HomeMy WebLinkAboutARB202100102 Plan - Submittal (First) 2021-08-09OCT STONEFIELD PROPERTY OWNER, LLC
STONEFIELD BUILDING A=5 LANDLORD WORK
ALBEMARLE COUNTY, VIRGINIA
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
August 9, 2021
A. PROJECT DESCRIPTION AND COMPATIBILITY WITH SURROUNDING AREA AND
ENTRANCE CORRIDOR
The proposed work at building A-5 (the former Pier One store) located at Stonefield
1951 Swanson Drive in Albemarle County, Virginia, is a renovation to the central
structural bay fagade for future tenant improvement work. The purpose of the A
renovation is to unify the whole of the building through a central hierarchical "staple" J 0
element. �
�~ B. EXTERIOR CHANGES AND ADDED OR ALTERED MECHANICAL EQUIPMENT LAJ
Z 0 Q
Existing mechanical equipment is hidden by existing parapet and screening elements —
ranging from 4'-10" to 7'-0" high. New roof top units and kitchen exhaust fans will be O Z
placed within the existing covered area and will not be visible from the Entrance W r �1
Corridor. O Q >
C. LANDSCAPING >M Z
No proposed changes to landscape Q 0
D. LIGHTING W
1_0 Z F—
Existing lighting will remain and no new exterior lighting is proposed am Q 0 Z
'I
E. APPEARANCE OF PROPOSED BUILDING I/ I �1 z O
• All proposed alterations utilize existing materials, colors, and finishes found throughout V Q U
.r the Stonefield development and already previously approved by County ARB. The Z
intention of utilizing the existing, pre -approved materials is to retain the cohesive J
aesthetic already established, and to minimize the observable revisions to the former W
single tenant retail space. =) Lo Q
F. SIGNAGE W W
I Building A-5 at Stonefield is intended to be added to the existing Comprehensive Sign Z
Plan already approved for the other buildings within the shopping center. Individual W
O J
J
tenants will be submitting sign permits to the Albemarle County Architecture Review 0 LL Q
Board for approval to ensure compliance with both the existing CSP and the Entrance y W
Corridor Guidelines for signs. z
'LAIL 41 U 0
oV)
CS.1 COVER SHEET
ISSUE DATE:
June 24, 2019
SHEET # 1 OF 8
I
I I I
I
i
I SWANSON DRIVE
I I
I
CORRIDOR
rr r
/ r '
r I
/ r
/ / r
/ / 0
' I
/ 1
l I I
/
/
i
/
SITE PLAN
B . l 1 „=20'
L
3
n
F-1
O
4
z
�,
O 4-10" and 7'-0" PARAPET WALL (BLUE)
O 5-1" PARAPET SCREENING (GREEN)
O NEW ROOF TOP UNIT (RED)
4O NEW LANDING
Zn
o 0
1
Lij
W LU
0 0
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
August 9, 2021
3imom Im am I
:
V�
�O
W 0
Z 10:�
O
00
QL
J
W
OQ
z
00
W J
W �
Z �
Ow
W
� Z
w ((/) D
Z �
O�
z
�U
w
Lo Q
O"
W
m
Q
SITE PLAN
ISSUE DATE:
June 24, 2019
■
SHEET # 2 OF 8
*NO PROPOSED CHANGES TO LANDSCAPE
I �
ISWANSON DRIVE
I I
n F�z
HYDRAULIC R
ENTRANCE
rr CORRIDOR
r i
r f
o � p
0 � r
i r
� / r
r r
r r
I
� r
r
r
r
i
i I
r I
i
i
LANDSCAPE
C . 1 i "=20'
0
F
im
0
C
Zn
o 0
1
Lij
W LU
in 0
CONTACT: BOB PINEO
TEL:434-806-8365
(E(:bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
August 9, 2021
U�
�O
DC
W 0
Z
3:O
00
� Z
IDC Q
W Lo
am I
OQ
am z
00
W J
W
Z
Ow
LU
Z
044
Z
LLJ V
>Q!�
0:� >
Z
O�
Z
O
Q
�U
LU
Lo Q
O"
LU
Q
LANDSCAPE
ISSUE DATE:
June 24, 2019
col
SHEET # 3 OF 8
Z CL
o 0
J
�Q
N w w>
�w
Cn J
LU ZJ
w Qw
o �F-
Vo
Q J
W
00 =
U
CONTACT: BOB PIN EO
TEL:434-806-8365
(E):bob@designdevelopllc.com
1
ARB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
4
LATEST REVISION
August 9, 2021
aft =A
1 DEMO ELEVATION
J �
E.l 3/16'= 1' >O
W c Q
Z Q:� Z
ow
p >
� QC>
Im J Z �
ODEMOLISH AND REMOVE am 1 O Z
EXISTING DECORATIVE LAP PANEL O Q
1 - - DEMOLISH AND REMOVE EXISTING SIGN. ! 11 L
�, LJ
PATCH AND REPAIR EIFS AS REQUIRED AND
�.J
J PREP.
