Loading...
HomeMy WebLinkAbout08 04 2009 PC MinutesPC M no �0 5 -- 8 - � -U0 9 COUNTY OF ALBEMARLE 4 ' Creating and Department of Planning & Community Development Connecting 401 McIntire Road, Room 218 • Communities Charlottesville, Virginia 22902-4596 in Northern Albemarle (434) 296 - 5832 Fax (434) 972 - 4035 MEMORANDUM TO: Albemarle County Planning Commission FROM: David Benish, Chief of Planning SUB]: Southern Expansion Area, Hollymead Community DATE: August 4, 2009 Background: The Commission requested that staff develop recommendations for a possible expansion of the Hollymead Development Area between the current southern boundary west of US 29 and the South Fork of the Rivanna River. This area had previously been recommended for expansion by the Places29 consultant and staff to: 1) encourage participation in the construction of Berkmar Drive extended, and 2) take advantage of the existence of the new road in this location to serve long term land use needs. In the first draft of the Places29 Plan, the consultants stated the following: This expansion area is related to the proposed extension of Berkmar Drive to Meeting Street in Hollymead Town Center. The cost for this transportation improvement is expected to be significant and will require a combination of public and private funding ... An alignment of Berkmar Drive Extended through the Development Area would likely offer more incentive for a development to finance this new road, and the new road would need to serve the new development around it... The previous expansion area recommended by the Places29 consultant consisted of almost 200 acres and was designated for a combination of Urban Density Residential (70 acres), Neighborhood Density Residential (90 acres), Neighborhood Service Center (10 acres), and Semi -Public Open Space (20+acres). The selection and distribution of these land uses "reflected the community's desire to maintain an appearance of the forested stretch of US 29 and to facilitate a transition from the high intensity of the Hollymead Town Center to the open space at the South Fork of the Rivanna River." This area had also been the subject of a public request to amend the Land Use Plan to include a Destination Center, "mixed use" and "residential area" land use designations in this area. This request was considered as part of the review and development of the Places29 Plan. The Commission recommended removing the expansion area proposed by the consultant and staff from the proposed Future Land Use Map and also did not support the public request for expansion. cm Places29: Southern Expansion Area, Hollymead Community, August 04, 2009 2 Attachment A is a revised version of the Future Land Use map that incorporates the proposed expansion area. Attachment B provides the potential language to be added to Chapter 4 if the *40 Commission decides to recommend the expansion area. Character of the Area: The area is mostly wooded and consists of rolling terrain. There is a higher concentration of critical slopes in the southern portion of the area, running along US 29 to the east and Rio Mills Road at the south and west edges of this area. The proposed southern boundary for the expansion area is located so as to exclude most of this critical slope area. There are several intermittent stream valleys and swales in the area, but there are no major perennial streams within the proposed expansion area. There is no existing development (homes, businesses, etc.) except for a radio transmission tower and cell phone tower site. One subdivision, Templeton Hills, and several other single family homes are located on Rio Mills Road adjacent to the northwestern boundary of the expansion area. New Expansion Proposal: The new expansion proposal consists of approximately 140 acres. The recommended Land Use designations are: • Neighborhood Density Residential (87 acres) • Neighborhood Service Center (10 acres). • Urban Mixed Use (34 acres) • One large format store up to 120,000 sq. ft. allowed in Urban Mixed Use area The new expansion proposal differs from the earlier expansion proposal in the following ways: • Less total area designated (140 acres vs. 190+ acres) • Replaces Urban Density Residential (UDR) (70 acres) with Urban Mixed Use and Neighborhood Density Residential (NDR) uses. • The large format retail store was not permitted in the earlier expansion concept. • Lowers the intensity of use in the area that is within in the existing Development Area just north of the expansion area (from NDR and UDR to Industrial Service and NDR) The recommendations for the Urban Mixed Use part of the expansion area would allow for one large -format retail use (big box store). Staff believes that the mix of uses permitted in the Urban Mixed Use land use designation, along with ability to locate a large retail use, create a greater ability for future development within this area to contribute significantly to the necessary infrastructure improvements. In addition to the new expansion area, staff is recommending that land uses be changed in the area just north of, and abutting, the expansion area. Staff is recommending that xx acres of land located west of Berkmar Drive Extended be changed from Neighborhood Density Residential to Light Industrial. The area between Berkmar Drive Extended and US 29 is also being recommended for a change from Urban Density Residential to Neighborhood Density Residential. Staff believes that these changes will reduce the amount of traffic generated from Places29: Southern Expansion Area, Hollymead Community, August 04, 2009 3 this area and provide a greater opportunity for industrial uses to locate near a major road '�Imw corridor. Transportation Impact of the Expansion Proposal: Staff does not have the capability to model the new expansion area proposal, and the transportation consultant is no longer under contract. However, traffic impacts from the expansion area are already included in the traffic modeling for Places29, based on the first expansion area proposal. The development anticipated from the previous expansion area concept could be accommodated in the recommended road network. On balance the proposed expansion will have a comparable impact as the previous expansion area proposal given the reduction in size of the expansion area and changes in land use designations in, and immediately adjacent to, the expansion area. The most significance difference in traffic impacts between the two expansion concepts would be from the introduction of the large format retail building. This use would be limited to 120,000 square feet in size and would potentially generate 6700 to 8500 vehicle trips per day. Large format uses of this size typically locate on sites of 12 to 15 acres. The same 15 acre site, if designated Urban Density Residential as recommended in the previous expansion proposal, would generate 600 to 3400 vehicle trips per day. Specific transportation/traffic impacts will be identified through the required traffic study and modeling for any proposed development in the area. Those impacts will be addressed through the phasing of rezoning actions (approvals) concurrent with the provision of the necessary infrastructure/road improvements to ensure that development does not take place until needed improvements are in place. Development Expectations: The expansion area is not within a recommended Priority Area for development in the short- term. New text to be included in Chapter Four of the Places29 Plan would state that no development should take place in this expansion area until a number of improvements are made to the transportation network. There are additional recommendations regarding expectations for physical development of the area. Staff has provided following comments regarding these recommendations: One large -format retail use is permitted within the Urban Mixed Use area. The size is limited to 120,000 square feet. This is consistent with the typical intermediate size big box retail stores, but is larger than the 1001000 sq. ft. limit established in the approval of the zoning map amendment for the North Pointe Development. Recommendations have been included which encourage the form of the big box development to be less conventional in nature and more in keeping with the expectations of the Neighborhood Model. This language is similar to the Comprehensive Plan recommendations for the Albemarle Place and Hollymead Town Center areas. Wooded buffers are recommended along US 29 to provide a break from the otherwise uninterrupted pattern of urban development from the city limits to NGIC. This is consistent with the current recommendation of the Comprehensive Plan for this area between the South Fork of the Rivanna River and the current Hollymead boundary. The current Plan states: Places29: Southern Expansion Areal Hollymead Community, August 04, 2009 4 The area between the southern boundary of the DA [Hollymead] and South Fork Rivanna River is to remain in an open state as a buffer between the UA and ' Community of Hollymead. This boundary is critical as it preserves the distinct identity of the Community from the Urban Area and prevents continuous development from Charlottesville to the North Fork Rivanna River. (p.79, Hollymead Community Profile) The expansion of the Industrial Service designation just north of the proposed expansion area will provide a larger Industrial Service area with frontage on Berkmar Drive to support the community's industrial needs. The recommendations for the expansion area encourage Office/R&D/Flex and space for contractor services be provided either in the expansion area or this area. Some of the properties in both of these areas are in common ownership. Recommendation: The Commission should provide staff direction on the attached expansion area addition to the Places29 Master Plan. Should the Commission recommend including the expansion area in the Master Plan, staff will revise the appropriate pages and maps in the master Plan prior to distribution to the public for review. ATTACHMENTS: Attachment A — Future Land Use Map, with Proposed Expansion Area Attachment B — Proposed Text Amendment, Chapter 4 Places29: Southern Expansion Area, Hollymead Community, August 04, 2009 5 ATTACHMENT B PROPOSED TEXTAMENDMENT, CHAPTER 4: [Text to be added to Chapter 4, p. 4-16 (to the end of the "Key Subareas of the Land Use Plan" section, which begins on page 4-11.1 Hollymead Southern Expansion Area The newly expanded portion of the Hollymead Community is located west of US 29 approximately 2000 feet north of Rio Mills Road, east of the critical slopes and stream adjacent to Rio Mills Road, and south of an unnamed stream. This area is to the east of the Templeton Hills Subdivision located off of Rio Mills Road. This area consists of approximately 140 acres of rolling terrain, with wooded and open areas. Existing development consists of radio and cellular communication towers. This expansion of the Hollymead Community is related to the proposed extension of Berkmar Drive north across the South Fork Rivanna River to Meeting Street in the Hollymead Town Center. The cost for this improvement is significant and will require a combination of public and private funding. The Master Plan expands the Development Area and designates urban uses along the alignment corridor for Berkmar