HomeMy WebLinkAboutSUB202100082 Bond Estimates 2021-08-24Project Name: Final Subdivision Plat - Dunlora Park, Phase II Plan number: SUB202100082 TM P (s): 06100-00-00-165 RO Date Estimate Completed: 7/27/21 (CE); chkhy1A tnlbemade st„i2, ; rev. 8/24/21 Road and Infrastructure Construction Bond Estimate (reads, site work, storm sewer) Item No. Unit Unit Cost Cost (installed % compete cost remaining Road Name: Lindley Lane - Note: this is an alley ; bond is not required for an alley Begin station 10+00.00 End station 14+04.00 , road length 0.0 ft 1 aggregate base 8.0 in d 0.0 ft L 20.0 ft W 0.0 ton $35.00 $0.00 0% $0.00 2 blotted or primeMouble seal 0.0 ft L 0.0 ft W 0.0 sy $10.00 $0.00 0% $0.00 3 asphalt base 0.0 in d 0.0 ft L 0.0 ft W 0.0 tons $100.00 $0.00 0% $0.00 4 asphalt surface 2.0 in d 0.0 ft L 20.0 ft W 0.0 tons $120.00 $0.00 0% $0.00 5 curb CG-2 0.0 ft $13.00 $0.00 0% $0.00 6 curb CG-6 0.0 ft $15.00 $0.00 0% $0.00 7 sidewalk, concrete (6) 250.0 ft $17.00 $4,260.00 0% $4.250.00 8 ramp CG-12 3each $350.00 $1,060.00 0% $1,050.00 9 street name sign 1 each $200.00 $200.00 0% $200.00 10 traffic control sign 1 each $200.00 $200.00 0% $200.00 11 Street Landscape 10 Each 10 each $275.00 $2,750.00 0% $2,750.00 12 guardrail 0 ES @J 3000 0.0 ft $17.00 $0.00 0% $0.00 13 drop inlet or grate 1 each $3,500.00 $3,500.00 0% $3,500.00 14 standard manhole frame top (not inlet) 1 each $500.00 $600.00 0% $500.00 15 manhole structure (per ft. rise) 15 ft $450.00 $6,760.00 0% $6,750.00 16 pipe, rcp, cmp (15 to 4n 15.0 in d 0 ES-1,2 0 EGi 170.0 ft $35.00 $6,960.00 0% $5,950.00 17 pipe, rcp, cmp (15 to 4n 24.0 in d 0 ES-1,2 0 EGi 0.0 ft $50.00 $0.00 0% $0.00 18 pipe, rcp, cmp (15 to 4n 0.0 in d 0 ES-1,2 0 EGi 0.0 ft $0.00 $0.00 0% $0.00 19 pipe, rcp, cmp (15 to 48") 0.0 in d 0 ES-1,2 0 EGi 0.0 ft $0.00 $0.00 0% $0.00 20 pipe, rcp, cmp (60 to 108") 0.0 in of 0 ES-1,2 0 EGi 0.0 ft $0.00 $0.00 0% $0.00 21 rip -rap, placed 0.8 ft of 35.0 ft L 0 ft W 9.5 ton $60.00 $667.00 0% $567.00 22 matting, EC-2 or 3 0.0 ft L 0.0 ft W 0.0 sy $2.00 $0.00 0% $0.00 23 clear and grub (for wooded Sites) 0.0 ft L 0 ft W 0.0 acre $24,000.00 $0.00 0% $0.00 24 cut grading 0.0 cy $6.00 $0.00 0% $0.00 25 fill grading 0.0 cy $12.00 $0.00 0% $0.00 26 as -built drawings (lk+prim per 0.1 mi.) 0.0 ft L 0 mi. 0 Isum $2,000.00 $0.00 0% $0.00 27 survey and layout (price per 0.1 mi.) 0.0 ft L 0 mi. 0 Isum $2,000.00 $0.00 0% $0.00 28 mobilization 11sum $5,000.00 $5,000.00 0% $5,000.00 29 materials testing 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 30 compaction testing 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 31 CBR tests (1 every 0.1 mi. per road) 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 32 stone depth inspections 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 33 pavement inspections 0.0 ft L 0 inc of 500' 0 each $200.00 $0.00 0% $0.00 34 pipe and drainage video inspections 170 ft $1.00 $170.00 0% $170.00 35 VDOT surety (1 lane) 0.0 ft L 0 mi. 0 Lanes $2,000.00 $0.00 0% $0.00 36 VDOT maintenance fee (1 In rd, 1 yr) 0.0 ft L 0 mi. 0 Lanes $150.00 $0.00 0% $0.00 37 VDOT admin. Cost recovery fee(1 lane) 0.0 ft L 0 mi. 0 Lanes $100.00 $0.00 0% $0.00 D:\work\I-drive offload 102519 -TO DO to cloudWnderson\040918_bonds\estimates\SUB202100082_RP Bond Eslim- Final_subdiv_Dunlora Park Phase II -Lindley Lane_072721_CE_08242VIIIll8S Project Name: Final Subdivision Plat - Dunlora Park, Phase II Plan number: SUB202100082 TM P (s): 06100-00-00-165 RO Date Estimate Completed: 7/27/21 (CE); chknyln 1nlbemade si„i2, ; rev. 8/24/21 Road and Infrastructure Construction Bond Estimate (reads, site work, storm sewer) Item Road Name: Lindley Lane - Note: this is an alley ; bond is not required for on alley No. Unit Unit Cost Cost (installed cost sum $30,887.00 contingency $3,088.70 Total $33,980 % compete cost remaining $30,887.00 $3,088.70 $33,980 D:\work\I-drive offload 102519 -TO DO to cloudWnderson\040918_bonds\estimates\SUB202100082_RP Bond Eslim- Final_subdiv_Dunlora Park Phase II_Lindley Lane_072721_CE_082421' Va Nd