQUIRES EXISTING FEATURES TO BE REMOVED, CLEANED AND REUSED, PERFORM THESE OPERATIONS WITHOUT DAMAGE TO THE MATERIALS THEMSELVES, TO ADJACENT MATERIALS, OR TO THE SUBSTRATE. WHEN CLEANING, MATCH SAMPLES OF EXISTING MATERIALS THAT HAVE BEEN CLEANED AND IDENTIFIED FOR ACCEPTABLE CLEANING LEVELS. AVOID OVER CLEANING TO PREVENT DAMAGE TO EXISTING MATERIALS DURING CLEANING. 22. TEMPORARY MATERIALS MAY BE NEW OR USED, BUT MUST BE ADEQUATE IN FOR REQUIRED USAGE, MUST NOT CREATE UNSAFE CONDITIONS AND MUST NOT VIOLATE REQUIREMENTS OF APPLICABLE CODES AND STANDARDS. 23. CONTRACTOR SHALL PROVIDE AND MAINTAIN ADEQUATE FIRE PROTECTION IN THE FORM OF FIRE EXTINGUISHER OR OTHER EFFECTIVE MEANS OF EXTINGUISHING FIRE, READY FOR INSTANT USE, DISTRIBUTED AROUND THE PROJECT AND IN AND ABOUT TEMPORARY, INFLAMMABLE STRUCTURES DURING CONSTRUCTION OF WORK. EXISTING FIRE HOSE CONNECTIONS SHALL BE ACCESSIBLE AT ALL TIMES BY FIRE DEPARTMENT PERSONNEL. MATERIAL SAND DEBRIS SHALL NOT BE STORED IN FRONT OF THE CONNECTION, THUS PREVENTING ACCESS. THE CONTRACTOR SHALL COORDINATE ACCESS PROCEDURES WITH THE FIRE MARSHALL. 24. GASOLINE AND OTHER FLAMMABLE LIQUIDS SHALL BE STORED AND DISPENSED FROM UL LISTED SAFETY CONTAINERS IN CONFORMANCE WITH THE NATIONAL BOARD OF FIRE UNDERWRITERS' RECOMMENDATIONS. 25. SUBMITTALS ARE NOT REQUIRED IF CONTRACTOR ELECTS TO USE THE PROPRIETARY PRODUCTS LISTED. SUBMITTALS WILL BE REQUIRED IF CONTRACTOR WISHES TO USE ALTERNATE PRODUCTS. ALL ALTERNATE PRODUCTS ARE SUBJECT TO REVIEW AND APPROVAL BY THE ENGINEER AND OWNER. 26. CONTRACTOR SHALL CALL MISS UTILITY AT 1-800-552-7001 BEFORE CONSTRUCTION COMMENCES. 27. TREE AND PLANT ROOTS OR BRANCHES THAT MAY INTERFERE WITH THE WORK SHALL BE TRIMMED OR CUT ONLY WITH THE APPROVAL OF THE OWNER AND ENGINEER. ANY TREES OR PLANTS WHICH ARE SHOWN TO REMAIN THAT DO NOT INTERFERE WITH THE WORK, BUT ARE DAMAGED BY CONTRACTOR OR HIS SUB -CONTRACTORS, SHALL BE REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. 28. ACCESSIBLE ROUTES AND FEATURES MUST MEET ICC A117.1-09 WORK AREA PROTECTION AND MAINTENANCE: 1. CLEARING AND GRUBBING SHALL BE CONFINED TO THOSE AREAS NEEDED FOR CONSTRUCTION, AND AS SHOWN IN THE DRAWINGS. 2. DISTURBED AREAS BEYOND THE ROADWAY CURB AND WHERE INDICATED ON THE PLANS SHALL RECEIVE TOPSOIL AS NECESSARY AND AS DIRECTED. SEEDING MIXTURE SHALL BE DETERMINED BY THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION 3.32 3. CONTRACTOR IS PERMITTED TO WORK IN THE PUBLIC RIGHT-OF-WAY AND ANY TEMPORARY OR PERMANENT EASEMENT SHOWN ON THE PLANS. HOWEVER, CONTRACTOR SHALL NOTIFY PROPERTY OWNER(S) FORTY-EIGHT (48) HOURS PRIOR TO WORKING ON ANY PRIVATE PROPERTY TO COORDINATE ACCESS AND TO DETERMINE A STORAGE AREA FOR MATERIALS IF NEEDED. COORDINATION OF ACCESS TO PUBLIC RIGHT-OF-WAY AND STORAGE OF MATERIALS THEREON SHALL BE COORDINATED WITH THE ENGINEER. CONTRACTOR'S FAILURE TO NOTIFY AND COORDINATE WITH PROPERTY OWNERS AND/OR THE ENGINEER MAY RESULT IN DELAYS. NO ADDITIONAL COMPENSATION OR TIME FOR PERFORMANCE WILL BE GIVEN FOR ANY SUCH DELAYS. 4. CONTRACTOR SHALL, AT HIS EXPENSE, MAINTAIN THE WORK SITE IN A CLEAN AND ORDERLY APPEARANCE AT ALL TIMES. ALL DEBRIS AND SURPLUS MATERIAL COLLECTED SHALL BE DISPOSED OF OFF THE WORK SITE BY CONTRACTOR, AT HIS EXPENSE. 5. EXISTING LAWNS, TREES, SHRUBS, FENCES, UTILITIES, CULVERTS, WALLS, WALKS, DRIVEWAYS, POLES, SIGNS, RIGHT-OF-WAY MONUMENTS, MAILBOXES AND THE LIKE SHALL BE PROTECTED FROM DAMAGE DURING THE WORK. ANY DAMAGE CAUSED TO SUCH ITEMS SHALL BE REPAIRED OR REPLACED BY CONTRACTOR AT NO ADDITIONAL COST. PROPERTY PINS DISTURBED BY CONTRACTOR THAT ARE NOT SHOWN ON THE PLANS TO BE DISTURBED SHALL BE RESTORED BY LICENSED SURVEYOR AT THE CONTRACTOR'S EXPENSE. 6. MEASURES TO CONTROL EROSION AND SEDIMENT SHALL BE PROVIDED PURSUANT TO AND IN COMPLIANCE WITH CURRENT FEDERAL, STATE AND LOCAL REGULATIONS. THE INFORMATION CONTAINED IN THE CONSTRUCTION PLANS AND/OR APPROVAL OF THE PLANS SHALL IN NO WAY RELIEVE THE CONTRACTOR OR HIS AGENT OF ANY LEGAL RESPONSIBILITY WHICH MAY BE REQUIRED BY THE CODE OF VIRGINIA OR ANY ORDINANCE ENACTED BY THE CITY OF CHARLOTTESVILLE. CONTRACTOR SHALL PROVIDE THE NECESSARY DIVERSION DITCHES, DIKES, OR TEMPORARY CULVERTS REQUIRED TO PREVENT MUD AND DEBRIS FROM BEING WASHED ONTO THE STREETS OR ADJACENT PROPERTY. CONTRACTOR'S VEHICLES SHALL BE KEPT CLEAN TO PREVENT MUD OR DUST FROM BEING DEPOSITED ON STREETS. NO AREA SHALL BE LEFT DENUDED FOR MORE THAN SEVEN (7) CALENDAR DAYS. 7. CONTRACTOR SHALL CLEAN UP, RESTORE, SEED AND MAINTAIN ALL DISTURBED AREAS IMMEDIATELY UPON COMPLETION OF WORK. TOPSOIL SEED, FERTILIZER AND MULCH SHALL BE PLACED IN ACCORDANCE WITH ALBEMARLE COUNTY STANDARDS ON ALL DISTURBED AREAS. A PERMANENT STAND OF GRASS ADEQUATE TO PREVENT EROSION SHALL BE ESTABLISHED PRIOR TO FINAL ACCEPTANCE. ALL EROSION AND SEDIMENT CONTROLS SHALL BE REMOVED WITHIN 30 DAYS AFTER THE PROJECT IS STABILIZED. (MS-18) 8. FOR FURTHER REQUIREMENTS AND DETAILS OF TREE PRESERVATION, PLANTING, EROSION AND SEDIMENT CONTROL, REFER TO THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. 9. AN EROSION AND SEDIMENT CONTROL CONTRACTOR CERTIFICATION (E.S.C.C.C) IS REQUIRED FOR ALL LAND DISTURBANCE ACTIVITIES. 10. THE CONTRACTOR SHALL PROPERLY INSTALL AND MAINTAIN EROSION AND SEDIMENT CONTROLS FOR THE LIFE OF THE PROJECT; AND ROUTINELY CHECK CONTROL DEVICES BEFORE, DURING AND AFTER STORM EVENTS. 1. PRIOR TO CONSTRUCTION OR EXCAVATION, THE CONTRACTOR SHALL ASSUME RESPONSIBILITY OF LOCATING ANY AND ALL UNDERGROUND UTILITIES (PUBLIC OR PRIVATE) THAT MAY EXIST WITHIN OR CROSS THROUGH THE AREA OF CONSTRUCTION WHETHER OR NOT THEY ARE SHOWN ON THE PLANS. PRIOR TO ANY CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL CALL 'MISS UTILITY OF VIRGINIA' AT 1-800-552-7001. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING, AT HIS SOLE EXPENSE, ANY EXISTING UTILITY DAMAGED DURING CONSTRUCTION. 