HomeMy WebLinkAboutWPO202100003 VSMP - SWPPP 2021-08-31of A COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
1 Charlottesville, Virginia 22902-4596
Tel. (434) 296-5832 • Fax (434) 972-4126
�IRGiN1P
Stormwater Pollution Prevention Plan (SWPPP)
For Construction Activities At:
Project Name: Starbucks — 2231 Seminole Lane
VSMP/WPO# 202100003
2231 Seminole Lane
Charlottesville, Virginia 22901
Prepared by:
Timmons Group
608 Preston Avenue, Suite 200
Charlottesville, VA 22903
Contact: Craig Kotarski, P.E.
434.327.1688
Prepared for:
Commercial Rentals LLC
1024 Carrington Pl. Ste. 100
Charlottesville, VA 22901
Contact: Dhanvant Goradia
434.989.8667
SWPPP Preparation Date: June 15, 2021
(This document is to be made publicly available according to 9VAC25-880-70, Part II, section D)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
CONTENTS: (from Albemarle County Code Sec. 17-405)
1. Registration statement
2. Notice of general permit coverage
3. Nature of activity
4. Erosion and Sediment Control Plan.
5. Stormwater Management Plan
6. Pollution Prevention Plan.
7. Discharges to impaired waters, surface waters within an applicable TMDL
wasteload allocation, and exceptional waters.
8. Qualified personnel
9. Signed Certification
10. Delegation of authority.
11. General permit copy
12. Inspection logs
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 1. Registration statement
(Provide a signed completed copy of the DEQ registration statement)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM
CONSTRUCTION ACTIVITIES (VAR10)
REGISTRATION STATEMENT 2019
Application type. ® NEW PERMIT ISSUANCE
(CHOOSE ONE) Cl MODIFICATION WITH ACREAGE INCREASE
❑ MODIFICATION WITHOUT ACREAGE INCREASE
❑ EXISTING PERMIT RE -ISSUANCE
Section 1. operator/Permittee Information.
PERMIT #:
PLAN/ID #:
TECHNICAL CRITERIA: IIB ❑ IIC ❑
A. Construction Activity Operator (Permittee). The person or entity that is applying for permit coverage and will have
operational control over construction activities to ensure compliance with the general permit. A person with
signatory authority for this operator must sign the certification in Section V. (per Part III. K. of the VAR10 Permit).
Operator Name:
Commercial Rentals LLC
Contact person:
Dhanvant Goradia
Address:
1024 Carrington Pl. Ste. 100
City, State and Zip Code:
Charlottesville, VA 22901
Phone Number:
434 989-8667
Primary and CC Email:
Dhanvant.Goradia@gde-inc.net; craig.kotarski@timmons.com
B. Electronic correspondence. To receive an emailed coverage letter or to pay by credit card, you must choose YES
and include a valid email. May we transmit correspondence electronically? YES ® NO ❑
Section 11. Construction Activity Information.
A.
Include a site map showing the location of the existing or proposed land -disturbing activities, the limits of land
disturbance, construction entrances and all waterbodies receiving stormwater discharges from the site.
B.
Project site location information.
Construction Activity Name:
Starbucks
Address:
2231 Seminole Lane
City and/or County and Zip Code:
Charlottesville, VA 22902
Construction Activity Entrance Location
(description, street address and/or
2231 Seminole Lane (38.09651,-78.46440)
latitude/longitude in decimal degrees):
Latitude and Longitude
(6-digit, decimal degrees format):
138.09651,-78.46440
C.
Acreage totals for all land -disturbing activities to be included under this permit coverage. Report to the nearest
one -hundredth of an acre.
Total land area of development (include entire area to be
0.59 AC
disturbed as approved in the Stormwater Management Plan):
Primary estimated area to be disturbed (include portions with
0.59 AC
Erosion and Sediment Control Plan approval only):
Off -site estimated area to be disturbed (if applicable):
0.00 AC
D.
Property Owner Status:
FEDERAL ❑ STATE ❑ PUBLIC ❑ PRIVATE IK
E.
Nature of the Construction Activity Description (i.e. commercial,
industrial, residential, agricultural, environmental, utility):
Commercial
F.
Municipal Separate Storm Sewer System (MS4) name(s) (if the
site is discharging to a MS4):
G.
Estimated Project Dates (MM/DD/YYYY).
Start Date:
10/01/2021
Completion Date:
08/01/2022
H.
Is this construction activity part of a larger common plan of
YES ❑ NO
development or sale?
Rev 11/2020 PAGE 1 1 6
CONSTRUCTION GENERAL PERMIT (VAR30) REGISTRATION STATEMENT 2019
I. 6" Order Hydrologic Unit Code (HUC) and Receiving Water Name(s). Include additional areas on a separate page.
HUC
NAME(S) OF RECEIVING WATERBODY
020802040203
South Fork Rivanna River
Section III. Off -site Support Activity Location Information.
List all off -site support activities and excavated material disposal areas being utilized for this project. Include additional
areas on a separate page.
Off -site Activity Name:
Address:
City or County:
Off -site Activity Entrance Location (description, street
address and/or latitude/longitude in decimal degrees):
Latitude and Longitude (6-digit, decimal degrees format):
Is this off -site activity an excavated material disposal
area?
YES ❑ NO ❑
If this off -site activity is an excavated material disposal
area, list the contents of the excavated fill material:
Will a separate VPDES permit cover this off -site activity?
YES ❑ NO ❑
Section IV. Other Information.
A.
A stormwater pollution prevention plan (SWPPP) must be prepared in accordance with the requirements of the
General VPDES Permit for Discharges of Stormwater from Construction Activities rio or to submitting the
Registration Statement. By signing the Registration Statement, the operator is certifying that the SWPPP has been
prepared.
B.
Has an Erosion and Sediment Control Plan been
submitted to the VESC Authority for review?
YES ® NO ❑
Erosion and Sediment Control Plan Approval Date (for
the estimated area to be disturbed MM/DD/YYYY):
C.
Has land -disturbance commenced?
YES ❑ NO IN
D.
Annual Standards and Specifications. If this project is utilizing approved Annual Standards and Specifications
(AS&S), attached the completed AS&S Entity Form.
AS&S Entity Name (if different from the Operator
identified in Section I):
E.
Billing information (leave blank if same as the Operator identified in Section I. above). This entity will receive
Annual Permit Maintenance and Permit Modification Fee invoices (if applicable).
Billing Name:
Contact Name:
Address:
City, State and Zip Code:
Phone Number:
Primary and CC Email:
Rev 11/2020 PAGE 2 16
CONSTRUCTION GENERAL PERMIT (VAR10) REGISTRATION STATEMENT 2019
Section V. Certification. A person representing the operator as identified in Section I. A. and meeting the requirements
of 9VAC25-880-70. Part III. K must physically sign this certification. A typed signature is not acceptable. Please note that
operator is defined in 9VAC25-870-10 as follows:
"Operator" means the owner or operator of any facility or activity subject to the Act and this chapter. In the context of stormwater
associated with a large or small construction activity, operator means any person associated with a construction project that meets
either of the following two criteria: (i) the person has direct operational control over construction plans and specifications, including
the ability to make modifications to those plans and specifications or (ii) the person has day-to-day operational control of those
activities at a project that are necessary to ensure compliance with a stormwater pollution prevention plan for the site or other state
permit or VSMP authority permit conditions (i.e., they are authorized to direct workers at a site to carry out activities required by the
stormwater pollution prevention plan or comply with other permit conditions). In the context of stormwater discharges from
Municipal Separate Storm Sewer Systems (MS4s), operator means the operator of the regulated MS4 system.
9VAC25-880-70. Part III. K. Signatory Requirements. Registration Statement. All Registration Statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a responsible corporate officer
means: (i) a president, secretary, treasurer, or vice-president of the corporation in charge of a principal business function, or
any other person who performs similar policy -making or decision -making functions for the corporation; or (ii) the manager
of one or more manufacturing, production, or operating facilities, provided the manager is authorized to make management
decisions that govern the operation of the regulated facility including having the explicit or implicit duty of making major
capital investment recommendations, and initiating and directing other comprehensive measures to assure long-term
compliance with environmental laws and regulations; the manager can ensure that the necessary systems are established or
actions taken to gather complete and accurate information for state permit application requirements; and where authority
to sign documents has been assigned or delegated to the manager in accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor, respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive officer or ranking elected official.
For purposes of this chapter, a principal executive officer of a public agency includes: (i) the chief executive officer of the
agency or (ii) a senior executive officer having responsibility for the overall operations of a principal geographic unit of the
agency.
Certification: "I certify under penalty of law that I have read and understand this Registration Statement and that this
document and all attachments were prepared in accordance with a system designed to assure that qualified personnel
properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage
the system or those persons directly responsible for gathering the information, the information submitted is to the best
of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting
false information including the possibility of fine and imprisonment for knowing violations."
Printed Name: Dhanvant Goradia
Signature (signed in Ink):
Date Signed: G 1 15
Section VI. Submittal Instructions. Submit this form to the VSMP Authority. If the locality is the VSMP Authority, please
send your Registration Statement submittal directly to the locality; do NOT send this form to DEQ. A list of local VSMP
Authorities is available here: VSMP Authorities.
If DEQ is the VSMP Authority, please send to: If the locality is the VSMP Authorityplease send to:
Department of Environmental Quality
Office of Stormwater Management Suite 1400
PO Box 1105
Richmond VA 23218
constructiongp@deg.virginia.gov
Rev 11/2020 PAGE 3 16
Section 2. Notice of general permit coverage
(This notice is to be posted near the main entrance according to 9VAC25-880-70, Part II, section C.)
(Provide a copy of the DEQ coverage letter when obtained)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 3. Nature of activity
(Provide a detailed narrative of the construction activities. Include or reference a construction schedule
and sequence. Include any phasing.)
This project includes the construction of a new building and associated parking, utilities & landscaping.
Erosion and sediment control limits of disturbance area is 0.59 acres.
The property is bound by convenience store/gas station to the north, a residential lot to the east, a vacant
lot to the south and route 29 to the west.
All construction shall take place in accordance with the Erosion and Sediment Control Sequence of
Installation on plan sheet C3.0. Estimated construction dates are as indicated on the Registration
Statement.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 4. Erosion and Sediment Control Plan.
(Provide a reduced, I W 7 copy of the latest Erosion and Sediment Control Plan. Do not reference
only.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
PROJECT DESCRIPTION
THIS PROJECT INCLUDES THE CONSTRUCTION OF A NEW BUILDING, PARKING AREA, UTILITIES, AND ASSOCIATED SITE WORK. LIMITS OF
DISTURBANCE TOTALS 0.59 AC.
AOJACEM PROPERTY
THE PROPERTY IS BOUND BY CONVENIENCE STORE TO THE NORTH, A RESIDENTIAL LOTTO THE EAST, A VACANT IM TO THE SOUTH AND
ROUTE 29 TO THE WEST.
EXISTING SITE CONDITIONS
THE SITE CURRENTLY CONTAINS A PAVED PARKING AREA AND OFFICE BUILDING.
OFF -SITE AREAS
THIS PROJECT INCLUDES WORK WITHIN THE ADJACENT ROW. ADDITIONALLY, APPROXIMATELY 216 CY OF FILL WILL BE NEEDED TO FILL
THE EXISTING BASEMENT TO PROPOSED FINISHED GRADE. IF THERE IS NOT ENOUGH EXCESS SOIL FROM THE PROJECT SITE, CLEAN FILL
FROM ANOTHER SITE WILL BE USED TO FILL THIS AREA. DEBRIS MUST BE TAKEN TO AN APPROVED LANDFlLL SUE.
CRITICAL EROSION AREAS
THE AREA WHERE THE FURRING RETAINING WALL WILL BE REMOVED AND PROPOSED RETAINING WALL WILL BE BUILT IS WITHIN THE
MANAGED STEEP SLOPES AREA.
EROSION AND SEDIMENT CONTROL MEASURES
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT CONTROL PMCUCES SHALL BE
CONSTRUCTED AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND $FECIRCATIONS OF THE CURRENT ADDITION OF THE
VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK. THE MINIMUM STANDARDS OF THE VESCH SHALL BE ADHERED TO UNLESS
OTHERWISE WANED OR APPROVED BY A NUANCE BY LOCAL AUTHORITIES HAVING IUFUSDICUON.
STORMWATER RUNOFF CONSIDERATIONS
ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE MAINTAINED IN ACCORDANCE WITH VISOR AND THE CONSTRUCTION
SEQUENCE, INCLUDING THE INSPECTION OF ALL MEASURES AFTER ALL RAIN EVENTS.
STRUCTURALFRACUCES:
1. TEMPORARY CONSTRUCTION EWMNCE-3.02 A TEMPORARY CONSTRUCTION ENTRANCE SHALL BE PROVIDED AT THE LOCATION
INDICATED ON THE PLANS. IT IS IMPERATIVE THAT THIS MEASURE BE MAINTAINED THROUGHOUT CONSTRUCTION. ITS PURPOSE IS
TO REDUCE THE AMOUNT OF MUD TRANSPORTED ONTO PAVED PUBLIC ROADS BY MOTOR VEHICLES OR RUNOFF.
2. SILT FENCE BARREN -3.05 SILT FENCE SEDIMENT BARRIERS SHAL L BE INSTALLED DOWNSWPE OF AREAS WITH MINIMAL GRADES
M FILTER SEDIMENT-IADEN RUNOFF FROM SHEET FLOW AS INDICATED. ITS PURPOSE IS TO INTERCEPT SMALL AMOUNTS OF
SEDIMENT MOM DISTURBED AREAS AND PREVENT SEDIMENT FROM LEAVING THE SUE.
