HomeMy WebLinkAboutWPO202000037 Calculations 2021-08-06GALAXIE FARM STORMWATER MANAGEMENT CALCULATIONS PACKET (Amendment #1 to WPO 202000037) SCOTT/R. Ct?LLINS2 Lic. No. 035791 � 7/19/21 Date of Calculations JULY 19, 2021 I:1C1W-AW4III -i'il ® COLLINS ENGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com SCS TR-55 Calculations Soils Table (Source: NRCS Web Soil Survey Online Database) Albemarle County, Virginia (VA003) Map percent of Unit Map Unit flame A0I Symbol 71B Rabun clay loam, 15.3% 2 to 7 percent slopes 72C3 Rabun clay, 7 to 20.9% 15 percent slopes, severely eroded 72D3 Rabun clay, 15 38.2% to 25 percent slopes, severely eroded 79B Meadowville silt 25.6% loam, 2 to 7 percent slopes Totals for Area of 100.00/0 Interest The NRCS web soil survey defines this development's soils as predominantly having a hydrologic group type B. Precipitation Data (Source: NCAA's National Weather Service, Hydrometerorological Design Studies Center, Atlas 14 Point Precipitation Frequency Estimates) Map � ❑ Terrain L � C O 04 P Cage *fie a1T I �9 I b? e 100m POINT PRECIPITATION FREQUENCY (PF) ESTIMATES WITH 90Ye CONFIDENCE INTERVALS AND SUPPLEMENTARY INFORMATION NOAA Atlas 14, Volume 2, Version 3 PDS•based precipitation frequency estimates with 90% confidence intervals (in inches)' A"mge rerm iM mal(years) wratloaOOO +� 0® +� ®® +� 24-nr 3.01 (2.733A7) 3.67 (3.30-4.12) 11 /.70 (4.215.27) 11 555 (4.96521) 11 6.63 (6.06-7.60) 11 7.92 (6.98A80) 11 9.11 (7.97-10.1) 11 105 (9.04-11.6) 123 (10.6-13.8) 11 14.2 (11.9A5.7) m n n x n i 0 a w N J � U a G � w � y a m o m 3 m a z o " u x u o v 00 m o vi N o o '^ a o 0 a N C vi m ry G C a ry 66 a 0 u` w e o o n o 0 o a v o 0 a` < o ri o o rvi v o o c o 0 0 Z (� W N b vl Ol b m Vl m eel b I!1 01 b W I!1 m eel b Vf Of b m Vf o `v an c a � { _o c 2 a o " � c o a a n a a a N � a a o c w o u v v o 0 o a o 0 m e v= v v= 6 = a 12 u o w o w o w c u es u u u u y w v a v w m w w a a o m o a o m o a o m o o '2 O 1 O 0 O l'J O O o c a c o c a c 0� Em a 3 , a 3 � x m m c o a w m x E .m c � w m m m a c a n n ion > L m w n D v o 0 D o c w o d c a 0 O "' O— 0- 0 0 C U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 3: Time of Concentration (Tt) or Travel Time (Tt) Project: Galaxie Farm Location: Galaxie Farm Ln. Designed By: Checked By: Check One: Present X Developed X Check One: Tt X Tt Segment ID: Sheet Flow: (Applicable to Tt only) 1 Surface description (Table 3-1) 2 Manning's roughness coeff., n (Table 3-1 3 Flow length, L (total L < 100) (ft) 4 Two-year 24-hour rainfall, PZ (in.) 5 Land slope, s (ft/ft) 6 Compute Tt = [0.007(n*L)0.8) / P20.5 S A Shallow Concentrated Flow: 7 Surface description (paved or unpaved) 8 Flow Length, L (ft) 9 Watercourse slope, s (ft/ft) 10 Average velocity, V (Figure 3-1) (ft/s) 11 Tt=L/3600*V Channel Flow: 12 Cross sectional flow area, a (ft) 13 Wetted perimeter, Pw (ft) 14 Hydraulic radius, r = a/Pw (ft) 15 Channel Slope, s (ft/ft) 16 Manning's Roughness Coeff, n 17 V= [ 1.49r2/3s05 ] / n 18 Flow length, L (ft) 19 Tt= L / 3600*V 20 Watershed or subarea Tt or Tt (Add Tt in steps 6, 11 and 19) Note: The shoretest SCS Tc is 0.10 hrs. FGM,PE Date: 7/30/2021 SRC, PE Date: 7/30/2021 Through subarea n/a Onsite DA A Onsite DA A Onsite DA B (Pre-Dev.) (Post-Dev.) (Post-Dev.) Short Short Short Grass Grass Grass 