2. THE PLAN DOES NOT GUARANTEE THE EXISTENCE, NONEXISTENCE, SIZE, TYPE, LOCATION, ALIGNMENT, OR DEPTH OF ANY OR ALL UNDERGROUND UTILITIES OR OTHER FACILITIES. WHERE SURFACE FEATURES (MANHOLES, CATCH BASINS, VALVES, ETC.) ARE UNAVAILABLE OR INCONCLUSIVE. INFORMATION SHOWN MAY BE FROM UTILITY OWNER'S RECORDS AND/OR ELECTRONIC LINE TRACING, THE RELIABILITY OF WHICH IS UNCERTAIN. THE CONTRACTOR SHALL PERFORM TEST EXCAVATIONS OR OTHER INVESTIGATION AS NECESSARY TO VERIFY LOCATION AND CLEARANCES. 3. WHEN THE WORK CROSSES EXISTING UTILITIES, THE EXISTING UTILITIES SHALL BE ADEQUATELY SUPPORTED AND PROTECTED FROM THE DAMAGE DUE TO THE WORK. ALL METHODS FOR SUPPORTING AND MAINTAINING THE EXISTING UTILITIES SHALL BE APPROVED BY THE RESPECTIVE UTILITY COMPANY AND/OR THE ENGINEER. CONTRACTOR SHALL EXERCISE CARE TO INSURE THAT THE GRADE AND ALIGNMENT OF EXISTING UTILITIES ARE MAINTAINED AND THAT NO JOINTS OR CONNECTIONS ARE DISPLACED. BACKFILL SHALL BE CAREFULLY PLACED AND COMPACTED TO PREVENT FUTURE DAMAGE OR SETTLEMENT TO EXISTING UTILITIES. ANY UTILITIES REMOVED AS PART OF THE WORK, AND NOT INDICATED TO BE REMOVED OR ABANDONED, SHALL BE RESTORED USING MATERIALS AND INSTALLATION EQUAL TO THE UTILITY'S STANDARDS. 4. CONTRACTOR SHALL NOTIFY LANDOWNERS TENANTS AND THE ENGINEER A MINIMUM OF 72 HOURS PRIOR TO THE INTERRUPTION OF ANY SERVICES. SERVICE INTERRUPTIONS SHALL BE KEPT TO A MINIMUM. 5. CONTRACTOR TO MAKE ANY NECESSARY ADJUSTMENTS TO ALL UTILITY JUNCTION BOXES, VALVE BOXES, MANHOLES, CLEAN -OUTS, AND OTHER GRADE RELATED ITEMS IN SIDEWALK, ROADWAY, AND/OR ADJACENT AREAS TO MATCH FINISHED GRADE. COSTS ARE TO BE INCLUDED UNDER THE VARIOUS UNIT BID ITEMS. NO SEPARATE PAYMENT WILL BE MADE. 6. PER THE VIRGINIA DEPARTMENT OF HEALTH WATERWORKS REGULATIONS (PART II, ARTICLE 3, SECTION 12 VAC 5-590 THROUGH 630), ALL BUILDINGS THAT HAVE THE POSSIBILITY OF CONTAMINATING THE POTABLE WATER DISTRIBUTION SYSTEM (HOSPITALS, INDUSTRIAL SITES, BREWERIES, ETC.) SHALL HAVE A BACKFLOW PREVENTION DEVICE INSTALLED WITHIN THE FACILITY. THIS DEVICE SHALL MEET SPECIFICATIONS OF THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE, SHALL BE TESTED IN REGULAR INTERVALS AS REQUIRED, AND TEST RESULTS SHALL BE SUBMITTED TO THE REGULATORY COMPLIANCE ADMINISTRATOR IN THE DEPARTMENT OF UTILITIES. 7. ALL BUILDINGS THAT MAY PRODUCE WASTES CONTAINING MORE THAN ONE HUNDRED (100) PARTS PER MILLION OF FATS, OIL, OR GREASE SHALL INSTALL A GREASE TRAP. THE GREASE TRAP SHALL MEET SPECIFICATIONS OF THE VIRGINIA UNIFORM STATEWIDE BUILDING CODE, MAINTAIN RECORDS OF CLEANING AND MAINTENANCE, AND BE INSPECTED ON REGULAR INTERVALS BY THE REGULATORY COMPLIANCE ADMINISTRATOR IN THE DEPARTMENT OF UTILITIES. 8. CONTACT THE REGULATORY COMPLIANCE ADMINISTRATOR AT 970-3032 WITH ANY QUESTIONS REGARDING THE GREASE TRAP OR BACKFLOW PREVENTION DEVICES. 9. ALL WATER LINES, SEWER LINES, AND FIRE LINES FROM THE MAIN TO THE STRUCTURE MUST HAVE A VISUAL INSPECTION PERFORMED BY THE BUILDING DEPARTMENT EARTH WORK AND SITE CONDITIONS: 1. EXCEPT AS OTHERWISE SHOWN ON THE PLANS, ALL CUTS AND FILLS SHALL BE NO GREATER THAN 3:1. 2. UNLESS OTHERWISE NOTED ON THE PLANS OR IN THE SPECIFICATIONS, ALL FILL MATERIALS SHALL BE COMPACTED TO 95% OF THEORETICAL MAXIMUM DENSITY AS DETERMINED BY AASHTO T-99 METHOD A, WITHIN PLUS OR MINUS 2% OF OPTIMUM MOISTURE, FOR THE FULL WIDTH AND THE DEPTH OF THE FILL. 3. THE CONTRACTOR SHALL ADD, CHANGE, OR RELOCATE EROSION AND SEDIMENT CONTROLS AT THE DIRECTION OF THE ALBEMARLE COUNTY E&S INSPECTOR TO THEIR SATISFACTION AT NO ADDITIONAL COST TO THE OWNER. 4. ALL GRADING AND IMPROVEMENTS TO BE CONFINED TO THE PROJECT AREA UNLESS OTHERWISE INDICATED. 5. PROPOSED GRADES SHALL BE FIELD ADJUSTED TO CONFORM TO THE INTENT OF THE TYPICAL SECTIONS. A SMOOTH GRADE SHALL BE MAINTAINED FROM THE BASELINE TO THE PROPOSED EDGE OF PAVEMENT OR FACE OF CURB TO PRECLUDE THE FORMING OF FALSE GUTTERS AND/OR PONDING OF WATER ON ALL PAVED SURFACES. 6. CONTRACTOR SHALL MAINTAIN A SMOOTH GRADE TO THE PROPOSED EDGE OF PAVEMENT OR FACE OF CURB TO PROVIDE POSITIVE DRAINGE ON ALL PAVED SURFACES. ANY AREAS WHERE WATER IS IMPOUNDED SHALL BE CORRECTED BY CONTRACTOR AT NO ADDITIONAL COST. POSITIVE DRAINAGE OF ALL ROADWAY AREAS TO THE STORM DRAIN INLETS OR OTHER ACCEPTABLE DRAINAGE CHANNELS AS NOTED ON THE PLANS IS REQUIRED. 7. CONTRACTOR SHALL MAINTAIN EXISTING STREAMS, DITCHES, DRAINAGE STRUCTURES, CULVERT AND FLOWS AT ALL TIMES DURING THE WORK. CONTRACTOR SHALL PAY FOR ALL PERSONAL INJURY AND PROPERTY DAMAGE WHICH MAY OCCUR AS A RESULT OF FAILING TO MAINTAIN ADEQUATE DRAINAGE. 8. ALL PIPES, DI'S AND OTHER STRUCTURES SHALL BE INSPECTED BY THE ENGINEER BEFORE BEING BACKFILLED OR BURIED. THE ENGINEER MAY REQUIRE CONTRACTOR, AT NO ADDITIONAL COST, TO UNCOVER AND RE-COVER SUCH STRUCTURES IF THE HAVE BEEN BACKFILLED OR BURIED WITHOUT SUCH INSPECTION. 9. ALL STORM CHANNELS, DRAINS, AND SEWER SYSTEMS SHALL BE CLEANED UPON COMPLETION OF THE PROPOSED WORK. SEDIMENT, CHEMICALS, AND/OR DEBRIS REMOVED FROM THESE SYSTEMS SHALL BE REMOVED AND DISPOSED OF PROPERLY. 10. ALL ROOF DRAINS SHALL DISCHARGE IN A MANNER NOT TO CAUSE A PUBLIC NUISANCE AND NOT OVER SIDEWALKS. MAINTENANCE OF TRAFFIC: 1. TEMPORARY STREET CLOSURE PERMIT REQUIRED FOR CLOSURE OF SIDEWALKS, PARKING SPACES AND ROADWAYS AND IS SUBJECT TO APPROVAL BY THE ALBEMARLE COUNTY TRAFFIC ENGINEER. 2. THE VIRGINIA WORK AREA PROTECTION MANUAL AND THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) SHALL GOVERN ALL TEMPORARY TRAFFIC CONTROL OPERATIONS THROUGHOUT CONSTRUCTION OF THIS PROJECT. ADHERENCE TO APPLICABLE PROVISIONS OF THE MANUAL IS REQUIRED OF THE CONTRACTOR EVEN THOUGH DETAILED REFERENCE TO ALL SUCH PROVISIONS MAY NOT BE CONTAINED IN THE PLANS. GENERAL NOTES 3. ALL EXISTING RESIDENTIAL AND COMMERCIAL ENTRANCES SHALL BE MAINTAINED AT ALL TIMES, UNLESS OTHERWISE DIRECTED BY THE ENGINEER. 4. NO TEMPORARY PAVEMENT MARKING SHALL BE ALLOWED ON THE FINAL ASPHALT SURFACE COURSE. 5. THE CONTRACTOR SHALL MAINTAIN ALL LANES OF TRAVEL OPEN FROM 6:30 AM TO 9:00 AM AND 3:00 PM TO 5:00 PM UNLESS DEEMED UNNECESSARY BY THE ENGINEER. SHORT PERIODS OF ONE WAY FLAGGING OPERATIONS MAY BE CONDUCTED OUTSIDE THE HOURS MENTIONED ABOVE. 6. ALL TRAFFIC SIGNALS SHALL BE ADJUSTED AS DEEMED NECESSARY BY THE ENGINEER PRIOR TO ANY TRAFFIC CHANGES. 