3. STORM DRAIN INLETPROTECTION-3.07 STONERLTEMSHALLMPIACEDATTHEINLETOFAUDMINAGESTRUMN PS
INDICATED ON PUNS. ITS PURPOSE IS TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAINAGE SYSTEM PRIOR TO
PERMANENT STABILIZATION.
4. DIVERSION DIKE -3.09 A RIDGE OF COMPACTED SOIL CONSTRUCTED AFIRE TOP OR BASE OF A SLOPING DISTURBED AREA WHICH
DIVERTS OFF -SUE RUNOFF AWAY FROM UNPROTECTED SLOPES AND TO A STABILIZED OUTLET, OR M DIVERT SEDIMENT-IAOEN
RUNOFF TO A SEDIMENT TRAPPING STRUCTURE. MAXIMUM EFFECTIVE LIFE IS 18 MONTHS.
5. SEDIMENT TRAP-3.13 A TEMPORARY BARRIER ON DAM WITH A CONTROLLED STORMWATER RELEASE TO DETAIN SEDIMENT4-ACEN
RUNOFF FROM 51STURBED AREAS IN FNET AND 'DRY' STORAGE LONG ENOUGH FOR THE MAJORITY CE SEDIMENT TO SETTLE OUT.
6. MAINTENANCE OF SEDIMENT WRAP- INSPECT TRAP EMBANKMENT WEEKLY TO ENSURE IT IS STRUCTURALLY BOUND AND HAS NOT BEEN
Z OUTSET PROTECTION -3.18 THE INSTALLATION OF RIPRAP CHANNEL SECTIONS ANE/OR STIWNG BASINS BELOW STORM DRAIN
OUTSETS TO REDUCE EROSION AND UNDER -OUTING FROM SCOURING AT OWLETS AND TO REDUCE FLOW VELOCITIES BEFORE
STORMWATER ENTERS RECEIVING CHANNELS BELOW THESE OIRLETS.
S. DUST CONTROL-3.39DUSCONTROLISTO BE USED THROUGH THE SUE IN AREAS SUBIE7TM SURFACE AND AIR MOVEMENT.
VEGETATIVE PRACTICES:
1. TOPSOIL (TEMPORARY STOCKPILE) - 3.30 TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADES AND STOCKPILED FOR LATER
SPREADING. STOCKPILE LOCATIONS SHALL SE LOCATED ENSUE AND SHALL BE STABILIZED WITH TEMPORARY SILT FENCE AND
VEGETATION.
2. TEMPORARY SEEDING - 3.31 ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR MORE THAN 30 DAYS SHALL BE SEEDED WITH
FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED
MIXTURE SHALL DEPEND ON THE TIME OF YEAR R IS APPLIED.
3. PERMANENT SEEDING -3.32 FOLLOWING GRADING ACTNITIES, ESTABLISH PERENNIAL VEGETATIVE COVER BY PLANTING SEED TO
REDUCE EROSION, STABIIJZE DISTURBED AREAS, AND ENHANCE NATURAL BEAUTY.
MANAGEMENT STRATEGIES
1. PROVIDE SEDIMENTTRAFFlNG MEASURES AS A FIRST STEP IN GRADING, SEED AND MULCH IMMEDIATELY FOLLOWING INSTALLATION.
2. PROVIDE TEMPORARY SEEDING OR OTHER STABILIZATION IMMEDIATELY AFTER GRADING.
3. ISOLATE TRENCHING FOR OFF ROES AND DRAINAGE FROM DOWNSTREAM CONVEYANCES IN ORDER TO MINIMIZE PERIMETER
CONTROLS.
4. ALL EROSION AND SEDIMENT CONTROL PRACTICES SMALL BE MAINTAINED UNTIL THEY ARE NO LONGER REQUIRED TO COMPLY WRH
THE CONTRACT DOCUMENTS OR SPATE LAW.
PERMANENT STABILIZATION
ALL NON -PAVED AREAS DISTURBED BY CONSTRUCTION SHALL BE STABILIZED WITH PERMANENT SEEDING IMMEDIATELY FOLLOWING
FINISHED GRADING, SEEDING SHALL BE IN ACCORDANCE WITH STD. ® SPEC. 3.32, PERMANENT SEEDING. SEED TYPE SHALL BE AS
SPECIFIED MR "MINIMUM CARE LAWNS' AND "GENERAL SLOPES" IN THE HANDBOOK FOR SLOPES LESS THAN 3:1. FOR SLOPES GREATER
SEQUENCE OF INSTALLATION
PHASE I (SEE SHEET CIA)
1. A PRE -CONSTRUCTION MEETING IS REQUIRED WITH ALBEMARLE COUNTY E®S INSPECTOR CO
NTRACTOR, OWNER AND ENGINEER.
THIS MEETING PSHALL ERIMETER
TAKE AT UETHE COUNTY OFFICE BUILDING.
2. INSTALL PERIMETER MEASURES, INLET PROTECTION, AND CONSTRUCTION ENTRANCE.
3. GRACE ROFFERSEDIMENT EXISTING
AND INSTALL DIVERSIONS.
3. AMR ALL EX6nxG BUDDING AND MEANICONTROL
E ALL.
4. AFfERALLEROSION AND INING SEDIMENT CONTROL MEASURES ARE IN PLACE SUE WORK CAN BEGIN.
5. CONSTRUCT NEW RETAINING WALL.
6. ROWH G AWAY EXESSDIEE FAREA.
7. MAUL CONSTRUCT
EXCESS OI0.TBDEBRIS
S. SEED ALL DENDEDABUILDING,
9. SEED ALL DENUDED AREAS PER VESCH STANDARDS.
PHASE II (SEE SHEET C32)
1. INSTALL ADDITIONAL INLET PROTECTION WHERE SHOWN ON THE PHASE 2 EROSION AND SEDIMENT COWROL PLAN AS THE STORM
SYSTEM IS CONSTRUCTED AND BECOMES OPERATIONAL
2. NNE GRADE PROJECT AREA. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS
ACHIEVED.
3. ALL SMRMWATER PIPING® STRUCTURES, SHALL BE INSPECTED MR SILT/SEDIMENT. IF PRESENT, SILUSEDIMEW SHALL BE
CLEANED OUR NR THE SYSTEM TO THE SATISFACTION OF THE EM INSPECTOR.
4. ONCE THE SITE UP HILL FROM THE SEDIMENT TRAP HAS BEEN STABILIZED AND APPROVED BY ISO INSPECTOR REMOVE, REMOVE THE
SEDIMENT TRAP AND COMPLETE ANY FINAL GRADING OR HARDSCAPE.
5. APPLY PERMANENT SOIL STABILIZATION TO THESE AREAS WITHIN SEVEN DAYS AFTER FINAL SPACE IS ACHIEVED.
6. ONCE CONSTRUCTION IS COMPLETE AND ALL CONTRIBUTING AREAS ARE STABILIZED, EROSION CONTROL MEAURES CAN BE
REMOVED UPON APPROVAL FROM THE INS INSPECTOR.
Igclgsl l<3J 0.85 I I I
unWllu venv I I I
el on lnl na p0 wlunyvy) wluma lay)
a21 893 ,w.myu
VA
B
quirt R )BT'DA)
n m)
ac
uM Icy) 710 ene YaeMWAX anvil AA VOmw,. oI.
bn¢alm31
-1N APO A)(AOA1 51
mwmofNp.-on(M w
9ulretl lcy)or.) 670 .P..-N. 87111'
Ix10 1PPelmm elretan ln) 11e.0
mldtlm S...tN, By, 67e toPAax o01 n*n x0
ES-1: UNLESS OTHERWISE INDICATED, CONSTRUCT AND MAINTAIN ALL VEGETATIVE AND STRUCTURAL EROSION AND SEDIMENT
CONTROL PRACTICES ACCORDING TO MINIMUM STANDARDS AND SPECIFICATIONS OF THE LATEST EDITION OF THE VIRGINIA
EROSION AND SEDIMENT CONTROL HANDBOOK AND VIRGINIA REGULATIONS VR 625-02-00 EROSION AND SEDIMENT CONTROL
REGULATIONS.
ES-2: THE CONTROLLING EROSION AND SEDIMENT CONTROL AUTHORITY WILL MAKE A CONTINUING REVIEW AND EVALUATION OF
THE METHODS AND EWECTIVENESS OF THE EROSION CONTROL PLAN.
ES-3: PLACE ALL EROSION ANDSEOIMEW CONTROL MEASURES PRIOR TO OR AS THE FIRST STEP IN CLEARING, GRADING, OR LAND
DISTURBANCE.
ES-0: MAINTAIN A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL PLAN ON THE SITE AT ALL TIMES.
ES-5: PRIOR TO COMMENCING LAND -DISTURBING ACTNINES IN AREAS OTHER THAN INDICATED ON THESE PLAINS (INCLUDING, MITI
NOT LIMITED TO, OFFSITE BORROW OR WASTE AREA), SUBMITA SUPPLEMENTARY EROSION CONTROL PLAIN TO THE
ARCHITECT/ENGINEER AND THE CONTROLLING EROSION AND SEDIMENT CONTROL ANHORIIY FOR RENEW AND ACCEPTANCE.
ES-6: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED
BY THE RESPONSIBLE LAND DISTURBER. (MOUTHED NOTE)
ES-7 ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL MEASURES AT ALL TIMES DURING LAND -DISTURBING
ACTIVRIES AND DURING SUE DEVELOPMENT.
EBRO: DURING DEWATERING OPERATIONS, PUMP WATER INTO AN APPROVED FILTERING DEVICE.
ES-9 : INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF- PRODUCING RAINFALL EVENT. MAKE ANY
NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF THE EROSION CONTROL DEVICES IMMEDIATELY.
MINIMUM STANDARDS:
AN EROSION AND SEDIMENT CONTROL PROGRAM ADOPTED BY A DISTRICT OR LGCALTIY MUST BE CONSISTENT WITH THE FOLLOWING
CRITERIA, TECHNIQUES AND METHODS:
M$-1. PERMANENT ORTEMPORARY SOIL STABIIJZATTON$HALF BE APPLIED TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE
MS-2. DURING CONSTRUCTION OF THE PROJECT, SOIL STOCKPILES AND BORROW AREAS SHALL BE STABILIZED OR PROTECTED WITH
SEDIMENTTRAPPING MEASURES. THE APPLICANT IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND PERMANENT
STABILIZATION OF ALL SOIL STOCKPILES ON SM AS WELL AS BORROW AREAS AND SOIL INTENTIONALLY TRANSPORTED FROM THE
PROJECT SITE.
MS-3. A PERMANENT VEGETATIVE COVER SHALL BE ESTABLISHED ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED.
PERMANENT VEGETATION SHALL NOT SE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IS UNIFORM,
MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION.
MS-4. SEDIMENT TRAPS, PERIMETER PINES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP SEOIMEW$HALL BE
CONSTRUCTED AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND SHALL BE MADE FUNCTIONAL BEFORE UPSLOPE LAND
DISTURBANCE TAKES RACE.
MS-5. STABILIZATION MEASURES SHALL BE REPLIED TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY
AMR INSTALLATION.
MS-5. SEDIMENTTRAPS SHALL BE DESIGNED AND CONSTRUCTED BASED UPON THE TOTAL DRAINAGE AREA TO BE SERVED BY THE TRAP.
A. THE MINIMUM STORAGE CAPACITY OF A SEDIMENT TRAP SHALL BE 134 CUBIC YARDS PER ACRE OF DRAINAGE AREA AND THE
TRAP SHALL ONLY CONTROL DRAINAGE AREAS LESS THAN THREE ACRES.
MS-7. CUT AND ELL SLOPES SMILE SHALL BE DESIGNED AND CONSTRUCTED INA MANNER THAT WILL MINIMIZE EROSION. SLOPESTHATARE
FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION SHALL BE PROVIDED WITH ADDITIONAL
SLOPE STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED.
MS-8. CONCENTRATED RUNOFF SHALL NOT ROW DOWN M OR ELL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE TEMPORARY OR
PERMANENT CHANNEL. ROME OR SLOPE GRAIN STRUCTURE.
MS-9. WHENEVER WATER SEEPS FROM A SLOPE FACE, ADEQUATE DRAINAGE OR OTHER PROTECTION $HALL BE PROVIDED.
MS-1O. ALL STORM SEWER INLETS THAT ARE MADE OPEFUBLE DURING CONSTRUCTION SHALL BE PROTECTED SO THAT SEDIMEM-LADEN
WATER CANNOT ENTER THE CONVEYANCE SYSTEM WITHOUT FRST BEING FILTERED OR OTHERWISE TREATED TO REMOVE
SEDIMENT.
MS-11. BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNELS OR PPES ARE MADE OPERATIONAL, ADEQUATE OUNET
PROTECTION AND ANY REQUIRED TEMPORARY OR PERMANENT CHANNEL LINING SHALL BE INSTALLED IN BOTH THE CONVEYANCE
CHANNEL AND RECEIVING CHANNEL.
MS-12. WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED PRECAUTIONS SHALL BE TAKEN TO MINIMIZE ENCROACHMENTCONTROL
SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING CONSTRUCTION.
