HomeMy WebLinkAboutSDP202100019 Review Comments Major Amendment, Final Site Plan 2021-08-12(Z)
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
Stephen C. Brich, P.E. 1401 East Broad Street
Commissioner Richmond, Virginia 23219
August 12, 2021
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
Attn: Megan Nedostup
Matt Wentland
(804) 786-2701
Fax: (804) 786,2940
Re: SDP-2021-00019 — Southwood Redevelopment — Village 1 — Amendment #1, Review #3
Dear Ms. Nedostup & Mr. Wentland:
The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has
reviewed the above referenced plan as submitted by Timmons Group, dated 30 July 2021, and find the
following:
1. Please remove the parking spaces within the sight line triangle of Block 11. Plan cannot be approved
with obstructions or the ability to obstruct clear view within the sight triangle.
2. "No Parking" signs are required along Horizon road sight line left from proposed Block 10 station
12+00 to 11+00 as shown on sheet C5.08
For additional information, please contact Max Greene at 434-422-9894.
A VDOT Land Use Permit will be required prior to any work within the right-of-way. The
owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at
(434) 422-9399 for information pertaining to this process.
Sincerely,
Adam J. Moore, P.E.
Area Land Use Engineer
Charlottesville Residency
VirginiaDOT.org
WE KEEP VIRGINIA MOVING