7. WHEN WORK IN THE EXCAVATION AREA IS DISCONTINUED FOR A SHORT PERIOD OF TIME, AS AT NIGHT, THE CONTRACTOR SHALL BACKFILL THE CUT AREAS ADJACENT TO THE BUSTING PAVEMENT WITH A'FILLET OF MATERIAL'. THE FILLET SHALL BE COMPOSED OF THE SAME MATERIAL (EXCAVATION, BORROW, BASE COURSE, ETC.) ALL COSTS FOR PLACING AND REMOVING THIS FILLET OF MATERIAL SHALL BE INCLUDED IN THE PRICE BID FOR OTHER BID ITEMS OF WORK ON THIS PROJECT, AND NO ADDITIONAL CHARGE WILL BE ALLOWED. 8. EXISTING SURFACE, AGGREGATE BASE AND SUBBASE MATERIAL WHICH WILL BE DEMOLISHED OR OBLITERATED DURING CONSTRUCTION AND WHICH IS SUITABLE FOR MAINTENANCE OF TRAFFIC AS DETERMINED BY THE ENGINEER, SHALL BE SALVAGED AND UTILIZED FOR MAINTENANCE OF TRAFFIC PRIOR TO THE USE OF COMMERCIAL MATERIAL. WHEN NOT SPECIFIED AS A SEPARATE PAY ITEM, THE REMOVAL AND SALVAGING OF EXISTING SURFACES AND AGGREGATE BASE AND SUBBASE MATERIAL WILL BE MEASURED AND PAID FOR AS REGULAR EXCAVATION IN ACCORDANCE WITH SECTION 303 OF THE VDOT ROAD AND BRIDGE SPECIFICATIONS. 9. CONSTRUCT ALL INTERSECTIONS AND DRIVEWAYS UNDER TRAFFIC. 10. IF USED, TEMPORARY TRAFFIC BARRIER SERVICE SHALL BE INSTALLED AND REMOVED SO AS NOT TO PRESENT ANY BLUNT END OR HAZARD TO THE MOTORING PUBLIC. 11. CONTRACTOR SHALL NOTIFY TRANSIT PROVIDERS A MINIMUM OF TWO WEEKS PRIOR TO ANY IMPACT OR DISRUPTION TO REGULAR SERVICE OR STOPS. 12. ALL EXISTING PAVEMENT MARKINGS CONFLICTING WITH PROPOSED CONSTRUCTION PAVEMENT MARKINGS (IF USED) SHALL BE ERADICATED. 13. INSTALLATION AND REMOVAL OF TEMPORARY TRAFFIC CONTROL DEVICES SHALL BE IN ACCORDANCE WITH THE SECTION 6G.25 OF THE WORK AREA PROTECTION MANUAL. 14. USE APPROPRIATE SIGNS TO SHIFT PEDESTRIAN TRAFFIC AS NEEDED. 15. CONTRACTOR SHALL ASSURE ENDS OF TEMPORARY CONCRETE BARRIER (IF USED) DO NOT OBSTRUCT INTERSECTION SIGHT LINES. FIRE PREVENTION: 1. SMOKING SHALL NOT BE ALLOWED ANYWHERE ON CAMPUS. "NO SMOKING" SIGNS SHALL BE POSTED AT EACH BUILDING SITE AND WITHIN EACH BUILDING DURING CONSTRUCTION PER VIRGINIA STATEWIDE FIRE PREVENTION CODE. 2. OVERHEAD WIRING OR OTHER OVERHEAD OBSTRUCTIONS SHALL NOT BE LOWER THAN 13 FEET 6 INCHES OVER A PUBLIC STREET PER THE VIRGINIA STATEWIDE FIRE PREVENTION CODE. 3. CONTRACTOR SHALL ENSURE THAT BUILDING STREET NUMBERS ARE PLAINLY VISIBLE FROM THE FRONTAGE STREET AT ALL TIMES DURING CONSTRUCTION FOR EMERGENCY RESPONDERS, PER VIRGINIA STATEWIDE FIRE PREVENTION CODE. 4. AN APPROVED WATER SUPPLY FOR FIRE PROTECTION SHALL BE MADE AVAILABLE AS SOON AS COMBUSTIBLE MATERIALS ARRIVE ON SITE. WASTE AND COMBUSTIBLE DEBRIS SHALL BE REMOVED FROM THE BUILDING AT THE END OF EACH DAY AND DISPOSED OF IN ACCORDANCE WITH VIRGINIA STATEWIDE FIRE PREVENTION CODE. 5. OPERATIONS INVOLVING THE USE OF CUTTING AND WELDING SHALL BE DONE IN ACCORDANCE WITH CHAPTER 35 OF THE VIRGINIA STATEWIDE FIRE PREVENTION CODE. 6. FIRE EXTINGUISHERS SHALL BE PROVIDED WITH NOT LESS THAN ONE APPROVED PORTABLE FIRE EXTINGUISHER AT EACH STAIRWAY ON ALL FLOOR LEVELS WHERE COMBUSTIBLE MATERIALS HAVE ACCUMULATED IN ACCORDANCE WITH THE VIRGINIA STATEWIDE FIRE PREVENTION CODE. 7. VEHICULAR ACCESS FOR FIRE FIGHTING SHALL BE PROVIDED AT ALL CONSTRUCTION AND DEMOLITION SITES AND TO WITHIN 100 FEET OF TEMPORARY OR PERMANENT FIRE DEPARTMENT CONNECTIONS. VEHICULAR ACCESS SHALL BE CAPABLE OF SUPPORTING FIRE APPARATUS AND VEHICLE LOADING UNDER ALL WEATHER CONDITIONS IN ACCORDANCE WITH THE VIRGINIA STATEWIDE FIRE PREVENTION CODE. 1. ALL MATERIAL INSIDE FORMS SHALL BE CLEAN AND FREE OF ALL ROCKS AND OTHER LOOSE DEBRIS. SUB -BASE MATERIAL SHALL BE COMPACTED BY MECHANICAL MEANS. 2. CONCRETE SHALL NOT BE PLACED UNLESS THE AIR TEMPERATURE IS AT LEAST 40 DEGREES FAHRENHEIT (F) IN THE SHADE AND RISING. 3. CONCRETE SHALL NOT BE PLACED UNTIL STEEL DOWELS HAVE BEEN INSTALLED IN EXISTING CONCRETE IN ACCORDANCE WITH ALBEMARLE COUNTY STANDARDS. 4. 1/2 " PREMOLDED EXPANSION JOINT MATERIAL SHALL BE PLACED AT A MAXIMUM OF 30' INTERVALS ON NEW SIDEWALK, CURB, CURB & GUTTER, AT EACH END OF DRIVEWAY ENTRANCES, AT EACH END OF HANDICAP RAMPS, SOME POINT ON ENTRANCE WALKS AND STEPS ADJUSTMENTS, AND ALONG BUILDINGS AND WALLS WHERE NEW CONCRETE SIDEWALKS ARE PLACED AGAINST THEM. 5. ALL EXISTING CURBS, CURB & GUTTER, SIDEWALK AND STEPS TO BE REMOVED SHALL BE TAKEN OUT TO THE NEAREST JOINT. DEMOLITION AND DISPOSAL COST TO BE INCLUDED IN OTHER UNIT BID ITEMS. NO SEPARATE PAYMENT WILL BE MADE FOR THIS WORK. 6. EXISTING ASPHALT CONCRETE PAVEMENT SHALL BE SAW CUT AND REMOVED AS PER THE SPECIFICATIONS. REMOVAL SHALL BE DONE IN SUCH A MANNER AS TO NOT TEAR, BULGE OR DISPLACE ADJACENT PAVEMENT. EDGES SHALL BE CLEAN AND VERTICAL, ALL CUTS SHALL BE PARALLEL OR PERPENDICULAR TO THE DIRECTION OF TRAFFIC. 7. DISPOSAL OF ALL EXCESS AND DEMOLITION MATERIAL IS THE RESPONSIBILITY OF THE CONTRACTOR. GENERAL SURVEY NOTES: TOPOGRAPHY SOURCE: ACTUAL GROUND SURVEY (2005) BASIS OF DATUM: HORIZONTAL: NAD-83 VIRGINIA SOUTH ZONE VERTICAL: NAVD-88 NOTE: THE EXISTING SITE FEATURES SHOWN HEREIN HAVE BEEN FIELD VERIFIED AT THE TIME OF THIS APPLICATION. ADDITIONAL SITE FEATURES INSTALLED AFTER THE ORIGINAL SURVEY WAS CONDUCTED HAVE BEEN DEPICTED USING FIELD MEASUREMENTS AND AERIAL PHOTOGRAMMETRIC DIGITIZATION. Q w C z_ G Of w � z> w ¢ F}- �z 8 G� O \w G LLJ / cf) D_ z'¢ LLJ m J z w O z Q rr w fw V TH Op� 00080021 DANIEL C. HYER Y LIC. No. 45596, ZONAL APPROVED DCH SUBMISSI010 N!'- 1 PROJECT 1907100 THE WORT, 01 I N E + G R A D L 59C HSG B II I I I I I I I I I I I I I I I I I I I I I I I I I I / 00 MULCH PLAY C00ul / I I I I b, PVN#SHED AREA AREA b / � 55 CHAINL INK FENCE \ \ ' a s• ' . / / -I• — ---------- —t-----`— r-6@ 2— ------------------------------' / I ----- 0b 05 • --� -� ---P------------------------ 08 I „\ IA . kL MUL CH ••� -P • PLAY PLAY OUNR Co . - {A9 ' •' 2 STORY BRICK wb f . an 00 r------- ol 0 M MULCH PLAY I a n AREA q5 "8 5gS'69/ AYGROUND 506 I I I I T x I I t SSMH#1 56799 O ` co ;BSI'?il; -------------------------- — i -- {-- ---- ------------------ C------------------- BASKETBALL I . . _ SSMH#1 COURT587.8 IN: 4"PVC 579.99 (EAST) I ---I IN: 4 " PVC 581.72 — — GRou — � OUT: 6"PVC578.38 ggb2 ❑�C'—�-----�'I OI' ---------�--------- A 17F LT a 5 I cl II • �BL WOIOCL ASPHAL T PARKING 6B/R tig ^ 4� /2� R P 2 6 PVC =In/l 5 5 b 4MA,C.