NONERODIBIE MATERIAL SHALL BE USED FOR THE CONSTRUCTION OF CAUSEWAYS AND COFFERDAMS. EARTHEN ELLMAY REUSED
FOR THESE STRUCTURES IF ARMORED BY NONERODIBLE COVER MATERIALS.
MS_13. WHEN A LIVE WATERCOURSE MUST BE CROSSED BY CONSTRUCTION VEHICLES MORE THAN TWICE IN ANY SIX-MONTH PERIOD, A
TEMPORARY VEHICULAR STREAM CROSSING CONSTRUCTED OF NONERODIBLE MATERIAL SHALL BE PROVIDED.
MS-14. ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES
SHALL BE MET.
MS- 15. THE BED AND BANKS OF A WATERCOURSE SHALL BE STABILIZED IMMEDIATELY AFTER WORK IN THE WATERCOURSE IS COMPLETED.
MS-16. UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH THE FOLLOWING STANDARDS IN ADDITION TO OTHER
APPLICABLE CRITERIA
A. NO MORE THAN 500 LINEAR FEET OF TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR PASSED THROUGH AN APPROVED SEDIMENT TRAPPING
DEVICE, OR BOTH, AND DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT FLOWING STREAMS OR OFF -SEE
PROPERTY.
D. MATERIAL USED MR BAWTLLING TRENCHES SHALL BE PROPERLY COMPACTED IN ORDER TO MINIMIZE EROSION AND PROMOTE
STABNZATION.
E. METABNZAGON SHALL BE ACCOMPLISHED IN ACCORDANCE WITH THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS SHALL BE COMPUTED WITH.
MS-17. WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED OR PUBLIC ROADS, PROVISIONS SHALL BE MADE TO MINIMIZE
THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT IS TRANSPORTED ONTO A
MS-18. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED WITHIN 30 DAYS AUER FINAL SUE
STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL
PROGRAM AUTHORITY. TRAPPED SEDIMENT AND THE DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY
MEASURES$HALF BE PERMANENTLY STABILIZED TO PREVENT FURTHER EROSION AND SEDIMENTATION.
MS-19. PROPERTIES AND WATERWAYS DOWNSTREAM FROM DEVELOPMENT SUES SHALL BE PROTECTED FROM SEDIMENT DEPOSITION,
EROSION AND DAMAGE DUE TO INCREASES IN VOLUME, VELOCITY AND PEAK FLOW RATE OF STORMWATER RUNOFF MR THE
STATED FREQUENCY STORM OF 24-HOUR DURATION IN ACCORDANCE WITH THE STANDARDS AND CRITERIA USTE01N SECTION 19
OF VIRGINIA ADMINISTRATIVE CODE 9VAC25-840-40 MINIMUM STANDARDS.
27B - SUGAR LOAM, 2 M 7 PERCENT SLOPES, MORE THAN AD INCHES TO RESTRICTNE FEATURE, HYDROLOGIC SOIL GROUP: B
34C - GLENELG LOAM, 7 TO 15 PERCENT SLOPES, MORE THAN 80INCHES TO RESTRICRVE FEATURE, HYDROLOGIC SOIL GROUP: B
39D - HAZEL LOAM, 15 M 25 PERCENT SLOPES. 20 M 40INCHES TO LEHIC BEDROCK HYDROLOGIC SOIL GROUP: B
OOMPAOTEERMIL I
LAT
NA
MEN
ONIII Hill
IIPXLL
1rM 11 11 �11
QQQ QQQ
STANDARD ORANGE VINYL OR PLASTIC CCNSTRUOTION
FENCE ATTACHED TO POSTS (PRE -WEATHERED VADOG
GALVANIZED STEEL, IRON OR THICK PVC PIASTICI AT
LEAST 40C ABOVE FINISH GRADE MINE SPAN BETWEEN
POSTS NO GREATER THAN 6ON CENTER. EVERY NINTH
OIDENTIFIES
POST SMALL CONTAIN A WARNING SIGN THAT CLEARLY
THE FENCE AS A TREE PROTECTION FENCE. 3 3S
TABLE 331-8
ACCEPTABLE TEMPORARY SEEDING PLANT MATERIALS
"OULCK REFERENCE FOR ALL REGIONS'
PUNTING DATES
SPECIES
RATE I SJACRE)
BEET 1-FEB. 15
MUST MIX OF
ANNUAL RYEGRASS
(LOLNM MULTI-FLCRUM)
B
50.1W
CERFAL(WRITER) RYE
(SECALE CEREALS)
FEB. M-APR. 30
ANNUAL RYEGRASS
N,100
)LOLNM MULTI-FLCRUM)
MAY 1-AOG. 31
GERMAN MILLET
W
ISETARw ITALICa)
O
33t
GRAANFL CURB INIFIET SEDIMENT FILTER
I
/u
`il�� Nei rtiN
, OF
WHi
NNEM
�
NM1W
ffnl
WTIEA 1ST
`aMIRR INNER
IP UXABTFCTEOaRI:Is. OAwGEro An.wcElrt smuciwESAi10 vio
2 .n AMS SILT FENCE DROP INLET PROTECTION OORRDDERINLET AM
RRALE
LS'
MAX.
y
CALMER
EXCRS
AT
OWNERS
PERSPECTIVE NEWS
STAKE
FABRIC
MI MIN.
7 A,
DETAIL A
ELEVATION OF STAKE AND FABRIC ORIENTATION
SP
ECIFIC SCNFlCA ARM m4RONRM manON
TMINE Is APPUCABLE INE ME WLET
R DRAINS A RAUSLY MAT AREA (SLOPE NO GREATER MAN EX) MERE
LEe' �n. "A acc 11 a1
PROFI
gcrnAnox a mul¢ ���mnPPixo rcgcr
PI AN
'INwAiwve
�i
nnrx qn,n- SECTION A -A
waM'tylo weLn rl Le brrlrtllM wYL• weLLrJleoe\ ru,Lxa'rryl�lY Ia weN4eaex'Yrah _ ee ta�:rawlntle
wM1rYN'meruc WnxL wnternupLbecnrtrcJ eweY RmnOearLlaebm
ryyaovlJ xtltlWg ertnlo rmrwe eetlbwL eVl wYxhaubepwnuetlfiow
auerv¢.rlonn4,eLu.,MVLex or w.mnxo,wa.
PAVED WASH RACK
1. EET TIE STN(64 IXUVATE A aY f OVEMON UNTOPE
AGENAM SiA.
i
G
/.
Ri
EXTEENDITINTOMETRIGNSH ExuvA Se��
�I� ��
$HEFT FLOW INSTALLATION
IiERSPELTNE WEK6
Al iW McXA \�
PprtB A yaRO EP MMRIER MAN IgNTB
O DRAINAGEWAY INSTAIIAMIN
(FRONT ELEVATICN)
ME IM£T ENGEL OR ORERLANO ROWS (NOT EXCEEDING 1 C.F.S) ARE
9 NT-1 IP TYPICAL ME METHOD MALL NOT APPLY TO INLETS RECBNNG
CONCENTRATE) ROWS, SUM AS IN SOVIET OR HIWWAY MEDIANS.
TABLE X32-D
SITE SPECIFIC SEEDING MATURES FOR PIEDMONT AREA
TOTAL HAS. PER ACRE
MINIMUM CARE LAWN
COMMERCIALORRESIDENTIAL 175400 TIES.
KENTUCKY 31 OR TURF -TYPE TALL FESCUE 904W%
IMPROVED PERENNIAL RYEGRASS ONK
KENTUCKY BLUEGRASS O NK
GENERAL$LOPE 91 OR LESS
KENTUCKY 3I FESCUE
128 L&S.
RED TOP GRASS
Y LBS.
$EASONALNURSECROP'
20 LEOF
I SULFUR
L014MAINTEMANCE SLOPE (STEEPER THAN 3:1)
- SEE SLOPE STABILIZATION SEED MIX
- USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES
AS STATED SELbN
FEBRUARY I6TH THROUGH APRIL _. ANNUALRYE
MAY TAT THROUGH AUGUST 11H FOXTAIL MILLET
AUGUST 16TH THROUGH OCTOBER _. ANNUALRYE
,CVEMBER THROUGH FEBRUARY I5TH _.. WINTER RYE
"SUBSTITUTE SERICEA LESPEOEZA FOR CROWNVETCH EAST OF
FARMVILLE VA (MAY THROUGH SEPTEMBER USE HULLED SERICEA, ALL
OTHERPERIODS, U BE U NHULLEDSERICEfB IF F(ATPEAIS USED IN LIEU
OF CRONNVETCH, NCREASERATETOMLB5/ACRE. ALLLEGUMESEED
MUST BE PROPERLY INOCULATED. KEEPING LOVEGRABS MAYBE
ADDEDTOANY SLOPE OR LOWMAINTENANCE MIX DURING WARMER
SEEDING PERIOD\ ADD 1620 LBSJACRE IN MIXES.
E
>E
Ong
CL
D
O
U)
z
O
p
302 2021
DRAWN BY
A. NNTATNE
DEEIGNED BY
A NNTA(NE
CHICKEN BY
C. KOTARSKI
W
Z
Q
w
J
O
Z
W
V/
11
M
N
N
'I
V/
Y
U
Da.��
00
V/
J
w
ca
U)
w
O
Z
U
06
w
47165
C3.0
_ - - - - --________ ________________________ EROSION CONTROL LEGEND
_ _ _ _ _ _ _ _ 08 f pMR50F CLEARING AND GPADING a VIp,AL2H OA
------_--------- ----------- ---- - - - — _—_ — __-_- _ _--_--_--_ I '�o
_— — — ___ us _`=<s-- �- �R_______________________ _ _ 4_--------- DRAINAGE DIVIDE -
__ _ _ _ _-� ]___ _ SOIL AREA DNIDE - VORpLGW ].I:UTAR3gs
_ _ _ _ _ _ _ _ yic. Na WOLN85M
95p -r � 0.58E-�_ �= 0I1BQ � - _ - LE >AVEO CONS3RDCTION ENTRANCE 3.02
_ _ -°</ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ FENCE 3.05 'NONAL t __ uy� 9 _ _ ___ ____ ___ _______
_______`4 \�_ _ __ __ _ __- ------ IP ® ..-wOTFrnoN 3.01
MANAGED STEEP SLOPES _ _ _ - - - 44O =n. - - _ _ _ _ _ r _ i
-�_ _ _ _ \ \ ` _ _ _ _ _ - 1REJLMIF- M PNSME, F�NgNO CEj,`IDLOD$_ ' _ 00 DNEBSION DIKE 3.0E m E
_ ______- - - _ - - - - - ________ ___ -_- _ - 8
- '
_________ Ro RDN-CF-wnv ONER ICx n >E
_ ; f i _ _ _ _ v iIMBERWALl - -- I- _ 6T SEDIMENTIPAP 3A3 € LL
- TS TERRI.. SHOING 3.3,
------ iPy ��.d
L P$ PERMANENT SEEDING 3.32 w O
A o
TiSTOR06THBAOFFILEBUILOING \II ^ MU MU¢HiHG 3.35 L' yrV
WIRI BASEMENT `I II fl 3 CQ g ^ N `L 3
1 DO r TP -�- 3REE PROIERIDB 3.30 N � d � Is £
\\ \\ I BRILKWIN OWWELCS �- T$ 1"e-_ a Is By9
12'ORAINAGE SEMENT \\\����""9yyy (Typl O OC DK47 CONTROL 3.39 r m j
DR 1159. PG2M \\ I DC e g S @ N¢
PROPANE wMRGINW EROSION AND SEDIMENT CONTROL XANDBOOK"SPECIFlCPl10N NUMBER Gam' R
F - I, T r G
r _ l FF=4 ,, APPROXIMATELY 2i6CY OF ,{ $� ip
T$ �\ FILLWILLSENEEDEDTOFILL / FF=43943' A p FQ W V
\\ \\`x i r THE EXISTING EASEMENT JJ 34C m C
L� AA A DC \\ �o
\ r C
UNABLETO LOL✓1]�INVERT II' f V W L,
l I-------=/eLe srea'wt III 'I r L 1/ y r rBR/CKPORLH
I \------- --
Ir---r,— `�T `� II
HANDlcavvGG ___-- - H F - -•-='f
's r IN �rrr
SIGN
\�' �✓ ���
RATE
J r r S ' e m
1 •\/I /I'�I. 3 Rw.wND.1
IIiI I �.
