Loading...
HomeMy WebLinkAboutWPO202100003 VSMP - SWPPP 2021-08-31of A COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing 1 Charlottesville, Virginia 22902-4596 Tel. (434) 296-5832 • Fax (434) 972-4126 �IRGiN1P Stormwater Pollution Prevention Plan (SWPPP) For Construction Activities At: Project Name: Starbucks — 2231 Seminole Lane VSMP/WPO# 202100003 2231 Seminole Lane Charlottesville, Virginia 22901 Prepared by: Timmons Group 608 Preston Avenue, Suite 200 Charlottesville, VA 22903 Contact: Craig Kotarski, P.E. 434.327.1688 Prepared for: Commercial Rentals LLC 1024 Carrington Pl. Ste. 100 Charlottesville, VA 22901 Contact: Dhanvant Goradia 434.989.8667 SWPPP Preparation Date: June 15, 2021 (This document is to be made publicly available according to 9VAC25-880-70, Part II, section D) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County CONTENTS: (from Albemarle County Code Sec. 17-405) 1. Registration statement 2. Notice of general permit coverage 3. Nature of activity 4. Erosion and Sediment Control Plan. 5. Stormwater Management Plan 6. Pollution Prevention Plan. 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. 8. Qualified personnel 9. Signed Certification 10. Delegation of authority. 11. General permit copy 12. Inspection logs Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 1. Registration statement (Provide a signed completed copy of the DEQ registration statement) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) REGISTRATION STATEMENT 2019 Application type. ® NEW PERMIT ISSUANCE (CHOOSE ONE) Cl MODIFICATION WITH ACREAGE INCREASE ❑ MODIFICATION WITHOUT ACREAGE INCREASE ❑ EXISTING PERMIT RE -ISSUANCE Section 1. operator/Permittee Information. PERMIT #: PLAN/ID #: TECHNICAL CRITERIA: IIB ❑ IIC ❑ A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit). Operator Name: Commercial Rentals LLC Contact person: Dhanvant Goradia Address: 1024 Carrington Pl. Ste. 100 City, State and Zip Code: Charlottesville, VA 22901 Phone Number: 434 989-8667 Primary and CC Email: Dhanvant.Goradia@gde-inc.net; craig.kotarski@timmons.com B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES and include a valid email. May we transmit correspondence electronically? YES ® NO ❑ Section 11. Construction Activity Information. A. Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site. B. Project site location information. Construction Activity Name: Starbucks Address: 2231 Seminole Lane City and/or County and Zip Code: Charlottesville, VA 22902 Construction Activity Entrance Location (description, street address and/or 2231 Seminole Lane (38.09651,-78.46440) latitude/longitude in decimal degrees): Latitude and Longitude (6-digit, decimal degrees format): 138.09651,-78.46440 C. Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest one -hundredth of an acre. Total land area of development (include entire area to be 0.59 AC disturbed as approved in the Stormwater Management Plan): Primary estimated area to be disturbed (include portions with 0.59 AC Erosion and Sediment Control Plan approval only): Off -site estimated area to be disturbed (if applicable): 0.00 AC D. Property Owner Status: FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE IK E. Nature of the Construction Activity Description (i.e. commercial, industrial, residential, agricultural, environmental, utility): Commercial F. Municipal Separate Storm Sewer System (MS4) name(s) (if the site is discharging to a MS4): G. Estimated Project Dates (MM/DD/YYYY). Start Date: 10/01/2021 Completion Date: 08/01/2022 H. Is this construction activity part of a larger common plan of YES ❑ NO development or sale? Rev 11/2020 PAGE 1 1 6 CONSTRUCTION GENERAL PERMIT (VAR30) REGISTRATION STATEMENT 2019 I. 6" Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page. HUC NAME(S) OF RECEIVING WATERBODY 020802040203 South Fork Rivanna River Section III. Off -site Support Activity Location Information. List all off -site support activities and excavated material disposal areas being utilized for this project. Include additional areas on a separate page. Off -site Activity Name: Address: City or County: Off -site Activity Entrance Location (description, street address and/or latitude/longitude in decimal degrees): Latitude and Longitude (6-digit, decimal degrees format): Is this off -site activity an excavated material disposal area? YES ❑ NO ❑ If this off -site activity is an excavated material disposal area, list the contents of the excavated fill material: Will a separate VPDES permit cover this off -site activity? YES ❑ NO ❑ Section IV. Other Information. A. A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the General VPDES Permit for Discharges of Stormwater from Construction Activities rio or to submitting the Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been prepared. B. Has an Erosion and Sediment Control Plan been submitted to the VESC Authority for review? YES ® NO ❑ Erosion and Sediment Control Plan Approval Date (for the estimated area to be disturbed MM/DD/YYYY): C. Has land -disturbance commenced? YES ❑ NO IN D. Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications (AS&S), attached the completed AS&S Entity Form. AS&S Entity Name (if different from the Operator identified in Section I): E. Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive Annual Permit Maintenance and Permit Modification Fee invoices (if applicable). Billing Name: Contact Name: Address: City, State and Zip Code: Phone Number: Primary and CC Email: Rev 11/2020 PAGE 2 16 CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019 Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that operator is defined in 9VAC25-870-10 as follows: "Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater associated with a large or small construction activity, operator means any person associated with a construction project that meets either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system. 9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: Dhanvant Goradia Signature (signed in Ink): Date Signed: G 1 15 Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authorityplease send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructiongp@deg.virginia.gov Rev 11/2020 PAGE 3 16 Section 2. Notice of general permit coverage (This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.) (Provide a copy of the DEQ coverage letter when obtained) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 3. Nature of activity (Provide a detailed narrative of the construction activities. Include or reference a construction schedule and sequence. Include any phasing.) This project includes the construction of a new building and associated parking, utilities & landscaping. Erosion and sediment control limits of disturbance area is 0.59 acres. The property is bound by convenience store/gas station to the north, a residential lot to the east, a vacant lot to the south and route 29 to the west. All construction shall take place in accordance with the Erosion and Sediment Control Sequence of Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration Statement. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 4. Erosion and Sediment Control Plan. (Provide a reduced, I W 7 copy of the latest Erosion and Sediment Control Plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County PROJECT DESCRIPTION THIS PROJECT INCLUDES THE CONSTRUCTION OF A NEW BUILDING, PARKING AREA, UTILITIES, AND ASSOCIATED SITE WORK. LIMITS OF DISTURBANCE TOTALS 0.59 AC. AOJACEM PROPERTY THE PROPERTY IS BOUND BY CONVENIENCE STORE TO THE NORTH, A RESIDENTIAL LOTTO THE EAST, A VACANT IM TO THE SOUTH AND ROUTE 29 TO THE WEST. EXISTING SITE CONDITIONS THE SITE CURRENTLY CONTAINS A PAVED PARKING AREA AND OFFICE BUILDING. OFF -SITE AREAS THIS PROJECT INCLUDES WORK WITHIN THE ADJACENT ROW. ADDITIONALLY, APPROXIMATELY 216 CY OF FILL WILL BE NEEDED TO FILL THE EXISTING BASEMENT TO PROPOSED FINISHED GRADE. IF THERE IS NOT ENOUGH EXCESS SOIL FROM THE PROJECT SITE, CLEAN FILL FROM ANOTHER SITE WILL BE USED TO FILL THIS AREA. DEBRIS MUST BE TAKEN TO AN APPROVED LANDFlLL SUE. CRITICAL EROSION AREAS THE AREA WHERE THE FURRING RETAINING WALL WILL BE REMOVED AND PROPOSED RETAINING WALL WILL BE BUILT IS WITHIN THE MANAGED STEEP SLOPES AREA. EROSION AND SEDIMENT CONTROL MEASURES UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PMCUCES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND $FECIRCATIONS OF THE CURRENT ADDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS OTHERWISE WANED OR APPROVED BY A NUANCE BY LOCAL AUTHORITIES HAVING IUFUSDICUON. STORMWATER RUNOFF CONSIDERATIONS ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VISOR AND THE CONSTRUCTION SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS. STRUCTURALFRACUCES: 1. TEMPORARY CONSTRUCTION EWMNCE-3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT THE LOCATION INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF. 2. SILT FENCE BARREN -3.05 SILT FENCE SEDIMENT BARRIERS SHAL L BE INSTALLED DOWNSWPE OF AREAS WITH MINIMAL GRADES M FILTER SEDIMENT-IADEN RUNOFF FROM SHEET FLOW AS INDICATED. ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF SEDIMENT MOM DISTURBED AREAS AND PREVENT SEDIMENT FROM LEAVING THE SUE. 3. STORM DRAIN INLETPROTECTION-3.07 STONERLTEMSHALLMPIACEDATTHEINLETOFAUDMINAGESTRUMN PS INDICATED ON PUNS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO PERMANENT STABILIZATION. 4. DIVERSION DIKE -3.09 A RIDGE OF COMPACTED SOIL CONSTRUCTED AFIRE TOP OR BASE OF A SLOPING DISTURBED AREA WHICH DIVERTS OFF -SUE RUNOFF AWAY FROM UNPROTECTED SLOPES AND TO A STABILIZED OUTLET, OR M DIVERT SEDIMENT-IAOEN RUNOFF TO A SEDIMENT TRAPPING STRUCTURE. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS. 5. SEDIMENT TRAP-3.13 A TEMPORARY BARRIER ON DAM WITH A CONTROLLED STORMWATER RELEASE TO DETAIN SEDIMENT4-ACEN RUNOFF FROM 51STURBED AREAS IN FNET AND 'DRY' STORAGE LONG ENOUGH FOR THE MAJORITY CE SEDIMENT TO SETTLE OUT. 6. MAINTENANCE OF SEDIMENT WRAP- INSPECT TRAP EMBANKMENT WEEKLY TO ENSURE IT IS STRUCTURALLY BOUND AND HAS NOT BEEN Z OUTSET PROTECTION -3.18 THE INSTALLATION OF RIPRAP CHANNEL SECTIONS ANE/OR STIWNG BASINS BELOW STORM DRAIN OUTSETS TO REDUCE EROSION AND UNDER -OUTING FROM SCOURING AT OWLETS AND TO REDUCE FLOW VELOCITIES BEFORE STORMWATER ENTERS RECEIVING CHANNELS BELOW THESE OIRLETS. S. DUST CONTROL-3.39DUSCONTROLISTO BE USED THROUGH THE SUE IN AREAS SUBIE7TM SURFACE AND AIR MOVEMENT. VEGETATIVE PRACTICES: 1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADES AND STOCKPILED FOR LATER SPREADING. STOCKPILE LOCATIONS SHALL SE LOCATED ENSUE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND VEGETATION. 2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR R IS APPLIED. 3. PERMANENT SEEDING -3.32 FOLLOWING GRADING ACTNITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY PLANTING SEED TO REDUCE EROSION, STABIIJZE DISTURBED AREAS, AND ENHANCE NATURAL BEAUTY. MANAGEMENT STRATEGIES 1. PROVIDE SEDIMENTTRAFFlNG MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH IMMEDIATELY FOLLOWING INSTALLATION. 2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING. 3. ISOLATE TRENCHING FOR OFF ROES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE PERIMETER CONTROLS. 4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SMALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WRH THE CONTRACT DOCUMENTS OR SPATE LAW. PERMANENT STABILIZATION ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING FINISHED GRADING, SEEDING SHALL BE IN ACCORDANCE WITH STD. ® SPEC. 3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS SPECIFIED MR "MINIMUM CARE LAWNS' AND "GENERAL SLOPES" IN THE HANDBOOK FOR SLOPES LESS THAN 3:1. FOR SLOPES GREATER SEQUENCE OF INSTALLATION PHASE I (SEE SHEET CIA) 1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E®S INSPECTOR CO NTRACTOR, OWNER AND ENGINEER. THIS MEETING PSHALL ERIMETER TAKE AT UETHE COUNTY OFFICE BUILDING. 2. INSTALL PERIMETER MEASURES, INLET PROTECTION, AND CONSTRUCTION ENTRANCE. 3. GRACE ROFFERSEDIMENT EXISTING AND INSTALL DIVERSIONS. 3. AMR ALL EX6nxG BUDDING AND MEANICONTROL E ALL. 4. AFfERALLEROSION AND INING SEDIMENT CONTROL MEASURES ARE IN PLACE SUE WORK CAN BEGIN. 5. CONSTRUCT NEW RETAINING WALL. 6. ROWH G AWAY EXESSDIEE FAREA. 7. MAUL CONSTRUCT EXCESS OI0.TBDEBRIS S. SEED ALL DENDEDABUILDING, 9. SEED ALL DENUDED AREAS PER VESCH STANDARDS. PHASE II (SEE SHEET C32) 1. INSTALL ADDITIONAL INLET PROTECTION WHERE SHOWN ON THE PHASE 2 EROSION AND SEDIMENT COWROL PLAN AS THE STORM SYSTEM IS CONSTRUCTED AND BECOMES OPERATIONAL 2. NNE GRADE PROJECT AREA. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS ACHIEVED. 3. ALL SMRMWATER PIPING® STRUCTURES, SHALL BE INSPECTED MR SILT/SEDIMENT. IF PRESENT, SILUSEDIMEW SHALL BE CLEANED OUR NR THE SYSTEM TO THE SATISFACTION OF THE EM INSPECTOR. 4. ONCE THE SITE UP HILL FROM THE SEDIMENT TRAP HAS BEEN STABILIZED AND APPROVED BY ISO INSPECTOR REMOVE, REMOVE THE SEDIMENT TRAP AND COMPLETE ANY FINAL GRADING OR HARDSCAPE. 5. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL SPACE IS ACHIEVED. 6. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION CONTROL MEAURES CAN BE REMOVED UPON APPROVAL FROM THE INS INSPECTOR. Igclgsl l<3J 0.85 I I I unWllu venv I I I el on lnl na p0 wlunyvy) wluma lay) a21 893 ,w.myu VA B quirt R )BT'DA) n m) ac uM Icy) 710 ene YaeMWAX anvil AA VOmw,. oI. bn¢alm31 -1N APO A)(AOA1 51 mwmofNp.-on(M w 9ulretl lcy)or.) 670 .P..-N. 87111' Ix10 1PPelmm elretan ln) 11e.0 mldtlm S...tN, By, 67e toPAax o01 n*n x0 ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL REGULATIONS. ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND EVALUATION OF THE METHODS AND EWECTIVENESS OF THE EROSION CONTROL PLAN. ES-3: PLACE ALL EROSION ANDSEOIMEW CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING, OR LAND DISTURBANCE. ES-0: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES. ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTNINES IN AREAS OTHER THAN INDICATED ON THESE PLAINS (INCLUDING, MITI NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMITA SUPPLEMENTARY EROSION CONTROL PLAIN TO THE ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL ANHORIIY FOR RENEW AND ACCEPTANCE. ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE RESPONSIBLE LAND DISTURBER. (MOUTHED NOTE) ES-7 ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND -DISTURBING ACTIVRIES AND DURING SUE DEVELOPMENT. EBRO: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE. ES-9 : INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. MAKE ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES IMMEDIATELY. MINIMUM STANDARDS: AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LGCALTIY MUST BE CONSISTENT WITH THE FOLLOWING CRITERIA, TECHNIQUES AND METHODS: M$-1. PERMANENT ORTEMPORARY SOIL STABIIJZATTON$HALF BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH SEDIMENTTRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SM AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE PROJECT SITE. MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. PERMANENT VEGETATION SHALL NOT SE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. MS-4. SEDIMENT TRAPS, PERIMETER PINES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEOIMEW$HALL BE CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE TAKES RACE. MS-5. STABILIZATION MEASURES SHALL BE REPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AMR INSTALLATION. MS-5. SEDIMENTTRAPS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP. A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES. MS-7. CUT AND ELL SLOPES SMILE SHALL BE DESIGNED AND CONSTRUCTED INA MANNER THAT WILL MINIMIZE EROSION. SLOPESTHATARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MS-8. CONCENTRATED RUNOFF SHALL NOT ROW DOWN M OR ELL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR PERMANENT CHANNEL. ROME OR SLOPE GRAIN STRUCTURE. MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION $HALL BE PROVIDED. MS-1O. ALL STORM SEWER INLETS THAT ARE MADE OPEFUBLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMEM-LADEN WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE SEDIMENT. MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PPES ARE MADE OPERATIONAL, ADEQUATE OUNET PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE CHANNEL AND RECEIVING CHANNEL. MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENTCONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION. NONERODIBIE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN ELLMAY REUSED FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS. MS_13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED. MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES SHALL BE MET. MS- 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED. MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER APPLICABLE CRITERIA A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME. B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES. C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SEE PROPERTY. D. MATERIAL USED MR BAWTLLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE STABNZATION. E. METABNZAGON SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS. F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPUTED WITH. MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AUER FINAL SUE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES$HALF BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION. MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SUES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION, EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF MR THE STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA USTE01N SECTION 19 OF VIRGINIA ADMINISTRATIVE CODE 9VAC25-840-40 MINIMUM STANDARDS. 27B - SUGAR LOAM, 2 M 7 PERCENT SLOPES, MORE THAN AD INCHES TO RESTRICTNE FEATURE, HYDROLOGIC SOIL GROUP: B 34C - GLENELG LOAM, 7 TO 15 PERCENT SLOPES, MORE THAN 80INCHES TO RESTRICRVE FEATURE, HYDROLOGIC SOIL GROUP: B 39D - HAZEL LOAM, 15 M 25 PERCENT SLOPES. 20 M 40INCHES TO LEHIC BEDROCK HYDROLOGIC SOIL GROUP: B OOMPAOTEERMIL I LAT NA MEN ONIII Hill IIPXLL 1rM 11 11 �11 QQQ QQQ STANDARD ORANGE VINYL OR PLASTIC CCNSTRUOTION FENCE ATTACHED TO POSTS (PRE -WEATHERED VADOG GALVANIZED STEEL, IRON OR THICK PVC PIASTICI AT LEAST 40C ABOVE FINISH GRADE MINE SPAN BETWEEN POSTS NO GREATER THAN 6ON CENTER. EVERY NINTH OIDENTIFIES POST SMALL CONTAIN A WARNING SIGN THAT CLEARLY THE FENCE AS A TREE PROTECTION FENCE. 3 3S TABLE 331-8 ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS "OULCK REFERENCE FOR ALL REGIONS' PUNTING DATES SPECIES RATE I SJACRE) BEET 1-FEB. 15 MUST MIX OF ANNUAL RYEGRASS (LOLNM MULTI-FLCRUM) B 50.1W CERFAL(WRITER) RYE (SECALE CEREALS) FEB. M-APR. 30 ANNUAL RYEGRASS N,100 )LOLNM MULTI-FLCRUM) MAY 1-AOG. 31 GERMAN MILLET W ISETARw ITALICa) O 33t GRAANFL CURB INIFIET SEDIMENT FILTER I /u `il�� Nei rtiN , OF WHi NNEM � NM1W ffnl WTIEA 1ST `aMIRR INNER IP UXABTFCTEOaRI:Is. OAwGEro An.wcElrt smuciwESAi10 vio 2 .n AMS SILT FENCE DROP INLET PROTECTION OORRDDERINLET AM RRALE LS' MAX. y CALMER EXCRS AT OWNERS PERSPECTIVE NEWS STAKE FABRIC MI MIN. 7 A, DETAIL A ELEVATION OF STAKE AND FABRIC ORIENTATION SP ECIFIC SCNFlCA ARM m4RONRM manON TMINE Is APPUCABLE INE ME WLET R DRAINS A RAUSLY MAT AREA (SLOPE NO GREATER MAN EX) MERE LEe' �n. "A acc 11 a1 PROFI gcrnAnox a mul¢ ���mnPPixo rcgcr PI AN 'INwAiwve �i nnrx qn,n- SECTION A -A waM'tylo weLn rl Le brrlrtllM wYL• weLLrJleoe\ ru,Lxa'rryl�lY Ia weN4eaex'Yrah _ ee ta�:rawlntle wM1rYN'meruc WnxL wnternupLbecnrtrcJ eweY RmnOearLlaebm ryyaovlJ xtltlWg ertnlo rmrwe eetlbwL eVl wYxhaubepwnuetlfiow auerv¢.rlonn4,eLu.,MVLex or w.mnxo,wa. PAVED WASH RACK 1. EET TIE STN(64 IXUVATE A aY f OVEMON UNTOPE AGENAM SiA. i G /. Ri EXTEENDITINTOMETRIGNSH ExuvA Se�� �I� �� $HEFT FLOW INSTALLATION IiERSPELTNE WEK6 Al iW McXA \� PprtB A yaRO EP MMRIER MAN IgNTB O DRAINAGEWAY INSTAIIAMIN (FRONT ELEVATICN) ME IM£T ENGEL OR ORERLANO ROWS (NOT EXCEEDING 1 C.F.S) ARE 9 NT-1 IP TYPICAL ME METHOD MALL NOT APPLY TO INLETS RECBNNG CONCENTRATE) ROWS, SUM AS IN SOVIET OR HIWWAY MEDIANS. TABLE X32-D SITE SPECIFIC SEEDING MATURES FOR PIEDMONT AREA TOTAL HAS. PER ACRE MINIMUM CARE LAWN COMMERCIALORRESIDENTIAL 175400 TIES. KENTUCKY 31 OR TURF -TYPE TALL FESCUE 904W% IMPROVED PERENNIAL RYEGRASS ONK KENTUCKY BLUEGRASS O NK GENERAL$LOPE 91 OR LESS KENTUCKY 3I FESCUE 128 L&S. RED TOP GRASS Y LBS. $EASONALNURSECROP' 20 LEOF I SULFUR L014MAINTEMANCE SLOPE (STEEPER THAN 3:1) - SEE SLOPE STABILIZATION SEED MIX - USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED SELbN FEBRUARY I6TH THROUGH APRIL _. ANNUALRYE MAY TAT THROUGH AUGUST 11H FOXTAIL MILLET AUGUST 16TH THROUGH OCTOBER _. ANNUALRYE ,CVEMBER THROUGH FEBRUARY I5TH _.. WINTER RYE "SUBSTITUTE SERICEA LESPEOEZA FOR CROWNVETCH EAST OF FARMVILLE VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL OTHERPERIODS, U BE U NHULLEDSERICEfB IF F(ATPEAIS USED IN LIEU OF CRONNVETCH, NCREASERATETOMLB5/ACRE. ALLLEGUMESEED MUST BE PROPERLY INOCULATED. KEEPING LOVEGRABS MAYBE ADDEDTOANY SLOPE OR LOWMAINTENANCE MIX DURING WARMER SEEDING PERIOD\ ADD 1620 LBSJACRE IN MIXES. E >E Ong CL D O U) z O p 302 2021 DRAWN BY A. NNTATNE DEEIGNED BY A NNTA(NE CHICKEN BY C. KOTARSKI W Z Q w J O Z W V/ 11 M N N 'I V/ Y U Da.�� 00 V/ J w ca U) w O Z U 06 w 47165 C3.0 _ - - - - --________ ________________________ EROSION CONTROL LEGEND _ _ _ _ _ _ _ _ 08 f pMR50F CLEARING AND GPADING a VIp,AL2H OA ------_--------- ----------- ---- - - - — _—_ — __-_- _ _--_--_--_ I '�o _— — — ___ us _`=<s-- �- �R_______________________ _ _ 4_--------- DRAINAGE DIVIDE - __ _ _ _ _-� ]___ _ SOIL AREA DNIDE - VORpLGW ].I:UTAR3gs _ _ _ _ _ _ _ _ yic. Na WOLN85M 95p -r � 0.58E-�_ �= 0I1BQ � - _ - LE >AVEO CONS3RDCTION ENTRANCE 3.02 _ _ -°</ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ FENCE 3.05 'NONAL t __ uy� 9 _ _ ___ ____ ___ _______ _______`4 \�_ _ __ __ _ __- ------ IP ® ..-wOTFrnoN 3.01 MANAGED STEEP SLOPES _ _ _ - - - 44O =n. - - _ _ _ _ _ r _ i -�_ _ _ _ \ \ ` _ _ _ _ _ - 1REJLMIF- M PNSME, F�NgNO CEj,`IDLOD$_ ' _ 00 DNEBSION DIKE 3.0E m E _ ______- - - _ - - - - - ________ ___ -_- _ - 8 - ' _________ Ro RDN-CF-wnv ONER ICx n >E _ ; f i _ _ _ _ v iIMBERWALl - -- I- _ 6T SEDIMENTIPAP 3A3 € LL - TS TERRI.. SHOING 3.3, ------ iPy ��.d L P$ PERMANENT SEEDING 3.32 w O A o TiSTOR06THBAOFFILEBUILOING \II ^ MU MU¢HiHG 3.35 L' yrV WIRI BASEMENT `I II fl 3 CQ g ^ N `L 3 1 DO r TP -�- 3REE PROIERIDB 3.30 N � d � Is £ \\ \\ I BRILKWIN OWWELCS �- T$ 1"e-_ a Is By9 12'ORAINAGE SEMENT \\\����""9yyy (Typl O OC DK47 CONTROL 3.39 r m j DR 1159. PG2M \\ I DC e g S @ N¢ PROPANE wMRGINW EROSION AND SEDIMENT CONTROL XANDBOOK"SPECIFlCPl10N NUMBER Gam' R F - I, T r G r _ l FF=4 ,, APPROXIMATELY 2i6CY OF ,{ $� ip T$ �\ FILLWILLSENEEDEDTOFILL / FF=43943' A p FQ W V \\ \\`x i r THE EXISTING EASEMENT JJ 34C m C L� AA A DC \\ �o \ r C UNABLETO LOL✓1]�INVERT II' f V W L, l I-------=/eLe srea'wt III 'I r L 1/ y r rBR/CKPORLH I \------- -- Ir---r,— `�T `� II HANDlcavvGG ___-- - H F - -•-='f 's r IN �rrr SIGN \�' �✓ ��� RATE J r r S ' e m 1 •\/I /I'�I. 3 Rw.wND.1 IIiI I �. DC`K \ I I � A. FONTA(NE /.'�Ia- A e_ A DERGNEDBY A.BONTALNE OlECKED BY DISTUREANCE=0.59 AC : • CKOTARSKI DC GROPINLET �Iv i APPROXIMA OCAT'IXJ roP =4z1.s 7� aw- 39DINV INJiJ�f`' n "P OF EXISTING NITARRAYL "v / T j,. , I 39D • PARKING. I \O I I I 7/ SFADING,AO ___ -// ee �� STORAGE AREA T$ \ - DO \••••• % i / i\ i\ I 0.5CAPEG I110TEEGRAPHCCOMPANOEASEMENT` II eM1>� \ r ST i _ �I �11,N`pI Q [MOP INLET ' STONEWEIR TOP=423.0' � _ 1V INV IN JI3J i � �O{' I AI INV OUT =41T 4' � ' � • � 1 i I / * 111 ---- —— 6.T DC _ LLI i J — _ J r \ — ss2 8 r esm aA rl� X I DEED \ � 's =¢i �SEMI�LANf -T- _-�� �I_ A M 2 b PUBLIC VARIABLE INBTN R/W \ \� I / PIPEFORTMISCIF TH ITT. � � \ W L y fA 06 5 -- ---.>�--- N \ I K1 sEOI MENTTRAP Ni -aj'r 1 ij 0.85 AC DRAINAGE AREA! �` \ EG TOTALSTORAGEREOUI$ED:113.B CY UG ✓90X 'NARK T \ ``I \ Y ---' ' _ T TOTALSTGRAGE PROVIDED: 133ACY PRE SERVE EXISTING _yyl- TOP OF DAM=426.0 \ T �� \ U� \ \ RENCHMARKSET ` ASPMALT FOR ACCESS TO a--Layr--___a�- I `I j�J���'� J� LHlSED SQUARE INTOP CONSTRUCTION ENTRANOE \�--k- y` RALK URB I .`��-TaD1r- r�{- oA- O \y\l\ ELEVATONJ2646' \ \ �1ry-/L� a $F I' \� JT \I� T�F � ry\1 IT I TO US. ROUTE 29 _ -Ti 1 SEMI. TRAIL 1 `0 ; - i 11 / I ` VARIABLE DM R/W STARM x TRAFFIC ff DftDP IrvLET c �/� a.I �, \1 T IN )1 f 36 ss \ Hro I _ � \ `G MV IIu-9zse —� "--- . c- —I --/ a - —""\ —"— �e a�V IN -4 \ i it\\ 6 \-° // INVOU -4235�" rNVOUT P 4. _ ` - Ip/� , , ____ \' - --E- - = 4 \ _ 1 8 _____ 30e.p $5 -- -- - f �� —s— — -- ----�� `- 47165 sz _ _ _ — - -- — —7/m" -- /mr '7fir— fi fi� E ,0 20 H"ar. WELLIPTICALRCP / / / / / / sMEFTNO ----- ----m-----A,— TM-----.N�IJ �— A, — C3.1 E� _-_-___________ EROSION CONTROL LEGEND _ _ _ _ _ _ _ _ _4�- >e f LIMR50F CLEARING AND GRADING m VIp,AL2H OA ---_ -_- - - - --------------- _ ` ____ — —ass __�5---_aR_________________________________ �-___ - DRAINAGE DIVIDE - _ qss _ _ _ _ __ o _ ____--DJOTRCFE- _ _ _ _ ___ ]___ _ SOIL AREA DNIDE - VORALf.W ].I:UfARSgs _ _ _ _ _ _ _ _ yic. Na WOLN850'/ _ _ _ _ - - - - CE PAVED CONS IOIDN ENTRAN. 3.. _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ SP -n %- SILi FENtE 3.05 'MDNAL -______9 _ _ ___ ____ ___ _______ y _ _ - _ _ _ _ _ _ _ _ _ _ _ - L - IP ® INIkT%IOlFC11ON 3.01 MANAGED STEEP SLOPES _ _ _ _ _ _ - 44O =n. -- - _ _ _ _ _ _ i _ _ _ _ _ -�_ _ _ _ - - - ` _ _ _ _ _ - 1RFELINE- MI%VF EVERGBF�NgNO DEGIDUOuS_ _ _ _ 00 DNERSION DIKE 3.09 FIE _ _ ________ _______ _ _ e — _ 3, ____ — __ ____ _ — — — -4---� ,s �q�q-- _ — - - _- - _ RIGM OF WAY DIVf0.51LN 3.11 "�"O a fr E AT SEDIMENTIRAP 3A3 u I TA TE.... SfEDING 3.31 —w m _ _ _ _ _ _ P$ fERMpHENT SEEDING A. w -h K% INS sx=.8 \\ \ uu nuLalxG 3.31 IP TP —^— TREE'.DR A. 12'DRAINAGEIM�EME11 1 - ' OC DVSI CONTROL A. \\ 1 IRS, P A �R p£ 0 3 wMRGINW EROSION ANDSEDINEM CONTROL XANDBOOK"EPECIFlCAl10N NUMBER GQQ T G a F" - 1, \ 1 2B 32 30 ' � MU � 8k c>✓ PS Oat p a w i< DC g =< �° 34C o NV8 _=M Pp.A I_A .I R —�.. ee MU PS o £S UNABLE7o LOGT�INVERT `pt - IF, IS �Io II I I �I� II II IIII�/�✓II � �� � 9� \\INNINNIM, II d iI III III I T�� ��� 30O2021 DR..wx BY - R PROPOSED V 1.15091`+ T N LIMRSOF • B OBY W I TEA DISTURBANCE • A..FONNTA(NE LU. 2�II T N CENTER OFDRIVE \�1� \� 0.6BAC • PECKED BY 'TMRDUGMWINDOW 1 \ II! I I I e l 1 e u� I \ • c. KorAzsa \ iI ' , I I � DD • • sTNE DROP.TOP 41 I14 II' J -jl T V% w • 3—ao• 39DIP INV INJO.D ,rvvOBP-a,zB " I I $F - �p ,a� \ ' _ 39D • IFCL II / Lu M1K DROV I211 NLEr I INV INUT O.12 IP NOP �' i, \ INV urafzm . s5 / \ _ '� °ii PS _Tl o - \ P$ MU A T� \. 1 \ w \ __------ _ _ _ _ _ _ ___ _ — _ _-- ---------_----- T DC T e w0� __ ----- - DO _ 1 f9HDP£ FEDEX9pA � -, -Ti �--\; i �6 1-41 e- ss -" ss—Br ss Bss—e` ss Ir ss ` AEEESSEAReMENT .- 11 1 A, OEED600NTkf6,PAG d96 T IDS/ \ \ W S brv�ow, r a oe T1L A e DDB_ B rs7�_s7a�`, t 88 1 e \ ¢ z — I "EMINOLE LANE \ M 4/ d B PUBLIC ,L�Lyyyy VARIABLE INDTN R/W \ Poa \ '"— N a (i QQ r.4 w �$ SF A. ` "'-----+>'-� ---"'-- -'a+-- �II \ vI eA. cp ■■ I UG ✓BOX RENCHMARKSET I I _ -} +00- -amN- __ .v1 < ` y BACsKE� DASQUARE INTOP ��_\ 11 1- • // I N y\ ELEVA ON 1 .' �I `Lg ITT{- / I Y xmq _ •• / m @@@@ \y ELEVATION J2646' \ ` 1'1 LJ T„/=F $F-T--+m- -am-- ____ I _ + ^Y / -ae» -.yn- -�aMR--_mar` - 4 T---- m-----+ --- 1---� —+ — T / I TIF o U 5. ROUTE 19 \ \ - ` I Y _ _ T= II I 1 sEMINoeE mat I '\\�\ \ �\ r ,�o'd" (n 'I IIi VARIABLE 4 DTH R/W1 STARM I C\ `B' x TRAFFIC , — -- ` OaOP IrvLET �r c '-,i// 1 \ �. \ .4\ _ _ __� arvVIN s36 S - --_--- c- �.< --_ R3PN .a 1 n / rNVOUa�V/N-4 / ` \ iY\ \ -'INVOU -4236 - — \'. -.-- — A. T P \ \ c — 4 1 a /OB Ip �_ a ` -- __ 1 --__- -- __ - - m a __: �_ 9FdEss -go- --_� --_ _ - - - 4 -'�� -s_ - --7/�Tr-`.� 0 Ta ao, X165 fa"ELLIPTICALRCP s FkT NO ----- —_--M-----N.— ,„,„ �,„ -- T,„-----,„ _—M --- N.— C32 E� Section 5. Stormwater Management Plan (Provide a reduced l 1x17 copy of the latest stormwater management plan. Do not reference only.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County K 1 K— _— M x X— CILAARSPROPERTYEINEBY03DRAJTO DITCHA 1 _ ___ _'4sn____ _ 1 ___—__ __--a65-a-_ _______-__F _ _ --_PFIVACYFENCE --- -� - - ________________________ • ENCROAC l AO`9_ _ _ - - - _ - _ - _ - - _ _ -485- P,EOPPFA'Sr______ _ \ — " _ - - - - - _ - - - - _ _ _ _ _ _ -�6R _ _ _ _ -_ IN-_ _ ------ _ - _ ASA ---- - - a�orACRE 7 _ = _ _ _ -w ass - -- _ - oasBLdioAoeo_ __ — .- 1{{ _ - _ - \ - - - _ _ _ _ _ _ _ 1 _ _ 1 U' 433 _ _ _ _ _ _ I ........... 933 _ 995 9- _ _ _ _ - _ _ _ _ r MANAGED STEEP SLOPESWv _ _ _ _ _ j - - _ _ - _ _ _ _ _ _ --I _ 45p DNAINAGEPREATODITCHA=F17AC _ _ _ _ __ __ _ c=o3p �_ �` \ - - - _ _ _ _ _ - �RFELINE: MUI-OF Ei£RGRF�EN AND D�DIQUOU$_ _ _ _ _ _ _ _ _ _ _ _ — _ Ta fi IN ___ _ _ <ae____ a]] T4Y - _ _ _ ____ _ _ 1,2}6pIWXR p(2) o3g6p)Io17J 026 CEs 435 - _ _ ___ ________ _ J9ew� _ N[. _ _ _ OI )- 3M II.O=DU CPS - 'a - �'� N1flT - 1,1p)=fifi INMR 1W= fib pl — _— — _ - ____ DFO) z2p PT/S (ALLDNPBLEVELOCITr=s PT/S] 4m>5 I t, 4 L - < = I'=- -_________-_______-- qtq=ps2' s p - .91m 4m GRASS LINED DITCH 3=70% 1 1zp � \� / GBF. - 411. IRS IIIINAGE T, —'ice 1 . 