HomeMy WebLinkAboutWPO202100036 Correspondence 2021-08-09SHIMP ENGINEERING, P.C.
Design Focused Engineering
August 5, 2021
Emily Cox
County of Albemarle
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902
RE: Response Letter #1 for WPO202100036 6889 Free Union Rd
Dear Emily,
Thank you for your review of the VSMP request for 6889 Free Union Rd. This letter contains responses
to County comments dated July 29, 2021.Our responses are as follows:
C1. A stormwater maintenance agreement must be executed before plan approval. Please contact Ana
Kilmer[akilmer@albemarle.org or 434-296-5832 ext. 3246] to complete the process.
RESPONSE: The process to execute a stormwater maintenance agreement has been initiated.
This will be submitted prior to approval.
C2. Please provide a stormwater agreement in lieu :
https://www.albemarle.org/home/showdocument?id=27 10
RESPONSE: A stormwater agreement has been provided.
C3. Since the agreement is being executed per 17-403-13, please remove water quality requirements
and VRRM. Water quantity and erosion issues must still be addressed.
RESPONSE: Acknowledged. Per 17-403-B, water quality and VRRM are not required. This has
been removed from the stormwater management plan. The designated open space originally
shown to meet water quality requirements has been removed.
C4. Clearly show parcel lines and owners. Ensure there is permission for all of the required access.
RESPONSE: Updated parcel lines and owners have been shown. Access is only required through
the owner's parcels.
C5. Please show a proposed cross section for the driveway.
RESPONSE: A cross section of the driveway has been provided on sheet C9.
C6. Please show the drainage areas to the culverts.
RESPONSE: Drainage areas to each culvert have been provided.
C7. Provide required maintenance of the pond on the plans.
912 E. High St. Charlottesville, VA 22902 1434.227.51401 shimp-engineenng.com
RESPONSE: Maintenance for the pond has been included on sheet C 1.
D1. Provide outlet protection for all pipes. Show required dimensions on the plans.
RESPONSE: Outlet protection has been provided for all pipes. Dimensions are shown in detail I 1
on sheet C8.
D2. Show dust control on the plans_
RESPONSE: Dust control has been added on sheet C6.
If you have any questions or concerns about these revisions, please feel free to contact me at
chris@shimp-en ine eering com or by phone at 434-227-5140.
Regards,
Chris Marshall, EIT
Staff Engineer
Shimp Engineering, P.C.
912 E. High St.. Charlottesville, VA 22902 1434.227.51401 shlmp-engineenrig.rom