Loading...
HomeMy WebLinkAboutWPO201800070 Agreement - SWM Maintenance 2017-04-17 ,' ii .. COUNTY OF ALBEMARLE - ®.... • Department of Community Development :- _ , -�} 401 McIntire Road,North Wing ; fIRriit• Charlottesville,Virginia 22902-4596 Erosion Control Tel.(434)296-5832•Fax(434)972-4126 , reement Number i EROSION AND SEDIMENT CONTROL AGREEMENT FOR ' SINGLE FAMILY RESIDENCE CONSTRUCTION Building Permit# 132017- I v! Tax Map/Parcel /DOOR—CO -00—OJ7, 7 Subdivision it t i/f J-o NI Phase Section Block Lot 1i9? Zoning RA A$150 fee is required with this agreement In lieu of submitting a formal erosion and sediment control plan for development of this single family residence and/or appurtenant structure, I agree to comply with the requirements of the Albemarle County Water Protection Ordinance, County Code Chapter 17,the Virginia Erosion and Sediment Control Law, Virginia Code, Title 62.1, Chapter 3.1,Article 2.3,and Erosion Control Regulations 9VAC25-840,and the Virginia Erosion and Sediment Control Handbook, latest edition. I agree to provide erosion control measures in accordance with the Handbook standards and specifications in order to protect against the transport of soil and sediment off of the property. 'I further agree to comply with additional requirements determined necessary by the Program Authority. Such requirements shall be based on established conservation standards and shall represent the minimum practices that Albemarle County deems necessary to provide adequate control of erosion and sedimentation on or resulting from this development. At a minimum,the following to the following measures will be implemented: 1. Silt fence, sediment traps and other protective measures shall be provided in areas where sediment.from disturbed areas may, leave the site,and must be properly installed before land disturbance. These measures must remain installed and maintained until adequate stabilization is achieved as determined by the Program Authority. 2. All erosion measures are subject to inspection periodically and after each runoff-producing rainfall event. Any necessary repairs to maintain the effectiveness of the erosion control devices and cleanup of sedimentation must be made immediately. If erosion control measures are found to be inadequate, or in need of repair, by a county inspector, you will be notified. A fee of$150 will be charged for each reinspection that is necessary. 3. A temporary stone construction entrance shall be provided wherever traffic will be leaving a construction site and where there'exists the possibility of transporting mud directly onto a road or other paved area. 4. All denuded areas on the site shall be stabilized within seven (7)days of final grading with permanent vegetation or a protective ground cover suitable for the time of year. Temporary soil stabilization shall be applied within seven (7) days to denuded areas that may not be at final grade but will remain dormant (undisturbed) for longer than thirty(30)days. 5. A permanent stabilization/vegetative cover shall be established on all denuded areas within nine (9) months of the start of clearing or grading. Unless documented in writing to the Program Authority at the start of land disturbance, the nine(9)months shall be measured from the permit issuance date. If an extension is necessary and construction extends for more than a year, a permit renewal fee.of$150 will be required. 6. During construction of the project, soil stock piles and borrow areas shall be stabilized,covered,or protected with sediment trapping measures. 7. All storm sewer inlets that are operable during construction shall be protected so that sedilxetit-la¢ex4 water cannot enter the storm water conveyance system without first being filtered or otherwise treated to remove sediment. 8. All temporary erosion and sediment control measures shall not be removed until disturbed.• Irreas are stabilized. After stabilization is complete, all measures shall be removed within 30 days,tunless otherwise authorized by the Program Authority.Trapped sediment and the disturbed soil areas resulting from the disposition of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. I further understand that failure to comply with such requirements within three(3)working days, following notice by a county official,could result in a citation for violation and may require the submission and approval of a formal erosion control plan with an appropriate performance bond as provided in Section 17-414 of the Albemarle County Water Protection Ordinance. I hereby agree to be responsible for carrying out each of the duties and responsibilities enumerated above,as well as all other requirements of Albemarle County's erosion and sediment control program. I also hereby agree to maintain responsibility for this permit regardless of the sale of the property prior to completion of the work covered by this permit. Landowner Responsible Land Disturber Print Name J O IV( /'/�'Ckf 1 ° QL 1 i•� J Print Name 17 ' so"( . T� Address ` o f O$l.€/ t (Oft I U.e. n Address City Y'�fr`rs'y�.�Q State VtQ Zip 4 d City K//`l�l/g//�/ State VA Zip Phone Number Li 3 `� - O 3/` �j J (�J Phone Number / Signature 5( Date LI_i) `7 Signature Date I hereby gr t the County of Albemarle-the right to enter upon subject RLD Cert.Number q 5-7Y-grjp/ 17 property for inspections to ensure compliance. Y , Comments/Additional Requirements from Plan Approving Authority: Office Use Only APPROVED BY Date Original:Engineering Inspector Copies: Building Permit File Landowner/Authorized Agent 09/07,Revised 03/09,10/14,05/15