Loading...
HomeMy WebLinkAboutARB202100102 Application 2021-08-09i � DESIGN w DEVELOP 08/09/2021: Transmittal Please deliver to: Margaret Maliszewski Chief of Planning - Resource Management Albemarle County Community Development Please find attached: • Stonefield Building A5_APPLICATION AND CHECKLIST • Stonefield Building A5_DRAWINGS Regarding: A staff level review of a county wide certificate of appropriateness for building permit where change is 50% or less of altered elevation for Stonefield Building A5 at 1952 Swan- son Drive. From: Bob Pineo Design Develop, LLC. 434.806.8365 418 E Main Street Charlottesville, VA 22902 Notes: Margaret, Please find our ARB submission for the Stonefield Building A5 at 1952 Swanson Drive. Please do not hesistate to contact with any questions! 418 EAST MAIN STREET, CHARLOTTESVILLE, VA 22902 www.designdeveloplic.org • 434.804.8365 Architectural Review Board Application J S`OI 1r� 1 Part A: Applicant, Contact and Parcel Information STONEFIELD BUILDING A-5 LANDLORD WORK PrWect Name; Tax map and arcel s : Physical Street Address: Contact Person: BOB PINED Business Name: DESIGN DEVELOP, LLC. Address 418 EAST MAIN STREET city CHARLOTTESVILLE State VA Zip 22902 Daytime Phone 434 806-8365 Fax # E-mail Owner of Record: OCT STONEFIELD Address 240 ROYAL PALM WAY city PALM BEACH State FL Zip 33480 Daytime Phone 561 514-6730 Fax # E-mail (Part B: Review Type and Fees - *Application FEE + Technology Surcharge $4% Select Review Type Review by the Architectural Review Board Conceptual Plan/Advisory Review Preliminary/Initial Review of a Site Development Plan Final Review of a Site Development Plan Major Amendment Building Permit Review County -wide Certificate of Appropriateness Structures 750' or more from the EC, no taller than 5 stories TOTAL FEE + surcharge $559.52 ($538.00 + $21.52) * $559.52 ($538.00 + $21.52) * $1230.32 ($1183 + $47.32) per review' $276.64 ($266.00 + $10.64) * $725.92 ($698 + $27.92) per review $559.52 Structures located behind a structure that fronts the EC $559.52 Personal wireless service facilities $559.52 Fencing or Equipment or Lighting $279.76 Additions to ARB-approved buildings $559.52 Minor amendments to site or architectural plans $559.52 Building permits where change is 50% or less of altered elevation $559.52 FOR OFFICE USE ONLY: BP# ($538.00 + $21.52) * ($538.00 + $21.52) * ($538.00 + $21.52) * ($269.00 + $10.76) * ($538.00 + $21.52) * ($538.00 + $21.52) * ($538.00 + $21.52) * Fee Amount $ Date Paid By who? Receipt # Check # By County of Albemarie Dept of Community Development, 401 McIntire Rd, Charlottesville, VA 22902 Voice: (434) 2%-5832 Fax: (434) 972-4126 7/1=1 Page 1of2 OVER Part C: Description of Proposal Describe your proposal. Attach a separate sheet if more space is needed. SEE ATTACHED BOOKLET/DRAWINGS. Part D: Applicant Agreement Applicant must read and sign: • Only complete application packages will be scheduled for ARB review. The application package is not complete without the appropriate checklist - completed, signed, and included with the required submittal materials indicated on the checklist APB checklists are available at www.albemarle.om at the Community Development Forms Library. • Digital submittals are encouraged, but paper submittals are accepted. • Paper submittals: Each application package must contain I folded copy of all plans and documents being submitted, and I set of building material samples (if indicated on the corresponding submittal checklist.) All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. A pdf copy of all submittal items is requested. • Digital submittals: One set of building material samples may be required. See the corresponding submittal checklist for requirements. