Loading...
HomeMy WebLinkAboutWPO201800025 Bond Estimates 2019-01-31 Crozet Water Treatment Plant Expansion WPO file number:WP0201800025 TMP(s):05700-00-00-010A0,05700-00-00-029B0 Date Estimate Completed: 01/31/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) stablization(PS,TS) 0.5 acres $5,000 00 $2,500 00 silt fence(SF) 2000.0 ft $5 00 $10,000 00 tree protection(TP) 280 0 ft $5 00 $1,400 00 diversion(DD,FD,RWD) 0 ft $13 00 $0 00 temporary slope drain(TSD) pipe length 111111F0 ft pipe diameter 0 in $0 00 $0 00 earthwork for trap/basin height of dam at toe `ft cut at high side 0 ft height of fill at face ft cut at face ft length of dam ft length of cut ft top width ft width of cut ft (area above transition 0 sf (area below transits 0 sf (total width of darn) 0 ft (total width of cut) 0 ft (height below transitio 0 ft (depth below transit 0 ft (area below transition' 0 sf (area above transits 0 sf (tote'" volume) 0 0 cy (total fill volume) 0 0 cy length of spillway ft (TOAL CY estimate 0 cy $13 00 $0 00 width of spillway ft (spillway stone tons 0 tons $50 00 $0 00 structures for basin riser height ft riser diameter III in f❑ser unit price) $0 00 $0 00 barrel length ft base plate or fin $200 00 $0 barrel diameter in (barrel unit price) $0 00 $0 00 barrel collars $200 00 $0 baffle length ft $50 00 $0 silt fence inlet protection(IP) $100 00 $0 00 stone inlet protection(IP) ■ $200 00 $800 00 outlet protection(OP) length 0 ft width ft $0 00 $0 00 channel(SCC,matted) length 0 ft width ft $0 00 check dam depth in channel O ft channel width ft $0 00 $0 00 construction entrance(CE) $2,500 00 $5,000 00 wash rack $2,000 00 $4,000 00 paved construction entrance $3,500 00 $0 00 rip-rap,placed depth Oft length IMIRP ft width 0 0 $60 00 $0 00 survey and layout(price per 0 1 mi) acres 0 traps and basins ii $0 00 mobilization $2,500 00 stream crossing(computed independently) $0 00 cost sum $26,200 00 contingency $2,620 00 1/31/2019 Crozet Water Treatment Plant Expansion WPO file number:WPO201800025 TMP(s):05700-00-00-010A0,05700-00-00-029B0 Date Estimate Completed:01/31/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number Jinstalled) Total $28,820 1/31/2019