0.15 0.15 0.15 100 100 75 3.67 3.67 3.67 0.06 0.06 0.12 0.10 0.10 0.06 Unpaved Unpaved 425 100 0.09 0.10 4.8 5.2 0.02 0.01 3 c W C 3 c W C O oz -3 O Q co -3 a:O :! LL � .00 N � .00 N O1 bO C N b0 cwai M E c U c E c m > m W to c C CL M ° U Q L w Q L w o o 0 o Q v o o Q v 00 0.00 0.00 0.12 1 0.11 10.10 w U i C 0 Y 0. V 4 0 CO Q > 0 0 O Y N C> O T C— O Q a0 0 w m 0 C 0 C O Q N 41 0 Q 0 O Q Y N N O ^ Ci _ — CD Q 0 a 0 w m O m C C O YO. VUi w Q Y O Q c a` C> w 00 O m c 0 I I � f6 u 11 U~ wU. Q N N C W C o 6 w w E + c ° n 3 N +w` 6 u ' aL c6 u w oo v �p c t c6 00 yam., cp c w C c O c-I K H K 0_ Y O N 'i LQ O V c-I Q Ln O O vi m 00 Q C � N rl n m o v = w ry R C) m wC) c-I L cn m o 0 0 0 > > o O u r o o i w N O O Ln Ln u1 O O e M O O N m O 3 I V u1 IR U Y ry R u1 ci rl l0 �y f6 3 m O O S .--I U O 00 Y C c6 w 0 a �v o000 0 c-I u1 ci u1 N �y K m O O 01 r4 w w N O Ln m 0 In v t Lq ci N N (n c-I Q Ln c-I O 01 m 9 O Ln -o I N n� W ry ran m c-I O W O '' '^ Y O U v m Il In oo o m I. v w m Ci o w N n LL 0 w w O L U C C 49 C E N H u Y w E t U o �_ w VYI VI y V N 3 U Y CL LL c to O m Q Q CY CY �n O s 6 u E m m E m Q N 0 3 m a w t f Cf w Q w c a '^ o_ o mCL a O w E c c m w �i � c u�� C a a c c.i I c» v ui cc I-� ao of 3 Channel and Flood Protection Computations (For Onsite Subareas A & B) 9 VAC 25-870-66 Section B: Channel Protection (Onsite Subarea A, Site Outfall #1) "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.b. "The peak discharge requirements for concentrated stormwater flow to natural stormwater conveyance systems in subdivision 3 of this subsection shall be met." Section B.3 "... the maximum peak flow rate from the one-year 24-hour storm following the land -disturbing activity shall be calculated either.." a. or b." Section B.3.a. In accordance with the following methodology: Q Allowed (Calcuated( 15 1.F• * (Q Pre -Developed * [RV Pre -Developed)) (RV Developed ) Q Allowed (Calcuated( < Where: Q Pre -Developed = CN Pre -Developed= S Pre -Developed — RV Pre -Developed = CN Post -Developed — S Post -Developed — RV Post-Developed— I.F. _ Q Developed 1.75 cfs 5.44 cfs (From Worksheet 4 Watershed Summary) 64 (From Worksheet 4 Watershed Summary) 5.66 (From SCS TR-55 eq. 2-4) 0.48 in. (From SCS TR-55 eq. 2-3) 79 (From Worksheet 4 Watershed Summary) 2.72 (From SCS TR-55 eq. 2-4) 1.20 in. (From SCS TR-55 eq. 2-3) 0.80 (Factor of Safety) 1.46 cfs Section B.4 Limits of Analysis The analysis terminates at the detention faclity since "...subsection 3 of this subsection is utilized to show compliance with the channel protection criteria..." 9 VAC 25-870-66 (Onsite Subarea A, Site Outfall #1) Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.b.: The point of discharge (the SWM facility), "releases a postdevelopment peak flow rate for the 10-year 24-hour storm event that is less than the predevelopment peak flow rate from the 10-year 24-hour storm event. Downstream stormwater conveyance systems do not require any additional analysis to show compliance with flood protection criteria if this option is utilized." 