Loading...
HomeMy WebLinkAboutSDP201300062 Other 2013-12-12 f SDP201300062, AT&T CV310 Meeting: 12/12/2013 Attending: Brent Nelson (BN) Estee Williams Gordon Nichols(GN) Applicant wanted to know if replacing existing tower(same location)with a tower of the same height could be considered a replacement(no Tier II review)—answer was no because of residence under separate ownership within 500'—also because of fall zone within VDOT right-of-way. BN—provided a memo outlining the need for a response letter indicating how and where the issues have been addressed in the resubmittal. BN—need to include the AMSL height of the existing tower in the resubmission. GN—will probably aim to meet the December 30, 2013 submittal deadline. ES—asked who did the balloon test? He had never attended one. Applicants did not understand the difference between datum and benchmark. BN—pointed out the need to email MM with a request to defer the ARB review.