HomeMy WebLinkAboutWPO201700022 Correspondence 2021-03-11 i I MERIDIAN
PLANNING GROUP, LLC�
Engineering• Surveying•Planning
l
I{i.. !'.'„I I'. 440 Premier Circle,Suite 200
Charlottesville VA 22901
March 11, 2021 Phone 4348320121
www tnende nwhe com
Emily Cox
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902
RE: WP0201700022 DALY'S RENT ALL— VSMP PLAN
Emily,
Enclosed are 2 copies of the revised VSMP Plans and SWPPP The following are responses to the
comments in your letter dated February 1, 2021
A.) STORMWATER PREVENTION PLAN (SWPPP)
1 Please provide a signed registration statement (section 1)and signed certification(section 9). Rev. 2:
Comment addressed; ho ' ver,the registration statement has changed again. The new one is attached
to this comment letter ease fill it out and send it back signed.
✓ 2020 GISTRATION STATEMENT HAS BEEN USED
5. Rev 1: Section 9. signed certification,must be signed before the plan can be approved Rev. 2: Comment not
addressed.
✓ SECTION 9 IS G ED IN PROVIDED SWPPP BOOK
6 Rev.2:Please provide a full S PP book for final review and approval.
✓ SWPPP BO ROVIDED.
C.) STORMWATER MANAGEMENT PLAN (SWMP)
2 Nutnent Credits must be purchased before plan can be approved Contact Am Kilmer before credits am
purchased Rev 1. Comment not addles d. Rev. 2:Please remove sheet C-504 from the plan set.A simple
note that 0.77 lb/yr will be purchas is tine. Coordinate with Ana Kilmer for the purchase of nutrient
credits.
✓ C-504 HAS BEEN MOVED; NOTE PROVIDED ON C-501.
18. Rev.2:Please provide this checklist o ie plans:
https://www.albemarle.org/ me/s wpublisheddocurnent?id=212
✓ 5/C-403: CHEC T PROVIDED.
D) EROSION AND SEDIMENT CONTR LAN (ESCP)
10. Rev. 1. Please sho%+ a wash ra k with th onstnlction entrance. Rev.2: Comment not addressed. It is not
evident on the E&S Plans.
✓ C-801 & 1/C-802 ASH RACK HAS BEEN INC.LUDED.
Please let me know if you need any additional information.
Sincerely,
Timothy Miller, P.E., L.S.
Pnncipal
Page 1