Loading...
HomeMy WebLinkAboutWPO201700004 Checklist - Project Closeout (Administrative) 2021-01-06 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form at)�n, of project completion and/or bond release;place the completed form in the WPO folder and forward to the Imaging Center for digital� `� LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward to Cent out into raliz WPO# d-�1 9 —� ed Filing. PROJECT TITLE W&L(ft1 ethitKat FULL NAME INSPECTOR: � ; �� -- FINAL ACTION DATE: �''l2 2/ CountyView— -----.-_______ ❑Status/Status Date updated Hor�dcopy—File Folder Closeout: All items 1 listed shou chronological order(latest on top), be placed in project folder,in reverse i Please check each item included in this folder. To indicate that an item is not applicnble to this file,place next to the check box. The Inspector/Management Analyst has the discretion to include any item deemed nec esary`ssar to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or,if the document is already in digital format, can be saved to LaserFiche. Please lrovide the digital locat' (patb/name)of the document in the space provided. ion ❑ Preconstruction Meeting Form ❑ Scan ❑ Saved location ❑ Grading Permit ❑ S• can 0 Saved location ❑ Inspection Requests ❑ Scan ❑ Saved location ❑ Inspection Results(Include any inspection tickets,memos,photos,etc.) ❑ S• can 0 Saved location ❑ Bond Reduction/Bond Release Notices from Inspector to Management Analyst ❑ Scan 0 Saved location ❑ Conservation Checklist ❑ Scan 0 Saved location 0 As-built/Construction Plans ❑ S• can ❑ Saved location 11 Other pease explain) ( i9 24a Scan ❑ Saved location I ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats may placed laced in the file if they lend clarity to the review at a later date. If such plans are included, they should be deadma unapproved and contain a note clarifying why it was included. v rked as ❑ Scan 0 Saved location NOTES: project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; ��^ _ �� 2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item a d return folder to the County Engineer for corrective action. Draft 12-5-2013