Loading...
HomeMy WebLinkAboutWPO201800015 Preconstruction Form 2018-04-03 11P illy. 1-11,3/ e to ti Request for Pre-construction Meeting and Grading Permit x Jil sirs '•A .Confrom Albemarle County ka.„.(cot � a Approved Plan Number: WPO- 1.6- 0 0 0 Approved Plan Name: LV 1 P Wi L0T22.. Aflit.( (Plans must be approved prior to a pre-construction meeting.) Bond approved date: h/�-"!, / (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: 1 ?A'J►? �V1Z.,vI AN(C. State Certification Number: i'Zt.-) b "2:S Address 41W47 " 0 J f> S U City Ct( > '•- -( i;%Q4At 1, State Vi' Zip �2`T0 Daytime Phone(4- 74 "! .,02670 E-mail Off1-S `('A 0 e tOM Primary Contractor: Print Name GV i 1 • GOh+61-RVC-1 014 4 C1= I.A4G 7 1E Address TO14 "( 1Zc 4 �' V� Zip City VC'L��-�U���--�1'�(�� State Daytime Phone(9/f) -3 - 1-2 cry "r E-mail L-Ixl..t X— • �M Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: •cres to • turbed - - • -t Grading Permit Less than 1 $63.80 - than 5 5 and less than 10 $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 For plans exempt from VSMP,VESCP fees were paid with the application. 7/1/14,Revised:8/29/14 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email -I-u "1 ONAt , Re, ,r✓-rat Vo?''r' I—b2-/f5 -i tv IS -NO{ c,allos 4)4Aartet4,41,rm 02o°) The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit issued Date By who? 7/1/14,Revised:8/29/14 Page 2 of 3 Information for Permit applicants; 9-Month Permanent Stabilization Deadline: Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after commencing land disturbing activity A. When permanent vegetation required.The owner shall install on all denuded areas on the site within nine(9) months after the date the land disturbing activity commenced,except for areas that the administrator determines are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface,including, but not limited to,the following surfaces: (i) roadways and sidewalks covered by gravel,asphalt pavement,or concrete;(ii)trails or paths covered by gravel,stone dust,or mulch; (iii)buildings and other permanent structures;and such other surfaces that the administrator determines would adequately provide a permanent barrier to erosion. (see code 17-808 for information about possible extensions) Notice to Comply and Permit Revoked for Overdue Fees Late fees will incur interest,and enforcement actions per code section 17-210. (1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply(NTC). The notice gives 7 days to make payments. (2) At the end of the NTC time period,the permit will be revoked, and a Stop Work Order will be issued for working without a current permit. Disturbed Area Reductions Acreage for the purpose of fee computations will be the entire permitted acreage. This is the disturbed acreage on approved plans. If fees are to be reduced,an application for plan amendment must be made,and areas reduced by changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee due date. Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and all erosion control measures(including traps and basins)removed. Refunds The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will not be pro-rated at payment,other than the first year VSMP fee as indicated in code section 17-209B. Re-inspection Fees Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order. Fees are$250 per inspection,or as given in code sections 17-207 and 17-208. 7/1/14,Revised: 8/29/14 Page 3 of 3 Todd Foster From: Greg Dickerson Sent: Wednesday, March 28,2018 3:32 PM To: Todd Foster Subject: Fwd:WPO-2018-00015 Belvedere Towncenter- Lot 22 Greg Dickerson Chief Executive Officer Cville Real Estate&Construction Charlottesville I Richmond I Outer Banks (434)326-3903 www.BuildCville.com Begin forwarded message: From:Ana Kilmer<akilmer@albemarle.org> Date: March 20,2018 at 4:54:12 PM EDT To:Greg Dickerson<Greg@cvillerec.com>,"info@izwre.com"<info@jzwre.com>, Michael Ball <mball@stonehaus.net> Cc:Jennifer Pritchett<Ipritchett@albemarle.org>,Jonney Otto<iotto@albemarle.org>, Kenny Thacker <KTHACKER@albemarle.org>, Frank Pohl<fpohl@albemarle.org> Subject:WPO-2018-00015 Belvedere Towncenter-Lot 22 The$5,860 water protection performance bond has been posted and approved(erosion only). Jennifer and Jonney Please check with Frank about the DEQ permit and email Mr. Dickerson the pre-construction form. Thank you Ana D. Kilmer Management Analyst II Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-5832 akilmer@albemarle.org 1 NP ' . . _,... .. .. . .. „:,, • ,-,- 2 504: .(:f,''', '.'.•,.., .: ' -' '..- ,.: .-- ' '' '• ' ,.. BBSIT - , .• ..,‘; ',•• .,,,, .•.,,,.: .,.. ,..., • „.,.,-.. •..„7-•:-- -..„:,.:,,,:,,s7„:„., ,CVILLE'RgAL ESTATE &CONSTRUCTION ' '-' --,, :',,,,,..,,yrr,c„9iN.Ifs•,, ,,,-.,,,,„,,-, 7-cr,,,,,,.,-,,,,, .- ., ..:,,.,1 .,,i,,'f,,,,,,,.., ,i.„$. ,-,':,. „. i,,, P.Q BOX 7565 _ ., .‘ CHARLOTTESVILLE,VIRGINIA'22906 I . , ., ,. „ ,:- -.68426/514, •:, " - -, ..--,, ,, 10, .. ; -,,, • • • • 1, • -• /2911,2'•gc 1 -' r` ' ,"" , ,,,-; !'.'-•''''''''.:.---;'. ' 1.' ' '' '' ' I' .,'''! ''''',7 '' ''• -:‘j 'i'-' ', ''',-,r •"#,-:r;,!4-P'''4 ..-.'',1'‘.. ... ,.„,:,,,,,,?,„.-e.,;•,,,:' - ,-;,.-..,I.:,;‘.-;.t, ,i".','-.: ,,- , ' -s :' 1'.. ' ' , •-:- ,--, 1,- r ' "...'4,* ',!'.' ,,, 'N''.,,•N,'-, :I, '' •,' ,'f;''',',2,'hi.,1',-),'':,,e't'2,,,,,, V'•,- P;' ..' . ' „..,•,,S;:,"., ..,`" `'l', , .., l'...,- ., '''`..,-; :1',,'•i '',4:, 't. , ...! .. ., ,:.‘,•,'4:'.'“`.C,,,' '. ,,,,....',. ''''',34 i .• L-.,\11,,‘,':','•• '''' ''; '' y. 'L,', ':(r! .•'' i'l.;':,.i ' • •*,-s•'i., ;, '','!'!'•,'''''.if.,''.;,,....Z,:r ''n.- .:,. ,,:.-1,-..,..i,..1., rip THE . ER'OF •• -uf • • • • -• . • ,,- —- '.-_--,.- - ' ,-•-' ' • -",-- ' '',.-.':•:'''.i".•'!"-" ;--\. ' .:' •••,"::..*--'.."•;•4';' ,:<•:7,'',.'''''“••':‘ei,-.•••••••c•'-,. - ..,,--,7",... -4-','.:.2--,:-_-,-.5. .".,- ,-_ ,d '°I.X.Aiff....11442 -1,417. - 1 - ‘0°-it oo - — .,,,--,,,,,,,,., -,,-...,.:,-;-.,.. ,.. ,-,. --•;.-..-•,..-••••,-.•-•••.;:-..-:, ..,, -„,...„.,,,- ,..-,..,---;• .....-: ' - ' --."` -"'.'''' '‘ '''• '''''' ' . ''-'' ''`'I''' v'- DOLLARS - •• -•' • ::•-• .• •-••• .•••• , • ',f' ". i ,.r,;•,i'..,,:ta`-`,:, •'' ''',,, ;....:• "'';,..tif. i''•",',',i' 4.::"" i`.:4:',.', , .,.., 2:,4,%, i. r ;-..,..,1z-'-',-..., -' !., ,,f '0',' ''''' V',..5- ,1 t.--I .,. „_.„-, , -,9".-- „ -• N. • ' •i „ ''. ,,'F', ',.:''-', L].'