Drive to support the development of the road. An alignment for Berkmar Drive through a Development Area (as opposed to a Rural Area) will create more opportunities and incentives for new development to finance the new road, and the road would be necessary to support the new development around it. The selection and distribution of the land uses within the expansion area reflect the community's desire to maintain the appearance of the forested stretch of US 29, and to facilitate a transition from the high intensity of the Hollymead Town Center to the open space at the south end of this corridor and along the South Fork of the Rivanna River. A Neighborhood Service Center designation is provided, surrounded by an Urban Mixed Use designation that would permit a single large -format retail store as an additional incentive for development to finance the road. It is important that commercial development (Neighborhood Service Center/Urban Mixed Use) be oriented primarily to the side street(s) and Berkmar Drive and not directly to US 29 in order to avoid replicating the commercial strip development pattern currently prevalent along the US 29 corridor. VDOT's access management regulations and the Access Management Plan component of Places29 will also guide access decisions in this area. Expectations for development within this expansion area include: • Within the Urban Mixed Use area, one large -format (big box) retail use of up to 120,000 square feet may be constructed, provided it is developed in a manner otherwise consistent with design/development expectations for the Urban Mixed Use designation. If no large - format retail use is developed, the area designated Urban Mixed Use should retain the character described in the definition of that designation. • The large -format retail building should adhere to the following guidelines for the purpose of creating an appropriate streetscape: —The building's facades and rooflines should be of visual interest and should reduce the massive scale and the uniform, impersonal appearance of such large buildings. Places29: Southern Expansion Area, Hollymead Community, August 04, 2009 6 —The building should have architectural features and patterns at a pedestrian scale to provide visual interest, reduce massive aesthetic effects, and recognize local character. These elements should be integral parts of the building fabric and not applied trim, graphics, or paint. —A large building's design should integrate small liner stores with entrances onto the sidewalk in order to break up the fagade of the larger user. —The large building's location should be integrated with other buildings and site features to encourage a more pedestrian -friendly composition. —All large buildings should present at least a two-story elevation to the streetscape. —Loading docks, trash collection facilities, outdoor storage and related facilities should be incorporated into the building design or site to limit visibility. • Retail uses within the Neighborhood Service Center should be those neighborhood scale uses typically expected in such a Center (see Land Use Table 1). • Office/R&D/Flex and space for contractor services are encouraged to be provided within or near (north of) the Urban Mixed Use area. • All development, including the Neighborhood Center and Urban Mixed Use area, should be primarily oriented to Berkmar Drive and/or the east -west connecting road(s) from US 29 to Berkmar Drive. • Access to all development within the Expansion Area, including the Neighborhood Service Center and the Urban Mixed Use area should be provided from Berkmar Drive and/or the planned perpendicular roads (consistent with the recommendations of the Access Management Plan). No new commercial entrances should be constructed on US 29 to serve individual properties or developments. • Provision of public active recreation space (playfields/practice fields) in this area should be considered to meet the larger community needs. • A wooded, naturalistic buffer along US 29 from Rio Mills Road to the southern edge of the Hollymead Town Center development should be provided to avoid or minimize the appearance of uninterrupted urban development from the City to northern end of Piney Mountain. This expansion area is not within a Priority Area for public capital investment and land use activity. Approval of any development within this new DA expansion area, as with other lands within the non -priority areas, will be predicated on the completion of a number of transportation and infrastructure improvements needed to support development in these areas. These improvements include: • The widening of US 29 to six lanes total between the South Fork Rivanna River and the existing six -lane section near Hollymead Town Center, including the grade separation/jug handle road system at US 29 and Ashwood Blvd. • The extension of Berkmar Drive north across the South Fork Rivanna River to Meeting Street in the Hollymead Town Center. • The construction of the east -west road from US 29 to Earlysville Road. • The construction of a road connecting Rio Mills Road to Berkmar Drive Extended. • All of the above improvements are needed to better distribute traffic generated from within this Expansion Area to various roads in the transportation network and to minimize the impact to US 29. Places29: Southern Expansion Area, Hollymead Community, August 04, 2009 7 Provision of an easement for the upgrade to the RWSA water distribution line to serve the �,. Hollymead and Piney Mtn. Development Areas. The easement is expected to run approximately adjacent to Berkmar Drive Extended and must be acceptable to RWSA. 8-4 version -desktop on m