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. One or more paper copies of the submittal may be requested during the review period. I hereby certify that I own the subject property or have the legal power to act on behalf of the owner in filing this application. I also certify that the information provided on this application and accompanying information is accurate, true, and correct to the best of my knowledge, and that the attached plans contain all information required by the appropriate checklist. Signature: owner/owner's representative/contract purchaser Date Printed name, Tide BOB PINED, PRINCIPAL 08/09/2021 Daytime phone number of Signatory 434-806-8365 7/1/2021 Page 2 of OVER Architectural Review Board °$10 Checklist of Submittal Requirements U �•► COUNTY -WIDE CERTIFICATE OF APPROPRIATENESS Building Permits where the change is 50% or less of the altered elevation Part A: Applicant Contact and Parcel Information Project name: STONEFIELD BUILDING A-5 LANDLORD WORK Contact person: BOB PINEO Part B: Submittal Requirements Note: Submittal packages must contain 2 collated & folded copies of all info unless otherwise stated. A. Written description of the proposal 1 V Provide a general description of all proposed work. 2 0 Explain how the proposal is compatible with the surrounding area and the Entrance Corridor. B. Site plan/Sketch plan showing the following (drawn to the scale of 1 "=20', clearly legible): 1 0 Location of all proposed changes in relation to the Entrance Corridor street. 2 0 If mechanical equipment or accessory structures are altered or added, then identify those features, their locations, and screening that will eliminate visibility from the Entrance Corridor. C. Landscape plan showing the following (drawn to the scale of 1"=20', clearly legible): 1 ❑ Existing landscaping to be removed. Include the location, size, and species. 2 ❑ Proposed landscaping. 3 ❑ Landscape schedule indicating plant species with common and botanical names, plant quantity, size at planting, and symbol used. D. If new lighting is proposed or existing lighting will be modified, provide a lighting plan showing the following (drawn to the scale of 1"=20' and clearly legible): 1 ❑ Location of all proposed building and site lighting. 2 ❑ Manufacturer's cut sheets with a diagram of the proposed fixture(s) sufficient to determine if it is a full cutoff fixture. Include cut sheets as a separate sheet of the site plan set. 3 ❑ Lighting schedule identifying all proposed light fixtures, poles and brackets. Identify illumination type, intensity, style, shielding, color, finish, and installation height. 4 ❑ Photometric plan addressing all fixtures and indicating that lighting meets the requirements of section 4.17 of the Zoning Ordinance. LLF must equal 1.0. E. Appearance of the proposed building(s) 1 0 Architectural elevations of the proposed building(s). Elevations must be drawn to the scale of at least 1/8"=1'-0". Include existing condition and proposed changes. Include a building materials schedule and key. 2 0 One set of all building material samples and colors. 3 0 A floor plan adequate to show exterior walls, windows and doors. Revised 6110110 - 1 OVER F. Additional material 1 0 Sheet number, total number of sheets, date of the drawing, date and description of the latest revision, and contact information for the firm preparing the drawings in the title block on all drawings. 2 0 Provide labeled, color 8-'/2" x 11" photos of the site as seen from both directions on the Entrance Corridor. 3 ® Any additional material that will make the review more productive. Clarification of topography, visibility, utilities, landscaping, or other unique or unusual conditions are welcome. Part C: Applicant Agreement Applicant must read and sign . Each application package must contain 2 collated and folded copies of all plans and documents being submitted. Only (1) set of building material samples is required. All submittal items, including building material samples, become the property of Albemarle County. Applicants are encouraged to maintain duplicate copies of all submittal items in their own files. . All information in this checklist is required prior to beginning review. Additional submittal materials may be required, depending on the proposal. In representing the above referenced firm submitting this application for review, I hereby state that the information provided in this application, and all accompanying information, is accurate, true and correct to the best of my knowledge, and that the attached plans contain all information required by this checklist. Signature of person completing checklist BOB PINEO, PRINCIPAL Printed Name / Title 08/09/2021 Date 434-806-8365 Daytime phone number of Signatory County of Albemarle Department of Community Development 401 McIntire Road, Charlottesville, VA 22902-4596; (434) 296-5832 Tel, (434) 972-4126 Fax www.albemade.org Revised 6/1/10 — 2 OVER