Loading...
HomeMy WebLinkAboutWPO202000043 Correspondence 2021-08-11VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) TRANSFER OF OWNERSHIP AGREEMENT 2019 Permit Coverage Number (VAR10N11110): VAR-10P973 Construction Activity Name: Airport Road Sheetz Section I. Current Construction Activity Operator/Permittee Information. Operator Information as it appears on the current, active permit coverage. Construction Activity Operator Name: Fielders Choice Enterprises, Inc.&-0\Vefm;f; C6frft.+-notjK- Ceivn(onStrutfiMV•wf Contact Person: David Thornton Address: 371 Expansion Drive <-- on permit, correct address Is 158Industrial Way, Suite 203 City, State and Zip Code: Hillsville, VA 24343 <- on permit, correct address Is Troy, VA 22974 Phone Number: 434.962,3573 Primary Email: DThornton@FCE-digs.com on permit CC Email: DThornton@ccg-builds.com preferred "I (We) hereby agree to the transfer of ownership modification to the referenced General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)," Printed Name: Signature: Date: �av�ct "�tornJan Section II. New Construction Activity Operator/Permittee Information. Permit coverage will be transferred to this person or entity. Construction Activity Operator Name (NEW): Sheetz, Inc. Contact Person: Lee May, Engineering/Permit Manager Address: 2708 Mount Olive Court City, State and Zip Code: Mount Airy, MD 21771 Phone Number: 814.552.0609 Primary Email: LMay(Sheetz.com CC Email: "I (We) hereby agree to the transfer of ownership modification to the referenced General VPDES Permit for Discharges of Stormwater from Construction Activities (VAR10)." Printed Name: --- — - Signature: Date: 7- a-8- akn t Rev 04/2019 Page 1 of 2 VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) TRANSFER OF OWNERSHIP AGREEMENT 2019 Section III. New Construction Activity Operator/Permittee Billing Information. This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Leave this section blank if same as the New Operator as identified in Section ll. A. above. Billing Entity Name: Contact Person: Address: City, State and Zip Code: Phone Number: Primary Email: CC Email: May we transmit correspondence electronically? You must choose YES and include a valid emali in order to pay by credit card and to receive your transfer approval letter via email: YES N NO ❑ Section IV. Instructions. A properly authorized Individual as specified in the General VPDES Permit for Stormwater Discharges from Construction Activities (VAR10), Part III K (Signatory Requirements) must physically sign this Transfer of Ownership Agreement. Please retain a copy of this agreement form for your records and Include a copy In your Stormwater Pollution Prevention Plan (SWPPP). Submit this form to the VSMP Authority. If the locality Is the VSMP Authority, please submit your Transfer of Ownership Agreement directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities Is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authorityplease send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructionapC@dea.virainia.aov Carla Harris Community Development, North Wing 401 McIntire Road Charlottesville, VA 22902 charris@albemarle.org Rev 04/2019 Page 2 of 2