10-Year, 24-Hour Pre -Development Subarea A Peak Flow Rate = 21.93 cfs 10-Year, 24-Hour Post -Development Subarea A Peak Flow Rate = 20.93 cfs Section C.3 Limits of Analysis The flood protection analysis terminates at the SWM facility since subsection C.2.b is met. 9 VAC 25-870-66 (Onsite Subarea B, Site Outfall #2) Section B: Channel Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet the criteria in subdivision 1, 2 or 3 of this subsection..." Section B.1: Manmade stormwater conveyance systems "When stormwater from a development is discharged to a manmade stormwater conveyance system, following the land -disturbing activity, either..." a. or b. shall be met: Section B.1.a. "The manmade stormwater conveyance system shall convey the postdevelopment peak flow rate from the two-year 24-hour storm event without causing erosion of the system." Note, the 2-year 24-hour storm event is not erosive on the concrete pipes and in the riprap lined outlet protection located within Cow Branch. Section B.4 Limits of Analysis "stormwater conveyance systems shall be analyzed for compliance with channel protection criteria to a point where either.." a. or b. are met Section B.4.a. "Based on land area, the site's contributing drainage area is less than or equal to 1.0% of the total watershed area;" Note, the analysis terminates at the point of analysis (i.e. the location in Cow Branch where manmade riprap improvements are proposed). 9 VAC 25-870-66 (Onsite Subarea B, Site Outfall #2) Section C: Flood Protection "Concentrated stormwater flow shall be released into a stormwater conveyance system and shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and hydraulic methodologies:" Section C.2.a: The point of discharge (site outfall #2), "Confines the postdevelopment peak flow rate from the 10-year 24-hour storm event within the stormwater conveyance system [i.e. the storm sewer and riprap] to avoid the localized flooding." 10-Year, 24-Hour Design Storm Peak Back Water Surface Elevation = 464.54 ft Lowest Rim Elevation Envisioned in Storm Sewer System = 470.75 ft (No overtopping Occurs in Structures 12 & 14) Section C.3 Limits of Analysis ....stormwater conveyance systems shall be analyzed for compliance with flood protection criteria to a point where:" a, b or c are met. Section C.3.a.: "The site's contributing drainage area [i.e. Onsite Subarea B] is less than or equal to 1.0% of the total watershed area draining to a point of analysis in the downstream stormwater conveyance system [i.e. the culverts and riprap];" Pre -Development SCS TR-55 Hydrographs (For Onsite Subarea A) Worksheet 5b (Modified for Clarity): Basic watershed Data 1-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am;Q (mi2-in) Onsite DA A (Pre-Dev.) 0.12 0.12 0.37 0.0058 Hydrograph Time 1-yr Discharges (hrs.) (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 0.90 12.0 3.30 12.1 5.44 12.2 3.05 12.3 1.26 12.4 1.00 12.5 0.87 12.6 0.73 12.7 0.62 12.8 0.56 13.0 0.50 13.2 0.44 13.4 0.40 13.6 0.37 13.8 0.34 14.0 0.31 14.3 0.28 14.6 0.27 15.0 0.24 15.5 0.22 16.0 0.20 16.5 0.18 17.0 0.17 17.5 0.16 18.0 0.16 19.0 0.14 20.0 0.12 22.0 0.11 26.0 0.