DC`K \ I I � A. FONTA(NE
/.'�Ia- A e_ A DERGNEDBY
A.BONTALNE
OlECKED BY
DISTUREANCE=0.59 AC : • CKOTARSKI
DC
GROPINLET
�Iv
i APPROXIMA OCAT'IXJ
roP =4z1.s 7� aw-
39DINV INJiJ�f`' n "P OF EXISTING NITARRAYL "v / T j,. , I 39D •
PARKING. I \O I I I
7/ SFADING,AO
___ -// ee �� STORAGE AREA T$ \ -
DO \••••• % i / i\ i\ I 0.5CAPEG I110TEEGRAPHCCOMPANOEASEMENT`
II eM1>� \ r
ST
i
_
�I
�11,N`pI Q
[MOP INLET ' STONEWEIR
TOP=423.0' � _
1V INV IN JI3J i � �O{' I AI
INV OUT =41T 4' � ' � • � 1 i I
/ *
111 ---- ——
6.T DC
_ LLI i
J —
_
J r \ —
ss2
8
r esm aA rl�
X I DEED \ � 's
=¢i
�SEMI�LANf -T- _-�� �I_ A M 2 b
PUBLIC
VARIABLE INBTN R/W \ \� I / PIPEFORTMISCIF TH ITT. � � \ W L y
fA 06 5
-- ---.>�--- N \ I K1
sEOI MENTTRAP Ni -aj'r 1 ij
0.85 AC DRAINAGE AREA! �` \ EG
TOTALSTORAGEREOUI$ED:113.B CY UG ✓90X 'NARK T \ ``I \ Y
---' ' _ T TOTALSTGRAGE PROVIDED: 133ACY
PRE SERVE EXISTING _yyl- TOP OF DAM=426.0 \ T �� \ U�
\ \ RENCHMARKSET ` ASPMALT FOR ACCESS TO a--Layr--___a�- I `I j�J���'� J�
LHlSED SQUARE INTOP CONSTRUCTION ENTRANOE \�--k-
y` RALK URB I .`��-TaD1r- r�{- oA- O
\y\l\ ELEVATONJ2646' \ \ �1ry-/L� a $F
I' \� JT \I� T�F �
ry\1
IT
I TO US. ROUTE 29 _
-Ti 1 SEMI. TRAIL 1 `0 ;
- i 11 /
I ` VARIABLE DM R/W
STARM x TRAFFIC
ff
DftDP IrvLET c �/� a.I �, \1 T IN
)1 f 36 ss \ Hro I _ � \ `G
MV IIu-9zse —� "--- . c- —I --/ a - —""\ —"— �e
a�V IN -4 \ i it\\ 6 \-° // INVOU -4235�"
rNVOUT P 4. _ ` - Ip/� , , ____ \' - --E- - = 4 \ _ 1 8 _____ 30e.p $5
-- -- - f �� —s— — -- ----�� `- 47165 sz
_ _ _
— -
-- — —7/m" -- /mr '7fir— fi fi� E ,0 20 H"ar.
WELLIPTICALRCP / / / / / / sMEFTNO
----- ----m-----A,— TM-----.N�IJ �— A, — C3.1 E�
_-_-___________ EROSION CONTROL LEGEND
_ _ _ _ _ _ _ _ _4�- >e f LIMR50F CLEARING AND GRADING m VIp,AL2H OA
---_ -_- - - - --------------- _ `
____ — —ass __�5---_aR_________________________________ �-___ - DRAINAGE DIVIDE -
_ qss _ _ _ _ __ o
_ ____--DJOTRCFE- _ _ _ _ ___ ]___ _ SOIL AREA DNIDE - VORALf.W ].I:UfARSgs
_ _ _ _ _ _ _ _ yic. Na WOLN850'/
_ _ _ _ - - - - CE PAVED CONS IOIDN ENTRAN. 3..
_ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ SP -n %- SILi FENtE 3.05 'MDNAL
-______9 _ _ ___ ____ ___ _______ y
_ _ - _ _ _ _ _ _ _ _ _ _ _ - L - IP ® INIkT%IOlFC11ON 3.01
MANAGED STEEP SLOPES _ _ _ _ _ _ - 44O =n. -- - _ _ _ _ _ _ i
_ _ _ _ _ -�_ _ _ _ - - - ` _ _ _ _ _ - 1RFELINE- MI%VF EVERGBF�NgNO DEGIDUOuS_ _ _ _ 00 DNERSION DIKE 3.09 FIE
_ _ ________ _______ _ _ e
— _ 3,
____ — __
____
_ — — —
-4---� ,s �q�q-- _ — - - _- - _ RIGM OF WAY DIVf0.51LN 3.11
"�"O a fr
E
AT SEDIMENTIRAP 3A3 u
I TA TE.... SfEDING 3.31
—w m
_ _ _ _ _ _ P$ fERMpHENT SEEDING A. w -h
K% INS
sx=.8
\\ \ uu nuLalxG 3.31
IP TP —^— TREE'.DR A.
12'DRAINAGEIM�EME11 1 - ' OC DVSI CONTROL A.
\\ 1 IRS, P A �R p£ 0 3 wMRGINW EROSION ANDSEDINEM CONTROL XANDBOOK"EPECIFlCAl10N NUMBER GQQ
T G
a
F" - 1, \ 1 2B 32
30 ' � MU � 8k c>✓
PS Oat p a w
i<
DC g =< �° 34C o
NV8 _=M
Pp.A I_A .I R —�.. ee MU PS o £S
UNABLE7o LOGT�INVERT `pt - IF, IS
�Io
II I I �I� II II IIII�/�✓II � �� � 9� \\INNINNIM,
II d iI III III I T�� ��� 30O2021
DR..wx BY
- R PROPOSED
V 1.15091`+ T N
LIMRSOF • B OBY
W I TEA DISTURBANCE • A..FONNTA(NE
LU. 2�II T N CENTER OFDRIVE \�1� \� 0.6BAC • PECKED BY
'TMRDUGMWINDOW 1 \ II! I I I e l 1 e u� I \ • c. KorAzsa
\ iI ' , I I � DD • • sTNE
DROP.TOP 41
I14 II' J -jl T V% w • 3—ao•
39DIP INV INJO.D
,rvvOBP-a,zB " I I $F - �p ,a� \ ' _ 39D •
IFCL
II
/ Lu
M1K
DROV I211
NLEr
I INV INUT O.12 IP NOP �' i, \
INV urafzm . s5 / \ _ '� °ii PS _Tl o - \ P$ MU A T� \. 1 \ w \
__------ _ _ _ _ _ _ ___ _ — _ _-- ---------_----- T DC
T
e
w0� __ ----- - DO _
1
f9HDP£ FEDEX9pA � -, -Ti �--\;
i �6
1-41
e- ss -" ss—Br ss Bss—e` ss Ir ss `
AEEESSEAReMENT .- 11 1
A, OEED600NTkf6,PAG d96 T IDS/ \ \ W S
brv�ow, r a oe T1L A e
DDB_
B rs7�_s7a�`, t 88 1 e \ ¢ z — I "EMINOLE LANE \ M 4/ d B
PUBLIC ,L�Lyyyy
VARIABLE INDTN R/W \ Poa \ '"— N a (i
QQ r.4 w �$
SF A. ` "'-----+>'-� ---"'-- -'a+-- �II \ vI eA.
cp
■■ I UG ✓BOX
RENCHMARKSET I I _ -} +00- -amN- __
.v1
< ` y
BACsKE� DASQUARE INTOP ��_\ 11 1- • // I N
y\ ELEVA ON 1 .' �I `Lg ITT{- / I Y xmq _ •• / m @@@@
\y ELEVATION J2646' \ ` 1'1 LJ T„/=F $F-T--+m- -am-- ____ I _ +
^Y / -ae» -.yn- -�aMR--_mar` -
4 T---- m-----+ --- 1---� —+ — T /
I TIF
o U 5. ROUTE 19 \ \ - ` I Y _ _ T=
II I 1 sEMINoeE mat I '\\�\ \ �\ r ,�o'd" (n
'I IIi VARIABLE 4 DTH R/W1 STARM I C\ `B' x TRAFFIC
, — --
`
OaOP IrvLET �r c '-,i// 1 \ �. \ .4\ _ _ __� arvVIN s36 S - --_--- c- �.< --_
R3PN .a 1 n /
rNVOUa�V/N-4 / ` \ iY\ \ -'INVOU -4236 - — \'. -.-- — A.
T P \ \ c — 4 1 a /OB Ip
�_ a ` --
__ 1
--__- -- __ - - m a __: �_ 9FdEss
-go- --_� --_ _ - - - 4
-'�� -s_ - --7/�Tr-`.� 0 Ta ao, X165
fa"ELLIPTICALRCP
s FkT NO
----- —_--M-----N.— ,„,„ �,„ -- T,„-----,„ _—M --- N.— C32 E�
Section 5. Stormwater Management Plan
(Provide a reduced l 1x17 copy of the latest stormwater management plan. Do not reference only.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
K 1 K— _—
M x X— CILAARSPROPERTYEINEBY03DRAJTO DITCHA 1
_ ___ _'4sn____ _ 1
___—__ __--a65-a-_ _______-__F
_ _
--_PFIVACYFENCE --- -� - - ________________________
• ENCROAC l AO`9_ _ _ - - - _ - _ - _ - - _ _ -485-
P,EOPPFA'Sr______ _ \ — " _ - - - - - _ - - - -
_ _ _ _ _ _ -�6R _ _ _ _
-_ IN-_ _ ------
_ - _ ASA ---- - - a�orACRE 7 _
= _ _ _ -w ass - -- _ - oasBLdioAoeo_ __ —
.- 1{{
_ - _ - \ - - - _ _ _ _ _ _ _ 1 _ _ 1 U' 433
_ _ _
_ _ _ I ........... 933
_ 995 9- _ _ _ _ - _ _ _ _ r
MANAGED STEEP SLOPESWv _ _ _ _ _ j - -
_ _ - _ _ _ _ _ _ --I _ 45p DNAINAGEPREATODITCHA=F17AC
_ _ _ _ __ __ _ c=o3p
�_ �` \ - - - _ _ _ _ _ - �RFELINE: MUI-OF Ei£RGRF�EN AND D�DIQUOU$_ _ _ _ _ _ _ _ _ _ _ _ — _ Ta fi IN
___ _ _
<ae____ a]] T4Y - _ _ _ ____ _ _ 1,2}6pIWXR p(2) o3g6p)Io17J 026 CEs
435 - _ _ ___ ________ _ J9ew� _ N[. _ _ _ OI )- 3M II.O=DU CPS
- 'a - �'� N1flT - 1,1p)=fifi INMR 1W= fib pl
— _— — _ -
____
DFO) z2p PT/S (ALLDNPBLEVELOCITr=s PT/S]
4m>5 I t, 4 L - < = I'=- -_________-_______-- qtq=ps2'
s p -
.91m 4m GRASS LINED DITCH
3=70%
1 1zp �
\� / GBF. - 411.
IRS IIIINAGE T, —'ice 1 . 4 iT 66'
OB 1159, PG 131\\ I 1 1 v, AG, 4N 11 iRSY a33 a35M
\ 11 la iP 9x3p' 43
F- -`ET, \
\\\ I II 430� ,32
:c
3 m �z
\ ale
UNABLE OLOCAI�INVERT I li
—_�eNE&TPI V /gLgy)= iD rvnCUTFOR II REw' e�ze�l o ` �, a
STgE
I I I II II � � III 1 ^• I \ 'ha 1 a39.n' .,
MWATQt
II I� IIIII { I yy 112 n 12
i Zvi IIO—�� II iI II 11�1 6-PVC
1 ROOF UMIN v U` - Isa
PROPOSED\ p �� ap' iC \TV
STARBUCKS
1 il iiSp SF -, �I ax U \ 99198
FFE42B.35 y o
1I11 CENTER OF CRIVE lE.R5'
'li 1 P' J TMRouGH VANDow 6PVC v
Try ` DowxSPOUTTo RooF GRAIN
I ' ROOF GRAIN
DROP INLET PRE) 1� 1 �� 1 yv/ ✓/\\I 5.91'
TOP<31.61d. ,1 , �` 411*
INV.lN=411, v 1 1 6WR
INVObT=aiT.p'427
a
I I II I
42
/TD
24•
�7E_D?T._0W
i
—B" SS B' SS-8
" SS B' S5
SAIIIARYMH
TOP=426.4'
X INV 1N =41J9' Y
/ lNV our=arzr
-
SEMINOLE LANE
PUBLIC
\
VARIABLE MAIN R/W
\
\
ROOFDRAIN NOTES:
1. PIPES FROM ROOFORAINS TO HAVE A MINIMUM SLOPE
` OF 1 R% OR AS SPECIFIED ON AIW.
2. PIPE FROM ROOFDRAINS TO HAVE A MINIMUM COVER
OFV
3. CONTRACTOR TO VERIFY IF DONMSPOUT BOOT CAN
BE SUBSTITUTED FOR CLEANOUT. IF NOT, PROVIDE
CLEANOUTS AT ALL LOCATIONS MERE ROOFDRAINS
TURN OR CONNECT TO PIPE OUT OF BUILDING.
4. CONTRACTOR TO FIELD VERIFY ALL EIBSTING AND
PROPOSED STORM INVERTS OUT OF THE BUILDING
AND CONFIRM REQUIRED SLOPES. COVER, CROSSING
AND CONNECTION POINTS CAN BE ACHIEVED.
ED
RSgssmt�
yIE
8k w�
aF�
O �jM�ll
i QI�pR~
�_ a DAIS
CONTRACTOR SHALL COORDINATE ANY CONFLICTS 3/22/2021
MATH ENGINEER BEFORE BEGINNING CONSTRUCTION.12
3B'ACCE53
A:
v
RISERIIA
\
4sv
I
\
i
II 9B"ACCE53
RISER
aa] U, 2
1 �
1
Ias 4W.m
ays 3
n'
1
\
-"1
\
Y
1
Tc Nb� SNNA 1
2 ____
TV
SRMAGE%PE
�e
'Y
WITH WEIR PLATE
� V
$ 4'
1
snpn-�'`-�•�_
`
_
is PUBLIC
—ARICIGE44FABENT
1
1
\
OEEO BCOK I$PAGE 968
B951AAVYA
1
L/
Be 11sa1sp a
\
�
\
I
OB 1676214TV
------rT-----�
--�--
_
`\
�9 BENCHMDRKSET
CHISELEDSOUARE IN TOP BACK
y� �\ BACK CURB
ELEVAT40N=a26I6' \
I 1 \
TO USIROUTE 2eSEMINCOE \ \�
A
IL
1VARIABLE 1{IH 19R/W I TSTARMIF RL"
„ z4M%' 1�41p \
I JC%T
I UG JBOX TEL
MARK
MA CH VATIONSTING
(yl FEVATICNI3
TRAFFIC
V]65 RIF ❑ // FROPINLET
roP <z64' \ I 1 \
INVI 6 -a255' _ __ _ ____ ___
�i--_ _ _�y__-_ ____
INVIM4136' - {�_ - p- v - -�
WEOV$a236' v - \'.n .. - 4.. 1
D�N BY
A. NVIDUME
•• A. NARDUME
• 7NEIXED 9Y
• C. KOTARSKL
scuE
• 1.-I
•
•
•
w E
Z
D 9
Q
O LLJ i
J g
O z
w/ z g2
G a W g
W , < S
Q E
riCD
- M
N W a6 gl
N
z!.