4 iT 66' OB 1159, PG 131\\ I 1 1 v, AG, 4N 11 iRSY a33 a35M \ 11 la iP 9x3p' 43 F- -`ET, \ \\\ I II 430� ,32 :c 3 m �z \ ale UNABLE OLOCAI�INVERT I li —_�eNE&TPI V /gLgy)= iD rvnCUTFOR II REw' e�ze�l o ` �, a STgE I I I II II � � III 1 ^• I \ 'ha 1 a39.n' ., MWATQt II I� IIIII { I yy 112 n 12 i Zvi IIO—�� II iI II 11�1 6-PVC 1 ROOF UMIN v U` - Isa PROPOSED\ p �� ap' iC \TV STARBUCKS 1 il iiSp SF -, �I ax U \ 99198 FFE42B.35 y o 1I11 CENTER OF CRIVE lE.R5' 'li 1 P' J TMRouGH VANDow 6PVC v Try ` DowxSPOUTTo RooF GRAIN I ' ROOF GRAIN DROP INLET PRE) 1� 1 �� 1 yv/ ✓/\\I 5.91' TOP<31.61d. ,1 , �` 411* INV.lN=411, v 1 1 6WR INVObT=aiT.p'427 a I I II I 42 /TD 24• �7E_D?T._0W i —B" SS B' SS-8 " SS B' S5 SAIIIARYMH TOP=426.4' X INV 1N =41J9' Y / lNV our=arzr - SEMINOLE LANE PUBLIC \ VARIABLE MAIN R/W \ \ ROOFDRAIN NOTES: 1. PIPES FROM ROOFORAINS TO HAVE A MINIMUM SLOPE ` OF 1 R% OR AS SPECIFIED ON AIW. 2. PIPE FROM ROOFDRAINS TO HAVE A MINIMUM COVER OFV 3. CONTRACTOR TO VERIFY IF DONMSPOUT BOOT CAN BE SUBSTITUTED FOR CLEANOUT. IF NOT, PROVIDE CLEANOUTS AT ALL LOCATIONS MERE ROOFDRAINS TURN OR CONNECT TO PIPE OUT OF BUILDING. 4. CONTRACTOR TO FIELD VERIFY ALL EIBSTING AND PROPOSED STORM INVERTS OUT OF THE BUILDING AND CONFIRM REQUIRED SLOPES. COVER, CROSSING AND CONNECTION POINTS CAN BE ACHIEVED. ED RSgssmt� yIE 8k w� aF� O �jM�ll i QI�pR~ �_ a DAIS CONTRACTOR SHALL COORDINATE ANY CONFLICTS 3/22/2021 MATH ENGINEER BEFORE BEGINNING CONSTRUCTION.12 3B'ACCE53 A: v RISERIIA \ 4sv I \ i II 9B"ACCE53 RISER aa] U, 2 1 � 1 Ias 4W.m ays 3 n' 1 \ -"1 \ Y 1 Tc Nb� SNNA 1 2 ____ TV SRMAGE%PE �e 'Y WITH WEIR PLATE � V $ 4' 1 snpn-�'`-�•�_ ` _ is PUBLIC —ARICIGE44FABENT 1 1 \ OEEO BCOK I$PAGE 968 B951AAVYA 1 L/ Be 11sa1sp a \ � \ I OB 1676214TV ------rT-----� --�-- _ `\ �9 BENCHMDRKSET CHISELEDSOUARE IN TOP BACK y� �\ BACK CURB ELEVAT40N=a26I6' \ I 1 \ TO USIROUTE 2eSEMINCOE \ \� A IL 1VARIABLE 1{IH 19R/W I TSTARMIF RL" „ z4M%' 1�41p \ I JC%T I UG JBOX TEL MARK MA CH VATIONSTING (yl FEVATICNI3 TRAFFIC V]65 RIF ❑ // FROPINLET roP <z64' \ I 1 \ INVI 6 -a255' _ __ _ ____ ___ �i--_ _ _�y__-_ ____ INVIM4136' - {�_ - p- v - -� WEOV$a236' v - \'.n .. - 4.. 1 D�N BY A. NVIDUME •• A. NARDUME • 7NEIXED 9Y • C. KOTARSKL scuE • 1.-I • • • w E Z D 9 Q O LLJ i J g O z w/ z g2 G a W g W , < S Q E riCD - M N W a6 gl N z!. ZV ^ �a / E. Y cD O U 00 SCALE I'=ttl �P41fll! 1p' te"recP e'. I I / T Y v� 1Aria- 21— I I AN4YSI5 1 .4 \` / I POINT 1 I v ."' / B" 55 S" S� A S /wassaw s •e' _ I �POINS ' 2�! � s I I WATER QUALITY ANALYSIS SITE DATA PRE DEVELOPED AREA IMPERVIOUS= nA2ACRES MAN,GED TURF =9.1T ACRES PRE DEVELOPMEM FRAUD (TP)(UB Tb=099 POSTOEVELOPEDAREA IMPERVIOUS=O.MACRES MAN,GED TURF =0.15 ACRES POST DEVELOPMENT LOAD ITE(LRrvR)=1A2 MAXIMUM REDUCTION REQUIRED FOR REDEVELOPMEM=1M TOTAL LOAD REDUCTION REQUIRED (LBrYR) = R13 D.13 CREDITS TO BE PURCHASED / I y - - -�- ---- _-- -LI as I PRE -DEVELOPED TOPOFRFSTORAGEPIPE TOP OF WEIR ELEV.=6xi.50 RATE6Y2.Tr _ QrO reAR ease a2z.n 35 ORIFICE INV. 419. STEEL PLATE _ Q t_YE_AR_WSE_ a1B_04_ 5 S ORIFICE EIEV VNTH TRASH RACK 41R00 IW41800 SWNI A WEIR PLATE SECTION DETAIL Ins Ion Activities SwineAsted Schedule • After alai Mofm evenliman extreme ilOnll event, in'Pecl for: ai,ns 9fdo Afthe inks orAmla s...— and sediment accumulation. As Needed • Inspectfor. (rash a" debris. clogging ofthe outkl annelums and any pilot ehanwhe excessive erosion. seecimcnt nerumuktien in the lusin and inleVoudet nmc.; mac gnewds on dole or embankmem: the pinewnec ofbll -n,animas; standing over where there shadd he Semiwnnually vigor and density oftbe grass turf on the basin side slopes and Rwx: diR mint senlemem: e.kin,leakaeand III Mbtlil, • Insect ffiI oufet anpurq pipts, and dowaaaeam and pilot ,hoardsare frte ofdebris nW no, aMmiotlal. • N9te Sipe of pollution, star as oil III dneolored moi or unpleasant odors. Annually • Cheekfor sediment acamalaton in the facility. • Cheek for prefer operation ofeomml pies. valves or Asher mechenitel devkta. Mail.-- Activities Sisosessed Schedule • perform structural nyairs to inlet and outlets Maably a As needed Clean and remove debris from inle, and Order alluclurts. • I" dn�Se to inktaM Audctarvcmrts.mnlml sales. valves. or other es,davka: air ZtM. Ar emdtd areas. As Needed • Monitor:dZint accumulation, and remove sedimem when prod volume M1ae becoia rtdA si ifcaml . As Needed ry _ _ F - I T ha na wAs J \ ANALYSISPt POINT S" 55 S" — was C` - \�_ ' MAVIII =ate? l I -.-__ r mvuwa wl2n LEGEND r SCALE t'=3D � UNDISTURBED PRFA 0 90 65 WATER QUANTITY ANALYSIS POINT 1 DRAINAGE AREAANALYSIS (PREDEVELOPMENTI PRE AREA IA AREA =0 WS ACRES 0273 ACRES (IMPERVIOUS) 0030 ACRES(GRASSI COVER) Tc=6 MIN D ICF31 Vfuern 1 YEAR 118 PON) 2YEAR t- 10YEAR 229 PREAREAIB AREA=0200 ACRES 0000 ACRES (IMPERVI W S) 0200 ACRES(GRASSI COVER) Tc=6 MIN O ICF31 t YEAR 010 2YEAR 020 10 YEAR O59 PRE AREA IC AREA =0214 ACRES 0 088 ACRES (I M PER V I W S) 0126 ACRES (FEARS COVER) Tc=6 MIN O ICFS t YEAR 0 2YEAR AN112 10VEAR 11z COMBINED FLOW TO ANALYSIS PRINT 1 Doe 1 YEAR 1AS 2YEAR 221 to YEAR 3% AMINIMUM TC OF DRAINAGE AREAS. (POSTIDEVELOPMENT) POST AREA to ARE1=0329 ACRES 0262 ACRES (R CROP 0002 ACRES (GRAGR&SS COVER) Tc=OMIN OICFSI VIAGFTI t YEAR i'M OAS[ 2 YEAR .40 10YEAR 2.32 POST AREA 1B AREA =0231 ACRES GOOD ACRES(IMPERNOUS) 0231 ACRES (SEARS COVER) Tc=6MIN OICFSI 1 YEAR 011 2 YEAR 0" 10YEAR OAS FLOW THROUGH SNM ADEIENTIOM PIPE OICFS) 1 YEAR OAt 2 YEAR 133 10YEAR 215 POSTAREAtC AREA =0214 ACRES 01109 ACRES(IMPERVIOUS) (Fl. ACRES(GRASS COVER) Tc=6MIN 0(cm) t YEAR 039 2 YEAR 056 10YEAR 112 POSTARFAtD AREA=0000ACRES 0 Ms ACRES UMPERVIOUS) 0025 ACR"' (SEARS COVER) Tc=6 MIN OICRU 1 YEAR 09 2 YEAR 03' 10YEAR 060 COMBINED FLOW TO ANALYSIS POINT t 0(cm) 1 YEAR 155 2 YEAR 2AIf 10YEAR 3,79 cesevnolFo 50 BO"14aaaeacrcn"RVracoawrtmnMVoa am. Ceram OK 145CFS 5O.W(1.1BCFS"0.O6-FTy(0052AC-FT)t040CFS =1 ]t CFS FLOOD PROTECTION' POST -DEVELOPED Cw 5 PREIDEV ELOPED On OK 3R9 CFS(POST-DEVELOPED OId 5399 CFS(PREDE LOPED Cho) AND POST DEVELOPED POST -DEVELOPED NWX u MI T vi LEGEND r UNDISTURBEDAREA AREATO ARM A WATER QUANTITY ANALYSIS POINT 2 DRAINAGE AREAANALYSIS (PRE DEVELOPMENIt PREAREA2A AREA =.112 ACRES 0142 ACRES(IMPERMOUS) 0087 ACRES (GRASS COVER, B SOILS) 0053 ACRES (GRASS COVER, D SOILS) Tc=6MIN O0ICES) V I 1 rEAR E. F. 2YEAR F. 10YEAR t.T6 PRE AREA 2B VNOISNRBEO ARFA=LOU ACRES 0052ACRES(IMPERNOUS) O146 ACRES (GRASS COVER, B SOILS) 0080 ACRES (GRASS COVER, D SOILS) Tc=6MIN O ICRN 1 YEAR OA0 2YEAR LIP, 10YEAR 141 O(CPS) t YEAR Lt9 2YEAR 1A7 LDYEAR 318 (POST-CEVELCPMENT) POST AREA 2A AREA =0. 167 ACRES 0120 ACRES(IMPERVIOUS) 0020 ACRES (GRASS COVER. B SOILS) 002T ACRES (GRASS COVER. D SOILS) Te=6 MIN D(CPS) VV IACm 1 YEAR .1 F. 2 YEAR ri L.YEAR 113 POST AREA 2B UNOISTNRBEO AREA, =025T ACRES 0053 ACRES (IMPERVIOUS) 0114 ACRES (GRASS COVER. B SOILS) 0080 ACRES (GRASS COVER. D SOILS) Tc=6 MIN D(CPS) 1 YEAR 0A0 2 YEAR 0.6T 10YEAR 1 D (CPS) 1 YEAR 1 m 2 YEAR 1M 10YEAR 25T QEwaren 5090'(Qn[aEtivarn RVnI[msaren)IRVeeygnp[o 1 Qypyl[ OK CUR CPS 5 PW(O73 CFSVPS4 AC-FTy(0030 AC-FT)+FR)CFS=139 CFS FLOOD PROTECTION' POST -DEVELOPED On PRE -DEVELOPED O'a OK 1. CPS (POST-0EVELOPED Olds>13 CFS(PRE-OEVELOPED On) ED 8 E a on in as se '8 Q W O� O i QhpN~ in DATE S 3 wish BY A. FONT UNE DEOGINED BY •• A. FONTUNE MIECKED BY • C. KOTARSKI iwOF AS SHOWN • • CL Lu a DZ Q a w Z J1 U o_ Z HI Z ILL F 's �w/� Y V) F �Lu V m Q 0 l� OV Z. Z y M � < i Nw Lug$g ¢ 8 ZI Y ft U o m 2 e )d 09 p. IMS 47165 FkT xO. C 6.0 E LEGEND AREA C INLET �;--'—, i� i S llryi "0000' I V WKOLW8 0 ...,,.'' Mo room : :`OTONAL Ety6" E It --_J— — ,♦ _,--_--'-___ \0.1860.30. __-_ _______ _ a ___________________________ --—<66-■_ —-- aSs ♦♦ _'J-� �_— _ ---__ ---- - _- ♦ �------------ ----------- — _____ -- --- ' — — — — — — —------■---------�---_-_-- �---- ---------------_ 3€aa • _ __ �—_--_— ♦__ -_ --_ — — _ — ■ -- _ eso— ____--0A98L- OA-OIFFJo-______ — 1{ — -- -_— - -�-- 9— _ J--- — ---■_---------- - o o 3 sa ■ '- -----_ _.,— t__ — --- • _ _ QS� j -- ♦ - ' _-_ — — __ _______ - — L-_______■____ - — _ -------------- - er p -_ __— _ _ __ '_-i-__-__ _1_____ — _ ________J4___________ riv 4 _-6_'/_ -_ __ ____ __ -—__—__—_ _ _ _ �TREELINE-M000F EVERi.HF._E ND QEL'IO �M iC - - _ _ _ _ _ _ _ _ _ _ ■ ■ - - _ _ _s% _ _ _ _ _ _ ■__-- _ ____ _____ ____________ _ _ — _ _ ___ _— _ _ _____ __ _ _ —__ _Y_____-_ _______ N - r -------- O ■ ■ ■ ----- I — --:-----_�__ 47 `�,Ro 0.03$0.80 W 11_ \� _ �nnn I f\ x Q y� p ■ �� � Kv, - u_ 11 <,a_ � oA,F �\ I �1 �I ♦ 1 . o_ ° 1 8. a a33 302/2021 II� ■ \\\ II q I ♦1 m '.11. _ - �. 11 °33 I NN...IN By I 030 4 NS tt6 O.OlT O.6T 3T 1 I I I ♦ A.NMA(NE ■ O \ ` g o.ols os6 III O AV 1 .� .. 1 `liz ♦ A, oat 11 ♦ Ngl°x.n N. II L ___ ______ I m .116 A.NMA(NE FA 0 � .. ♦ ♦ •� l 1y111y1—�1\ ♦e NOS e.B . ♦ ♦ OI[[K[o BY ■ UNABLE IO [OCAT[INVERT—' '^ p � _. B➢,� °� I O u ♦1 ; I I�♦ • CKOTARSKI ■ r — JB'8E&T BN.,1G 1 4 \ ` 0.5$ 1 • scar: 0.020 I� � II I I I I II II II '�I I .♦ � ♦ ♦; w., ■ 1"-m• II ■ II I I I I II II III �/y I I 4 122 � i ♦ �� ■III I I I I II I III I° ♦ I ■ 112 vv ■ 11 I I I I II �� I 'I 'I � - • ' ■ - � o.oaz 0.74- II I mWOW. \ 0 'ks A ;Lu n BUCKS 1 1,1WSF � 9 \ ♦ 0.216 0.55 WIi ° V ♦ I a oanoo il� cENTEit ♦♦♦ ♦ . F`JIY``II1 I I OBIDE. 11 ' ^ �r Uea DD ♦♦ ♦ `y I i J KN TKROUGW0.0.245 0.63NooB LJJ 1 .0 1 ♦ OROPINLET Z p ♦ TOPJ1.61j� •II y \ \J( r" I ,�•__ J 1 ♦ INVIN-anv 6 y v a 01 10R ■` ♦ \ f06'VIRGINN JELEPHONEB 3 > IJl . \�e • 1 7 !��`y• • ,� ♦♦� I SOB SLa, PO gp LPLEGRAPI COMPANY EASEMENTS Z Q E . / .1 \�\\�� / // III 03 . ♦ \I 1 0 b II DROPINeW / \'\'^ ♦ �L: �0 I ♦ \ .'�-. ne ♦ i'3s N a Z !!✓ 1h-� .< I TOP=a23 a CyP ♦ ` ; I W g 1 " i i y5T P �\ INV OUT ta' .%'t5 / \ i 2> �rv0\ to �. ♦R `I • / li \� ♦♦ 1 \ 3 ORE Lu Lu ,5•RDPE -- i■<fEit�f■■i�fE■� �j"�� n\ \ ••��� `�� /r / 0.04 0.27 i 1\ \ ���. \0 -----T---------- ------ --- I_\L'--\=___--- _ � E? t n✓EM \ ` 'A 8' S5 B" ss-8' ss-8' S5 1 t FNTCUT Rom\ \ —Y \ ----- g ♦e♦1�--e• ss a- ss� ' ez-ge ♦+1 = _ \\ ___ _ __ _ ______ ____ 00 �. SEMIPUBLICLANE \ 33 1 —iT CO — ® U) }+S VARIABLE WD71R R/W OGJSOX MARK JOe 1p. g$ \\a BENCRMARKSET \\ -�IIj \\ 111 a�--_ IL + -1aRn— —ate 0 0yi0 47165 -9 A� A1A1EDSOUAREINTOP 1�-1 II �--+P" —+ ___ - ' H NO. $n ___ / 1 �n�� _ / 1 sl BAGK URBC6.1g 114. rBaer-Said Onsr �pJYiFt pA, STA 1wB2.]fi / TOP 42050 112:12' Basin - Clraular Ga@ STA 10K1 25 INV 0422. 90(1 Us) INV OUT 42200 (113) O V CypIG W ].XUfAR3gs TOP 62]99 11612 Basin-ClmularG24 Lic. Na WOlAA85M INV IN 4223T (113) INV COF 42227(111) STA 10+9350 TOP 427 03 110'. MH-1 INV IN 42331(117) `TfONAL STA 10+52W IW OUT 42321(115) TOP 42] 91 110: OI 2A INV IN42201(111) STA 11+07M INV IN 42255 (121) TOP.1133 NV OUT42182 (109) 100. 012B 6 fl lNoal INV IN.35.(11.) INV OUT 42341 U1n ry8 STA tON3/9 120: 30"Basin-Grwlar GaM V} > E _ `o TOP 42T85 STA 11 W 00 INV IN 421 B.(109) INV OUT 42094 TOP 42l 35 INVOUT 42a33 oRm�a (101) 435 (119) 435 tovo m mroyRw6n W EX-1C0 STA 1M00.W + 2 S �` O 8 iy 3E� zS q Mg, m g rovazi Sz Ba'o �Fa__o ..Fad INVIN41710(101) �mR M4 4. a 3� as oe Ng� i si appsi 6 F q S� ka si W aF� 'o o� SIB SINNAA HBEE ��$ SO 1 F 6 P~ O DA IF S jr, sE 3/22/2021 A. FOYBDUNE •• A. FOYBDUNE ECKED BY C KOOTTARSKI • • wW tw00 tt«W 11a50 wW 1wOp lFTS' t2«W 9t50 1wOp 11«Op tt+5p q$$HOWN STORM: 100-SWM A PROFILE STORM: SWM A-120 PROFILE STORM: 108 - 116 PROFILE HORIZ SCALE: ls= HORIZ SCALE: ls= HORIZ SC 1�w VERTSCNE: 1�5 VERTSCNE: 1�5 VEf2T$CAlE: 1�5 $TA1t+30.fi3 3 TOP 7) INV IN42051 1 1 1 •.. a (37) INV IN42a51 (34) 4 TA 11+342b TOP 4202b �J INVOUT42051(23) INV IN 42058 FTGT) INV OUT 42058 F-n 5 L Q g v $T01P-]1� z 5 sTA 11 «s3Cfi sTA1w1s0] $TA 1w38.18 45°BEND 4'PLUG6YF1IlING J INV IN 4t9.a5 (2.'iJ TOP42835 INV IN4209](S6) STA. tw10.00 STA tw5]W INV OUT41B45 (EXt-2) INVWT4209T (GT-5) 45'BEND Fs WATER NITER w Es STA fO«0000' £X 1 6 STA 1H01]9 $TA 1-T.08 $TA1w9922 00 J TOF42540 TOP I2823 GATE VALVE aS BEND 50 j 1.11.11290(EX1.2) INVIN 422.T0("TOO) $TA UFNFM STA 11«3t.93 PROFILE SCALE O INVOUT4/7]0 (EX 1-2) INV OUT 422]II (5b] 4'X 8'TEE 45°BEND e HI G 2 a w> W's IJ/ x 7J O $IDS O V � b M a K Nw� a� F$ Z' E Y [SIB $ E " O y� W@ F yyP e� Ep B✓,A 1w00 11«Op 1MOp 12«5p 9«sp 1wW 11«03 12«W 1a+p0 13«59 $F SANITARY SEWER PROFILE WATER LINE PROFILE = e$ HORL'SCALE:l=sS OW SCALE: t'--5 HORL'SCALE V=5f1 VERT SCALE 1= S IME 47165 = sxEaT xs. C70 3n PROPOSED GRADE IXISTING GRADE 4zs / A 4zo 80' CMP INV=H0.0 15 09 H 2.Sa' OF 5'HCPE 101 9.19% 2028 dF 1S HDFE 1 ®1.8]% a1 E%ISTING GRADE PROPOSED 430 GRADE q3p Y WATERLINE SO a2 ta' I ne 38 BSOF 1n 1r I(DPE az0 Bu•OF 2M% azo 5B'CMP INV=a180 2.Op% t15 is ]4'OF tY XDPE a15 20p% a15 10 SAN. PIPE GT t2 ]SO tY HOP SAN. PIPE 3] ®10B 1t9 2t.5T a1 1pB H 3B.B$'OF ®2. tY HOPE t11 ®201% B.B90F tY HOPE ®200% ISBN PRCP0.5FD i GRADE \ ✓ � PROPOSED BUIL➢ING r 5 WA RUNE $ ORM a25 PI tt3 Ltl MIN. SEE 21 420 B6LfHa` a.00OF 2-3 3J ypyp 5320'OF 3T2'OF GT-5 ®]50% 0"PVC 0"PVC 0IXJ'OF 1 ®20%6 2W% 0"PJC ®2p5% 58 a1 IX12 29 ]3'CE OF 0.GT GREASE $• wC ®]10% ��, 1]0'OF GB-]S MATH �2� e'PVC FIBER PIPE 10 a10 IXISIING pRppp ED GRADE GRADE azs 42s 121 420 Ba.]0OF 12'HDPE ®18B% $AIIIT PIPE2J n at a1 at STING a E _ PROPos$D _ GRADE \ P CPO.RFD 490 \ V B IIDING a30 SS 425 MIN. a25 LocATEARO a'DIv COMIECTTO tA' IXIST. B' 2'TYP KCOPPER WATERLINE MT NE 42 4zp PIPE 100 $ANRARY PIPE 2S tl5 H5 Section 6. Pollution Prevention Plan. (reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4) A. Plan showing pollution activities and prevention practices (Provide a reduced I Ix17 copy of a site plan on which all of the following activity locations are clearly marked. Keep this plan up-to-date with ongoing site changes and inspections.) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County I I I I i I I I I I I— � T �- - - - - - - - - - - - - - - - - - - - - - - I - - - - - - - _ I 1 I e I I I �fl DUMPSTER _ I Ir TI ------- --- CONSTRUCTION TRAILER _ TEMPORARY lyj TOILETS / I I MORTAR MIXING STATION CONCRETE WASHOUT ----------- ------ 8" SS 8" SS 8" SS All_ I—==— • — �' n— — — —len \� —lon— — n— — PROPOSED `3 ABOVE GROUND FUEL CONTAINER —J9n— CONSTRUCTION n — i WITH IMPERMEABLE HEAVY -MIL I ENTRANCE — TO ❑� ,.... LUME - T ----• -- -. ��. � � — _ OSTORED FUELED T — � CONTAIN VOLUME + 10% (GAS/DIESEL) __--____-� — =—,�T — — --" — - —_- 0.3 M/LES TO U.S. ROUTE 29 RIVANNA R/VER SEMINOLE TRAIL NORTH BOUND LANE VAR/ABLE W707H R/W STARBUCKS - POLLUTION PREVENTION PLAN PHASE 1 SCALE 1"=30' .