(0 3X o � U • 0 `'g5 56CO 31VAGIO 4X CE 5y AI INK FEN SDMH /l f all r rq EXISTING CONDITIONS AND DEMOLITION PLAN 1" = 20': 0 20 40 S.AQ REPLACE WITH—er--c-------� MOUNTABLE CURB ASFHAL T E ' PARKING REMOVE BOLLARD FOR , FIRE LANE INSTALLATION �6s;PI�15 � 586 0 Z HSG 6 arc — O �b R9 0 o _ Qh"R� 6M G/2 3WL 0/2 �� CO 9 g9 6SPRl5 2 57� Q 58/. 90 IN: 6"PVC 576.37 (WEST) IN: 6"PVC 574.16 (EAST) IN: 15" RCP 576. 94 (NORTH) / V OUT.' I5" RCP 573.9573.70 5I B 30 I I I I I 72CJ HSG B � 29 5ib.1 I 5�1 W z J 72CJ HSG B � 29 5ib.1 I 5�1 W z J Q z 0 LLJ Q LLJ 0 z 0 � z z Q !Z O� U >;� z z Q 0 m Q z � Q z O V J W TH op;-7 07�08�2021 � DANIEL C. HYER Y LIC. No. 45596' ZONAL B� APPROVED DCH SUBMISSIONI N!'- 1 PROJECT 1907100 THE WORT. 0 I N E + G R A D 59C HSG S MULCH PLAY PLAY OUNK, , a A - tA! 2 STORY Ea l EN BRICK :�.z_ r 17` �! I c IQ y MULCH PLAY I AREA �gb q5 �• I I 5 A YGROUND {. I E UIPME T x I I 33 50 v lzi \ 4 SSMH#1 ! 4. 597.99i' 9 0. Co0 ----------— — — — — — — I I ' _ _---------------- C------------------- (X BASKETBALL SSMH#1 DIRECTIONAL BORE COURT 58789 RECEIVING TRENCH IN: 4"PVC 579.99 (EAST) YGROAr N4"PVC 581..72 v _ 5 Z . I 5 LF I I I OUT- 6"PVC 578.38 b ❑ c. / I e _---�---- OI / 5 / \ FRAMY Qe �k 85 qb * V MULCHFLAY O�G• OSMN#SHED GRPCE AREA 55 1 E /! I DIRECTIONAL BORE / • \ RECEIVING TRENCH e a ------------------------------- / I \ r 1 , / h 2 I \: • __ ,..I � .•�.... ..°. p?`:2 .y r j,°°. µ..f:dr-q,♦ a.4 •"�.r¢ ® I x+_ �� / I � • 6.5�r�. r✓ • � riF4� •.Y xF ♦ 4 cl a r z �• ASPHAL T PARKING 4ay Yf��e 5v' k T� 1C � L6B R Lu y6 ^ 4WL /?-- b 4MASz(0 3X 0 O • • 5g0 CO 31VACIO 4X CE 5g0 q' gINLINK FEN SDMH r rn N' rn EROSION AND SEDIMENT CONTROL PLAN - PHASE 1" = 20': 0 20 40 ASPHAL T PARKING - �615 58C ° Z HSG B 6 Pvc — b RRPP o QO--y1°� 6M0-012 o C 5 q 5q 3WL Olt 65PR15 • CO 579- Q 58/. 90 IN: 6"PVC 576.37 (WEST) IN: 6"PVC 574,16 (EAST) 1N: 15" RCP 576. 94 (NORTH) 1 OUT.' 15" RCP 573.95 73 70 l7-14 ?5 SF LF 72CJ HSG B ^b k y1 511 29 I y16 11 k #I W z J w Q z_ 2 g w z> J W ¢ z 0- o w 2w >;� z � Qw z D V J 2 Q O C) w Lij C) Q C) O w TH Op-7 0008001" DANIEL C. HYER Y LIC. No. 4559(D' ZONAL E-0A APPROVED DCH SUBMISSI010 N!'- 1 PROJECT 1907100 THE WORT. OF . I N E + G R A D E C200 • L ---------- rnm a' M. r, A♦ n¢ .may 4 ' 5 ' '�rn Z. m ° rn.�° EROSION AND SEDIMENT CONTROL PLAN - PHASE II 1" = 20': 0 20 40 uv: io rLr-V/V. Y4 (/VUR1r/ OUT.- 15" RCP 573. 95 AIL DIViv� DO NOT COMPACT LEVEL SPREADER AREA - KEEP HEAVY EQUIPMENT OUT OF AREA 59C HSG B 72C3 HSG B d U W z J w U) Q O z O z w 2 0 U) 0 Q z O O w TH Op-7 0�/W�2o21 S, DANIEL C. HYER Y LIC. No. 45596' ZONAL E-0A APPROVED DCH SUBMISSION! N!'- 1 PROJECT 1907100 THE WORT. 0 I N E + G R A D C201 EROSION & SEDIMENT CONTROL NARRATIVE: EROSION AND SEDIMENT CONTROL MEASURES: MAINTENANCE: THIS PROJECT CONSISTS OF THE ADDITION OF A MODULAR CLASSROOM BUILDING. THE DISTURBANCE AREA ASSOCIATED WITH THIS PROJECT IS ±0.4O AC (17,625 SF). IT IS ANTICIPATED THAT THE WORK WILL START IN AUGUST AND LAST TWO MONTHS. EXISTING SITE CONDITIONS: THE SITE CONSISTS OF AN EXISTING ELEMENTARY SCHOOL WITH ASSOCIATED PARKING AND AMENITIES. THE SLOPES WITHIN THE PROJECT AREA RANGE FROM 2 TO 7 PERCENT. ADJACENT AREAS: THE PROPOSED PROJECT IS ADJACENT TO OFFICE BUILDINGS ON THE NORTH SIDE, AVON STREET EXTENDED ON THE EAST, RESIDENTIAL HOUSING SOUTH, AND VACANT LAND ON THE WEST. OFF -SITE AREAS: IT IS NOT ANTICIPATED THAT ANY OFF -SITE AREAS WILL BE DISTURBED DURING CONSTRUCTION. UNSUITABLE MATERIALS RESULTING FROM THE PROPOSED WORK SHALL BE HAULED FROM THE SITE AND DISPOSED OF AT AN APPROVED DISPOSAL SITE PERMITTED SEPARATELY FROM THIS PROJECT. SOILS: SEE THE USDA SOILS DELINEATION MAP ON THIS SHEET. CRITICAL AREAS: THIS PROJECT SITE DOES NOT HAVE ANY CRITICAL AREAS. EROSION & SEDIMENT CONTROL MEASURES: REFER TO THIS SHEET FOR A LIST OF ALL PROPOSED EROSION AND SEDIMENT CONTROL MEASURES TO BE USED ON SITE. PERMANENT STABILIZATION: THE SITE WILL BE STABILIZED THROUGH THE USE OF PERMANENT SEEDING. SEEDING INFORMATION, DATES AND AMENDMENTS ARE INCLUDED ON THE PLANS. SOIL TESTING SHALL BE COMPLETED THE CONTRACTOR TO DETERMINE THE SUITABILITY OF EXISTING SOILS AND THE NEED FOR ANY SOIL AMENDMENTS TO ENSURE THAT PERMANENT SEEDING WILL GROW EFFECTIVELY. STORM WATER RUNOFF CONSIDERATIONS: THE PROPOSED WORK WILL NOT SIGNIFICANTLY ALTER THE EXISTING DRAINAGE PATTERNS ON SITE. STORMWATER RUNOFF DURING CONSTRUCTION WILL BE DIRECTED THROUGH APPROPRIATE EROSION AND SEDIMENT CONTROLS TO CLEAN WATER BEFORE DISCHARGING TO AN ADEQUATE OUTFALL PROTECTED FROM EROSION AND SEDIMENT AS SHOWN ON THE PLANS. MAINTENANCE: ALL E&S MEASURES SHALL BE INSPECTED REGULARLY AS REQUIRED BY STATE STANDARDS AND MAINTAINED IN GOOD WORKING ORDER. REQUIRED REPAIRS SHALL BE MADE IMMEDIATELY. SEE THE MAINTENANCE NARRATIVE ON THIS SHEET FOR SPECIFIC MAINTENANCE ITEMS AND INSPECTION TIMES. 3 WWN a WWN Custom Soil Resource Report b Soil Map a m k k 71� 719 ]19610 n1 71 o 71W b � Map 5mk:1:1,61n iFprinted onApoNaR (8.5"x ll'DsP1enL A k N MEMM n o an 4o ep tan k N Rdo so 100 20D aoo Map pear: Web MercaWr Go Owrdnab :WG584 Edgelk6 UrMZmel7Nw(S84 9 USDA SOIL MAP 31 39 W' N a WWN UNLESS OTHERWISE INDICATED, ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL REGULATIONS AND VESC HANDBOOK OR ALBEMARLE COUNTY STANDARDS, WHICHEVER ARE MORE STRINGENT. TEMPORARY STONE CONSTRUCTION ENTRANCE - 3.02 A STABILIZED STONE PAD WITH A FILTER FABRIC UNDERLINER LOCATED AT POINTS OF VEHICULAR INGRESS AND EGRESS ON A CONSTRUCTION SITE. SILT FENCE - 3.05 A TEMPORARY SEDIMENT BARRIER CONSISTING OF A SYNTHETIC FILTER FABRIC STRETCHED ACROSS AND ATTACHED TO SUPPORTING POSTS AND ENTRENCHED. STORM DRAIN INLET PROTECTION - 3.07 A SEDIMENT FILTER OR AN EXCAVATED IMPOUNDING AREA AROUND A STORM DRAIN DROP INLET OR CURB INLET. TEMPORARY SEEDING - 3.31 THE ESTABLISHMENT OF A TEMPORARY VEGETATIVE COVER ON