ZV
^ �a / E.
Y cD
O U
00
SCALE I'=ttl �P41fll!
1p' te"recP
e'.
I
I
/
T
Y
v�
1Aria- 21—
I
I AN4YSI5 1 .4 \` /
I POINT 1 I v ."' /
B" 55 S" S� A S /wassaw
s •e'
_
I �POINS ' 2�! �
s
I I
WATER QUALITY ANALYSIS
SITE DATA
PRE DEVELOPED AREA
IMPERVIOUS= nA2ACRES
MAN,GED TURF =9.1T ACRES
PRE DEVELOPMEM FRAUD (TP)(UB Tb=099
POSTOEVELOPEDAREA
IMPERVIOUS=O.MACRES
MAN,GED TURF =0.15 ACRES
POST DEVELOPMENT LOAD ITE(LRrvR)=1A2
MAXIMUM REDUCTION REQUIRED FOR REDEVELOPMEM=1M
TOTAL LOAD REDUCTION REQUIRED (LBrYR) = R13
D.13 CREDITS TO BE PURCHASED
/ I
y - - -�- ---- _-- -LI
as
I
PRE -DEVELOPED
TOPOFRFSTORAGEPIPE
TOP OF WEIR
ELEV.=6xi.50
RATE6Y2.Tr
_ QrO reAR ease a2z.n
35 ORIFICE
INV. 419.
STEEL
PLATE _
Q t_YE_AR_WSE_ a1B_04_
5 S ORIFICE
EIEV
VNTH TRASH RACK
41R00
IW41800
SWNI A WEIR PLATE SECTION DETAIL
Ins Ion Activities
SwineAsted Schedule
• After alai Mofm evenliman extreme ilOnll event, in'Pecl for: ai,ns
9fdo Afthe inks orAmla s...— and sediment accumulation.
As Needed
• Inspectfor. (rash a" debris. clogging ofthe outkl annelums and any
pilot ehanwhe excessive erosion. seecimcnt nerumuktien in the lusin
and inleVoudet nmc.; mac gnewds on dole or embankmem: the
pinewnec ofbll -n,animas; standing over where there shadd he
Semiwnnually
vigor and density oftbe grass turf on the basin side slopes and
Rwx: diR mint senlemem: e.kin,leakaeand III Mbtlil,
• Insect ffiI oufet anpurq pipts, and dowaaaeam and pilot
,hoardsare frte ofdebris nW no, aMmiotlal.
• N9te Sipe of pollution, star as oil III dneolored moi or
unpleasant odors.
Annually
• Cheekfor sediment acamalaton in the facility.
• Cheek for prefer operation ofeomml pies. valves or Asher mechenitel
devkta.
Mail.-- Activities
Sisosessed Schedule
• perform structural nyairs to inlet and outlets
Maably a As needed
Clean and remove debris from inle, and Order alluclurts.
• I" dn�Se to inktaM Audctarvcmrts.mnlml sales. valves. or
other es,davka: air ZtM. Ar emdtd areas.
As Needed
• Monitor:dZint accumulation, and remove sedimem when prod
volume M1ae becoia rtdA si ifcaml .
As Needed
ry
_ _ F
-
I T
ha
na wAs
J \ ANALYSISPt
POINT
S" 55 S"
—
was
C` -
\�_ '
MAVIII
=ate? l I
-.-__
r
mvuwa wl2n
LEGEND
r
SCALE t'=3D
�
UNDISTURBED PRFA
0 90 65
WATER QUANTITY ANALYSIS POINT 1
DRAINAGE AREAANALYSIS
(PREDEVELOPMENTI
PRE AREA IA
AREA =0 WS ACRES
0273 ACRES (IMPERVIOUS)
0030 ACRES(GRASSI COVER)
Tc=6 MIN
D ICF31 Vfuern
1 YEAR 118 PON)
2YEAR t-
10YEAR 229
PREAREAIB
AREA=0200 ACRES
0000 ACRES (IMPERVI W S)
0200 ACRES(GRASSI COVER)
Tc=6 MIN
O ICF31
t YEAR 010
2YEAR 020
10 YEAR O59
PRE AREA IC
AREA =0214 ACRES
0 088 ACRES (I M PER V I W S)
0126 ACRES (FEARS COVER)
Tc=6 MIN
O ICFS
t YEAR 0
2YEAR AN112
10VEAR 11z
COMBINED FLOW TO ANALYSIS PRINT 1
Doe
1 YEAR 1AS
2YEAR 221
to YEAR 3%
AMINIMUM TC OF
DRAINAGE AREAS.
(POSTIDEVELOPMENT)
POST AREA to
ARE1=0329 ACRES
0262 ACRES (R CROP
0002 ACRES (GRAGR&SS COVER)
Tc=OMIN
OICFSI VIAGFTI
t YEAR i'M OAS[
2 YEAR .40
10YEAR 2.32
POST AREA 1B
AREA =0231 ACRES
GOOD ACRES(IMPERNOUS)
0231 ACRES (SEARS COVER)
Tc=6MIN
OICFSI
1 YEAR 011
2 YEAR 0"
10YEAR OAS
FLOW THROUGH SNM ADEIENTIOM PIPE
OICFS)
1 YEAR OAt
2 YEAR 133
10YEAR 215
POSTAREAtC
AREA =0214 ACRES
01109 ACRES(IMPERVIOUS)
(Fl. ACRES(GRASS COVER)
Tc=6MIN
0(cm)
t YEAR 039
2 YEAR 056
10YEAR 112
POSTARFAtD
AREA=0000ACRES
0 Ms ACRES UMPERVIOUS)
0025 ACR"' (SEARS COVER)
Tc=6 MIN
OICRU
1 YEAR 09
2 YEAR 03'
10YEAR 060
COMBINED FLOW TO ANALYSIS POINT t
0(cm)
1 YEAR 155
2 YEAR 2AIf
10YEAR 3,79
cesevnolFo 50 BO"14aaaeacrcn"RVracoawrtmnMVoa am. Ceram
OK 145CFS 5O.W(1.1BCFS"0.O6-FTy(0052AC-FT)t040CFS
=1 ]t CFS
FLOOD PROTECTION'
POST -DEVELOPED Cw 5 PREIDEV ELOPED On
OK 3R9 CFS(POST-DEVELOPED OId 5399 CFS(PREDE LOPED Cho)
AND POST DEVELOPED
POST -DEVELOPED
NWX u
MI
T vi LEGEND
r UNDISTURBEDAREA
AREATO ARM A
WATER QUANTITY ANALYSIS POINT 2
DRAINAGE AREAANALYSIS
(PRE DEVELOPMENIt
PREAREA2A
AREA =.112 ACRES
0142 ACRES(IMPERMOUS)
0087 ACRES (GRASS COVER, B SOILS)
0053 ACRES (GRASS COVER, D SOILS)
Tc=6MIN
O0ICES) V I
1 rEAR E. F.
2YEAR F.
10YEAR t.T6
PRE AREA 2B
VNOISNRBEO
ARFA=LOU ACRES
0052ACRES(IMPERNOUS)
O146 ACRES (GRASS COVER, B SOILS)
0080 ACRES (GRASS COVER, D SOILS)
Tc=6MIN
O ICRN
1 YEAR OA0
2YEAR LIP,
10YEAR 141
O(CPS)
t YEAR Lt9
2YEAR 1A7
LDYEAR 318
(POST-CEVELCPMENT)
POST AREA 2A
AREA =0. 167 ACRES
0120 ACRES(IMPERVIOUS)
0020 ACRES (GRASS COVER. B SOILS)
002T ACRES (GRASS COVER. D SOILS)
Te=6 MIN
D(CPS) VV IACm
1 YEAR .1 F.
2 YEAR ri
L.YEAR 113
POST AREA 2B
UNOISTNRBEO
AREA, =025T ACRES
0053 ACRES (IMPERVIOUS)
0114 ACRES (GRASS COVER. B SOILS)
0080 ACRES (GRASS COVER. D SOILS)
Tc=6 MIN
D(CPS)
1 YEAR 0A0
2 YEAR 0.6T
10YEAR 1
D (CPS)
1 YEAR 1 m
2 YEAR 1M
10YEAR 25T
QEwaren 5090'(Qn[aEtivarn RVnI[msaren)IRVeeygnp[o 1 Qypyl[
OK CUR CPS 5 PW(O73 CFSVPS4 AC-FTy(0030 AC-FT)+FR)CFS=139 CFS
FLOOD PROTECTION'
POST -DEVELOPED On PRE -DEVELOPED O'a
OK 1. CPS (POST-0EVELOPED Olds>13 CFS(PRE-OEVELOPED On)
ED
8
E
a
on
in
as
se '8
Q
W
O�
O
i QhpN~
in DATE
S
3 wish BY
A. FONT UNE
DEOGINED BY
•• A. FONTUNE
MIECKED BY
• C. KOTARSKI
iwOF
AS SHOWN
•
•
CL
Lu
a
DZ
Q
a
w
Z
J1
U
o_
Z
HI
Z
ILL F
's
�w/� Y
V) F
�Lu
V m
Q
0
l� OV
Z.
Z y
M �
< i
Nw
Lug$g
¢
8
ZI
Y
ft
U
o
m
2
e
)d
09 p.
IMS
47165
FkT xO.
C 6.0
E
LEGEND
AREA C
INLET
�;--'—,
i�
i
S
llryi
"0000'
I
V WKOLW8 0
...,,.''
Mo
room : :`OTONAL
Ety6"
E
It
--_J— — ,♦ _,--_--'-___ \0.1860.30.
__-_ _______
_ a ___________________________ --—<66-■_ —--
aSs
♦♦
_'J-� �_— _ ---__ ---- - _-
♦
�------------
----------- —
_____ -- --- ' — — — — — — —------■---------�---_-_-- �----
---------------_
3€aa
•
_ __ �—_--_—
♦__ -_ --_ — — _ —
■ --
_ eso— ____--0A98L- OA-OIFFJo-______ — 1{
— -- -_— -
-�--
9—
_ J--- —
---■_----------
-
o
o
3
sa
■
'- -----_ _.,—
t__
—
---
•
_ _ QS�
j -- ♦ - ' _-_
— — __
_______
- — L-_______■____
- — _ -------------- -
er
p
-_
__— _ _ __
'_-i-__-__
_1_____ — _
________J4___________
riv
4
_-6_'/_
-_
__ ____
__ -—__—__—_
_ _ _ �TREELINE-M000F EVERi.HF._E ND QEL'IO �M iC - - _ _ _ _ _ _ _
_ _ _
■
■
- - _ _ _s%
_ _ _ _ _
_ ■__-- _ ____ _____ ____________
_ _ —
_ _ ___ _— _ _ _____ __ _ _ —__ _Y_____-_ _______
N
-
r --------
O
■
■
■ -----
I
—
--:-----_�__ 47 `�,Ro 0.03$0.80 W 11_ \� _ �nnn I
f\ x Q y� p
■ �� � Kv, - u_ 11 <,a_ � oA,F
�\ I �1 �I ♦ 1 . o_ ° 1 8. a a33 302/2021
II� ■ \\\ II q I ♦1 m '.11. _ - �. 11 °33 I NN...IN By
I 030 4 NS tt6 O.OlT O.6T 3T 1 I I I ♦ A.NMA(NE
■ O \ ` g o.ols os6
III O AV 1 .� .. 1 `liz ♦ A, oat 11 ♦ Ngl°x.n N.