•'`s``% June 15, 2021 0 301 s0- TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. I � AIL---- v v i 464646469- I - 464 5� - \ Z v \\�_ _ = e 454545459�✓=_ 1 n�Q Q Q p 1 I -- -- -- -- _ _ I "--Q 465. = I 450 _445_--- I 9 1,- TRAILER TOILETSCONSTRUCTION o • ►iMORTAR STATION ` WASHOUT I 1 � ICONCRETE I � II r n NQ_ i i A. _ 1 2 0.3 A9 TO RIVANNA RIVER \ f 1 1 lion — PROPOSED I 1 I — 1 n I \l-gn— CONSTRUCTION o �t \ ENTRANCE —AA— — — — U.S. ROUTE 29 SEM/NOLE TRAIL NORTH BOUND LANE VARIABLE W/DTH R/W STARBUCKS - POLLUTION PREVENTION PLAN PHASE 2 June 15, 2021 ❑iC m ABOVE GROUND FUEL CONTAINER I SCALE 1 "=30' 0 30sa TIMMONS GROUP YOUR VISION ACHIEVED THROUGH OURS. WITH IMPERMEABLE HEAVY -MIL LINER. VOLUME SUFFICIENT TO — CONTAIN STORED FUELED �,;� _ VOLUME + 10% (GAS/DIESEL) r--�--�- ts. sources or rouutants, vocations, anu Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures C. Sources of Pollutants continued. Common activities and minimum control and prevention practices Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Follow Erosion and Sediment Control Clearing, grading, excavating, and on- Land disturbance area Plan. Dispose of clearing debris at stabilized areas acceptable disposal sites. Seed and mulch, or sod within 7 days of land clear" Cover storm drain inlets and use drip pans Paving operations Roads and driveways and absorbentloil dry for all paving machines to limit leaks ands ills Concrete washout shall occur in area Direct concrete wash water into a leak - Concrete washout and adjacent to the construction entrance as proof container or leak -proof settling basin cement waste designated on the Pollution Prevention that is designed so that no overflows can Plan. occur Enclose or cover material storage areas. Mix paint indoors in a containment area or Structure construction, stucco, Structures in a flat unpaved area. Prevent the painting and cleaning discharge of soaps, solvents, detergents and wash water, paint, form release oils and curing compounds. Dewatering if necessary when Water shall be filtered, settled or similarly Dewatering operations converting culvert inlet protection treated prior to discharge as shown on shown on plans plan. Designated areas for material delivery and Material delivery and storage Adjacent to construction entrance and storage. Placed near construction construction trailer. entrances, away from waterways and drainage paths Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Pollutant, or Pollutant Location on site Prevention Practices, Generating Activity Control Measures Material use during building process Building areas Follow manufacturer's instructions. MSDS's attached. Waste collection area will not receive a substantial amount of runoff from upland areas and does not drain directly to a waterway. Containers have lids covered before periods of rain, or are in a covered area. Scheduled collection to prevent As provided by contractor overfilling. MATERIALS NOT TO BE Solid waste disposal BURIED ON -SITE Convenient and well -maintained portable sanitary facilities will be provided, and Sanitary waste Current locations shown on plan located away from waterways or inlets. Such facilities shall be regularly maintained. Apply fertilizers in accordance with Landscaping operations Landscape areas shown on plan manufacturer's recommendations and not during rainfall events To be treated in a sediment basin or better Wash area is located at the construction control as specified on plan. Minimize Wash Waters entrance. Adjacent diversion dike will the discharge of pollutants from divert wash water to sediment trap. equipment and vehicle washing Vehicle and equipment washing Designated areas and details shown on Provide containment and filtering for all Ian wash waters per the plan Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other materials present on the site to precipitation and to stormwater. (Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater discharges.) D. Non-stormwater discharges Discharge Pollutants or Pollutant Location on Site Constituents Dust control water Sediment As shown on plan Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Discharge Pollutants or Pollutant Location on Site Constituents E. Persons responsible for pollution prevention practices (Provide the names and contact information for all persons responsible for prevention practices as listed above.) :E F. Response and reporting practices Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures as follows. Respond to all spills, leaks and discharges as follows, Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter, sand, saw dust, and plastic and metal trash containers. All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash containers for disposal. Report all spills, leaks and discharges as follows, (Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.) Reports will be made to the following: Virginia Department of Emergency Management Emergency Operations Center (EOC) Phone: (800) 468-8892 Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800424-8802. G. Pollution Prevention Awareness (Describe training and procedures to provide awareness and compliance for all measures in this document; waste management, wash waters, prevention measures, etc.) The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by registered land disturber each time a new E&SC procedure is constructed. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 7. Discharges to impaired waters, surface waters within an applicable TMDL wasteload allocation, and exceptional waters. This site discharges to impaired waters as detailed on the following sheets. Enhanced inspection freauency is required as outlined below: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Addition items for implementation: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 8. Qualified personnel The following personnel are responsible for inspections; (Provide the name, telephone number, and qualifications of the qualified personnel conducting inspections.) :R Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 9. Signed Certification v "i. ,uili, I I(,''ILIhl; 6 ;A,�o 25-870-370. Forpurposes of plan review and approva Is, this certification should be the owner of the property, the same signature as appears on the bonds and applications. Another operator can be designated on the delegation of authority form to follow.) CERTIFICATION "I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." Owner/Operator Name: Dhanvant Goradia CCv"'Merua� r�,CA=6 I- .C. Company: Title: Owner Signature: j4aR�- W ' Date: G (IS Issued - 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 10. Delegation of authority. (Provide the persons or positions with authority to sign inspection reports or to modify the stormwater pollution prevention plan. A formal, signed delegation of authority is needed.) Delegation of Authority I, (name), hereby designate the person or specifically described position below to be a duly authorized representative for the purpose of overseeing compliance with environmental requirements, including the Construction General Permit, at the construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans and all other documents required by the permit. (name of person or position) (company) (address) (city, state, zip) (phone) By signing this authorization, I confirm that I meet the requirements to make such a designation as set forth in the Construction General Permit (CGP), and that the designee above meets the definition of a "duly authorized representative". Operator Name: Company: Title: Signature: Date: Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County Section 11. General permit copy (Provide a copy of the construction general permit, 9VAC25-880) Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County COMMONWEALTH of VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY General Permit No.: VAR10 Effective Date: July 1, 2019 Expiration Date: June 30, 2024 GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of construction activities are authorized to discharge to surface waters within the boundaries of the Commonwealth of Virginia, except those specifically named in State Water Control Board regulations that prohibit such discharges. The authorized discharge shall be in accordance with the registration statement filed with the Department of Environmental Quality, this cover page, Part I - Discharge Authorization and Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions Applicable to All VPDES Permits as set forth in this general permit. Construction General Permit Effective July 1, 2019 Page 2 of 26 10M.T 1 DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS A. Coverage under this general permit. During the period beginning with the date of coverage under this general permit and lasting until the general permit's expiration date, the operator is authorized to discharge stormwater from construction activities. This general permit also authorizes stormwater discharges from support activities (e.g., concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated material disposal areas, borrow areas) located on -site or off -site provided that: a. The support activity is directly related to the construction activity that is required to have general permit coverage for discharges of stormwater from construction activities; b. The support activity is not a commercial operation, nor does it serve multiple unrelated construction activities by different operators; c. The support activity does not operate beyond the completion of the last construction activity it supports; d. The support activity is identified in the registration statement at the time of general permit coverage; e. Appropriate control measures are identified in a stormwater pollution prevention plan and implemented to address the discharges from the support activity areas; and f. All applicable state, federal, and local approvals are obtained for the support activity. B. Limitations on coverage. 1. Post -construction discharges. This general permit does not authorize stormwater discharges that originate from the site after construction activities have been completed and the site, including any support activity sites covered under the general permit registration, has undergone final stabilization. Post -construction industrial stormwater discharges may need to be covered by a separate VPDES permit. Discharges mixed with nonstormwater. This general permit does not authorize discharges that are mixed with sources of nonstormwater, other than those discharges that are identified in Part I E (Authorized nonstormwater discharges) and are in compliance with this general permit. Discharges covered by another state permit. This general permit does not authorize discharges of stormwater from construction activities that have been covered under an individual permit or required to obtain coverage under an alternative general permit. Page 3 of 26 4. Impaired waters and total maximum daily load (TMDL) limitation. Nutrient and sediment impaired waters. Discharges of stormwater from construction activities to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for (i) sediment or a sediment -related parameter (i.e., total suspended solids or turbidity) or (ii) nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a stormwater pollution prevention plan (SWPPP) in accordance with Part II B 5 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations and implements an inspection frequency consistent with Part II G 2 a. Polychlorinated biphenyl (PCB) impaired waters. Discharges of stormwater from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit for PCB are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 6 of this permit that minimizes the pollutants of concern and, when applicable, is consistent with the assumptions and requirements of the approved TMDL wasteload allocations, and implements an inspection frequency consistent with Part II G 2 a. Exceptional waters limitation. Discharges of stormwater from construction activities not previously covered under the general permit effective on July 1, 2014, to exceptional waters identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit unless the operator develops, implements, and maintains a SWPPP in accordance with Part II B 7 of this permit and implements an inspection frequency consistent with Part II G 2 a. 6. There shall be no discharge of floating solids or visible foam in other than trace amounts C. Commingled discharges. Discharges authorized by this general permit may be commingled with other sources of stormwater that are not required to be covered under a state permit, so long as the commingled discharge is in compliance with this general permit. Discharges authorized by a separate state or VPDES permit may be commingled with discharges authorized by this general permit so long as all such discharges comply with all applicable state and VPDES permit requirements. D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all discharges covered by this general permit shall be composed entirely of stormwater associated with construction activities. All other discharges including the following are prohibited: 1. Wastewater from washout of concrete; 2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; Page 4 of 26 3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; 4. Oils, toxic substances, or hazardous substances from spills or other releases; and 5. Soaps, solvents, or detergents used in equipment and vehicle washing. E. Authorized nonstormwater discharges. The following nonstormwater discharges from construction activities are authorized by this general permit when discharged in compliance with this general permit: 1. Discharges from firefighting activities; 2. Fire hydrant flushings; 3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge; 5. Potable water sources, including uncontaminated waterline flushings, managed in a manner to avoid an instream impact; 6. Routine external building wash down where soaps, solvents or detergents have not been used and the wash water has been filtered, settled, or similarly treated prior to discharge; 7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred (or where all spilled or leaked material has been removed prior to washing); where soaps, solvents, or detergents have not been used; and where the wash water has been filtered, settled, or similarly treated prior to discharge; 8. Uncontaminated air conditioning or compressor condensate; 9. Uncontaminated ground water or spring water; 10. Foundation or footing drains where flows are not contaminated with process materials such as solvents; 11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations that have been filtered, settled, or similarly treated prior to discharge; and 12. Landscape irrigation. F. Termination of general permit coverage. 