DISTURBED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR PERIODS OF 30 DAYS TO ONE YEAR BY SEEDING WITH APPROPRIATE RAPIDLY -GROWING ANNUAL PLANTS. PERMANENT SEEDING - 3.32 THE ESTABLISHMENT OF PERENNIAL VEGETATIVE COVER BY PLANTING SEED ON ROUGH -GRADED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A YEAR OR MORE OR WHERE PERMANENT VEGETATIVE COVER IS NEEDED ON FINE -GRADED AREAS IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL TECHNICAL BULLETIN NO. 4: NUTRIENT MANAGEMENT FOR DEVELOPMENT SITES. GENERAL EROSION AND SEDIMENT CONTROL NOTES: ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS (4VAC5O-30). ES-2: THE PLAN -APPROVING AUTHORITY MUST BE NOTIFIED ONE WEEK PRIOR TO THE PRE -CONSTRUCTION CONFERENCE, ONE WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING ACTIVITY, AND ONE WEEK PRIOR TO THE FINAL INSPECTION. THE NAME OF THE RESPONSIBLE LAND DISTURBER MUST BE PROVIDED TO THE PLAN -APPROVING AUTHORITY PRIOR TO ACTUAL ENGAGEMENT IN THE LAND -DISTURBING ACTIVITY SHOWN ON THE APPROVED PLAN. IF THE NAME IS NOT PROVIDED PRIOR TO ENGAGING IN THE LAND -DISTURBING ACTIVITY, THE PLANTS APPROVAL WILL BE REVOKED. ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES ARE TO BE PLACED PRIOR TO OR AS SOON AS THE FIRST STEP IN CLEARING. ES-4: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT LIMITED TO OFF SITE BORROW OR WASTED AREAS), THE CONTRACTOR SHALL SUBMIT A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR REVIEW AND APPROVAL BY THE PLAN APPROVING AUTHORITY. ES-6: THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE PLAN APPROVING AUTHORITY. ES-7: ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED, AFTER WHICH, UPON APPROVAL OF THE PLAN -APPROVING AUTHORITY, THE CONTROLS SHALL BE REMOVED. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE REMOVAL OF TEMPORARY MEASURES SHALL BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. ES-8: DURING DEWATERING OPERATIONS, WATER WILL BE PUMPED INTO AN APPROVED FILTERING DEVICE. ES-9: THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES AT LEAST EVERY 2 WEEKS AND IMMEDIATELY AFTER EACH RUNOFF -PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. ES-10: THE CONTRACTOR IS RESPONSIBLE FOR THE DAILY REMOVAL OF SEDIMENT THAT HAS BEEN TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE. ES-11: SEEDING OPERATIONS SHALL BE INITIATED WITHIN 7 DAYS AFTER REACHING FINAL GRADE OR UPON SUSPENSION OF GRADING OPERATIONS FOR AN ANTICIPATED DURATION OF GREATER THAN 14 DAYS OR UPON COMPLETION OF GRADING OPERATIONS FOR A SPECIFIC AREA. ES-12: THE CONTRACTOR SHALL BE RESPONSIBLE FOR PREVENTING SURFACE AND AIR MOVEMENT OF DUST FROM EXPOSED SOILS WHICH MAY PRESENT HEALTH HAZARDS, TRAFFIC SAFETY PROBLEMS, OR HARM ANIMAL OR PLANT LIFE. ES-13: A VSMP IS REQUIRED FOR PROJECTS DISTURBING 2,500 SQUARE FEET OR GREATER IN A DESIGNATED CHESAPEAKE BAY PRESERVATION AREA (CBPA) OR ONE ACRE OR GREATER OUTSIDE THE CBPA. FOR MORE INFORMATION VISIT THE VIRGINIA STORMWATER MANAGEMENT PROGRAM PERMITTING WEB PAGE AT: http://www.deq.virginia.gov/Programs/Water/StormwaterManagement.aspx IN GENERAL, ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED DAILY AND AFTER EACH RAINFALL EVENT GREATER THAN 0.25 INCHES. MEASURES SHOULD BE CLEANED AND REPAIRED ACCORDING TO THE FOLLOWING SCHEDULE AND THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE FOLLOWING WILL BE CHECKED IN PARTICULAR: 1. THE CONSTRUCTION ENTRANCES AND CONSTRUCTION ROAD STABILIZATION AREAS SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW OF MUD ONTO PUBLIC RIGHTS -OF -WAY THROUGH PERIODIC TOP DRESSING WITH ADDITIONAL STONE AND/OR WASHING AND REWORKING OF EXISTING STONE. 2. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SILT FENCE AFTER EACH RAINFALL. UNDER NO CIRCUMSTANCES SHALL DEPOSITS BE ALLOWED TO ACCUMULATE ABOVE HALF THE HEIGHT OF THE FENCE. DAMAGED OR UNDERCUT SILT FENCE SHALL BE REPAIRED IMMEDIATELY. SHOULD SILT FENCE BECOME INEFFECTIVE OR REACH THE END OF THE EXPECTED USEABLE LIFE, FABRIC SHALL BE REPLACED IMMEDIATELY. UPON SILT FENCE REMOVAL, DRESS ANY SEDIMENT DEPOSITS TO CONFORM WITH EXISTING GRADE AND SEED. 3. INLET PROTECTION SHALL BE CHECKED REGULARLY FOR SEDIMENT. IF EXCESSIVE SEDIMENT IS PRESENT, OR IF EXCESSIVE PONDING OCCURS AFTER RAINFALL, THE STONE SHALL BE PULLED AWAY AND CLEANED OR REPLACED. 4. STONE USED IN CULVERT INLET PROTECTION SHALL BE INSPECTED REGULARLY FOR CLOGGING AND REPLACED AS NEEDED TO MAINTAIN FULL FUNCTIONALITY. UNDER NO CIRCUMSTANCES SHALL SEDIMENT BE ALLOWED TO ACCUMULATE ABOVE ONE-HALF OF THE HEIGHT OF THE INLET PROTECTION. ACCUMULATED SEDIMENT SHALL BE REMOVED AND UPSTREAM AREAS PERMANENTLY STABILIZED BEFORE THIS CONTROL IS REMOVED. 5. CHECK DAMS SHALL BE INSPECTED REGULARLY TO ENSURE THE CENTER OF THE DAM IS LOWER THAN THE EDGES. SEDIMENT SHALL BE REMOVED WHEN IT REACHES ONE HALF THE HEIGHT OF THE DAM. 6. ANY SOIL WITHIN TREE PROTECTION AREAS THAT IS INADVERTENTLY COMPACTED SHALL BE AERATED WITH AN IRON BAR EVERY 18 INCHES TO A DEPTH OF 12 INCHES. PHYSICAL DAMAGE TO TREES SHALL BE REPAIRED AS OUTLINED IN THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK SECTION 3.38. TREES THAT ARE STRESSED OR DAMAGED SHALL RECEIVE AN APPROPRIATE APPLICATION OF FERTILIZER TO AID RECOVERY. 7. ALL SEEDED AREAS WILL BE CHECKED REGULARLY TO SEE THAT A GOOD STAND IS MAINTAINED. AREAS SHOULD BE FERTILIZED AND RESEEDED AS NEEDED. 8. ALL TEMPORARY EROSION AND SEDIMENT MEASURES SHALL BE DISPOSED OF WITHIN THIRTY (30) DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED AND VEGETATION IS ESTABLISHED. FINAL SITE STABILIZATION SHALL BE APPROVED BY THE OWNER AFTER THE INSPECTOR HAS DETERMINED THAT THE SITE IS STABILIZED. MANAGEMENT STRATEGIES: THE FOLLOWING SEQUENCE OF EVENTS AND EROSION CONTROL MEASURES SHALL BE INCORPORATED INTO THE CONSTRUCTION SCHEDULE FOR THIS PROJECT AND SHALL APPLY TO ALL CONSTRUCTION ACTIVITIES WITHIN PROJECT LIMITS. 1. CONSTRUCTION WILL BE SEQUENCED SO THAT TRENCHING AND EXCAVATION OPERATIONS CAN BEGIN AND END AS QUICKLY AS POSSIBLE. 