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 -1.00 SCS TR-55 Pre -Development Unit Hydrograph (Onsite DA A) 0.0 Worksheet 5b (Modified for Clarity): Basic watershed Data 2-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Below Subarea Tc (hrs.) Tt (hr.) la / P Am;Q (mi2-in) Onsite DA A (Pre-Dev.) 0.12 0.12 0.31 0.0095 Hydrograph Time 2-yr Discharges (hrs.) (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 1.46 12.0 5.40 12.1 8.90 12.2 4.98 12.3 2.06 12.4 1.63 12.5 1.42 12.6 1.20 12.7 1.02 12.8 0.92 13.0 0.82 13.2 0.72 13.4 0.66 13.6 0.60 13.8 0.55 14.0 0.50 14.3 0.46 14.6 0.44 15.0 0.40 15.5 0.36 16.0 0.32 16.5 0.29 17.0 0.29 17.5 0.27 18.0 0.26 19.0 0.23 20.0 0.19 22.0 0.18 26.0 0.00 SCS TR-55 Pre -Development Unit Hydrograph (Onsite DA A) Worksheet 51b (Modified for Clarity): Basic watershed Data 10-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Belov Subarea Tc (hrs.) Tt (hr.) la / P Am`Q (mil -in) Onsite DA A (Pre-Dev.) 0.12 0.12 0.20 0.0234 Hydrograph Time 10-yr Discharges (hrs.) (cfs) 0.0 0.00 11.0 0.00 11.3 0.00 11.6 0.00 11.9 3.61 12.0 13.31 12.1 21.93 12.2 12.28 12.3 5.09 12.4 4.03 12.5 3.49 12.6 2.95 12.7 2.51 12.8 2.27 13.0 2.02 13.2 1.78 13.4 1.62 13.6 1.48 13.8 1.36 14.0 1.24 14.3 1.12 14.6 1.08 15.0 0.98 15.5 0.89 16.0 0.80 16.5 0.73 17.0 0.70 17.5 0.66 18.0 0.63 19.0 0.56 20.0 0.47 22.0 0.45 26.0 0.00 25.00 20.00 15.00 10.00 5.00 0.00 0 SCS TR-55 Pre -Development Unit Hydrograph (Onsite DA A) Proposed Dry Detention Basin 'A' Routing Calculations (For Onsite Subarea A) Galaxie Farm- Basin Routings BasinFlow printout INPUT: Basin: Galaxie Farm- Basin Routings 7 Contour Areas Elevation(ft) Area(sf) Computed Vol.(cy) 470.00 110.00 0.0 472.00 653.00 25.5 474.00 1658.00 108.2 476.00 3090.00 281.3 478.00 4971.00 577.1 480.00 6216.00 990.6 482.00 8129.00 1520.3 Start—Elevation(ft) 5 Outlet Structures Outlet structure 0 Orifice 470.00 Vol.(cy) 0.00 name: Barrel area (sf) 1.767 diameter or depth (in) 18.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 469.900 multiple 1 discharge out of riser Outlet structure 1 Orifice name: Low -Flow Orifice area (sf) 0.136 diameter or depth (in) 5.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 470.000 multiple 1 discharge into riser Page 1 Galaxie Farm- Basin Routings Outlet structure 2 Orifice name: Mid -Flow Orifices area (sf) 0.785 diameter or depth (in) 12.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 477.330 multiple 5 discharge into riser Outlet structure 3 Weir name: Riser diameter (in) 48.000 side angle 0.000 coefficient 3.300 invert (ft) 479.500 multiple 1 discharge into riser transition at (ft) 1.215 orifice coef. 0.500 orifice area (sf) 12.566 Outlet structure 4 Weir name: Emergency Spillway length (ft) 40.000 side angle 75.960 coefficient 3.300 invert (ft) 480.500 multiple 1 discharge through dam 4 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr 24-hr SCS TR-55 Design Storm Area (acres) 7.750 CN 79.000 Type 2 rainfall, P (in) 3.040 time of conc. (hrs) 0.1100 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 11.747 peak time (hrs) 11.923 volume (cy) 1267.864 Page 2 Galaxie Farm- Basin Routings Hydrograph 1 SCS name: 2-yr 24-hr SCS TR-55 Design Storm Area (acres) 7.750 CN 79.000 Type 2 rainfall, P (in) 3.670 time of conc. (hrs) 0.1100 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 16.390 peak time (hrs) 11.923 volume (cy) 1769.000 Hydrograph 2 SCS name: 10-yr 24-hr SCS TR-55 Design Storm Area (acres) 7.750 CN 79.000 Type 2 rainfall, P (in) 5.550 time of conc. (hrs) 0.1100 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 31.644 peak time (hrs) 11.923 volume (cy) 3415.500 Hydrograph 3 SCS name: 100-yr 24-hr SCS TR-55 Design Storm Area (acres) 7.750 CN 