1. The operator of the construction activity shall submit a notice of termination in accordance with 9VAC25-880-60, unless a registration statement was not required to be submitted in accordance with 9VAC25-880-50 A 1 c or A 2 b for single-family detached residential structures, to the VSMP authority after one or more of the following conditions have been met: Page 5 of 26 a. Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator has operational control. When applicable, long term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a complete and accurate notice of termination and the construction record drawing prepared; b. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; c. Coverage under an alternative VPDES or state permit has been obtained; or d. For individual lots in residential construction only, final stabilization as defined in 9VAC25- 880-1 has been completed, including providing written notification to the homeowner and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. The notice of termination shall be submitted no later than 30 days after one of the above conditions in subdivision 1 of this subsection is met. 3. Termination of authorization to discharge for the conditions set forth in subdivision 1 a of this subsection shall be effective upon notification from the department that the provisions of subdivision 1 a of this subsection have been met or 60 days after submittal of a complete and accurate notice of termination in accordance with 9VAC25-880-60 C, whichever occurs first. 4. Authorization to discharge terminates at midnight on the date that the notice of termination is submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection unless otherwise notified by the VSMP authority or department. 5. The notice of termination shall be signed in accordance with Part III K of this general permit. G. Water quality protection. 1. The operator shall select, install, implement, and maintain control measures as identified in the SWPPP at the construction site that minimize pollutants in the discharge as necessary to ensure that the operator's discharge does not cause or contribute to an excursion above any applicable water quality standard. If it is determined by the department that the operator's discharges are causing, have reasonable potential to cause, or are contributing to an excursion above any applicable water quality standard, the department, in consultation with the VSMP authority, may take appropriate enforcement action and require the operator to: a. Modify or implement additional control measures in accordance with Part II C to adequately address the identified water quality concerns; b. Submit valid and verifiable data and information that are representative of ambient conditions and indicate that the receiving water is attaining water quality standards; or Page 6 of 26 c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3. All written responses required under this chapter shall include a signed certification consistent with Part III K. STORMWATER POLLUTION PREVENTION PLAN A. Stormwater pollution prevent plan. A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission of a registration statement and implemented for the construction activity, including any support activity, covered by this general permit. SWPPPs shall be prepared in accordance with good engineering practices. Construction activities that are part of a larger common plan of development or sale and disturb less than one acre may utilize a SWPPP template provided by the department and need not provide a separate stormwater management plan if one has been prepared and implemented for the larger common plan of development or sale. The SWPPP requirements of this general permit may be fulfilled by incorporating by reference other plans such as a spill prevention control and countermeasure (SPCC) plan developed for the site under § 311 of the federal Clean Water Act or best management practices (BMP) programs otherwise required for the facility provided that the incorporated plan meets or exceeds the SWPPP requirements of Part II B. All plans incorporated by reference into the SWPPP become enforceable under this general permit. If a plan incorporated by reference does not contain all of the required elements of the SWPPP, the operator shall develop the missing elements and include them in the SWPPP. 3. Any operator that was authorized to discharge under the general permit effective July 1, 2014, and that intends to continue coverage under this general permit, shall update its stormwater pollution prevention plan to comply with the requirements of this general permit no later than 60 days after the date of coverage under this general permit. B. Contents. The SWPPP shall include the following items: 1. General information. a. A signed copy of the registration statement, if required, for coverage under the general VPDES permit for discharges of stormwater from construction activities; b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for discharges of stormwater from construction activities (i.e., notice of coverage letter); c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from construction activities; d. A narrative description of the nature of the construction activity, including the function of the project (e.g., low density residential, shopping mall, highway, etc.); e. A legible site plan identifying: Page 7 of 26 (1) Directions of stormwater flow and approximate slopes anticipated after major grading activities; (2) Limits of land disturbance including steep slopes and natural buffers around surface waters that will not be disturbed; (3) Locations of major structural and nonstructural control measures, including sediment basins and traps, perimeter dikes, sediment barriers, and other measures intended to filter, settle, or similarly treat sediment, that will be installed between disturbed areas and the undisturbed vegetated areas in order to increase sediment removal and maximize stormwater infiltration; (4) Locations of surface waters; (5) Locations where concentrated stormwater is discharged; (6) Locations of any support activities, including (i) areas where equipment and vehicle washing, wheel wash water, and other wash water is to occur; (ii) storage areas for chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste facilities, including those temporarily placed on the construction site; and (vi) construction waste storage; and (7) When applicable, the location of the on -site rain gauge or the methodology established in consultation with the VSMP authority used to identify measurable storm events for inspection as allowed by Part II G 2 a (1) (ii) or Part II G 2 b (2). Erosion and sediment control plan. a. An erosion and sediment control plan designed and approved in accordance with the Virginia Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and sediment control plan prepared in accordance with annual standards and specifications approved by the department. b. All erosion and sediment control plans shall include a statement describing the maintenance responsibilities required for the erosion and sediment controls used. c. An approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications, implemented to: (1) Control the volume and velocity of stormwater runoff within the site to minimize soil erosion; (2) Control stormwater discharges, including peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion; Page 8 of 26 (3) Minimize the amount of soil exposed during the construction activity; (4) Minimize the disturbance of steep slopes; (5) Minimize sediment discharges from the site in a manner that addresses (i) the amount, frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater runoff; and (iii) soil characteristics, including the range of soil particle sizes present on the site; (6) Provide and maintain natural buffers around surface waters, direct stormwater to vegetated areas to increase sediment removal, and maximize stormwater infiltration, unless infeasible; (7) Minimize soil compaction and, unless infeasible, preserve topsoil; (8) Ensure initiation of stabilization activities, as defined in 9VAC25-880-1, of disturbed areas immediately whenever any clearing, grading, excavating, or other land - disturbing activities have permanently ceased on any portion of the site, or temporarily ceased on any portion of the site and will not resume for a period exceeding 14 days; and (9) Utilize outlet structures that withdraw stormwater from the surface (i.e., above the permanent pool or wet storage water surface elevation), unless infeasible, when discharging from sediment basins or sediment traps. 3. Stormwater management plan. a. Except for those projects identified in Part II B 3 b, a stormwater management plan approved by the VSMP authority as authorized under the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25-870), or an "agreement in lieu of a stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or a stormwater management plan prepared in accordance with annual standards and specifications approved by the department. b. For any operator meeting the conditions of 9VAC25-870-47 B of the VSMP regulation, an approved stormwater management plan is not required. In lieu of an approved stormwater management plan, the SWPPP shall include a description of, and all necessary calculations supporting, all post -construction stormwater management measures that will be installed prior to the completion of the construction process to control pollutants in stormwater discharges after construction operations have been completed. Structural measures should be placed on upland soils to the degree possible. Such measures must be designed and installed in accordance with applicable VESCP authority, VSMP authority, state, and federal requirements, and any necessary permits must be obtained. Pollution prevention plan. A pollution prevention plan that addresses potential pollutant - generating activities that may reasonably be expected to affect the quality of stormwater discharges from the construction activity, including any support activity. The pollution prevention plan shall: a. Identify the potential pollutant -generating activities and the pollutant that is expected to be exposed to stormwater; Page 9 of 26 b. Describe the location where the potential pollutant -generating activities will occur, or if identified on the site plan, reference the site plan; c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that are or will be commingled with stormwater discharges from the construction activity, including any applicable support activity; d. Identify the person responsible for implementing the pollution prevention practice or practices for each pollutant -generating activity (if other than the person listed as the qualified personnel); e. Describe the pollution prevention practices and procedures that will be implemented to: (1) Prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G; (2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling and maintenance activities (e.g., providing secondary containment such as spill berms, decks, spill containment pallets, providing cover where appropriate, and having spill kits readily available); (3) Prevent the discharge of soaps, solvents, detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs) to prevent contact with stormwater; (ii) collection and proper disposal in a manner to prevent contact with stormwater; and (iii) a similarly effective means designed to prevent discharge of these pollutants); (4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash water, and other types of washing (e.g., locating activities away from surface waters and stormwater inlets or conveyance and directing wash waters to sediment basins or traps, using filtration devices such as filter bags or sand filters, or using similarly effective controls); (5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The container or basin shall be designed so that no overflows can occur due to inadequate sizing or precipitation. Hardened concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wastes. Liquid concrete wastes shall be removed and disposed of in a manner consistent with the handling of other construction wash waters and shall not be discharged to surface waters; (6) Minimize the discharge of pollutants from storage, handling, and disposal of construction products, materials, and wastes including (i) building products such as asphalt sealants, copper flashing, roofing materials, adhesives, and concrete admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape Page 10 of 26 materials; and (iii) construction and domestic wastes such as packaging materials, scrap construction materials, masonry products, timber, pipe and electrical cuttings, plastics, Styrofoam, concrete, and other trash or building materials; (7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic wastes, waste concrete, and sanitary wastes; (8) Address any other discharge from the potential pollutant -generating activities not addressed above; (9) Minimize the exposure of waste materials to precipitation by closing or covering waste containers during precipitation events and at the end of the business day, or implementing other similarly effective practices. Minimization of exposure is not required in cases where the exposure to precipitation will not result in a discharge of pollutants; and f. Describe procedures for providing pollution prevention awareness of all applicable wastes, including any wash water, disposal practices, and applicable disposal locations of such wastes, to personnel in order to comply with the conditions of this general permit. The operator shall implement the procedures described in the SWPPP. SWPPP requirements for discharges to nutrient and sediment impaired waters. For discharges to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for sediment for a sediment - related parameter (i.e., total suspended solids or turbidity) or nutrients (i.e., nitrogen or phosphorus), the operator shall: a. Identify the impaired waters, approved TMDLs, and pollutants of concern in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. SWPPP requirements for discharges to polychlorinated biphenyl (PCB) impaired waters. For discharges from construction activities that include the demolition of any structure with at least 10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to the term of this general permit for PCB, the operator shall: Page 11 of 26 a. Identify the impaired waters, approved TMDLs, and pollutant of concern in the SWPPP; b. Implement the approved erosion and sediment control plan in accordance with Part II B 2; c. Dispose of waste materials in compliance with applicable state, federal, and local requirements; and d. Implement a modified inspection schedule in accordance with Part II G 2 a. 7. SWPPP requirements for discharges to exceptional waters. For discharges to surface waters identified in 9VAC25-260-30 A 3 c as an exceptional water, the operator shall: a. Identify the exceptional surface waters in the SWPPP; and b. Provide clear direction in the SWPPP that: (1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final grade is reached on any portion of the site; (2) Nutrients shall be applied in accordance with manufacturer's recommendations or an approved nutrient management plan and shall not be applied during rainfall events; and (3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a. 8. Identification of qualified personnel. The name, phone number, and qualifications of the qualified personnel conducting inspections required by this general permit. 