2. SOIL STOCKPILES WILL BE PROTECTED WITH APPROPRIATE EROSION CONTROL MEASURES. STOCKPILES REMAINING FOR MORE THAN 14 DAYS SHALL BE TEMPORARILY SEEDED. 3. THE CONTRACTOR SHALL USE APPROPRIATE CONSTRUCTION METHODS TO MINIMIZE DISTURBANCE ALONG MANAGED SLOPES AND EXISTING STEEP SLOPES WHERE EROSION HAZARD IS HIGH. 4. ALL STORM SEWER INLETS THAT ARE MADE OPERABLE DURING CONSTRUCTION SHALL BE PROTECTED WITH INLET PROTECTION SO THAT SEDIMENT -LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM. 5. PREVIOUSLY GRASSED AREAS SHALL BE SEEDED AND STRAW MULCHED IMMEDIATELY AFTER TRENCHING OPERATION. 6. ALL THE EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED 48 HOURS AFTER EVERY RAIN EVENT GREATER THAN 0.25 INCHES AND EVERY 5 DAYS EVEN IF A RAIN EVENT DOES NOT OCCUR. REQUIRED REPAIRS SHALL BE MADE AS NEEDED TO MAINTAIN DESIGNED STANDARD. 7. PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVERED IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. 8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL THE INSTALLATION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL PRACTICES. MINIMUM STANDARD COMPLIANCE: MS-1 HAVE TEMPORARY AND PERMANENT STABILIZATION BEEN ADDRESSED IN THE NARRATIVE? HAVE THE PROPOSED PRACTICES BEEN SHOWN ON THE PLAN? YES SEED SPECIFICATION YES MULCHING YES GRAVEL YES MS-2 HAS STABILIZATION OF SOIL STOCKPILES BEEN ADDRESSED IN THE NARRATIVE? IS SEDIMENT TRAPPING MEASURES PROVIDED? YES. MS-3 HAS MAINTENANCE OF PERMANENT STABILIZATION BEEN ADDRESSED FOR EXPOSED AREAS? YES. MS-4 ARE SEDIMENT TRAPPING FACILITIES TO BE CONSTRUCTED AS A FIRST STEP IN LDA? YES. MS-5 HAS STABILIZATION OF EARTHEN STRUCTURES BEEN ADDRESSED? YES. MS-6 ARE SEDIMENT BASINS REQUIRED WHERE NEEDED? NO. N/A. MS-7 HAS STABILIZATION OF CUT AND FILL SLOPES BEEN ADEQUATELY ADDRESSED? YES. MS-8 ARE PAVED FLUMES, CHANNELS OR SLOPED DRAINS REQUIRED WHERE NECESSARY? NO. N/A. MS-9 HAS STABILIZATION THROUGH SURFACE ROUGHENING OR OUTLET PROTECTION BEEN ADDRESSED? NO. N/A. MS-10 IS ADEQUATE INLET PROTECTION REQUIRED ON ALL OPERATIONAL STORM SEWER INLETS? YES. MS-11 HAS MAINTENANCE OF PERMANENT STABILIZATION BEEN ADDRESSED FOR CONVEYANCE AND RECEIVING CHANNELS? YES. MS-12 ARE IN STREAM CONSTRUCTION MEASURES REQUIRED SO THAT CHANNEL DAMAGE IS MINIMIZED? NO. N/A. MS-13 ARE TEMPORARY STREAM CROSSINGS OF NON -ERODIBLE MATERIAL REQUIRED WHERE APPLICABLE? NO. N/A. MS-14 THIS REGULATION REQUIRES THAT ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES BE FOLLOWED. NO. N/A. MS-15 HAS RESTABILIZATION OF AREAS SUBJECT TO INSTREAM CONSTRUCTION BEEN ADEQUATELY ADDRESSED? NO. N/A MS-16 IS STABILIZATION OF UTILITY TRENCHES ADDRESSED? YES. MS-17 IS THE TRANSPORT OF SOIL AND MUD ONTO PUBLIC ROADWAYS PROPERLY CONTROLLED? (I.E. CONSTRUCTION ENTRANCES, WASH RACKS, DAILY CLEANING OF ROADWAYS, TRANSPORT OF SEDIMENT TO A TRAPPING FACILITY) YES. MS-18 HAS THE REMOVAL OF TEMPORARY PRACTICES BEEN ADDRESSED? YES. HAS MAINTENANCE OF PRACTICES BEEN ADDRESSED? (I.E. REPAIR OF STRUCTURES AND REMOVAL OF ACCUMULATED SEDIMENT) YES. MS-19 ARE PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT ADEQUATELY PROTECTED FROM EROSION AND SEDIMENT DEPOSITION DUE TO INCREASES IN PEAK STORM WATER RUNOFF? YES. EROSION AND SEDIMENT CONTROL SEOUENCING: 1. CONTRACTOR SHALL CONDUCT A PRE -CONSTRUCTION MEETING WITH THE PLAN APPROVING AUTHORITY PRIOR TO ANY LAND DISTURBANCE OR E&S CONTROL INSTALLATIONS. 2. INSTALL CONSTRUCTION ENTRANCE AND PERIMETER CONTROLS PRIOR TO ANY DISTURBANCE. 3. INSTALL STORMWATER INLET PROTECTION AROUND EXISTING DRAINAGE STRUCTURES. 4. ONCE INITIAL MEASURES ARE IN PLACE, REQUEST AN INSPECTION OF THE INITIAL EROSION AND SEDIMENT CONTROL MEASURES FROM THE ALBEMARLE COUNTY E&S INSPECTOR. CALL 24-HOURS IN ADVANCE OF INSPECTION. 5. PROTECT PERMANENT VEGETATION FOR THE DURATION OF THE PROJECT. 6. COMMENCE DEMOLITION NECESSARY TO PERFORM PROPOSED WORK ONLY (INCLUDING EXCAVATION WORK). 7. CONTRACTOR TO LEAVE EXISTING STABILIZED AREAS IN A NON -EROSIVE CONDITION UNTIL NECESSARY TO INSTALL PROPOSED IMPROVEMENTS. DISTURBED AREAS NOT IMPROVED SHALL BE SEEDED WITHIN 14 DAYS OF DISTURBANCE. 8. COMMENCE CONSTRUCTION OF PROPOSED SITE ELEMENTS, WITH THE EXCEPTION OF ANY PROPOSED BMPS. 9. FOR GRASSY AREAS: INSTALL PERMANENT SEEDING AND MULCH. STABILIZE ALL DISTURBED AREAS. 10. FOR GRAVEL / PAVEMENT AREAS: RESTORE GRAVEL/ PAVEMENT AFTER TRENCHING AND EXCAVATION OPERATIONS ARE COMPLETE. 13. REPAIR ANY EROSION AND REMOVE ANY SEDIMENT. 15. DRESS AND OVER -SEED ALL DISTURBED AREAS AS NECESSARY TO AFFECT PERMANENT VEGETATIVE COVER. STABILIZE ALL REMAINING DISTURBED AREAS WITH TOPSOIL, SEED, AND MULCH ONCE WORK IS COMPLETE. 16. BEGIN INSTALLATION OF ANY PROPOSED BMPS ONCE ALL CONTRIBUTING AREAS ARE STABILIZED AND FREE OF DEBRIS. REFER TO INSTALLATION CHECKLIST AND INSPECTION MILESTONES FOR CONSTRUCTION MILESTONES. 17. AFTER FINAL SITE STABILIZATION AND APPROVAL FROM THE APPROPRIATE EROSION AND SEDIMENT CONTROL AUTHORITY, THE SILT FENCE, INLET PROTECTION AND OTHER STABILIZATION MEASURES SHALL BE REMOVED. Q LL ] ¢_ C z G � LL ] z> wQ� � z 8 G� O \w G LLI / cf) D' z'LLJ C0 m J z Q Z cC W Uj Z 't9 Z LU 1 U ( ) LU 0 z 0 z 0 LLI LLI G ''IO v) ID z Q 0 v) 0 LL.I TH Op� 07�08�202> S, DANIEL C. HYER Y LIC. No. 45596, 10NAL APPROVED DCH SUBMISSION! N!'- 1 PROJECT 1907100 THE WORT, 01 I N E + G R A D I C202 STONE CONSTRUCTION ENTRANCE GROUND 70' MIN. A FILTER CLOTHS 6" MIN.I A' SIDE ELEVATION EXISTING PAVEMEN 5:1 MOUNTABLE BERM (OPTIONAL) 70' MIN. 4 B WASHRACK IO' MIN, F (OPTIONAL) _ -_-- VDDT •1 I �� POSITIVE DRAINAGE L�N. COURSE AGGREGATE B TO SEDIMENT TRAPPING DEVICE I I • MUST EXTEND FULL WIDTH OF AND EGRESS PLAN VIEW OPERATION 12' MIN. " ."1 - 1. SECTION A -A RE,mu,.K... ........ YRI'lll\ Jr M1C SECTION B-B Source: Adapted from 1983 Maryland Standards for Soil Erosion and Sediment Control, and Va. DSWC Plate 3.02-1 CONSTRUCTION OF A SILT FENCE (WITHOUT WIRE SUPPORT) 1. SET THE STAKES. 2. EXCAVATE A 4"X 4" TRENCH UPSLOPE ALONG THE LINE OF STAKES. WMAX. low FLOW 3. STAPLE FILTER MATERIAL TO STAKES AND EXTEND IT INTO THE TRENCH. 