79.000 Type 2 rainfall, P (in) 9.130 time of conc. (hrs) 0.1100 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 63.352 peak time (hrs) 11.923 volume (cy) 6837.930 Page 3 Galaxie Farm- Basin Routings OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of Peaks: 1-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 11.746 at 11.92 (hrs) discharge (cfs) 1.455 at 12.22 (hrs) water level (ft) 477.288 at 12.28 (hrs) storage (cy) 455.690 Hydrograph 1 Routing Summary of Peaks: 2-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 16.388 at 11.92 (hrs) discharge (cfs) 8.385 at 12.06 (hrs) water level (ft) 477.933 at 12.06 (hrs) storage (cy) 564.794 Hydrograph 2 Routing Summary of Peaks: 10-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 31.641 at 11.92 (hrs) discharge (cfs) 20.929 at 12.04 (hrs) water level (ft) 479.369 at 12.04 (hrs) storage (cy) 850.193 Hydrograph 3 Routing Summary of Peaks: 100-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 63.347 at 11.92 (hrs) discharge (cfs) 61.002 at 11.94 (hrs) water level (ft) 480.928 at 11.94 (hrs) storage (cy) 1218.911 Wed Jul 28 11:18:25 EDT 2021 Page 4 Post -Development SCS TR-55 Hydrographs (For Onsite Subarea B) Worksheet 51b (Modified for Clarity): Basic watershed Data 1-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Belov Subarea Tc (hrs.) Tt (hr.) la / P Am*Q (m1 2-in) Onsite DA B (Post-Dev.) 0.10 0.10 0.16 0.0019 Hydrograph Time 1-yr Discharges (hrs.) (cfs) 0.0 0.00 11.0 0.05 11.3 0.06 11.6 0.10 11.9 0.63 12.0 1.22 12.1 1.90 12.2 1.17 12.3 0.41 12.4 0.28 12.5 0.23 12.6 0.20 12.7 0.16 12.8 0.14 13.0 0.12 13.2 0.11 13.4 0.10 13.6 0.09 13.8 0.08 14.0 0.07 14.3 0.06 14.6 0.06 15.0 0.05 15.5 0.05 16.0 0.04 16.5 0.04 17.0 0.04 17.5 0.04 18.0 0.03 19.0 0.03 20.0 0.02 22.0 0.02 26.0 0.00 2.00 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 0.00 SCS TR-55 Post -Development Unit Hydrograph (Onsite DA B) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Worksheet 51b (Modified for Clarity): Basic watershed Data 2-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Belov Subarea Tc (hrs.) Tt (hr.) la / P Am*Q (mi2-in) Onsite DA B (Post-Dev.) 0.10 0.10 0.13 0.0026 Hydrograph Time 2-yr Discharges (hrs.) (cfs) 0.0 0.00 11.0 0.06 11.3 0.09 11.6 0.14 11.9 0.86 12.0 1.67 12.1 2.61 12.2 1.61 12.3 0.56 12.4 0.38 12.5 0.32 12.6 0.27 12.7 0.22 12.8 0.20 13.0 0.17 13.2 0.15 13.4 0.13 13.6 0.12 13.8 0.11 14.0 0.10 14.3 0.09 14.6 0.08 15.0 0.08 15.5 0.07 16.0 0.06 16.5 0.05 17.0 0.05 17.5 0.05 18.0 0.05 19.0 0.04 20.0 0.03 22.0 0.03 26.0 0.00 3.00 2.so 2.00 Lso 1.00 0.50 0.00 SCS TR-55 Post -Development Unit Hydrograph (Onsite DA B) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 Worksheet 51b (Modified for Clarity): Basic watershed Data 10-yr. 24-hr. SCS TR-55 Method Unit Hydrograph for the la/P & Tc Listed Belov Subarea Tc (hrs.) Tt (hr.) la / P Am*Q (mi2-in) Onsite DA B (Post-Dev.) 0.10 0.10 0.09 0.0049 Hydrograph Time 10-yr Discharges (hrs.) (cfs) 0.0 0.00 11.0 0.12 11.3 0.17 11.6 0.26 11.9 1.63 12.0 3.15 12.1 4.92 12.2 3.04 12.3 1.06 12.4 0.72 12.5 0.60 12.6 0.51 12.7 0.42 12.8 0.37 13.0 0.32 13.2 0.28 13.4 0.25 13.6 0.22 13.8 0.20 14.0 0.19 14.3 0.17 14.6 0.16 15.0 0.14 15.5 0.13 16.0 0.11 16.5 0.10 17.0 0.10 17.5 0.09 18.0 0.09 19.0 0.07 20.0 0.06 22.0 0.06 26.0 0.00 6.00 5.00 4.00 3.00 