9. Delegation of authority. The individuals or positions with delegated authority, in accordance with Part III K, to sign inspection reports or modify the SWPPP. 10. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K. C. SWPPP amendments, modification, and updates. 1. The operator shall amend the SWPPP whenever there is a change in the design, construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters and that has not been previously addressed in the SWPPP. The SWPPP shall be amended if, during inspections or investigations by the operator's qualified personnel, or by local, state, or federal officials, it is determined that the existing control measures are ineffective in minimizing pollutants in discharges from the construction activity. Revisions to the SWPPP shall include additional or modified control measures designed and implemented to correct problems identified. If approval by the VESCP authority, VSMP authority, or department is necessary for the control measure, revisions to the SWPPP shall be completed no later than seven calendar days following approval. Implementation of these additional or modified control measures shall be accomplished as described in Part II H. Page 12 of 26 3. The SWPPP shall clearly identify the contractors that will implement and maintain each control measure identified in the SWPPP. The SWPPP shall be amended to identify any new contractor that will implement and maintain a control measure. 4. The operator shall update the SWPPP as soon as possible but no later than seven days following any modification to its implementation. All modifications or updates to the SWPPP shall be noted and shall include the following items: a. A record of dates when: (1) Major grading activities occur; (2) Construction activities temporarily or permanently cease on a portion of the site; and (3) Stabilization measures are initiated; b. Documentation of replaced or modified controls where periodic inspections or other information have indicated that the controls have been used inappropriately or incorrectly and were modified; c. Areas that have reached final stabilization and where no further SWPPP or inspection requirements apply; d. All properties that are no longer under the legal control of the operator and the dates on which the operator no longer had legal control over each property; e. The date of any prohibited discharges, the discharge volume released, and what actions were taken to minimize the impact of the release; f. Measures taken to prevent the reoccurrence of any prohibited discharge; and g. Measures taken to address any evidence identified as a result of an inspection required under Part II G. 5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with Part III K. D. Public notification. Upon commencement of land disturbance, the operator shall post conspicuously a copy of the notice of coverage letter near the main entrance of the construction activity. For linear projects, the operator shall post the notice of coverage letter at a publicly accessible location near an active part of the construction project (e.g., where a pipeline crosses a public road). The operator shall maintain the posted information until termination of general permit coverage as specified in Part I F. E. SWPPP availability. 1. Operators with day-to-day operational control over SWPPP implementation shall have a copy of the SWPPP available at a central location on -site for use by those identified as having responsibilities under the SWPPP whenever they are on the construction site. Page 13 of 26 The operator shall make the SWPPP and all amendments, modifications, and updates available upon request to the department, the VSMP authority, the EPA, the VESCP authority, local government officials, or the operator of a municipal separate storm sewer system receiving discharges from the construction activity. If an on -site location is unavailable to store the SWPPP when no personnel are present, notice of the SWPPP's location shall be posted near the main entrance of the construction site. The operator shall make the SWPPP available for public review in an electronic format or in hard copy. Information for public access to the SWPPP shall be posted and maintained in accordance with Part II D. If not provided electronically, public access to the SWPPP may be arranged upon request at a time and at a publicly accessible location convenient to the operator or his designee but shall be no less than once per month and shall be during normal business hours. Information not required to be contained within the SWPPP by this general permit is not required to be released. F. SWPPP implementation. The operator shall implement the SWPPP and subsequent amendments, modifications, and updates from commencement of land disturbance until termination of general permit coverage as specified in Part I F. All control measures shall be properly maintained in effective operating condition in accordance with good engineering practices and, where applicable, manufacturer specifications. If a site inspection required by Part II G identifies a control measure that is not operating effectively, corrective actions shall be completed as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority, to maintain the continued effectiveness of the control measures. If site inspections required by Part II G identify an existing control measure that needs to be modified or if an additional or alternative control measure is necessary for any reason, implementation shall be completed prior to the next anticipated measurable storm event. If implementation prior to the next anticipated measurable storm event is impracticable, then additional or alternative control measures shall be implemented as soon as practicable, but no later than seven days after discovery or a longer period as established by the VSMP authority. G. SWPPP Inspections. 1. Personnel responsible for on -site and off -site inspections. Inspections required by this general permit shall be conducted by the qualified personnel identified by the operator in the SWPPP. The operator is responsible for ensuring that the qualified personnel conduct the inspection. 2. Inspection schedule. a. For construction activities that discharge to a surface water identified in Part 11 B 5 and B 6 as impaired or having an approved TMDL or Part I B 7 as exceptional, the following inspection schedule requirements apply: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when Page 14 of 26 there are more than 24 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections as authorized in Part II G 2 d shall not be allowed. b. Except as specified in Part II G 2 a, inspections shall be conducted at a frequency of: (1) At least once every five business days; or (2) At least once every 10 business days and no later than 24 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 24 hours between business days, the inspection shall be conducted on the next business day. c. Where areas have been temporarily stabilized or land -disturbing activities will be suspended due to continuous frozen ground conditions and stormwater discharges are unlikely, the inspection frequency described in Part II G 2 a and 2 b may be reduced to once per month. If weather conditions (such as above freezing temperatures or rain or snow events) make discharges likely, the operator shall immediately resume the regular inspection frequency. d. Except as prohibited in Part II G 2 a (2), representative inspections may be utilized for utility line installation, pipeline construction, or other similar linear construction activities provided that: (1) Temporary or permanent soil stabilization has been installed and vehicle access may compromise the temporary or permanent soil stabilization and potentially cause additional land disturbance increasing the potential for erosion; (2) Inspections occur on the same frequency as other construction activities; (3) Control measures are inspected along the construction site 0.25 miles above and below each access point (i.e., where a roadway, undisturbed right-of-way, or other similar feature intersects the construction activity and access does not compromise temporary or permanent soil stabilization); and (4) Inspection locations are provided in the inspection report required by Part II G. e. If adverse weather causes the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. Any time inspections are delayed due to adverse weather conditions, evidence of the adverse weather conditions shall be included in the SWPPP with the dates of occurrence. 3. Inspection requirements. a. As part of the inspection, the qualified personnel shall: (1) Record the date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; Page 15 of 26 (2) Record the information and a description of any discharges occurring at the time of the inspection or evidence of discharges occurring prior to the inspection; (3) Record any land -disturbing activities that have occurred outside of the approved erosion and sediment control plan; (4) Inspect the following for installation in accordance with the approved erosion and sediment control plan, identification of any maintenance needs, and evaluation of effectiveness in minimizing sediment discharge, including whether the control has been inappropriately or incorrectly used: (a) All perimeter erosion and sediment controls, such as silt fence; (b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment trapping measures; (c) Completed earthen structures, such as dams, dikes, ditches, and diversions for stabilization and effective impoundment or flow control; (d) Cut and fill slopes; (e) Sediment basins and traps, sediment barriers, and other measures installed to control sediment discharge from stormwater; (f) Temporary or permanent channels, flumes, or other slope drain structures installed to convey concentrated runoff down cut and fill slopes; (g) Storm inlets that have been made operational to ensure that sediment laden stormwater does not enter without first being filtered or similarly treated; and (h) Construction vehicle access routes that intersect or access paved or public roads for minimizing sediment tracking; (5) Inspect areas that have reached final grade or that will remain dormant for more than 14 days to ensure: (a) Initiation of stabilization activities have occurred immediately, as defined in 9VAC25-880-1; and (b) Stabilization activities have been completed within seven days of reaching grade or stopping work; (6) Inspect for evidence that the approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion and sediment control plan prepared in accordance with department -approved annual standards and specifications has not been properly implemented. This includes: Page 16 of 26 (a) Concentrated flows of stormwater in conveyances such as rills, rivulets, or channels that have not been filtered, settled, or similarly treated prior to discharge, or evidence thereof; (b) Sediment laden or turbid flows of stormwater that have not been filtered or settled to remove sediments prior to discharge; (c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch basins that discharge to surface waters. Inlets and catch basins with failing sediment controls due to improper installation, lack of maintenance, or inadequate design are considered unprotected; (d) Sediment deposition on any property (including public and private streets) outside of the construction activity covered by this general permit; (e) Required stabilization has not been initiated or completed or is not effective on portions of the site; (f) Sediment basins without adequate wet or dry storage volume or sediment basins that allow the discharge of stormwater from below the surface of the wet storage portion of the basin; (g) Sediment traps without adequate wet or dry storage or sediment traps that allow the discharge of stormwater from below the surface of the wet storage portion of the trap; and (h) Land disturbance or sediment deposition outside of the approved area to be disturbed; (7) Inspect pollutant generating activities identified in the pollution prevention plan for the proper implementation, maintenance, and effectiveness of the procedures and practices; (8) Identify any pollutant generating activities not identified in the pollution prevention plan; and (9) Identify and document the presence of any evidence of the discharge of pollutants prohibited by this general permit. 4. Inspection report. Each inspection report shall include the following items: a. The date and time of the inspection and, when applicable, the date and rainfall amount of the last measurable storm event; b. Summarized findings of the inspection; c. The locations of prohibited discharges; d. The locations of control measures that require maintenance; Page 17 of 26 e. The locations of control measures that failed to operate as designed or proved inadequate or inappropriate for a particular location; f. The locations where any evidence identified under Part II G 3 a (6) exists; g. The locations where any additional control measure is needed; h. A list of corrective actions required (including any changes to the SWPPP that are necessary) as a result of the inspection or to maintain permit compliance; i. Documentation of any corrective actions required from a previous inspection that have not been implemented; and The date and signature of the qualified personnel and the operator or its duly authorized representative. 