LU
DEMOLISH AND REMOVE EXISTING CANOPIES
- 2 AND EXTERIOR LIGHTING J
..,� W Q
AREA OF STOREFRONT TO BE DEMOLISHED.
PREP FOR NEW FRAMLESS STOREFRONT SYSTEM W
��
4 WITH DOUBLE AND SINGLE INTEGRAL DOORS.
SALVAGE REMAINING STOREFRONT. 0 w
iiriirrr�7rrTrr i i � i�l
W
r
�#
2 STREET VIEW EXISTING FRONT
E. Nrs ELEVATION
ISSUE DATE:
June 24, 2019
■
SHEET # 4 OF 8
z 0-
0
*VISIBILITY OF ALL MECHANICAL EQUIPMENT SHALL BE ELIMINATED FROM THE ENTRANCE CORRIDOR. J
�Q
Nw w>
�w
~ J
Cn J
FURRED OUT EIFS FACADE ADDITION TO EXISTING FACE W w Z
PAINT NEW FACE AND RECOAT EXISTING COLUMNS Q
w
`n
PAINT SHALL MATCH EXISTING COLOR: Q
PPG DELICATE WHITE #518-1 V)
Q J
w
00 =
I �U
HEW TENANT
CONTACT: BOB PINEO
TEL:434-806-8365
(E):bob@designdevelopllc.com
------------
------------
ARB STAFF REVIEW
1 1 1 1 1 1 1
ORIGINAL
June 24, 2019
\. LATEST REVISION
August 9, 2021
1 SOUTHEAST ELEVATION U
E,Z 3/16"= V-0" PATCH AND REPAIR ANY HOLES J
IN EIFS FACADE FROM EXISTING SIGN; J O
PAINT SHALL MATCH EXISTING COLOR;
PREVIOUSLY SPECIFIED PAINT AND COLOR:
PPG SHARKSKIN #513-5
W c Q
Z 0:� Z
w
0 1
� J Z �
amL9Oz
OQc/,::D
z0
amOQU
Z w
Uj
::D Lr) <Q
W
Z 0 m
0 1_1_I
H E Q
w
Z
UO
O V%
FRONT ELEVATION
ISSUE DATE:
June 24, 2019
E02
SHEET # 5 OF 8
N
zo
c+>
a
Zn
o 0
J
A B C D E �\w wQ
t / �LLi
20' 0" 40'-0" 40'-0" 40'-0" LU W Q � J
. w
��
Q�
w
&(Dx
. _ . — . _ . — . _ . — . _ . _ . _ . _ . — . _ . — i. _ . _ . _ . _ . _ . — . _ . — . _ . _ . _ . _
o
I •
-- -- --- J
I I I
I I I
I I
59' 9 1 /2" 56' 10 1 /4"
6.