2.00 1.00 0.00 SCS TR-55 Post -Development Unit Hydrograph (Onsite DA B) 0.0 5.0 10.0 15.0 20.o Storm Sewer Analysis 1. For verification of Onsite DA B's channel and flood protection compliance, and 2. For the proposed bypass storm sewer system associated with the ESC plan. Note: For the bypass storm sewer system's contributing drainage area, please see the sheet entitled 'Drainage Plan for the Bypass Storm Sewer' and the section at the back of this report entitled 'Synchronized Hydrographs to the Bypass Storm Sewer'. w w h (lay' U U U z_ W F N m p O N W w ry a �i y O ^ O m O a O Q C C Q C C C C Q W O h o s o 0 _ 0 x q ry a Z o m e 8 8 F — — Q a m h N N U U o0 p < p O N a 0 00 w w w 00000 00 a� O N b as A F O W W 9 W a 0 }o W F a w 3 19 a 19 a & v, � O xi O O V O O T `^ z z 2 z z z z O O O N N O to r r q — O T — O y OE 0 0 0 0 0 0 0 N N T N O O N O ch - - mr 0 0 0 0 0 0 0 t0 O v v o 6 0 o a v n oo C o to N 1p N, T O O O N O N N O O O O O O O O O O m o o kr^ a N [Lj W a w o N v+ o v v rn 3 a a > a a a a a o o w P-- �T x SO Water Quality Calculations Using the DEQ Virginia Runoff Reduction Method for New Developments (Compliance is met through a nutrient credit purchase.) MQVirgM Bumff eM M&M New Devebpmem Cmpl Spre stat- deadpan 34 02 BMP Standards and Specifications M 2013 Draft BMP Standards ands Spetllkalbm Pro)ect Nam: Go avie Farm- VSMIs Amendment Nl m�sme y®Ils Datee: 7/30/2021 ® hies enfe0esrynspecihsmions.n. 2013Drah Stdsa Spea elaWtian Mls (Site Information Project (Treatment Volume and Loads) Impervin.. tmlaenl Constants m pnN l dgmmes) 1.m rurellPIF ]) 0.26 geed liNI1111M /N pans/0 I.B6 aslaiave-a OA1 Cj lun ancd 090 Forest/Open SWcaC—,(sored 0.00 W-Onsid Rv Rorert) 000 is Forert M sanapdTuhmeerlares) ].56 WeyMad Rv Muhl O.M %Managed lit 60M Im —.00s Corr (sores) 1.14 Rv to mon) 0.95 M lmpvNwe CO% Site Rrez )sores) RumlFUeffidents lRvl Tr 'N v-a71 0.5333 u W Q O p S pp O pp O p S 00 O 00 O O O O O W OC Q Q 0 O 0 O 0 O 0 O O O O Y O Q 0' O O O O O O O O O c'888SSx 0000co chi a 00000x QoS o S S a E m p 0 o 0 0 0 0 0 0 o 0 0 m D� O o O 0 O 0 O 0 m 7 W a+ 3 S °^CS a888SSx Qo8$S c o 0 0 aiGti of o00 N �+ N Y o �?V �? \OWL �N/ a u 6 z 0QT LdLN OWQT QJ AW :a _O z O W C W U W C z U W u'ON Wz z C z yz j 0 F�F F F Ea 5aFz F O W O u L W F O g 0 a O W O F p Wp, w C O W C OC f OC a+ WC OJ % N Y.O Q J OJOJ a a O „LL„6 Diu W G ' W a f z W Q f u f y f C d z W 0 O z F OO z O z OD O O N 1 F z Y F 6 C O z Q Z z to z u ' @ z_ Q W o � W Q C i Synchronized Hydrographs that Contribute to the Bypass Storm Sewer (These hydrographs were generated so that the proposed bypass storm sewer associated with the ESC plan could be sized appropriately. These peak flows are reflected in the storm sewer computations for the bypass storm sewer.) Avinity I Outflow Hydrograph (From Basin's Routings) Time (hrs) Outflow (cfs) 0.0 0.00 0.5 0.00 1.0 0.06 1.5 0.19 2.0 0.35 2.5 0.48 3.0 0.59 3.5 0.68 4.0 0.75 4.5 0.81 5.0 0.87 5.5 0.92 6.0 0.95 6.5 1.18 7.0 1.23 7.5 1.29 8.0 1.36 8.5 1.44 9.0 1.59 9.5 1.77 10.0 1.92 10.5 2.15 11.0 2.49 11.5 3.02 11.9 4.63 12.0 5.51 12.1 17.61 12.2 37.20 12.3 34.03 12.4 26.36 12.5 19.84 13.0 7.02 13.5 5.86 14.0 5.59 14.5 5.28 15.0 4.93 15.5 4.57 16.0 4.20 16.5 3.80 17.0 3.40 17.5 3.02 18.0 2.64 18.5 2.29 19.0 1.97 19.5 1.70 20.0 1.45 20.5 1.24 21.0 0.96 