APRIL 9, 1996
The Albemarle County Planning Commission held a public hearing on Tuesday, April 9,
1996, in the County Office Building, Charlottesville, Virginia. Those members present
were: Mr. Bill Nitchmann, Chairman; Ms. Babs Huckle, Ms. Hilda Lee -Washington; and
Mr. Jared Loewenstein. Others officials present were: Mr. Wayne Cilimberg, Director
of Planning and Community Development; Mr. Ron Keeler, Chief of Planning; Mr. Ron
Lilley, Senior Planner; Mr. Larry Davis, County Attorney; Mr. Greg Kamptner, Assistant
County Attorney; and Mr. Bob Tucker, County Executive. Absent: Commissioners
Dotson, Finley and Tice.
For the first agenda item (ZMA-95-04), a joint public hearing was conducted with the
Board of Supervisors. Those Supervisors present were: Ms. Charlotte Humphries,
Chair; Ms. Sally Thomas; Mr. David Bowerman; Mr. Charles Martin; Mr. Forest
Marshall; and Mr. Walter Perkins.
At 7:00 p.m. Mr. Nitchmann called the Planning Commission meeting to order and
established that a quorum was present. Ms. Humphries called the Board of
Supervisors meeting to order at 7:00 p.m. and established that a quorum was present.
---------------------------------------------------------
ZMA-95-04 The University of Virginia Real Estate Foundation - Petition to rezone
approximately 525 acres from RA, Rural Areas, PD-IP, Planned Development Industrial
park, R-1, Residential and LI, Light Industrial to PD-IP, Planned Development Industrial
Park. This request also includes the following special use permits: SP-95-40 -
Laboratories, medical or pharmaceutical (27.2.2.1; 29.2.2.1); SP-95-41 Supporting
commercial uses (27.2.2.14, 29.2.2.1) SP-95-42 - Hotels, Motels, Inns (29.2.2.2).
Property, described as ax Map 32, Parcels 4B, 6, 6A, 19 and 19C, is located south of
the North Fork Rivanna River between Routes 29 and 606 in the Rivanna Magisterial
District. This site is recommended for Industrial Service in the Community of
Hollymead.
Commissioner Loewenstein read a Transactional Disclosure Statement, a copy of
which is made a part of this record as Attachment A.
Mr. Keeler presented the staff report. The report concluded: "The University Real
Estate Foundation has responded to the County with four proffers that control in one
fashion or another the timing/intensity of development. Three proffers are easily
monitored during site plan review. The proffer related to water consumption would be
ongoing and would apply to expansion/change of process of an existing business as
well as to a new use. While Proffer III -Density does not preclude the possible location
jW
VAO
4-9-96 2
of a large industry or the expansion of an existing industry to a large scale, it does
provide for an annual limit to development."
Mr. Nitchmann noted that the applicant had requested this public hearing after realizing
errors had occurred in the posting of the signs on the property prior to the previous
hearing. The applicant has also revised previous proffers to address concerns which
were raised at the prior hearing.
The applicant was represented by Mr. Leonard Sandridge, Executive Vice President of
the University of Virginia and a member of the Board of the University Real Estate
Foundation and by Mr. Tim Rose, Chief Operating Officer for the UREF. Mr. Sandridge
stressed that the applicant has, throughout this process, made every effort to respond
to issues raised by the Commission, the Board and the public. He said he believed this
applicant has gone well beyond any other to ensure the quality of the development of
this project. He thanked the Commission and the Board for their patience in hearing
this item again and for their willingness to respond to additional information. Mr. Rose's
comments included the following:
--He called attention to a letter which the applicant had written to the Lake Acres
residents, in which UREF explained how it will respond to their concerns. He presented
a copy to Ms. Ella Carey, Clerk of the Board of Supervisors, and asked that it be placed
in the County Clerk's file.
--Because of the new phasing proffer--" 500,000 sq. ft. the first year, 200,000 sq.
ft. each year thereafter" --the applicant feels the proposal is even more favorable than
that which was already approved by the Commission in December.
--"The Planning Staff and County Attorney's office have researched our
proposed proffers and prepared a summary report which shows that our proffer
statement represents a significant contribution by the University of Virginia Foundation
over and above that which could be required by the County. The Planning staff has
reported that this application provides 4 proffers to control the timing and intensity of
development, which are concerns of this community. The Planning Staffs reported
research shows that a variety of factors make the prospect of a large relocation to the
North Fork Park very unlikely. In every step of the process we have tried to address
concerns raised by various constituencies.... We have incorporated changes into our
proffers that were based on concerns of the Piedmont Environmental Council. We
added proffers regarding the fire station, hazardous materials handling, water usage
restrictions and development density phasing to address concerns expressed by the
previous Planning Commission, the Board of Supervisors and citizens who have been
at these meetings. We have closely followed the recommendations of the
Comprehensive Plan in correcting this application. The Planning Staff, in Section 4 of
its November 21, 1995 report to the Planning Commission concluded that: 'Staff
opinion is that the North Fork Rezoning proposal substantially complies with the ,
detailed amendments of the Comprehensive Plan under CPA 94-1.'
