Loading...
HomeMy WebLinkAboutWPO201800046 Checklist - Project Closeout (Administrative) 2020-11-10 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BONI) RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this formifta4 " of project completion release; place the completed form in the WPO folder and forward to the Imaging and/or bond LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff ill forward to CentralizedCenter for digital closeout into WPO#2.O/�� Filing. 4 b PROJECT TITLE FULL NAME INSPECTOR: � --_ AL ACTION DATE: i /D 20 •untyView— `�-'-------- -------------- N Status/Status Date updated �^`—'-- ____ Hardcopy y—File Folder Closeout: _______ -______---` -------- `-_-�-`"� chronological order(latest on top). All items listed should be placed in project folder,in reverse i Please check each item included in this folder. To indicate that an item is not applickble to this file, next to the check box. The Inspector/Management Analyst has the discretion to include any item deemed necessary provide clarity to the file,please indicate that item on the place an"N/A" "Other"lines prove I -d. to Digital Closeout Instructions: Below each item please indic. - if ImagingCenter or,if the document is already in digital format,can be saved to Las- 'iche. Please rovide the digital location (path/name)of the document in the space provided. I� $�is to scan the document; ❑ Preconstruction Meeting Form ❑ Scan 0 Saved location ❑ Grading Permit ❑ Scan 0 Saved location ❑ Inspection Requests ❑ Scan 0 Saved loc. ion 0 Inspection Results (Include any inspec'on tickets,memos,photos,etc.)0 Scan 0 Save, location ❑ Bond Reduction/Bond Release N. ices from Inspector to Management Analyst ❑ Scan ❑ :aved location ❑ Conservation Checklist ❑ Scan ■ Saved location ❑ As-built/Construction P : ,s ❑ Scan 0 Saved location ❑ Other(Please expl.' ❑ Scan 0 Saved location ❑ Other Plans - A the Inspector's discretion, copies of unapproved lend clarity to 'he review at a later date. If such plansare inclluded, the mshould be c ear ay be placed in1 markedr they unapproved : 1 d contain a note clarifying why it was included. lv as ❑ an 0 Saved location NOTES: WPO project folders will be accepted b ythe Imaging~�— 1) Checklist is completed and included in folder; Cefiter when the following items are complete: 2) Documents are Acco-fastened(except plats/plans),and in chronological orde (latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item a d return folder to theCounty Engineer for corrective action. 1 Draft 12-5-2013 l