21.5 0.93 22.0 0.89 22.5 0.86 23.0 0.82 23.5 0.79 24.0 0.77 24.5 0.55 25.0 0.27 25.5 0.11 26.0 0.03 26.5 0.00 27.0 0.00 27.5 0.00 28.0 0.00 28.5 0.00 29.0 0.00 29.5 0.00 30.0 0.00 30.5 0.00 31.0 0.00 a0.00 35.00 30.00 25.00 20.00 15.00 10.00 s.00 0.00 -s.00 Outflow Hydrograph (10-yr Design Storm) 35.0 Avinity II Outflow Hydrograph (From Basin's Routings) Time (hrs) Outflow (cfs) 0.0 0.00 0.5 0.17 1.0 0.27 1.5 0.33 2.0 0.36 2.5 0.38 3.0 0.40 3.5 0.41 4.0 0.43 4.5 0.44 5.0 0.46 5.5 0.48 6.0 0.50 6.5 0.52 7.0 0.53 7.5 0.55 8.0 0.57 8.5 0.60 9.0 0.63 9.5 0.68 10.0 0.72 10.5 0.78 11.0 0.87 11.5 1.00 11.9 2.10 12.0 2.98 12.1 7.35 12.2 8.50 12.3 8.40 12.4 8.35 12.5 5.10 13.0 3.00 13.5 2.83 14.0 2.61 14.5 2.33 15.0 2.02 15.5 1.63 16.0 1.29 16.5 1.26 17.0 1.23 17.5 1.20 18.0 1.16 18.5 1.13 19.0 1.09 19.5 1.05 20.0 1.00 20.5 0.95 21.0 0.89 21.5 0.84 22.0 0.78 22.5 0.72 23.0 0.65 23.5 0.59 24.0 0.54 24.5 0.43 25.0 0.29 25.5 0.16 26.0 0.06 26.5 0.02 27.0 0.01 27.5 0.00 28.0 0.00 28.5 0.00 29.0 0.00 29.5 0.00 30.0 0.00 30.5 0.00 31.0 0.00 10.00 9.60 8.60 2.60 6.00 5.00 4.60 3.00 2.60 1.00 am Outflow Hydrograph (10-yr Design Storm) 0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0 Structure ESl Inflow Hydregraph for Oeecland Runoff (Does not Include Routed A Inity I & II) Time (min.) Inflow(cfs) 1.0 2.17 2.0 4.33 3.0 6.50 4.0 8.67 5.0 10.83 6.0 13.00 7.0 15.16 8.0 17.33 9.0 19.50 10.0 21.66 11.0 23.83 12.0 26.00 13.0 28.16 14.0 30.33 1S.0 32.49 16.0 34.66 17.0 36.83 18.0 35.53 19.0 34.23 20.0 32.93 21.0 31.64 22.0 30.34 23.0 29.04 24.0 27.75 25.0 26A5 26.0 25.15 27.0 23.85 28.0 22.56 29.0 21.26 30.0 19.96 31.0 18.67 32.0 17.37 33.0 16.07 34.0 14.77 35.0 13AS 36.0 12.18 37.0 10.88 38.0 9.59 39.0 8.29 40.0 6.99 41.0 5.69 42.0 4.40 43.0 3.10 44.0 1.80 45.0 0.51 46.0 0.00 47.0 0.00 48.0 0.00 49.0 0.00 so.0 0.00 51.0 0.00 52.0 0.00 53.0 0.00 54.0 0.00 55.0 0.00 56.0 0.00 5].0 0.00 58.0 0.00 59.0 0.00 60.0 0.00 n0 00 35 W 30 00 zs o0 20 00 is o0 MOO son OM 5 00 Inflow Hydrograph (10-yr Design Storm) 5ynchronized (Inflow) unit Hydrograph To Proposed Strui EiI This inflow hydrograph sychronizes the Avinity I outflow hydrograph, the Avinity II outflow, hydrograph and the Str. ES3 inflow hydrograph to determine the peak flow to structure ES-1(i.e. the upstream point of the bypass storm sewer). Hydrograph Time 10yr Discharges (hrs.) (cfs) 0.0 2.17 0.1 13.00 0.2 26.00 0.3 36.83 0A 27.75 0.5 20.13 0.6 12.18 0.7 4.40 0.8 O.W 0.9 O.W 1.0 0.33 1.5 0.52 2.0 0.70 2.5 0.86 3.0 0.99 3.5 LIM) 4.0 1.18 4.5 1.26 5.0 1.33 5.5 1.40 6.0 1.45 6.5 1.69 7.0 1.77 7.5 1.85 8.0 1.93 8.5 2.03 9.0 2.22 9.5 2.44 10.0 1.64 10.5 2.93 11.0 3.36 11.5 4.02 11.9 6.73 12.0 8.50 12.1 24.96 12.2 4530 12.3 42.43 12A 34.71 12.5 24.94 13.0 10.03 13.5 8.69 14.0 8.20 14.5 7.61 15.0 6.95 15.5 6.20 16.0 5.48 16.5 5.06 17.0 4.63 17.5 4.21 18.0 3.81 18.5 3.41 19.0 3.06 19.5 2.74 20.0 2.45 20.5 2.19 21.0 1.85 21.5 1.)T 22.0 1.67 22.5 1.57 23.0 1.48 23.5 1.39 24.0 1.31 24.5 0.98 25.0 0.57 25.5 0.28 26.0 0.09 26.5 0.02 27.0 0.01 27.5 0.01 28.0 0.00 28.5 0.00 29.0 0.00 29.5 0.00 30.0 0.00 30.5 0.00 31.0 0.00 Structure 4 Inflow Hytlrograph (Amounts for Overland Runoff & SWM Facility ID 0446.01) Tme(min.) Inflow(cfs) 1.0 1.64 2.0 3.27 3.0 4.91 4.0 6.55 5.0 8.18 6.0 9.82 7.0 11.45 8.0 13.09 9.0 14.73 10.0 16.36 11.0 18.00 