11.0 FLOW 4. BACKFILL AND COMPACT THE EXCAVATED SOIL. SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) Source: Adapted from Installation of Straw and Fabric Filter Barriers for Sediment Control, Sherwood and Wyant Plate 3.05-2 O3.02-1 CONSTRUCTION ENTRANCE O 3.05-2 SILT FENCE O Source: Va. DSWC 0 3.07-3 GRATE INLET PROTECTION Plate 3.07-3 TABLE 3.31-B (REVISED JUNE 2003) TEMPORARY SEEDING SPECIFICATIONS QUICK REFERENCE FOR ALL REGIONS APPLICATION SPECIES APPLICATION RATES 50/50 Mix of Annual Ryegrass Sept 1-Feb. 15 (Lolium mul&Flomm)&Cereal 50-100(lbs/acm) (Winter) Rye (Secale creale) Feb. 16-Apr. 30 Annual Ryegrass(Iolium multi-florom) 60-SOO(lbs/acre) May 1-Aug. 31 German Millet 5011bs/acre) FERTILIZER & LIME Apply 10-10-10 Fertilizer at a rate of 450 Ibs/acre (or 10 lbs. / 1,000 sq. ft.) Apply Pulverized Agricultural Limestone at a rate of 2 tons/acre (or 901bs. / LOOO sq. ft) NOTE: 1. A and test is necessary W determine the actual amount of lime required to adjust the soil pH of site. 2. Incorporate the lime and fertilizer into the top 46 inches of the soil by disking or by other means. 3. When applying Slowly Available Nitrogen, use rates available in Erosion & Sediment Control Technical Bulletin N4 2003 Nuldent Management for Development Sites at http://www.tleq.virgi nia.gov/Programs/water/5.rmwaw Management/Publications.aswc TABLE 3.32-D (REVISED JUNE 2003) PERMANENT SEEDING SPECIFICATIONS FOR PIEDMONT AREA SEED' LAND USE SPECIES APPLICATION RATES PER ACRE Tall Fescue 95-100% Minimum Care Lawn Perennial Ryegrass P5% (Commercial or Residentiap Kentucky Bluegrass' 15% Total: 175-200Ibs High Maintenance, Lawn Tall Fescue° Total: 200-2501bs. Tall Fescue 128 me. General Slope (3:1 or Is Red Top Grass of Creeping Red Fescue Seasonal Nurse Crop 2 me. 20 lbs. Total: 1501bs. Tall Fescue 1081bs. Low Maintenance Slope Red Top Grass of Creeping Red Fescue Seasonal Nurse Crop CrownvWcW 21be. 201bs. 20 lbs. (Steeper than 3:1) Total: 1501bs. 1- When selecting varieties of turtgrass, use the Virginia Crop Improvement Association (VCIA) recommendetl turfgrass variety ilst Quality seed will bear a label indicating that they are approved by VCIA. A current turfgrass variety list is available at the local County Extension office or through VCIA at 804746d884 or W hUp://sudan.cses.vtedu/Mml/Turf/turt/public tons/public tons2.html 2. - Use seasonal nurse crop in accordance with the seeding dates as stated below: February I& - April. Annual Rye May I- - August 15u'..................................... Foxtail Millet August 16u -Wober...................................... Annual Rye November -February 15u'. Winter Rye 3- Substitute Sauces lespedeza for Crownvetch east of Farmville, VA (May through September use hulled seer. all other Periods, use unhulled Sericea.)If Flatpea is used, increase rate to 301bs./acre. If Weeping Lovegrass is used, include in any slope or low maintenance mixture during warmer seeding periods, increase W 30 A0. FERTILIZER & LIME Apply 10­20-10 Fertilizer at a rate of 5001bs/acre (or 12 lbs. / LOOO sq. ft.) Apply Pulverized! Agricultural Limestone at a rate of 2 tone/acre (or 90los. / 1.000 sq. ft.) NOTE: -A soil test is necessary to determine the actual amount of lime required to adjust the soil pH of site. - Incorporate the lime and fertilizer into the top 46 inches of the soil by risking or by other means. - When applying Slowly Available Nitrogen, use rates available in Erosion & Sediment Control Technical Bulletin N4 2003 Nutrient Management for Development Sites at hUp.//w .dN.virginia.goy/Nograms/water/Swrmwater Managemerrt/Publications.aspx SEEDING SCHEDULES Uj Z 0Uj W Z Z W 1 W z J U) Q W `} o z W ¢_ z z � o W J z> 0 W Q� �? z 0- o W wow z'< Q cn z D o z 0 0 W TH Op� 000180021 I DANIEL C. HYER Y LIC. N0. 45596, IONAL APPROVED DCH SUBMISSION) N!'- 1 PROJECT 1907100 THE WORT. 0 I N E + G R A D C23 Lu ui .ice° • ° " •... •„tl. .a s Z ^o' Lu 59C > HSG B .3a.. tQ V , _ -- IDE A .n4: 2sTORr SOIL HIV BRICK I PROPOSED SIDEWALK 5' CONCRETE I Lu CONNECT TO EX. / 578.13 579.13 .07 HSG B 579.13 579 PROPOSED LEVEL SPREADER .� ® - - / I ------------ -------- _ •r WITH 10 LF RIGID LIP 1-- �• r 19 I SEE DETAIL 5/C4.0 I 579.07 ® X! •� -- -- I� 578.25 y / I_-- 579.25 � I 579.25 I I ENTIRE ROOF DRAINAGE AREA TO I (. I ❑ I DOWNSPOUT TO LEVEL SPREADER ELECTRICAL TRANSITIONER I / PAD (BY PAD) - - -I ED 8 CLASSROOM I \ PROP OSED 1 MODULAR BUILDING t ° SSMH#1 J FEE = 583.5 \ a: • DIRECTIONAL BORE TO- ' HERE, THEN OPEN TRENCH " ry� 'Co0 i. ---- - - - - - - -------------------------� UTILITY �E U6E UGE UGE WE UOE UOE (2) 2" ELECTRICAL CONDUITS CLOSET-----------------5------------------� �� i ------------------------- --- - ---- � � I SEWER PUMP ` b87H8 l DIRECTIONAL BORE h RECEIVING TRENCH / y i / / i / I (SEE PLUMBING PLANS) I Q Q I 0 I I IN: 4"PVC 579.99 (EAST) z IN., 4"PVC 58L72 - I - ------ - - - - - f IN: 4 / -- SANITARY SEWER _$ ----- $ J a T?6 PVC58..39 ------------ DIRECTIONAL BORE) / OUT. 6"PVC578.38 8 --$—( / I C _ �g C C.� �--• J_ I _ STORY / I ��� �f 1 2" BACK FLOW PREVENTER FIA / I HOUSED IN HOTBOX 1 J TIE-IN 18" ABOVE / Q } BOTTOM OF MANHOLE / C7/ w Z PV �#C/ SHED b �� I LOD 17625 SF /�55M r _ I W 0 i G z P. (} \ n CONNECT TO EX. SIDEWALK 12 ; J DIRECTIONAL BORE r 7/ i� I Q RECEIVING TRENCH I a a . .!m: • a. 4 "..' r-•6@4-�\Z-W -------- - --�-- 8 I LmV ----------------�c----- ------------------------- QW W— 2WATERSERVICE W D(pRECTIONAL BORE) - - - - - - - z \ J I Q EX. VAULT .�r G 7"unDC lnc `FX FIRF HVf1RANT t •.: ��� CNAINLINKFENCE 591.90DH �P�T Op Df A IN: 6"PVC 576.37 (WEST) • IN. 6"PVC 574.16 (EAST) -------_ 0 0008�202> Z IN: 15" RCP 576. 94 (NORTH) /�7J 7O --- - a D A N I E L C. H Y E R v _ > OUT l5" RCP 573. 95 LIC. No. 45596 i A w APPROVED DCH .�. .• . � � • , � M. . -. SUBMISSICn) nIV 1 N. ..,..• PROJECT 1907100 E •,TO THE WORT. 0 1 I N E + G R A D I GRADING AND UTILITY PLAN C3mO 1" = 20': 0 20 40 � - o J .