.. ' ` .• : ::', , ',:".,,.,'' `,•!;c:::'.•,•:, '1 i!,. t,'','r.,,,ii-, t,,',i‘'',‘;':,.'. ,F lb f. .,Y. :'.'•,,101 "','-.'',''',,,,' ''' ', ;',1 81., , , ,r r r 4 ''r', :r.44 1,...I't,.: .4 tl,..1,7';' -r":r;:i..c.'''' ' ,r'f'-' ,',.!?I e'.': j',• :If'','.:,4,,, ,-1.i "..;;r i''' 4 1-•'.' ' ' • , ., 1' ., ''1 ' C '''''''., K`,,:!•••— ....41'''rf,R\••ti X,,, "•' ' ,s,,' •:. :, , ''K '. '.,',./' (“" ''''• .' '.:•;.,.. ,..07:1',s (s„.,,', .7..; , . '', •'• '''' ''''-',•;..! ':'•,‘,•!•+-a.....).:-.'.4.i'',•A'1.173i.:10141ZEDSI.ENii•;‘',•: 'Z..%'s,7/fis''C'f';.%)'. 7 ...''''''sr,'--.A'•t•`;'- ''71;1' V .. ' -,. - ')--•-,1-,I .. ,,....4 (,,4, .,,,,, , .., .. '----.4' terf---- ..., ,--- - -. ---.....-„ ' --- F1.44(' • ' -,•AUT • IZEDSIG AT Id WR2.016-000 i- ' " . .• ., • -,, -, ,,--,, i• ,... 0.,, ,y- :,..,. . ..-.. .-- -,-..::,.,-,,,,,. : ,,,.. •:....',,, „..„(2.•',-,t --- - 4,, ,,.• . ,, - $ . • , ."."' •V'i JP Ikvir-v- '• , 's-. ',4 1';'1:6,...A.,..y I il.- •',/,'70r, I".-:I.:e i-- - i : ..: , •,,,,,.. 1 PreCon Meeting Sheet VSMP-SWPPP • Make sure the SWPPP book is available at all times/ Post SWPPP doc at Construction Entrance —Contact list (site Operator with Phone # and location of SWPPP book), Gen Permit and Reg Statement signature sheet • E&S plan with Narrative • Cuts and fill logs/Activity log-record of the grading operations during construction with location, dates for start of grading and stabilization • Full list of all potential chemical pollutants sources that will be on site (Fuel, oil, concrete additives, pesticides, herbicides...etc.) with MSDS clean up procedures outlined. • A listing of all subcontractors with their potential chemical pollutants and MSDS clean up methods will also have to be included • The SWPPP plan will also show where on site are the current locations of the protected Concrete washout area, Port-a-john and the Chemical storage area, updated as these areas are moved • Site inspections (Impaired waterways) once every 4 days or once every 5 and 48 hours after a storm event (anything over ")Time/date, record amount of rainfall (if any), deficiencies and corrective measures made, condition of Concrete washout/Chemical Storage/Port-a-john ...all inspection items are listed in your VPDES General Permit for Stormwater Discharge. • Review the 9 month County ordinance which gives the operator 6 months of major grading prior to contacting the County Engineer for a 3 month extension • Pass out plans: 1 for Owner, 1 for Developer and 2 for the County's use —Make sure they are stamped �O1c,,,IPw-;tires Pre-con meeting Sheet • Ask for Cards • Talk about "First Steps" ( Only E&S controls and Tree Protection allowed) • Reinspection Fees = Warnings, NTC and SWO in that order with reinspection fees of $250. With each reinspection (Mud in the roadway will have a NTC issued without a warning) • Albemarle County ordinance with 3:1 slopes. Slopes that are greater than 3:1 will have to have ground cover applied. All engineered slopes greater than 3:1 will have ground cover applied • Use of top soil is required for permanent stabilization. • Use Buckwheat seed for topsoil stockpile stabilization