II
L ___ ______ I m .116 A.NMA(NE
FA
0 � .. ♦ ♦ •� l 1y111y1—�1\ ♦e NOS e.B . ♦ ♦ OI[[K[o BY
■ UNABLE IO [OCAT[INVERT—' '^ p � _. B➢,� °� I O u ♦1 ; I I�♦ • CKOTARSKI
■ r — JB'8E&T BN.,1G 1 4 \ `
0.5$ 1 • scar:
0.020
I� � II I I I I II II II '�I I .♦ � ♦ ♦; w., ■ 1"-m•
II ■ II I I I I II II III �/y I I 4 122 � i ♦
�� ■III I I I I II I III I° ♦ I ■
112
vv ■ 11 I I I I II �� I 'I 'I � - • ' ■
-
� o.oaz 0.74-
II I mWOW. \ 0 'ks A ;Lu
n
BUCKS
1 1,1WSF � 9 \
♦ 0.216 0.55 WIi ° V ♦ I a
oanoo il� cENTEit
♦♦♦ ♦ . F`JIY``II1
I I OBIDE. 11 ' ^ �r Uea DD ♦♦ ♦ `y
I i J
KN TKROUGW0.0.245 0.63NooB LJJ
1 .0
1
♦ OROPINLET Z p
♦ TOPJ1.61j� •II y \ \J( r" I ,�•__ J
1 ♦ INVIN-anv
6 y v a
01
10R ■` ♦ \ f06'VIRGINN JELEPHONEB 3 > IJl
. \�e • 1 7 !��`y• • ,� ♦♦� I SOB SLa, PO gp LPLEGRAPI COMPANY EASEMENTS Z Q E
. / .1 \�\\�� / // III 03 . ♦ \I 1 0 b
II DROPINeW / \'\'^ ♦ �L: �0 I ♦ \ .'�-. ne ♦ i'3s N a Z
!!✓ 1h-� .<
I TOP=a23 a CyP ♦ ` ; I W g
1
"
i
i
y5T
P
�\ INV OUT ta' .%'t5 / \ i 2> �rv0\ to �. ♦R `I
• / li \� ♦♦ 1 \ 3
ORE Lu
Lu
,5•RDPE -- i■<fEit�f■■i�fE■� �j"�� n\ \
••��� `�� /r / 0.04 0.27 i 1\ \ ���. \0 -----T---------- ------ --- I_\L'--\=___--- _
� E?
t n✓EM \ ` 'A
8' S5 B" ss-8' ss-8' S5 1 t FNTCUT Rom\ \ —Y \ ----- g
♦e♦1�--e• ss a- ss� ' ez-ge ♦+1 = _ \\ ___ _ __ _ ______ ____
00
�.
SEMIPUBLICLANE \ 33 1 —iT CO — ® U) }+S
VARIABLE WD71R R/W
OGJSOX MARK JOe 1p. g$
\\a BENCRMARKSET \\ -�IIj \\ 111 a�--_ IL + -1aRn— —ate 0 0yi0 47165 -9
A� A1A1EDSOUAREINTOP 1�-1 II �--+P" —+ ___ - ' H NO. $n
___
/ 1 �n�� _ /
1 sl BAGK URBC6.1g
114. rBaer-Said Onsr
�pJYiFt pA,
STA 1wB2.]fi
/
TOP 42050
112:12' Basin - Clraular Ga@
STA 10K1 25
INV 0422. 90(1 Us)
INV OUT 42200 (113)
O
V CypIG W ].XUfAR3gs
TOP 62]99
11612 Basin-ClmularG24
Lic. Na WOlAA85M
INV IN 4223T (113)
INV COF 42227(111)
STA 10+9350
TOP 427 03
110'. MH-1
INV IN 42331(117)
`TfONAL
STA 10+52W
IW OUT 42321(115)
TOP 42] 91
110: OI 2A
INV IN42201(111)
STA 11+07M
INV IN 42255 (121)
TOP.1133
NV OUT42182 (109)
100. 012B 6 fl lNoal
INV IN.35.(11.)
INV OUT 42341 U1n
ry8
STA tON3/9
120: 30"Basin-Grwlar GaM
V}
> E
_
`o
TOP 42T85
STA 11 W 00
INV IN 421 B.(109)
INV OUT 42094
TOP 42l 35
INVOUT 42a33
oRm�a
(101)
435
(119)
435
tovo
m
mroyRw6n
W
EX-1C0
STA 1M00.W
+ 2 S
�` O
8 iy
3E� zS
q
Mg,
m
g
rovazi Sz
Ba'o
�Fa__o
..Fad
INVIN41710(101)
�mR
M4
4.
a
3�
as
oe
Ng�
i
si
appsi
6
F
q
S�
ka
si
W
aF�
'o
o�
SIB
SINNAA
HBEE
��$
SO 1
F
6
P~
O
DA
IF
S
jr, sE
3/22/2021
A. FOYBDUNE
••
A. FOYBDUNE
ECKED BY
C KOOTTARSKI
•
•
wW tw00
tt«W 11a50
wW 1wOp
lFTS' t2«W
9t50 1wOp
11«Op
tt+5p
q$$HOWN
STORM:
100-SWM A PROFILE
STORM: SWM A-120 PROFILE
STORM: 108 - 116 PROFILE
HORIZ SCALE: ls=
HORIZ SCALE: ls=
HORIZ SC 1�w
VERTSCNE: 1�5
VERTSCNE:
1�5
VEf2T$CAlE: 1�5
$TA1t+30.fi3
3
TOP 7)
INV IN42051
1 1 1
•..
a
(37)
INV IN42a51 (34) 4
TA 11+342b
TOP 4202b
�J
INVOUT42051(23)
INV IN 42058 FTGT)
INV OUT 42058 F-n
5
L
Q
g
v
$T01P-]1� z
5 sTA 11 «s3Cfi
sTA1w1s0] $TA 1w38.18
45°BEND 4'PLUG6YF1IlING
J
INV IN 4t9.a5 (2.'iJ
TOP42835
INV IN4209](S6)
STA. tw10.00 STA tw5]W
INV OUT41B45 (EXt-2)
INVWT4209T (GT-5)
45'BEND Fs WATER NITER
w
Es
STA fO«0000'
£X 1
6 STA 1H01]9
$TA 1-T.08 $TA1w9922
00
J
TOF42540
TOP I2823
GATE VALVE aS BEND
50
j
1.11.11290(EX1.2)
INVIN 422.T0("TOO)
$TA UFNFM STA 11«3t.93
PROFILE SCALE
O
INVOUT4/7]0 (EX 1-2)
INV OUT 422]II (5b]
4'X 8'TEE 45°BEND
e
HI
G
2
a
w>
W's
IJ/
x
7J
O
$IDS
O
V
�
b
M
a
K
Nw�
a�
F$
Z'
E
Y
[SIB $
E
"
O
y�
W@
F
yyP
e�
Ep
B✓,A 1w00
11«Op
1MOp 12«5p
9«sp 1wW 11«03
12«W
1a+p0
13«59
$F
SANITARY SEWER PROFILE
WATER LINE
PROFILE
=
e$
HORL'SCALE:l=sS
OW SCALE: t'--5
HORL'SCALE V=5f1
VERT SCALE 1=
S
IME
47165
=
sxEaT xs.
C70
3n
PROPOSED
GRADE
IXISTING
GRADE
4zs
/
A
4zo
80' CMP
INV=H0.0
15
09
H
2.Sa' OF
5'HCPE
101
9.19%
2028 dF
1S HDFE
1
®1.8]%
a1
E%ISTING
GRADE
PROPOSED
430 GRADE
q3p
Y
WATERLINE
SO
a2
ta'
I
ne
38 BSOF
1n
1r I(DPE
az0
Bu•OF
2M% azo
5B'CMP
INV=a180
2.Op%
t15
is ]4'OF
tY XDPE
a15
20p%
a15
10
SAN. PIPE GT
t2 ]SO
tY HOP
SAN. PIPE 3]
®10B
1t9
2t.5T
a1
1pB
H
3B.B$'OF
®2.
tY HOPE
t11
®201%
B.B90F
tY HOPE
®200%
ISBN
PRCP0.5FD
i
GRADE
\
✓
�
PROPOSED
BUIL➢ING
r
5
WA
RUNE
$
ORM a25
PI
tt3
Ltl MIN.
SEE
21
420
B6LfHa`
a.00OF
2-3
3J
ypyp
5320'OF
3T2'OF GT-5
®]50%
0"PVC
0"PVC 0IXJ'OF
1
®20%6
2W% 0"PJC
®2p5%
58 a1
IX12
29 ]3'CE
OF
0.GT GREASE
$• wC
®]10%
��,
1]0'OF GB-]S MATH
�2�
e'PVC FIBER PIPE
10
a10
IXISIING
pRppp
ED
GRADE
GRADE
azs
42s
121
420
Ba.]0OF
12'HDPE
®18B%
$AIIIT
PIPE2J
n
at
a1
at
STING
a
E
_
PROPos$D
_
GRADE
\
P
CPO.RFD
490
\ V
B
IIDING
a30
SS
425
MIN.
a25
LocATEARO
a'DIv
COMIECTTO
tA'
IXIST. B'
2'TYP
KCOPPER
WATERLINE
MT
NE
42
4zp
PIPE 100
$ANRARY
PIPE 2S
tl5
H5
Section 6. Pollution Prevention Plan.
(reference County Code 17-404 and State Regulation 9VAC25-880-70 part II section A.4)
A. Plan showing pollution activities and prevention practices
(Provide a reduced I Ix17 copy of a site plan on which all of the following activity locations are clearly
marked. Keep this plan up-to-date with ongoing site changes and inspections.)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
I
I
I
I
i
I
I I
I I
I— � T
�- - - - - - - - - - - - - - - - - - - - - - - I - - - - - - - _
I 1 I
e I
I I
�fl DUMPSTER _
I Ir TI ------- --- CONSTRUCTION
TRAILER
_
TEMPORARY
lyj TOILETS / I I MORTAR MIXING
STATION
CONCRETE WASHOUT
----------- ------
8" SS 8" SS 8" SS All_ I—==—
• — �' n— — — —len \�
—lon—
— n— — PROPOSED `3 ABOVE GROUND FUEL CONTAINER
—J9n— CONSTRUCTION n — i WITH IMPERMEABLE HEAVY -MIL I
ENTRANCE —
TO
❑�
,....
LUME
- T ----• -- -.
��. � � — _ OSTORED FUELED
T
— � CONTAIN
VOLUME + 10% (GAS/DIESEL)
__--____-� — =—,�T — — --" — - —_-
0.3 M/LES TO U.S. ROUTE 29
RIVANNA R/VER SEMINOLE TRAIL
NORTH BOUND LANE
VAR/ABLE W707H R/W
STARBUCKS - POLLUTION PREVENTION PLAN PHASE 1 SCALE 1"=30' .•'`s``%
June 15, 2021 0 301 s0- TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
I �
AIL----
v v
i
464646469-
I - 464 5� -
\ Z v \\�_ _ = e 454545459�✓=_
1 n�Q Q Q p
1
I
-- -- -- --
_ _ I
"--Q 465.
= I
450
_445_---
I
9
1,-
TRAILER
TOILETSCONSTRUCTION
o •
►iMORTAR
STATION
`
WASHOUT
I
1 �
ICONCRETE
I
�
II
r
n
NQ_ i
i
A.
_ 1 2
0.3 A9 TO
RIVANNA RIVER
\
f 1 1
lion —
PROPOSED I 1 I
—
1 n I
\l-gn— CONSTRUCTION o �t
\ ENTRANCE
—AA— — — —
U.S. ROUTE 29
SEM/NOLE TRAIL
NORTH BOUND LANE
VARIABLE W/DTH R/W
STARBUCKS - POLLUTION PREVENTION PLAN PHASE 2
June 15, 2021
❑iC
m
ABOVE GROUND FUEL CONTAINER I
SCALE 1 "=30'
0 30sa TIMMONS GROUP
YOUR VISION ACHIEVED THROUGH OURS.
WITH IMPERMEABLE HEAVY -MIL
LINER. VOLUME SUFFICIENT TO
— CONTAIN STORED FUELED
�,;� _ VOLUME + 10% (GAS/DIESEL)
r--�--�-
ts. sources or rouutants, vocations, anu
Pollutant, or Pollutant Location on site Prevention Practices,
Generating Activity Control Measures
C. Sources of Pollutants continued. Common activities and minimum control and prevention
practices
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Follow Erosion and Sediment Control
Clearing, grading, excavating, and on-
Land disturbance area
Plan. Dispose of clearing debris at
stabilized areas
acceptable disposal sites. Seed and mulch,
or sod within 7 days of land clear"
Cover storm drain inlets and use drip pans
Paving operations
Roads and driveways
and absorbentloil dry for all paving
machines to limit leaks ands ills
Concrete washout shall occur in area
Direct concrete wash water into a leak -
Concrete washout and
adjacent to the construction entrance as
proof container or leak -proof settling basin
cement waste
designated on the Pollution Prevention
that is designed so that no overflows can
Plan.
occur
Enclose or cover material storage areas.
Mix paint indoors in a containment area or
Structure construction, stucco,
Structures
in a flat unpaved area. Prevent the
painting and cleaning
discharge of soaps, solvents, detergents
and wash water, paint, form release oils
and curing compounds.
Dewatering if necessary when
Water shall be filtered, settled or similarly
Dewatering operations
converting culvert inlet protection
treated prior to discharge as shown on
shown on plans
plan.
Designated areas for material delivery and
Material delivery and storage
Adjacent to construction entrance and
storage. Placed near construction
construction trailer.
entrances, away from waterways and
drainage paths
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Pollutant, or Pollutant
Location on site
Prevention Practices,
Generating Activity
Control Measures
Material use during building process
Building areas
Follow manufacturer's instructions.
MSDS's attached.
Waste collection area will not receive a
substantial amount of runoff from upland
areas and does not drain directly to a
waterway. Containers have lids covered
before periods of rain, or are in a covered
area. Scheduled collection to prevent
As provided by contractor
overfilling. MATERIALS NOT TO BE
Solid waste disposal
BURIED ON -SITE
Convenient and well -maintained portable
sanitary facilities will be provided, and
Sanitary waste
Current locations shown on plan
located away from waterways or inlets.
Such facilities shall be regularly
maintained.
