Loading...
HomeMy WebLinkAboutARB201700129 Correspondence 2018-12-03 A 1i ` 1 SHIMPi PROJECT MANAGEMENT CIVIL ENGINEERING LAND PLANNING ENGI N EERI:N:Ga 41 December 3rd, 2018 Margaret Maliszewski, County of Albemarle Department of Community Development 401 McIntire Road, North Wing Charlottesville,VA 22902 Regarding: SDP 201700070 HTC Hotel—Comfort Inn—Final Site Plan Dear Ms. Maliszewski, Thank you for your ARB review of the final site plan for HTC Hotel.We have:reviewed and revised the plan per your most recent comments dated November 8, 2018. See below for detailed responses to each of your comments. In reference to Paty Saternye's letter of August 3, 2018: 1. Provide an offsite planting easement to meet the EC landscape requirements. Included is the Deed Of Easement with the adjacent parcel (T.M. 32-41D6), which covers all improvements including landscape.Also please note that the location of the 6 plantings would not be visible from the EC(Seminole Trail)as they are on the far northwestern side of the building. 2. The landscape quantities do not appear to be correct. Ensure that all quantities are shown correctly. There are 43 sweetspire on the plan and 38 in the schedule. After previous updates to the end of the building,the final count of sweetspire is 42.This is reflected on the Landscape Schedule. If there is any confusion or discrepancies on the Landscape Schedule please contact me(434.227.5140). In reference to the requirements outlined by the ARB on October 15,2018: 1. The architectural elevations show brick added to the sides of the new parking area, and a window in the front elevation. However, the floor plan shows piers at the first floor— no wall at the sides. Revise the floor plan to be consistent with the elevations by showing the brick side wall(s)and the added window. Architect has provide floor plans that have implemented wall as seen in elevation. Page 1 of 2 A 2. The depth of the brick beam does not appear to have changed. Increase the depth of the beam. Provide information (i.e., a marked-up sketch, etc.)to clarify the change that has been made. Architect has increased the thickness/depth of the brick beam to be a more substantive architectural element. If you have any questions or concerns about these revisions please feel free to call me at(434)227-5140 or email Peter Russell at peter@shimp-engineering.com and we can discuss any questions that you may have in further detail. Best Regards, Peter Russell Shimp Engineering, P.C. Page 2 of 2