12.0 22.17 13.0 21.27 14.0 22.91 15.0 24.54 16.0 23.56 17.0 22.58 18.0 21.60 19.0 20.62 20.0 19.65 21.0 18.67 22.0 17.69 23.0 16.71 24.0 15.73 25.0 14.75 26.0 13.77 22.0 12.79 28.0 11.81 29.0 10.83 30.0 9.85 31.0 8.87 32.0 7.89 33.0 6.91 34.0 5.93 35.0 4.95 36.0 3.97 32.0 2.99 38.0 2.01 39.0 1.03 40.0 0.05 41.0 0.00 42.0 0.00 43.0 0.00 44.0 0.00 45.0 0.00 46.0 0.00 47.0 0.00 48.0 0.00 49.0 0.00 50.0 0.00 51.0 0.00 52.0 0.00 53.0 0.00 54.0 0.00 55.0 0.00 56.0 0.00 52.0 0.00 58.0 0.00 59.0 0.00 60.0 0.00 Inflow Hydrograph (10-yr Design Storm) 30 W SM Mn 40.0 50.0 sa.o 70.0 NOTE: This inflow hytlrograph was completed to ensure the proposed bypass pipes 1& 3 are appropriately sized. The bypass' proposed structure 4 will accept this upland offsite runoff with the developmet of Galaxie Farm. Note, this hytlrograph takes into consideration the overland flow captured by the existing culvert beneath Galaxie Farm lane and the approved WPO 201200022, SWM Facility ID 0446.01. This SWM facility contains 3 outlet control structures. The primary control (underdrains and a connected riser/barrel system) and the tertiary control (emergency spillway) release runoff to a subarea outside of Galaxie Farm's watershed. The secondary control (a second riser/barrel system) is partially activated during the 10yr design storm and releases runoff to Galaxie Farm's watershed (peak flow of 2.53 cfs at a time of 12.11 hrs. per the asbuilt routings). Synchronized (Inflow) Unit Nydmgraph to Proposed Structure 4 This inflow hydragraph sychronizes the Str. ESl hydragraph (whi A accounts for the Avinity I outflow, hydragraph, the Avinity II outflow, hydragraph and the structure ESVs overland flaw) and the St, 4 inflow hydragraph (which accounts for the SWM Facility ID 0446.01 and structure 4's overland flaw). This inflow hydmgraph daes not take into account the minor offsite areas flawing directly to structures 4 & 6. new areas/Flaws are amounted for separately in the swim sewer compuations. Hydragraph Time 10, Discharges (hm.) (cfs) 0.0 3.80 0.1 22.81 0.2 48.16 0.3 59.41 0.4 43.4T 0.5 29.98 0.6 48.18 0.7 4.40 0.8 0.00 0.9 0.00 1.0 0.33 1.5 0.52 2.0 OJO 2.5 0.86 3.0 0.99 3.5 1.09 0.0 1.18 0.5 1.26 5.0 1.33 5.5 1.40 6.0 1.45 6.5 1.69 7.0 1.77 7.5 1.85 8.0 1.93 8.5 2.03 9.0 2.22 9.5 2.44 10.0 2.64 10.5 2.93 11.0 3.36 11.5 4.02 11.9 6.73 12.0 8.50 12.1 24.% 12.2 45.70 12.3 42.43 12.4 M.71 12.5 24.94 13.0 10.03 13.5 8.69 14.0 8.20 14.5 7.61 15.0 6.95 15.5 6.20 16.0 5.48 16.5 5.06 17.0 4.63 17.5 4.21 18.0 3.81 18.5 3.41 19.0 3.06 19.5 2.74 20.0 2.45 20.5 2.19 21.0 1.85 21.5 1.77 22.0 1.67 22.5 1.57 23.0 1.48 23.5 1.39 24.0 1.31 24.5 0.98 25.0 0.59 25.5 0.28 26.0 0.09 26.5 0.02 27.0 0.01 27.5 0.01 28.0 0.00 28.5 0.00 29.0 0.00 29.5 0.00 30.0 0.00 30.5 0.00 31.0 0.00 NOTE: Approved WPO 201200022, SWM Facility ID 0446.01, releases a peak flaw of 2.53 cfs at a time of 12.11 ha. (per the asbuilt routings). While this outflow does not synchronize with the adjacent downstream subarea/ inflow hydrogaph shown on the previous page, it daes synchronic, with the Avinity I and Avinity II peak autflaws resulting from the attenuation in these facilities. As a result, the 2.53 chs peak outflow from SWM Facility ID 0446.01 was added to this synchronized hydmgraph to ensure its runoff was properly accounted far.