4-9-96
--Approval of this plan does not mean the North Fork will build out overnight. It is
envisioned to be a 20 to 30 year project. Given the density phasing proffer, the buildout
could not occur sooner than 14 years from the date of the rezoning approval.
--"The restrictions associated with this application provide significantly more
assurances to the Community as to how development will proceed, than development
under the currently zoned 225 acres, which has a by -right potential of nearly 7 million
square feet, and very few proffers to guide the quality or pace of development."
--"North Fork will be developed by the University, an entity with probably the
biggest single stake in this community and this region, which will ensure that its
commitment to North Fork's success will always remain."
Public comment was invited.
Speakers who expressed support for the proposal included the following:
--Attachment B: Brian Carlson, past Chairman of the Chamber of Commerce and
Regional Vice Chairman for State Farm Insurance Company: He praised the applicant
and the proposal and stressed the many community benefits which are the result of the
presence of a quality employer.
--Attachment C: Ronald Flack, Chair of the Mechanical, Aerospace and Nuclear
Engineering Dept. of the University of Virginia - He supported the proposal.
--Tom Jackson, present Chairman of the Charlottesville/Albemarle Chamber of
Commerce - On behalf of the 1,200 members of the Chamber of Commerce, he asked
that the County support the applicant's proposal.
--Angus Arrington - He supported the new jobs that will result from this
development.
Speakers expressing concerns or opposition to the proposal were as follows:
--Tim Lindstrom, representing the Piedmont Environmental Council - Though not
expressing opposition, he made the following comments and listed the following
concerns:
-The 3,000,000 sq. ft. proffer is "substantive" and is one which could not
be required by the County
--The 200 acres of open space is a "substantial" proffer, though over one-
half of that is in critical slopes and floodplain and could not be developed under
County ordinances.
--The ball fields and the fire station are "substantial" proffers.
--The transportation proffers are "more questionable." Many of the items
proffered are things which the County could require under existing ordinances.
The County Attorney's and staffs analyses of these proffers are accurate.
--He urged the Commission and the Board to view the proffers in terms of
the "impact this proposal will have on the community and decide whether you
75
4-9-96
think there is a substantial enough benefit associated with this rezoning
application to justify accepting the proposal on its face."
— "(PEC's) concern is with the amount of development that these proffers
and this rezoning will allow to happen at one time. The applicant has said they
anticipate this development will occur over a 20-year period. If, in fact, the
zoning ensured something along those lines of a phasing, then I don't think the
PEC and any citizens would have any concern with the proposal on the table.
The problem is the proffers and the zoning do not limit the phasing in that way."
--Two proffers, which deal with the amount of development that can
happen at one time, are of concern:
(1) That which puts a cap on water usage of 125,000 gallons
per day per user. (For comparison State Farm uses 60,000-70,000 gpd
and GE uses 30,000-40,000 gpd.) The proffer would allow a number of
different users, all of whom could have up to 125,000 gpd. Therefore, the
water cap is not particularly effective.
(2) That dealing with square footage which limits amount
annually to 500,000 sq. ft. first year and 200,000 sq. ft. each year
thereafter. What is not used each year may be carried forward and
accumulated. This is "a significant increase over what has been the
previous experience of the community." "This proffer is not meaningful in
terms of limiting the amount or the size of a facility which could be built in
one year and our fear is turning off from the public's review the decision
about something that significant." To address this concern Mr. Lindstrom
proposed that the Commission adopt a Resolution of Intent to amend the
Zoning Ordinance so that for uses which are single users of significant
size (possibly more than 50,000 to 75,000 sq. feet) a special permit would
be required; below that size would be by -right. See Attachment D.
--PEC has no doubts about the intent of this applicant, but does have
concerns about what may occur in the future with different owners. "There is no
guarantee that some future owner will not have a substantially different concept
of what is appropriate for this community."
--"There is a concern that has been expressed to me that if you take this
step to propose a zoning text amendment or ask for more substantial proffers on
phasing, the UREF will walk --that they will drop this project. That will leave you
with half of this property zoned for Planned Development Industrial Park and the
other half for Rural Areas. I would suggest to you that you look at this proposal
and you analyze what the county and the public is getting for that, and the
development potential of the southern half. I would submit that that is not a risk I
would advise you to take in a flippant manner, but it is a risk that should be
considered taking in view of the substantial impact to the community's changing
character that this proposal could visit upon the community because there is no
n
4-9-96 5
meaningful limit on the amount of development that can be realized in any one
year. That is the heart and soul of our concern."