Apply fertilizers in accordance with
Landscaping operations
Landscape areas shown on plan
manufacturer's recommendations and not
during rainfall events
To be treated in a sediment basin or better
Wash area is located at the construction
control as specified on plan. Minimize
Wash Waters
entrance. Adjacent diversion dike will
the discharge of pollutants from
divert wash water to sediment trap.
equipment and vehicle washing
Vehicle and equipment washing
Designated areas and details shown on
Provide containment and filtering for all
Ian
wash waters per the plan
Minimization of exposure to precipitation and stormwater. Minimize the exposure of building materials, building products,
construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste, and other
materials present on the site to precipitation and to stormwater.
(Identify all non-stormwater discharges to occur on your site. Keep this plan up-to-date with ongoing
site changes and inspections. See CGP, 9VAC25-880-70 section E for examples of non-stormwater
discharges.)
D. Non-stormwater discharges
Discharge Pollutants or Pollutant Location on Site
Constituents
Dust control water Sediment As shown on plan
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Discharge Pollutants or Pollutant Location on Site
Constituents
E. Persons responsible for pollution prevention practices
(Provide the names and contact information for all persons responsible for prevention practices as listed
above.)
:E
F. Response and reporting practices
Minimize discharges from spills and leaks. Minimize the discharge of pollutants from spills and leaks and implement
chemical spill and leak prevention and response procedures as follows.
Respond to all spills, leaks and discharges as follows,
Materials and equipment necessary for oil or chemical spill cleanup will be kept in the temporary material storage
trailer onsite. Equipment will include, but not be limited to, brooms, dust pans, mops, rags, gloves, goggles, kitty litter,
sand, saw dust, and plastic and metal trash containers.
All oil or other chemical spills will be cleaned up immediately upon discovery. Identify and stop source of
discharge. Use absorptive materials to soak up as much chemical as possible. Place all contaminated material in trash
containers for disposal.
Report all spills, leaks and discharges as follows,
(Provide detailed response and reporting practices according to 9VAC25-880-70, Part II, section A.4.e.)
Reports will be made to the following:
Virginia Department of Emergency Management
Emergency Operations Center (EOC)
Phone: (800) 468-8892
Spills large enough to reach the storm sewers will be reported to the National Response Center at 1-800424-8802.
G. Pollution Prevention Awareness
(Describe training and procedures to provide awareness and compliance for all measures in this
document; waste management, wash waters, prevention measures, etc.)
The registered land disturber shall oversee all construction activities to implement and maintain pollution prevention
measures. As such training and procedures shall be provided by contractor for each worker on site before they begin land
disturbing activities. Training on implementation of erosion and sediment control devices/procedures must be provided by
registered land disturber each time a new E&SC procedure is constructed.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 7. Discharges to impaired waters, surface waters within an applicable
TMDL wasteload allocation, and exceptional waters.
This site discharges to impaired waters as detailed on the following sheets.
Enhanced inspection freauency is required as outlined below:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business
days or (ii) at least once every five business days and no later than 48 hours following a
measurable storm event. In the event that a measurable storm event occurs when there are
more than 48 hours between business days, the inspection shall be conducted on the next
business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other
similar linear construction activities shall inspect all outfalls discharging to surface waters
identified as impaired or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit.
Addition items for implementation:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within seven
days after final grade is reached on any portion of the site.
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 8. Qualified personnel
The following personnel are responsible for inspections;
(Provide the name, telephone number, and qualifications of the qualified personnel conducting
inspections.)
:R
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 9. Signed Certification
v "i. ,uili, I I(,''ILIhl; 6 ;A,�o 25-870-370. Forpurposes of plan review and approva Is, this
certification should be the owner of the property, the same signature as appears on the bonds and
applications. Another operator can be designated on the delegation of authority form to follow.)
CERTIFICATION
"I certify under penalty of law that this document and all attachments were prepared under my direction
or supervision in accordance with a system designed to assure that qualified personnel properly gather
and evaluate the information submitted. Based on my inquiry of the person or persons who manage the
system, or those persons directly responsible for gathering the information, the information submitted
is, to the best of my knowledge and belief, true, accurate, and complete. I am aware that there are
significant penalties for submitting false information, including the possibility of fine and imprisonment
for knowing violations."
Owner/Operator Name: Dhanvant Goradia
CCv"'Merua� r�,CA=6 I- .C.
Company:
Title: Owner
Signature: j4aR�- W '
Date: G (IS
Issued - 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 10. Delegation of authority.
(Provide the persons or positions with authority to sign inspection reports or to modify the stormwater
pollution prevention plan. A formal, signed delegation of authority is needed.)
Delegation of Authority
I, (name), hereby designate the person or specifically described position below
to be a duly authorized representative for the purpose of overseeing compliance with environmental
requirements, including the Construction General Permit, at the
construction site. The designee is authorized to sign any reports, stormwater pollution prevention plans
and all other documents required by the permit.
(name of person or position)
(company)
(address)
(city, state, zip)
(phone)
By signing this authorization, I confirm that I meet the requirements to make such a designation as set
forth in the Construction General Permit (CGP), and that the designee above meets the definition of a
"duly authorized representative".
Operator Name:
Company:
Title:
Signature:
Date:
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
Section 11. General permit copy
(Provide a copy of the construction general permit, 9VAC25-880)
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
COMMONWEALTH of VIRGINIA
DEPARTMENT OF ENVIRONMENTAL QUALITY
General Permit No.: VAR10
Effective Date: July 1, 2019
Expiration Date: June 30, 2024
GENERAL VPDES PERMIT FOR DISCHARGES OF
STORMWATER FROM CONSTRUCTION ACTIVITIES
AUTHORIZATION TO DISCHARGE UNDER THE VIRGINIA STORMWATER MANAGEMENT
PROGRAM AND THE VIRGINIA STORMWATER MANAGEMENT ACT
In compliance with the provisions of the Clean Water Act, as amended, and pursuant to the
Virginia Stormwater Management Act and regulations adopted pursuant thereto, operators of
construction activities are authorized to discharge to surface waters within the boundaries of the
Commonwealth of Virginia, except those specifically named in State Water Control Board
regulations that prohibit such discharges.
The authorized discharge shall be in accordance with the registration statement filed with the
Department of Environmental Quality, this cover page, Part I - Discharge Authorization and
Special Conditions, Part II - Stormwater Pollution Prevention Plan, and Part III - Conditions
Applicable to All VPDES Permits as set forth in this general permit.
Construction General Permit
Effective July 1, 2019
Page 2 of 26
10M.T 1
DISCHARGE AUTHORIZATION AND SPECIAL CONDITIONS
A. Coverage under this general permit.
During the period beginning with the date of coverage under this general permit and lasting
until the general permit's expiration date, the operator is authorized to discharge stormwater
from construction activities.
This general permit also authorizes stormwater discharges from support activities (e.g.,
concrete or asphalt batch plants, equipment staging yards, material storage areas, excavated
material disposal areas, borrow areas) located on -site or off -site provided that:
a. The support activity is directly related to the construction activity that is required to have
general permit coverage for discharges of stormwater from construction activities;
b. The support activity is not a commercial operation, nor does it serve multiple unrelated
construction activities by different operators;
c. The support activity does not operate beyond the completion of the last construction
activity it supports;
d. The support activity is identified in the registration statement at the time of general permit
coverage;
e. Appropriate control measures are identified in a stormwater pollution prevention plan and
implemented to address the discharges from the support activity areas; and
f. All applicable state, federal, and local approvals are obtained for the support activity.
B. Limitations on coverage.
1. Post -construction discharges. This general permit does not authorize stormwater discharges
that originate from the site after construction activities have been completed and the site,
including any support activity sites covered under the general permit registration, has
undergone final stabilization. Post -construction industrial stormwater discharges may need to
be covered by a separate VPDES permit.
Discharges mixed with nonstormwater. This general permit does not authorize discharges that
are mixed with sources of nonstormwater, other than those discharges that are identified in
Part I E (Authorized nonstormwater discharges) and are in compliance with this general
permit.
Discharges covered by another state permit. This general permit does not authorize
discharges of stormwater from construction activities that have been covered under an
individual permit or required to obtain coverage under an alternative general permit.
Page 3 of 26
4. Impaired waters and total maximum daily load (TMDL) limitation.
Nutrient and sediment impaired waters. Discharges of stormwater from construction
activities to surface waters identified as impaired in the 2016 § 305(b)/303(d) Water
Quality Assessment Integrated Report or for which a TMDL wasteload allocation has
been established and approved prior to the term of this general permit for (i) sediment
or a sediment -related parameter (i.e., total suspended solids or turbidity) or (ii)
nutrients (i.e., nitrogen or phosphorus) are not eligible for coverage under this general
permit unless the operator develops, implements, and maintains a stormwater
pollution prevention plan (SWPPP) in accordance with Part II B 5 of this permit that
minimizes the pollutants of concern and, when applicable, is consistent with the
assumptions and requirements of the approved TMDL wasteload allocations and
implements an inspection frequency consistent with Part II G 2 a.
Polychlorinated biphenyl (PCB) impaired waters. Discharges of stormwater from
construction activities that include the demolition of any structure with at least 10,000
square feet of floor space built or renovated before January 1, 1980, to surface waters
identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment
Integrated Report or for which a TMDL wasteload allocation has been established and
approved prior to the term of this general permit for PCB are not eligible for coverage
under this general permit unless the operator develops, implements, and maintains a
SWPPP in accordance with Part II B 6 of this permit that minimizes the pollutants of
concern and, when applicable, is consistent with the assumptions and requirements
of the approved TMDL wasteload allocations, and implements an inspection frequency
consistent with Part II G 2 a.
Exceptional waters limitation. Discharges of stormwater from construction activities not
previously covered under the general permit effective on July 1, 2014, to exceptional waters
identified in 9VAC25-260-30 A 3 c are not eligible for coverage under this general permit
unless the operator develops, implements, and maintains a SWPPP in accordance with Part
II B 7 of this permit and implements an inspection frequency consistent with Part II G 2 a.
6. There shall be no discharge of floating solids or visible foam in other than trace amounts
C. Commingled discharges. Discharges authorized by this general permit may be commingled
with other sources of stormwater that are not required to be covered under a state permit, so long
as the commingled discharge is in compliance with this general permit. Discharges authorized by
a separate state or VPDES permit may be commingled with discharges authorized by this general
permit so long as all such discharges comply with all applicable state and VPDES permit
requirements.
D. Prohibition of nonstormwater discharges. Except as provided in Parts I A 2, 1 C, and I E, all
discharges covered by this general permit shall be composed entirely of stormwater associated
with construction activities. All other discharges including the following are prohibited:
1. Wastewater from washout of concrete;
2. Wastewater from the washout and cleanout of stucco, paint, form release oils, curing
compounds, and other construction materials;
Page 4 of 26
3. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
4. Oils, toxic substances, or hazardous substances from spills or other releases; and
5. Soaps, solvents, or detergents used in equipment and vehicle washing.
E. Authorized nonstormwater discharges. The following nonstormwater discharges from
construction activities are authorized by this general permit when discharged in compliance with
this general permit:
1. Discharges from firefighting activities;
2. Fire hydrant flushings;
3. Waters used to wash vehicles or equipment where soaps, solvents, or detergents have not
been used and the wash water has been filtered, settled, or similarly treated prior to discharge;
4. Water used to control dust that has been filtered, settled, or similarly treated prior to discharge;
5. Potable water sources, including uncontaminated waterline flushings, managed in a manner
to avoid an instream impact;
6. Routine external building wash down where soaps, solvents or detergents have not been used
and the wash water has been filtered, settled, or similarly treated prior to discharge;
7. Pavement wash waters where spills or leaks of toxic or hazardous materials have not occurred
(or where all spilled or leaked material has been removed prior to washing); where soaps,
solvents, or detergents have not been used; and where the wash water has been filtered,
settled, or similarly treated prior to discharge;
8. Uncontaminated air conditioning or compressor condensate;
9. Uncontaminated ground water or spring water;
10. Foundation or footing drains where flows are not contaminated with process materials such
as solvents;
11. Uncontaminated excavation dewatering, including dewatering of trenches and excavations
that have been filtered, settled, or similarly treated prior to discharge; and
12. Landscape irrigation.
F. Termination of general permit coverage.
1. The operator of the construction activity shall submit a notice of termination in accordance
with 9VAC25-880-60, unless a registration statement was not required to be submitted in
accordance with 9VAC25-880-50 A 1 c or A 2 b for single-family detached residential
structures, to the VSMP authority after one or more of the following conditions have been met:
Page 5 of 26
a. Necessary permanent control measures included in the SWPPP for the site are in place
and functioning effectively and final stabilization has been achieved on all portions of the
site for which the operator has operational control. When applicable, long term
responsibility and maintenance requirements for permanent control measures shall be
recorded in the local land records prior to the submission of a complete and accurate
notice of termination and the construction record drawing prepared;
b. Another operator has assumed control over all areas of the site that have not been finally
stabilized and obtained coverage for the ongoing discharge;
c. Coverage under an alternative VPDES or state permit has been obtained; or
d. For individual lots in residential construction only, final stabilization as defined in 9VAC25-
880-1 has been completed, including providing written notification to the homeowner and
incorporating a copy of the notification and signed certification statement into the SWPPP,
and the residence has been transferred to the homeowner.
The notice of termination shall be submitted no later than 30 days after one of the above
conditions in subdivision 1 of this subsection is met.
3. Termination of authorization to discharge for the conditions set forth in subdivision 1 a of this
subsection shall be effective upon notification from the department that the provisions of
subdivision 1 a of this subsection have been met or 60 days after submittal of a complete and
accurate notice of termination in accordance with 9VAC25-880-60 C, whichever occurs first.
