Loading...
HomeMy WebLinkAboutWPO201900007 Approval - County 2021-08-06County of Albemarle m COMMUNITY DEVELOPMENT DEPARTMENT �acrrrtP Project title: Project file number: Plan preparer: Owner or rep.: Plan received date: Rev. 1 received: Rev. 2 Received: Date of comments: Rev. 1 comments: Approval: Reviewer: VSMP Permit Plan Review Old Trail Master Mitigation Plan WP0201900007 Amendment 1 Ammy George [ageorge@roudabush.com] Dave Brockman [Dave@oldtrailvillage.com] 03 June 2021 20 July 2021 03 Aug 2021 09 July 2021 02 Aug 2021 06 Aug 2021 Emily Cox 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 Telephone:434-296-5832 WWW.ALBEMARLE.ORG County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied/approved. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Mitigation Plan 1. Please only provide the cover sheet and any sheets with revisions. Rev. 1: Comment addressed. 2. Sheet 2 still shows approved mitigation areas for Block 32. These should be removed or a note added that the Block 32 plan has been amended and those areas are not needed, but may be planted in the future, as shown on sheet 4, as "potential areas". Rev. 1: Can you add a star or note pointing to the areas that are not needed anymore. In other words, make it clear to people where this note applies. Is it only for Block 32? This applies to sheet 2 & 4. (or you can note to refer to sheet 4A to see where areas were planted) Rev. 2: Comment addressed. 3. The tracking on sheet 5 should be on sheet 4A or on its own sheet. Rev. 1: Comment addressed. 4. Please add a note why the proposed and potential areas are the best locations for mitigation in Old Trail. Rev. 1: Comment addressed. 5. Rev. 1: Label 4A sheet title, as -built mitigation planting areas as shown on the cover sheet. Rev. 2: Comment addressed. 6. Rev. 1: Is the mitigation still required for Blocks 5.20, 21 as shown in the approved plan? Please clarify. It appears that it is not included in your calculations at and is separate and still required. If so, please note this. Rev. 2: Comment addressed. Engineering Review Comments Page 2 of 3 The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, erosion and sediment control and stormwater management improvements must be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, ajoint VSMP and grading permit will be issued by the County so that work may begin. Engineering Review Comments Page 3 of 3 County forms can be found on the county website forms center under engineering; https://www.albemarle.org/govern ment/commu n ity-development/apply-for/engineering-aool ications