--Attachment E: Kathryn Hobbs, League of Women Voters - Their main concern
was "the impact of this project ... on the infrastructure necessary for water supply and
sewage treatment and disposal for the whole Charlottesville/Albemarle County urban
area."
--Attachment F: Larry Taylor, a resident of the Lake Acres community - He
hoped the county would "slow down the rate of growth and expansion" in the county.
He asked that the county study the impact this type of project has had on communities
in other areas.
--Charles Tractor, representing the Woodbrook Neighborhood Association - He
expressed concerns about impact on schools and water. He invited the applicant to
hold public meetings.
--Lisa Harmon, President of the Earlysville Area Residents' League - She
expressed concerns about the cumulative water use for the entire park and the
cumulative square footage, which she feared were not being considered. She also
thought the definition of "user" should be clearer.
--Attachment G: Karen Dame, Citizens for Albemarle - Her comments focused
on the impact of increased population on the resources of the County.
-- Attachment H: Tom Olivier - He cautioned the County to review the proposal
carefully and "approve it only after we are convinced it is right."
--Paul Grady - He expressed concerns about road plans and whether or not
VDOT will make Rt. 29 a limited access highway. He thought approval should be
deferred until highway plans are definite.
There was no further public comment.
Ms. Humphries asked staff to respond to a question raised in a letter she had received,
i.e. is the drinking water supply intake for North Fork below the stormwater dumping
area for the UREF Park? Mr. Glen Brooks, representing the County Engineering
Department responded by pointing out the location of the intake area on the plan. He
explained: "The applicant is proposing to channel the runoff past the intake, with a
small section next to Jacob's Run draining to the North Fork Rivanna, but not a
significant portion." Mr. Dean Sincala, representing the applicant, also addressed this
question. He called attention to Section 12 of the application and a Table which shows
how the applicant proposes to mitigate the impact on the raw water intake. He said
there are 3 acres "of developed, vegetated fill slope that will actually flow into the raw
water intake. Everything else is redirected into the master stormwater management
system and ultimately into the North Fork below the raw water intake."
The public hearing was closed at 8:10 p.m.
%s
4-9-96 6
It was the decision of the Commission to delay discussion of this item until April 23rd.
MOTION: Mr. Loewenstein moved, Ms. Huckle seconded, that discussion of ZMA 95-04
be deferred to April 23, 1996. The motion passed unanimously.
The Board offered no comment. Ms. Humphries adjourned the Board meeting to April
10, 1996 at 7:00 p.m.
---------------------------------------------------------
The meeting recessed from 8:05 to 8:15.
The minutes of the March 26, 1996 meeting were unanimously approved as submitted.
SP-96-10 Gateway Partnership, XXI, LP - Proposal to establish a motel on
approximately 1.9 acres zoned PUD, Planned Unit Development [20.4.2(1)]. Property,
described as Tax Map 61Z, Section 3, Parcel 10 is located on the east side of Hillsdale
Drive opposite Branchlands Boulevard in the Rio Magisterial District. This site is
recommended for Medium Density in Neighborhood 2.
The applicant was requesting indefinite deferral.
MOTION: Mr. Loewenstein moved, Ms. Huckle seconded, that SP-96-10 be indefinitely
deferred. The motion passed unanimously.
SP-96-08 Dr. Charles H. Wood, Jr. - Proposal to establish a veterinary office and
hospital for small animals in an existing building at Airport Plaza. Property, described
as Tax Map 32, parcel 38, is located at the northwest corner of Rt. 29 North and Airport
Road (Rt. 649), in the Rivanna Magisterial District. The property is zoned C-1, and is
designated for Regional Service use in the Hollymead Community.
Mr. Lilley presented the staff report. Staff recommended approval subject to conditions
The applicant. Dr. Wood, offered to answer Commission questions.
Public comment was invited.
Mr. Roger McNamara, Pastor of the church which will share the lower floor of the same
building, addressed the Commission. He expressed concerns about animal droppings 04
in the parking lot, possible odor within the building, the disposal of dead animals, and 1000
possible flea infestation within the building.
7�
4-9-96
There was no further public comment.