I I I
I I I
I I I
I I
I I
I I
I I
i40' 6 3/,V 6,
I I
I I I
I I I
I I
I I
I I
I I
I I
I I
� I I
486'-6" I �486'-6"
Nsi
486'-6" I�
EXTENTS OF PROJECT SCOPE
9.91. ` 1 1' 5 3/4"
6"
21' 8 3/4'
6'
37' 11"
NOTE: DIMENSIONS FROM EXISTING F/ WALL TO F/ FRAMING
CONTACT: BOB PINEO
TEL:434-806-8365
(E(:bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
August 9, 2021
V�
�O
W 0 Q
Z 0:� Z
1 W V
00>Q:�
� QC>
Im J � Z
am O z
OQz::D
�OQO
z�U
oLLJ
C)
W J
:::) Lo <Q
W
W
Z m
O LU I
H LL Q
LU
H Z
O
V
FLOOR PLAN
ISSUE DATE:
June 24, 2019
E03
SHEET # 6 OF 8
2 1 /2" 4' 2„
N
42"
4' 2"
2 1 /2" 30"
3' 0" if 21/2' 4'81/2"
4' 8 1 /2"
2 1 /2" 3' 0"
-
-
o
o
- - -
- - -
a
(V
N
--
--
- - - - - - - - - - - - - - -
- - - - - - - - - - - - - - -
---------- - - - - --
---------- - - - - --
- - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - - - - - - - - -
- - - - - - - - - - -
- - - - - - - - - - -
STOREFRONT + DOOR ELEVATIONS
1 /2" = l'-0"
2 1 /7'
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
TYP. T/ STOREFRONT
_ _8'-0"
-------------------------------------------------------------------------------------------T/DOOR
_ _7'-0"
-------------------------------------------------------------------------------------------T/DOOR
----------------------------------------------------------------------------------------------1-4—
T/ KNEE WALL BASE
-----------------------------------------------------------------------------------------FLOOR SLAB
DOORS & HARDWARE NOTES:
1. FIELD VERIFY ALL CONSTRUCTED CONDITIONS, DIMENSIONS, SWINGS, JAMB THICKNESSES AND QUANTITIES PRIOR TO PLACING ORDER.
2. COORDINATE KEYING REQUIREMENTS WITH OWNER.
3. PROVIDE ALL HARDWARE NECESSARY TO PROVIDE A COMPLETE DOOR AND HARDWARE ASSEMBLY AT EACH DOOR.
4. ALL ENTRY DOORS SHALL HAVE CODE COMPLIANT PANIC HARDWARE.
5. IF IMPACT RESISTANT GLAZING SYSTEM IS REQUIRED BY CODE, LANDLORD SHALL PROVIDE SUCH SYSTEM.
6. LANDLORD WILL PROVIDE ALL NECESSARY WEATHERPROOFING TO DOORS AND SOTRFRONT AS REQUIRED.
STOREFRONT
DESCRIPTION
SF1 CLEAR ANODIZED ALUMINUM FRAMLESS GLAZING SYSTEM. TO BE
MINIMUM 10'-0"TALL WITH CLEAR INSULATED LOW-E GLASS. DOUBLE
ENTRY DOORS ACTING DOOR WITH A SMALL FORMAT
INTERCHANGABLE CORE, KEYED ON ONE SIDE. SINGLE ENTRY ACTING
DOOR WITH A SMALL FORMAT INTERCHANGABLE CORE, KEYED ON
ONE SIDE
1
LJ
w
0
CONTACT: BOB PINEO
TEL:434-806-8365
(E(:bob@designdevelopllc.com
,RB STAFF REVIEW
ORIGINAL PUBLICATION
June 24, 2019
LATEST REVISION
August 9, 2021
U�
�O
W 0 Q
Z ry Z
0 w (D
00>Q:�
H Q n >
� J Z �
am O z
O Q z �
�OQO
z�U
� p J
W J
:::) Lo <Q
W
W
Z I m
O LU
H LL Q
W
Z
DOOR AND WINDOW
SCHEDULE
ISSUE DATE:
June 24, 2019
Fm
SHEET # 7 OF 8