5. The inspection report shall be included into the SWPPP no later than four business days after the inspection is complete. The inspection report and any actions taken in accordance with Part II shall be retained by the operator as part of the SWPPP for at least three years from the date that general permit coverage expires or is terminated. The inspection report shall identify any incidents of noncompliance. Where an inspection report does not identify any incidents of noncompliance, the report shall contain a certification that the construction activity is in compliance with the SWPPP and this general permit. The report shall be signed in accordance with Part III K of this general permit. H. Corrective actions. The operator shall implement the corrective actions identified as a result of an inspection as soon as practicable but no later than seven days after discovery or a longer period as approved by the VSMP authority. If approval of a corrective action by a regulatory authority (e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control measures shall be implemented to minimize pollutants in stormwater discharges until such approvals can be obtained. The operator may be required to remove accumulated sediment deposits located outside of the construction activity covered by this general permit as soon as practicable in order to minimize environmental impacts. The operator shall notify the VSMP authority and the department as well as obtain all applicable federal, state, and local authorizations, approvals, and permits prior to the removal of sediments accumulated in surface waters including wetlands. Page 18 of 26 PART III CONDITIONS APPLICABLE TO ALL VPDES PERMITS NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to monitor stormwater discharges or control measures, the operator shall comply with the requirements of subsections A, B, and C, as appropriate. A. Monitoring. 1. Samples and measurements taken for the purpose of monitoring shall be representative of the monitoring activity. Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or alternative methods approved by the U.S. Environmental Protection Agency, unless other procedures have been specified in this general permit. Analyses performed according to test procedures approved under 40 CFR Part 136 shall be performed by an environmental laboratory certified under regulations adopted by the Department of General Services (1 VAC30-45 or 1 VAC30-46). 3. The operator shall periodically calibrate and perform maintenance procedures on all monitoring and analytical instrumentation at intervals that will ensure accuracy of measurements. B. Records. 1. Monitoring records and reports shall include a. The date, exact place, and time of sampling or measurements; b. The individuals who performed the sampling or measurements; c. The dates and times analyses were performed; d. The individuals who performed the analyses; e. The analytical techniques or methods used; and f. The results of such analyses. 2. The operator shall retain records of all monitoring information, including all calibration and maintenance records and all original strip chart recordings for continuous monitoring instrumentation, copies of all reports required by this general permit, and records of all data used to complete the registration statement for this general permit, for a period of at least three years from the date of the sample, measurement, report or request for coverage. This period of retention shall be extended automatically during the course of any unresolved litigation regarding the regulated activity or regarding control standards applicable to the operator, or as requested by the board. C. Reporting monitoring results. Page 19 of 26 1. The operator shall update the SWPPP to include the results of the monitoring as may be performed in accordance with this general permit, unless another reporting schedule is specified elsewhere in this general permit. 2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms provided, approved or specified by the department; or in any format provided that the date, location, parameter, method, and result of the monitoring activity are included. If the operator monitors any pollutant specifically addressed by this general permit more frequently than required by this general permit using test procedures approved under 40 CFR Part 136 or using other test procedures approved by the U.S. Environmental Protection Agency or using procedures specified in this general permit, the results of this monitoring shall be included in the calculation and reporting of the data submitted in the DMR or reporting form specified by the department. 4. Calculations for all limitations which require averaging of measurements shall utilize an arithmetic mean unless otherwise specified in this general permit. D. Duty to provide information. The operator shall furnish, within a reasonable time, any information which the board may request to determine whether cause exists for terminating this general permit coverage or to determine compliance with this general permit. The board, department, EPA, or VSMP authority may require the operator to furnish, upon request, such plans, specifications, and other pertinent information as may be necessary to determine the effect of the wastes from his discharge on the quality of surface waters, or such other information as may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater Management Act. The operator shall also furnish to the board, department, EPA, or VSMP authority, upon request, copies of records required to be kept by this general permit. E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress reports on, interim and final requirements contained in any compliance schedule of this general permit shall be submitted no later than 14 days following each schedule date. F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except in compliance with a state permit issued by the department, it shall be unlawful to cause a stormwater discharge from a construction activity. G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a hazardous substance or oil in an amount equal to or in excess of a reportable quantity established under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or causes or allows a discharge that may reasonably be expected to enter surface waters, shall notify the Department of Environmental Quality of the discharge immediately upon discovery of the discharge, but in no case later than within 24 hours after said discovery. A written report of the unauthorized discharge shall be submitted to the department and the VSMP authority within five days of discovery of the discharge. The written report shall contain: 1. A description of the nature and location of the discharge; 2. The cause of the discharge; Page 20 of 26 3. The date on which the discharge occurred; 4. The length of time that the discharge continued; 5. The volume of the discharge; 6. If the discharge is continuing, how long it is expected to continue; 7. If the discharge is continuing, what the expected total volume of the discharge will be; and Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present discharge or any future discharges not authorized by this general permit. Discharges reportable to the department and the VSMP authority under the immediate reporting requirements of other regulations are exempted from this requirement. H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge including a "bypass" or "upset," as defined in this general permit, should occur from a facility and the discharge enters or could be expected to enter surface waters, the operator shall promptly notify, in no case later than within 24 hours, the department and the VSMP authority by telephone after the discovery of the discharge. This notification shall provide all available details of the incident, including any adverse effects on aquatic life and the known number of fish killed. The operator shall reduce the report to writing and shall submit it to the department and the VSMP authority within five days of discovery of the discharge in accordance with Part III 12. Unusual and extraordinary discharges include any discharge resulting from: 1. Unusual spillage of materials resulting directly or indirectly from processing operations; 2. Breakdown of processing or accessory equipment; 3. Failure or taking out of service of some or all of the facilities; and 4. Flooding or other acts of nature. I. Reports of noncompliance. The operator shall report any noncompliance which may adversely affect surface waters or may endanger public health. An oral report to the department and the VSMP authority shall be provided within 24 hours from the time the operator becomes aware of the circumstances. The following shall be included as information that shall be reported within 24 hours under this subdivision: a. Any unanticipated bypass; and b. Any upset that causes a discharge to surface waters. 2. A written report shall be submitted within five days and shall contain: a. A description of the noncompliance and its cause; Page 21 of 26 b. The period of noncompliance, including exact dates and times, and if the noncompliance has not been corrected, the anticipated time it is expected to continue; and c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the noncompliance. The department may waive the written report on a case -by -case basis for reports of noncompliance under Part III I if the oral report has been received within 24 hours and no adverse impact on surface waters has been reported. 3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in writing as part of the SWPPP. The reports shall contain the information listed in Part 111 1 2. NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP authority. Reports may be made by telephone, email, or by fax. For reports outside normal working hours, leaving a recorded message shall fulfill the immediate reporting requirement. For emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone service at 1-800-468-8892. 4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of incorrect information in any report, including a registration statement, to the department or the VSMP authority, the operator shall promptly submit such facts or correct information. J. Notice of planned changes. 1. The operator shall give notice to the department and the VSMP authority as soon as possible of any planned physical alterations or additions to the permitted facility or activity. Notice is required only when: a. The operator plans an alteration or addition to any building, structure, facility, or installation that may meet one of the criteria for determining whether a facility is a new source in 9VAC25-870-420; b. The operator plans an alteration or addition that would significantly change the nature or increase the quantity of pollutants discharged. This notification applies to pollutants that are not subject to effluent limitations in this general permit; or 2. The operator shall give advance notice to the department and VSMP authority of any planned changes in the permitted facility or activity, which may result in noncompliance with state permit requirements. K. Signatory requirements. 1. Registration statement. All registration statements shall be signed as follows: a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager of one or more manufacturing, production, or operating facilities, provided the Page 22 of 26 manager is authorized to make management decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or actions taken to gather complete and accurate information for state permit application requirements; and where authority to sign documents has been assigned or delegated to the manager in accordance with corporate procedures; b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official. For purposes of this chapter, a principal executive officer of a public agency includes (i) the chief executive officer of the agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the agency. 2. Reports and other information. All reports required by this general permit, including SWPPPs, and other information requested by the board or the department shall be signed by a person described in Part III K 1 or by a duly authorized representative of that person. A person is a duly authorized representative only if: a. The authorization is made in writing by a person described in Part III K 1; b. The authorization specifies either an individual or a position having responsibility for the overall operation of the regulated facility or activity such as the position of plant manager, operator of a well or a well field, superintendent, position of equivalent responsibility, or an individual or position having overall responsibility for environmental matters for the operator. (A duly authorized representative may thus be either a named individual or any individual occupying a named position); and c. The signed and dated written authorization is included in the SWPPP. A copy shall be provided to the department and VSMP authority, if requested. 3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because a different individual or position has responsibility for the overall operation of the construction activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to the VSMP authority as the administering entity for the board prior to or together with any reports or information to be signed by an authorized representative. 