Dr. Wood addressed Mr. McNamara's concerns. He said the parking lot area will be
cleaned three times daily --morning, noon, and evening --and will be sprayed so as to
eliminate odors. Wastes will be bagged and removed by trash disposal service. The
offices will be vented to the outside but air is filtered before it leaves the building. The
building will be sprayed monthly for insects. (He offered to spray the church area more
often if a problem should occur.) Deceased animals are placed in a freezer until they
can be picked up and disposed of by the SPCA. No animals will be boarded overnight
at the facility. The area to be occupied by the veterinary operation is only 10% of the
total floor area which is above the church.
Mr. Nitchmann asked staff if any County ordinances address any of the concerns raised
by Mr. McNamara. Mr. Lilley said the Planning Department does not deal with these
issues. However, the applicant will have to meet Building Code regulations in terms of
ventilation, etc. He noted that the Health Department expressed no concerns about the
use.
Dr. Wood noted that the State Board of Veterinary Medicine must approve the proposal
�%w and will inspect the facility every two years. State regulations address issues such as
water and ventilation. This is a "tightly regulated" use.
MOTION: Ms. Washington moved, Ms. Huckle seconded, that SP-96-08 for Dr.
Charles H. Wood, Jr. be recommended to the Board of Supervisors for approval subject
to the following conditions:
1. The building plans for renovations shall provide for sound attenuation to the
adjoining space such that sound levels from this use will not exceed 40 decibels.
2. This use shall have no outdoor runs or pens.
3. Fencing shall be maintained adjacent to the agricultural/residential property to the
rear of this property (Parcel 39).
The motion passed unanimously.
SP-96-13 Robert Aaron - Proposal to enlarge an existing dam and pond located within
the 100-year floodplain [Zoning Ordinance Section 30.3.5.2.1.1]. Property, described
as Tax Map 65, Parcel 7, is the present Kinloch Farm, located on the western side of
`,, Route 231, about 1 /2 mile north of Cismont in the Rivanna Magisterial District. The
7%
4-9-96 8
property is zoned RA, Rural Areas, and is not located within a designated Growth Area
(Rural Area 2).
Mr. Lilley presented the staff report. Staff recommended approval subject to conditions.
The applicant was represented by Kurt Gloeckner, engineer for the project. He said the
proposal is to replace an existing dam with a larger one and will not change the
floodplain significantly.
Mr. Loewenstein asked why the proposed dam is 4 or 5 times larger than the existing
dam. Mr. Gloeckner said if the dam were replaced at the same size, the pond will silt in
again. Also, the applicant wants to use the pond for irrigation purposes. The size of
the pond will increase from 1 1/2 acres to 7 acres. The dam will fall within dam safety
regulations which allow 100 acre feet of storage. Mr. Gloeckner confirmed there will be
no impact to the downstream floodplain.
No public comment was offered.
There was no further Commission discussion.
MOTION: Ms. Huckle moved, Mr. Loewenstein seconded, that SP-96-13 for Robert
Aaron, be recommended to the Board of Supervisors for approval subject to the
following conditions:
1. Albemarle County Engineering approval of hydrologic and hydraulic computations.
2. Albemarle County Engineering approval of plans for the dam showing all grading
activities and the existing and revised floodplain.
3. Albemarle County Engineering approval of an erosion control plan.
4. Albemarle County Engineering receipt of proof of compliance with dam safety
regulations through the Virginia Department of Conservation and Recreation.
The motion passed unanimously.
--------------------------------------------------------
Humagen Site Plan - Request for increase in maximum grade of access aisle -
[Modification of Section 4.12.6.3(b)].
Mr. Keeler presented a brief staff report. He explained the relocation of the entrance by
VDOT had resulted in the need for this modification. The report stated: "During review
7q
4-9-96 9
of final grading and drainage plans and computations, the Engineering Department
commented on the 16% grade in the access road and need for approval of this
modification by the Planning Commission. Engineering supports the 16% grade as it is
the allowable grade for public roads meeting mountainous terrain standards. Moreover,
there does not appear to be any way to achieve a 10% grade without necessitating
substantial regrading of the site or sacrificing the 4% entrance landing."
Mr. Loewenstein asked if there was sufficient room for a service -type vehicle to
manuver without getting hung up on the grade. Mr. Keeler responded: "It meets the
requirement of our Ordinance." Mr. Glenn Brooks, representing the County
Engineering Department added: "Actually for change in grade our ordinance does not
address private travelways. We assure that it won't cause a problem on the public road
by setting it back at least 40 feet. But the change of grade on the travelway within the
site --say if they drag their bumper --is not something we regulate."
There was no public comment.
MOTION: Ms. Washington moved that a modification of Section 4.12.6.3(b) be granted
to Humagen Diagnostics to allow maximum grading of access driveway off of Hunters
`4w Way to exceed 10%. Ms. Huckle seconded the motion.
The motion passed unanimously.
There being no further business, the meeting adjourned at 9:10 p.m.