�=: ------------------------ -- E I�11I�1I�1I11 I I IMPERVIOUS AREA WITHIN LIMITS OF DISTURBANCE TOTAL 0.04 AC wffi Y a l I I I I I I I I I I C) I I I/ at ro- o oo PRE DEVELOPMENT SWM MAP 1" = 30': 0 30 60 58C HSG B .SOIL � �I 0I 72C3 -------- I HSG B I I I I I I I I \ I NOTE: ALL STORMWATER WITHIN PROJECT AREA DRAINS TO SAME POINT OF ANALYSIS Ali _ I I y I 0 I I I I LOD 17625 SF I / � I ----------- - ------ \ I I I I • �I 58C • 0 `�' HSG B • non- STORMWATER FROM THE SITE CURRENTLY DRAINS TO A LARGE DITCH EAST OF THE PROPERTY. STORMWATER EITHER FLOWS OVERLAND OR IN PIPES, WHERE IT IS THEN OUTLET TO RIPRAP TO RETURN TO OVERLAND FLOW. THE PROPOSED DEVELOPMENT ON SITE WILL NOT CHANGE THESE GENERAL DRAINAGE PATTERNS. RUNOFF FROM THE ADDED MODULAR CLASSROOM BUILDING ROOF WILL BE COLLECTED AND ROUTED TO A LEVEL SPREADER TO RETURN TO SHEET FLOW BEFORE LEAVING THE PROJECT LIMITS. QUALITY COMPLIANCE THE NUTRIENT REMOVAL REQUIREMENTS WERE CALCULATED WITH THE VRRM SPREADSHEET, UTILIZING THE LIMITS OF DISTURBANCE AREA AS THE PROJECT LIMITS. THIS PROJECT MEETS STORMWATER QUALITY REQUIREMENTS SET FORTH BY 9VAC25-870-63 THROUGH THE PURCHASE OF NUTRIENT CREDITS IN THE EQUIVALENT OF 0.41 LBS/YR PHOSPHORUS. SEE VRRM TABULATIONS ON THIS SHEET. QUANTITY COMPLIANCE CHANNEL AND FLOOD PROTECTION REQUIREMENTS ARE BOTH ADDRESSED BY RETURNING RUNOFF FROM WITHIN THE PROJECT LIMITS TO SHEET FLOW VIA A LEVEL SPREADER (9VAC25-870-66D). THE VOLUME OF SHEET FLOW IS NOT SIGNIFICANTLY ALTERED IN A WAY THAT WOULD ERODE OR FLOOD DOWN GRADIENT PROPERTIES. OSTORMWATER MANAGEMENT NARRATIVE Site Results (Water Quality Compliance) Area Checks D.A. A D.A. B D.A. C D.A. D D.A. E AREA CHECK mREST/OPEN SPACE (a.) coo 0,00 OK. 0.00m000 IMMWMUSCOVERlac 0.00 0.000OKIMPERVIOUS COVERlIlE11EO (df Goo 000 To D.DoMANAGEOMUMEA(ac) 0.00 000 0,00MMAGEDTURFMEATRFATED(.e 0.00 coo 0.00 OK. AREACHECK OK. OK. OK. OK. OK She Treatment Volume (ft) L.mp Runoff Reduction Volume and TP By Drainage Area D.A. A D.A. B D.A. C D.A. D D.A. E TOTAL RUNmFRED1ILTID AQKAL 0 0 0 MRR TP IDADAVAIIAME m0.REMOVAL (Ib/yr lb/rtal��� 0.00 000 000 000 000 0.00 TP LOAD RED MM ACHIEVED(lb/yr oo0 000 000 000 0.00 0,00 TP LOAD REMAINING(lb/yrl ow 11 0.00 0.00 coo 0.00 0.00 NnROGENLOADREDUCEMMHIWED (IbIvril o.o0 1 0.00 0.00 0.00 o.DO o.00 Total Phosphorus LINEAR PROJECT: RNALPOGT OEVEIOPMEM TP LOAD I b/yr) DAM TPWADREDULTONREQUIRED(Ib/yr 0.41 TP WAD REDUImON AOMEVED(lbM 0.00 TPLOADREMAINING(IbM): DAM REMAINING TP LOAD REDUCTION REQUIRED (Iblftl 0.41 11 =+..: o6B:::. ------------------ I �H C2) POST DEVELOPMENT SWM MAP 1" = 30': 0 30 60 Post -Development Project (Treatment Volume and Loads) Enter TOMl Disturbed Areaf..01 Dao .m"'n't ec o oreoarepee p.C.rebn%eeetlrekyt: $take meaa Ia_n %3N eMopvo. epoebeLire)ni[eanpe.a m..... bedmeD entered? J ReaYOewIDRMM Wdtww (keaJ ANN esmk I t9M o9pr T.0 ru+aMeltk�ha- amo m,mooYrtep{ememweetrYtlM dNortl kubMblw 0.36 am UrelaW a. O.W dod PM-0evelopmeM lma area iaaee AbM InMb Cade 03191; robl pad Iraq - unalrw... �rnq¢p �erl.pr.peee.r.e..e.rea le.e om ° eeurcaeaaee A. .ud... o-rl .rba o.n1 O:n Area CMh ¢K pL OIL OK 0M "Re -- Rumfl GoeRldenb M ea MY%IeXla As.r esas emu etbN aakrcw smlKn., rvww.esa Nameturen ozu IeyrMu[om .n rsmm; euramp'ebNe ce000 - a re. aarery...f 'to -bet- e.em.r sDmmerysen pert eu Deep...t Ne. evee.e°. amnwpbe-M 1. level W Ilr-lM,EF%,nylL) w/rcrvm, net a.n wmm.•erse,. b.e.wwY A,a Eprauopaesp.aw.arwaal 000 000 n .wa Tu�rifurc Wnrnre°ev lwm .rl nneome' Ta nzo 3a% o.z] Oro "It . aNi.re.n om yaiurl Weal to uu.n oz0 YYaogeiurl 7)% Ib�l�qu o.w n• Imieml"ecc rcr az3 ure or MnyaxYROerand WtlONJMIwm o.le o.zo %called Turf 9D1 77% Ian'-,.-reaesl ¢m ma metalooM 0.95 IMnee ade att.rool..q 0.95 a'ro ..1...1 E6f6 YlnaYnfiu x394 m al Lrepnrc. l.e 1 oqo one Molae Aeu Dew, oA0 Maq o.it ine to o.xe MYbncee... oa I%wr0w O.a] Treatment Volume and Nutrient Load Treatment Volume and Nutrient Load Pe,;;r .,.1. Doo93 Doo,s MeL ° V e o.to55 .,m.re."L� rton a11 R.oe etom,e.< To,r...f pew.. re..eew.mYlmre405 r`I1.- x<3 9=t Vawm j Tre'lt..mm. e.x.3 a wmeMr.a-9eoeealop,.em3r 779 lode Rou Pan. p .netupmemTpem Tposs � o.is Melop-airp wad I.ae lTpl o.II cue/nl o.a9 IL Db/10 Iminl' .r.a.weimxleiwe .e. p.b pa: .Ipaa:2/nl m� a aoei>,.r,•,I'w Dae sMl a ws%weA`uaooa p.. nw rD. r..s..rw. rP a... wade= mAa'r.wx«Yr w..froe.efAmeprsrexawewrawrwu .U=e=rmua e. came, 0.az rvxee at0 rmnrye'I MluaxeAp.Wed(a'iw'MMrefuua vum. ervkus Lrea Rb/yd ,b/vrl veewerA®bmraKba%eeaNlrvl¢tr¢eea Rase raw.. gwawrn3pl¢wa1 6M3raemef.AareYaererarpr.rePYYaemr.. ¢.cent.. aary.d ka silt ¢u Aaa.avl Tp Loatl Retlutlian RlquireE Rb/yq 0.an STILLING BASIN T LINING AND } WIDTH PER PLAN 611x6" PRESSURE TREATED TIMBERS - LENGTH PER PLAN 31� FILTER FABRIC TO BE CONTINUOUS BELOW STILLING BASIN LINING NON -WOVEN GEOTEXTILE FILTER FABRIC NOTES I 58C HSG B I 111-3" DIAMETER RIVER STONE C. - #4 EPDXY COATED REBAR - 2' O.C. MINIMUM FOR LENGTH OF TIMBERS - I I I REBAR SHALL PENETRATE GROUND 12" MIN. ,SOIL � DI -F� I NOTE: ALL STORMWATER WITHIN PROJECT AREA DRAINS J TO SAME POINT OF ANALYSIS I,I AR A • I • �I I I •I I I I I` LOD 17625 SF Fill 2% MAX. FOR 10, 1. LEVEL SPREADER LIP SHALL BE COMPLETELY LEVEL ALONG ENTIRE LENGTH. 2. TIMBER ENDS SHALL BE KEYED INTO GROUND A MINIMUM OF 18" TO PREVENT SCOURING AROUND ENDS. 3. REBAR SHALL BE PLACED NO MORE THAN 1' FROM TIMBER ENDS. 4. CONTRACTOR SHALL NOT COMPACT STILLING BASIN AREA OR ALLOW HEAVY EQUIPMENT IN THE STILLING BASIN VICINITY TO ALLOW FOR INFILTRATION OF PONDED RUNOFF BEHIND LEVEL SPREADER. LEVEL SPREADER SIZING SUMMARY Total Nitrogen (For Information Purposes) POST -DEVELOPMENT LOAD IIb/yr a.sB NITROGEN LOAD REDUCTION ACHIEVED IIb/yr D.Oo LEVEL C INTENSITY TOTAL AREA TO TOTAL MINIMUM LENGTH PROVIDED LENGTH RIGID LIP REMAINING POST -DEVELOPMENT NITROGEN LOAD (Ib/yr) a.sR LEVEL SPREADER FLOW OF RIGID LIP OF RIGID LIP SPREADER FACTOR (IN/HR) (AC) (CFS) (FT) (FT) MATERIAL A 0.63 7.10 0.37 1.68 10.00 10.00 TIMBER O VRRM TABULATIONS O LEVEL SPREADER 5 72C3 HSG B w Q W z J I..L cw z G � w J Z > w J Z0 0-0 LL] 2 w > z Q w m J z ZD 0 2 119 z LLI Ill z z W 1 U J w 0 0 z J le- LLI LLI Q Cz G w C� G o 'CHOPP DANIEL C. HYER Y Lic. No. 45596, IONAL B� APPROVED DCH SUBMISSION NO. 1 PROJECT 1907100 T H E W 0 R K O F L I N E + G R A D E C4m0