4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following certification: "I certify under penalty of law that I have read and understand this document and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are significant Page 23 of 26 penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations." L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the Clean Water Act, except that noncompliance with certain provisions of this general permit may constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act. Permit noncompliance is grounds for enforcement action; for state permit coverage, termination, revocation and reissuance, or modification; or denial of a state permit renewal application. The operator shall comply with effluent standards or prohibitions established under § 307(a) of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish these standards or prohibitions or standards for sewage sludge use or disposal, even if this general permit has not yet been modified to incorporate the requirement. M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit after the expiration date of this general permit, the operator shall submit a new registration statement at least 60 days before the expiration date of the existing general permit, unless permission for a later date has been granted by the board. The board shall not grant permission for registration statements to be submitted later than the expiration date of the existing general permit. N. Effect of a state permit. This general permit does not convey any property rights in either real or personal property or any exclusive privileges, nor does it authorize any injury to private property or invasion of personal rights, or any infringement of federal, state or local law or regulations. O. State law. Nothing in this general permit shall be construed to preclude the institution of any legal action under, or relieve the operator from any responsibilities, liabilities, or penalties established pursuant to any other state law or regulation or under authority preserved by § 510 of the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U) and "upset' (Part III V), nothing in this general permit shall be construed to relieve the operator from civil and criminal penalties for noncompliance. P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to preclude the institution of any legal action or relieve the operator from any responsibilities, liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through 62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act. Q. Proper operation and maintenance. The operator shall at all times properly operate and maintain all facilities and systems of treatment and control (and related appurtenances), which are installed or used by the operator to achieve compliance with the conditions of this general permit. Proper operation and maintenance also includes effective plant performance, adequate funding, adequate staffing, and adequate laboratory and process controls, including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or similar systems, which are installed by the operator only when the operation is necessary to achieve compliance with the conditions of this general permit. R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of treatment or management of pollutants shall be disposed of in a manner so as to prevent any pollutant from such materials from entering surface waters and in compliance with all applicable state and federal laws and regulations. Page 24 of 26 S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in violation of this general permit that has a reasonable likelihood of adversely affecting human health or the environment. T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an enforcement action that it would have been necessary to halt or reduce the permitted activity in order to maintain compliance with the conditions of this general permit. U. Bypass. 1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams from any portion of a treatment facility. The operator may allow any bypass to occur that does not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and 3. 2. Notice. a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the operator shall submit prior notice to the department, if possible at least 10 days before the date of the bypass. b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as required in Part III I. 3. Prohibition of bypass. a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may take enforcement action against an operator for bypass unless: (1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property damage. Severe property damage means substantial physical damage to property, damage to the treatment facilities that causes them to become inoperable, or substantial and permanent loss of natural resources that can reasonably be expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in production; (2) There were no feasible alternatives to the bypass, such as the use of auxiliary treatment facilities, retention of untreated wastes, or maintenance during normal periods of equipment downtime. This condition is not satisfied if adequate back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a bypass that occurred during normal periods of equipment downtime or preventive maintenance; and (3) The operator submitted notices as required under Part III U 2. b. The department may approve an anticipated bypass, after considering its adverse effects, if the department determines that it will meet the three conditions listed in Part III U 3 a. Page 25 of 26 V. Upset. 1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is unintentional and temporary noncompliance with technology -based state permit effluent limitations because of factors beyond the reasonable control of the operator. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or careless or improper operation. 2. An upset constitutes an affirmative defense to an action brought for noncompliance with technology -based state permit effluent limitations if the requirements of Part III V 4 are met. A determination made during administrative review of claims that noncompliance was caused by upset, and before an action for noncompliance, is not a final administrative action subject to judicial review. 3. An upset does not include noncompliance to the extent caused by operational error, improperly designed treatment facilities, inadequate treatment facilities, lack of preventative maintenance, or careless or improper operation. 4. An operator who wishes to establish the affirmative defense of upset shall demonstrate, through properly signed, contemporaneous operating logs or other relevant evidence that: a. An upset occurred and that the operator can identify the cause of the upset; b. The permitted facility was at the time being properly operated; c. The operator submitted notice of the upset as required in Part III I; and d. The operator complied with any remedial measures required under Part III S. 5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset has the burden of proof. W. Inspection and entry. The operator shall allow the department as the board's designee, the VSMP authority, EPA, or an authorized representative of either entity (including an authorized contractor), upon presentation of credentials and other documents as may be required by law to: 1. Enter upon the operator's premises where a regulated facility or activity is located or conducted, or where records shall be kept under the conditions of this general permit; 2. Have access to and copy, at reasonable times, any records that shall be kept under the conditions of this general permit; 3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring and control equipment), practices, or operations regulated or required under this general permit; and 4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management Act, any substances or parameters at any location. Page 26 of 26 For purposes of this section, the time for inspection shall be deemed reasonable during regular business hours, and whenever the facility is discharging. Nothing contained herein shall make an inspection unreasonable during an emergency. X. State permit actions. State permit coverage may be modified, revoked and reissued, or terminated for cause. The filing of a request by the operator for a state permit modification, revocation and reissuance, or termination, or a notification of planned changes or anticipated noncompliance does not stay any state permit condition. Y. Transfer of state permit coverage. 1. State permits are not transferable to any person except after notice to the department. Except as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator only if the state permit has been modified or revoked and reissued, or a minor modification made, to identify the new operator and incorporate such other requirements as may be necessary under the Virginia Stormwater Management Act and the Clean Water Act. As an alternative to transfers under Part III Y 1, this state permit may be automatically transferred to a new operator if: a. The current operator notifies the department at least 30 days in advance of the proposed transfer of the title to the facility or property; b. The notice includes a written agreement between the existing and new operators containing a specific date for transfer of state permit responsibility, coverage, and liability between them; and c. The department does not notify the existing operator and the proposed new operator of its intent to modify or revoke and reissue the state permit. If this notice is not received, the transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b. 3. For ongoing construction activity involving a change of operator, the new operator shall accept and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking over operations at the site. Z. Severability. The provisions of this general permit are severable, and if any provision of this general permit or the application of any provision of this state permit to any circumstance, is held invalid, the application of such provision to other circumstances and the remainder of this general permit shall not be affected thereby. Section 12. Inspection logs INSPECTION FREQUENCY: (1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at least once every five business days and no later than 48 hours following a measurable storm event. In the event that a measurable storm event occurs when there are more than 48 hours between business days, the inspection shall be conducted on the next business day; and (2) Representative inspections used by utility line installation, pipeline construction, or other similar linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired or for which a TMDL wasteload allocation has been established and approved prior to the term of this general permit. Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I PROJECT: MONITORING FOR THE WEEK BEGINNING: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount Inches Initials EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part IB4d.) Facility Identification Date and Time of Inspection Operating Properly (YIN) Description of inspection observations OBSERVATION OF RUNOFF AT OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part IB4d.) By this signature, I certify that this report is accurate and complete to the best of my knowledge: Qualified Personnel By this signature, I certify that the contruction activity is in compliance with the SW PP and general permit. Qualified Personnel ceritication statement on page 3 shall be signed. By this signature, I certify that this report is accurate and complete to the best of my knowledge: Operator/Duly Authorized Representative By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Operator/Duly Authorized Representative Stormwater Discharge Outfall Identification Date Clarity Floating Solids Suspended Solids Oil Sheen Otherobvious indicators of stormwater pollution (list and describe) Visible sediment leavingthe site?(Y/N) If yes, describe actions taken to prevent future releases (may need to attach additional information) Describemeasurestakento clean up sediment outside of disturbed limits (may need to attach additional information) Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)? STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I PROJECT: MONITORING FOR THE WEEK BEGINNING: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount Inches Initials EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part IB4d.) Facility Identification Date and Time of Inspection Operating Properly (YIN) Description of inspection observations OBSERVATION OF RUNOFF AT OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part IB4d.) By this signature, I certify that this report is accurate and complete to the best of my knowledge: Qualified Personnel By this signature, I certify that the contruction activity is in compliance with the SW PP and general permit. Qualified Personnel ceritication statement on page 3 shall be signed. By this signature, I certify that this report is accurate and complete to the best of my knowledge: Operator/Duly Authorized Representative By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Operator/Duly Authorized Representative Stormwater Discharge Outfall Identification Date Clarity Floating Solids Suspended Solids Oil Sheen Otherobvious indicators of stormwater pollution (list and describe) Visible sediment leavingthe site?(Y/N) If yes, describe actions taken to prevent future releases (may need to attach additional information) Describemeasurestakento clean up sediment outside of disturbed limits (may need to attach additional information) Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)? STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I PROJECT: MONITORING FOR THE WEEK BEGINNING: DATE AND TIME OF INSPECTION: RAINFALL: Date of Rain Amount Inches Initials EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part IB4d.) Facility Identification Date and Time of Inspection Operating Properly (YIN) Description of inspection observations OBSERVATION OF RUNOFF AT OUTFALLS: (Inspections shall be conducted according to Part IIF2 of the Permit. However, if the discharges of stormwater from construction activities are to surface waters identified as imparied, inspections shall be conducted according to Part IB4d.) By this signature, I certify that this report is accurate and complete to the best of my knowledge: Qualified Personnel By this signature, I certify that the contruction activity is in compliance with the SW PP and general permit. Qualified Personnel ceritication statement on page 3 shall be signed. By this signature, I certify that this report is accurate and complete to the best of my knowledge: Operator/Duly Authorized Representative By this signature, I certify that the contruction activity is in compliance with the SWPP and general permit. Operator/Duly Authorized Representative Stormwater Discharge Outfall Identification Date Clarity Floating Solids Suspended Solids Oil Sheen Otherobvious indicators of stormwater pollution (list and describe) Visible sediment leavingthe site?(Y/N) If yes, describe actions taken to prevent future releases (may need to attach additional information) Describemeasurestakento clean up sediment outside of disturbed limits (may need to attach additional information) Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy. Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?