4. Authorization to discharge terminates at midnight on the date that the notice of termination is
submitted for the conditions set forth in subdivisions 1 b through 1 d of this subsection unless
otherwise notified by the VSMP authority or department.
5. The notice of termination shall be signed in accordance with Part III K of this general permit.
G. Water quality protection.
1. The operator shall select, install, implement, and maintain control measures as identified in
the SWPPP at the construction site that minimize pollutants in the discharge as necessary to
ensure that the operator's discharge does not cause or contribute to an excursion above any
applicable water quality standard.
If it is determined by the department that the operator's discharges are causing, have
reasonable potential to cause, or are contributing to an excursion above any applicable water
quality standard, the department, in consultation with the VSMP authority, may take
appropriate enforcement action and require the operator to:
a. Modify or implement additional control measures in accordance with Part II C to
adequately address the identified water quality concerns;
b. Submit valid and verifiable data and information that are representative of ambient
conditions and indicate that the receiving water is attaining water quality standards; or
Page 6 of 26
c. Submit an individual permit application in accordance with 9VAC25-870-410 B 3.
All written responses required under this chapter shall include a signed certification
consistent with Part III K.
STORMWATER POLLUTION PREVENTION PLAN
A. Stormwater pollution prevent plan.
A stormwater pollution prevention plan (SWPPP) shall be developed prior to the submission
of a registration statement and implemented for the construction activity, including any support
activity, covered by this general permit. SWPPPs shall be prepared in accordance with good
engineering practices. Construction activities that are part of a larger common plan of
development or sale and disturb less than one acre may utilize a SWPPP template provided
by the department and need not provide a separate stormwater management plan if one has
been prepared and implemented for the larger common plan of development or sale.
The SWPPP requirements of this general permit may be fulfilled by incorporating by reference
other plans such as a spill prevention control and countermeasure (SPCC) plan developed for
the site under § 311 of the federal Clean Water Act or best management practices (BMP)
programs otherwise required for the facility provided that the incorporated plan meets or
exceeds the SWPPP requirements of Part II B. All plans incorporated by reference into the
SWPPP become enforceable under this general permit. If a plan incorporated by reference
does not contain all of the required elements of the SWPPP, the operator shall develop the
missing elements and include them in the SWPPP.
3. Any operator that was authorized to discharge under the general permit effective July 1, 2014,
and that intends to continue coverage under this general permit, shall update its stormwater
pollution prevention plan to comply with the requirements of this general permit no later than
60 days after the date of coverage under this general permit.
B. Contents. The SWPPP shall include the following items:
1. General information.
a. A signed copy of the registration statement, if required, for coverage under the general
VPDES permit for discharges of stormwater from construction activities;
b. Upon receipt, a copy of the notice of coverage under the general VPDES permit for
discharges of stormwater from construction activities (i.e., notice of coverage letter);
c. Upon receipt, a copy of the general VPDES permit for discharges of stormwater from
construction activities;
d. A narrative description of the nature of the construction activity, including the function of
the project (e.g., low density residential, shopping mall, highway, etc.);
e. A legible site plan identifying:
Page 7 of 26
(1) Directions of stormwater flow and approximate slopes anticipated after major grading
activities;
(2) Limits of land disturbance including steep slopes and natural buffers around surface
waters that will not be disturbed;
(3) Locations of major structural and nonstructural control measures, including sediment
basins and traps, perimeter dikes, sediment barriers, and other measures intended to
filter, settle, or similarly treat sediment, that will be installed between disturbed areas
and the undisturbed vegetated areas in order to increase sediment removal and
maximize stormwater infiltration;
(4) Locations of surface waters;
(5) Locations where concentrated stormwater is discharged;
(6) Locations of any support activities, including (i) areas where equipment and vehicle
washing, wheel wash water, and other wash water is to occur; (ii) storage areas for
chemicals such as acids, fuels, fertilizers, and other lawn care chemicals; (iii) concrete
wash out areas; (iv) vehicle fueling and maintenance areas; (v) sanitary waste
facilities, including those temporarily placed on the construction site; and (vi)
construction waste storage; and
(7) When applicable, the location of the on -site rain gauge or the methodology established
in consultation with the VSMP authority used to identify measurable storm events for
inspection as allowed by Part II G 2 a (1) (ii) or Part II G 2 b (2).
Erosion and sediment control plan.
a. An erosion and sediment control plan designed and approved in accordance with the
Virginia Erosion and Sediment Control Regulations (9VAC25-840), an "agreement in lieu
of a plan" as defined in 9VAC25-840-10 from the VESCP authority, or an erosion and
sediment control plan prepared in accordance with annual standards and specifications
approved by the department.
b. All erosion and sediment control plans shall include a statement describing the
maintenance responsibilities required for the erosion and sediment controls used.
c. An approved erosion and sediment control plan, "agreement in lieu of a plan," or erosion
and sediment control plan prepared in accordance with department -approved annual
standards and specifications, implemented to:
(1) Control the volume and velocity of stormwater runoff within the site to minimize soil
erosion;
(2) Control stormwater discharges, including peak flow rates and total stormwater volume,
to minimize erosion at outlets and to minimize downstream channel and stream bank
erosion;
Page 8 of 26
(3) Minimize the amount of soil exposed during the construction activity;
(4) Minimize the disturbance of steep slopes;
(5) Minimize sediment discharges from the site in a manner that addresses (i) the amount,
frequency, intensity, and duration of precipitation; (ii) the nature of resulting stormwater
runoff; and (iii) soil characteristics, including the range of soil particle sizes present on
the site;
(6) Provide and maintain natural buffers around surface waters, direct stormwater to
vegetated areas to increase sediment removal, and maximize stormwater infiltration,
unless infeasible;
(7) Minimize soil compaction and, unless infeasible, preserve topsoil;
(8) Ensure initiation of stabilization activities, as defined in 9VAC25-880-1, of disturbed
areas immediately whenever any clearing, grading, excavating, or other land -
disturbing activities have permanently ceased on any portion of the site, or temporarily
ceased on any portion of the site and will not resume for a period exceeding 14 days;
and
(9) Utilize outlet structures that withdraw stormwater from the surface (i.e., above the
permanent pool or wet storage water surface elevation), unless infeasible, when
discharging from sediment basins or sediment traps.
3. Stormwater management plan.
a. Except for those projects identified in Part II B 3 b, a stormwater management plan
approved by the VSMP authority as authorized under the Virginia Stormwater
Management Program (VSMP) Regulation (9VAC25-870), or an "agreement in lieu of a
stormwater management plan" as defined in 9VAC25-870-10 from the VSMP authority, or
a stormwater management plan prepared in accordance with annual standards and
specifications approved by the department.
b. For any operator meeting the conditions of 9VAC25-870-47 B of the VSMP regulation, an
approved stormwater management plan is not required. In lieu of an approved stormwater
management plan, the SWPPP shall include a description of, and all necessary
calculations supporting, all post -construction stormwater management measures that will
be installed prior to the completion of the construction process to control pollutants in
stormwater discharges after construction operations have been completed. Structural
measures should be placed on upland soils to the degree possible. Such measures must
be designed and installed in accordance with applicable VESCP authority, VSMP
authority, state, and federal requirements, and any necessary permits must be obtained.
Pollution prevention plan. A pollution prevention plan that addresses potential pollutant -
generating activities that may reasonably be expected to affect the quality of stormwater
discharges from the construction activity, including any support activity. The pollution
prevention plan shall:
a. Identify the potential pollutant -generating activities and the pollutant that is expected to be
exposed to stormwater;
Page 9 of 26
b. Describe the location where the potential pollutant -generating activities will occur, or if
identified on the site plan, reference the site plan;
c. Identify all nonstormwater discharges, as authorized in Part I E of this general permit, that
are or will be commingled with stormwater discharges from the construction activity,
including any applicable support activity;
d. Identify the person responsible for implementing the pollution prevention practice or
practices for each pollutant -generating activity (if other than the person listed as the
qualified personnel);
e. Describe the pollution prevention practices and procedures that will be implemented to:
(1) Prevent and respond to leaks, spills, and other releases including (i) procedures for
expeditiously stopping, containing, and cleaning up spills, leaks, and other releases;
and (ii) procedures for reporting leaks, spills, and other releases in accordance with
Part III G;
(2) Prevent the discharge of spilled and leaked fuels and chemicals from vehicle fueling
and maintenance activities (e.g., providing secondary containment such as spill
berms, decks, spill containment pallets, providing cover where appropriate, and having
spill kits readily available);
(3) Prevent the discharge of soaps, solvents, detergents, and wash water from
construction materials, including the clean-up of stucco, paint, form release oils, and
curing compounds (e.g., providing (i) cover (e.g., plastic sheeting or temporary roofs)
to prevent contact with stormwater; (ii) collection and proper disposal in a manner to
prevent contact with stormwater; and (iii) a similarly effective means designed to
prevent discharge of these pollutants);
(4) Minimize the discharge of pollutants from vehicle and equipment washing, wheel wash
water, and other types of washing (e.g., locating activities away from surface waters
and stormwater inlets or conveyance and directing wash waters to sediment basins or
traps, using filtration devices such as filter bags or sand filters, or using similarly
effective controls);
(5) Direct concrete wash water into a leak -proof container or leak -proof settling basin. The
container or basin shall be designed so that no overflows can occur due to inadequate
sizing or precipitation. Hardened concrete wastes shall be removed and disposed of
in a manner consistent with the handling of other construction wastes. Liquid concrete
wastes shall be removed and disposed of in a manner consistent with the handling of
other construction wash waters and shall not be discharged to surface waters;
(6) Minimize the discharge of pollutants from storage, handling, and disposal of
construction products, materials, and wastes including (i) building products such as
asphalt sealants, copper flashing, roofing materials, adhesives, and concrete
admixtures; (ii) pesticides, herbicides, insecticides, fertilizers, and landscape
Page 10 of 26
materials; and (iii) construction and domestic wastes such as packaging materials,
scrap construction materials, masonry products, timber, pipe and electrical cuttings,
plastics, Styrofoam, concrete, and other trash or building materials;
(7) Prevent the discharge of fuels, oils, and other petroleum products, hazardous or toxic
wastes, waste concrete, and sanitary wastes;
(8) Address any other discharge from the potential pollutant -generating activities not
addressed above;
(9) Minimize the exposure of waste materials to precipitation by closing or covering waste
containers during precipitation events and at the end of the business day, or
implementing other similarly effective practices. Minimization of exposure is not
required in cases where the exposure to precipitation will not result in a discharge of
pollutants; and
f. Describe procedures for providing pollution prevention awareness of all applicable wastes,
including any wash water, disposal practices, and applicable disposal locations of such
wastes, to personnel in order to comply with the conditions of this general permit. The
operator shall implement the procedures described in the SWPPP.
SWPPP requirements for discharges to nutrient and sediment impaired waters. For
discharges to surface waters (i) identified as impaired in the 2016 § 305(b)/303(d) Water
Quality Assessment Integrated Report or (ii) with an applicable TMDL wasteload allocation
established and approved prior to the term of this general permit for sediment for a sediment -
related parameter (i.e., total suspended solids or turbidity) or nutrients (i.e., nitrogen or
phosphorus), the operator shall:
a. Identify the impaired waters, approved TMDLs, and pollutants of concern in the SWPPP;
and
b. Provide clear direction in the SWPPP that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
and
(3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a.
SWPPP requirements for discharges to polychlorinated biphenyl (PCB) impaired waters. For
discharges from construction activities that include the demolition of any structure with at least
10,000 square feet of floor space built or renovated before January 1, 1980, to surface waters
(i) identified as impaired in the 2016 § 305(b)/303(d) Water Quality Assessment Integrated
Report or (ii) with an applicable TMDL wasteload allocation established and approved prior to
the term of this general permit for PCB, the operator shall:
Page 11 of 26
a. Identify the impaired waters, approved TMDLs, and pollutant of concern in the SWPPP;
b. Implement the approved erosion and sediment control plan in accordance with Part II B 2;
c. Dispose of waste materials in compliance with applicable state, federal, and local
requirements; and
d. Implement a modified inspection schedule in accordance with Part II G 2 a.
7. SWPPP requirements for discharges to exceptional waters. For discharges to surface waters
identified in 9VAC25-260-30 A 3 c as an exceptional water, the operator shall:
a. Identify the exceptional surface waters in the SWPPP; and
b. Provide clear direction in the SWPPP that:
(1) Permanent or temporary soil stabilization shall be applied to denuded areas within
seven days after final grade is reached on any portion of the site;
(2) Nutrients shall be applied in accordance with manufacturer's recommendations or an
approved nutrient management plan and shall not be applied during rainfall events;
and
(3) A modified inspection schedule shall be implemented in accordance with Part II G 2 a.
8. Identification of qualified personnel. The name, phone number, and qualifications of the
qualified personnel conducting inspections required by this general permit.
9. Delegation of authority. The individuals or positions with delegated authority, in accordance
with Part III K, to sign inspection reports or modify the SWPPP.
10. SWPPP signature. The SWPPP shall be signed and dated in accordance with Part III K.
C. SWPPP amendments, modification, and updates.
1. The operator shall amend the SWPPP whenever there is a change in the design, construction,
operation, or maintenance that has a significant effect on the discharge of pollutants to surface
waters and that has not been previously addressed in the SWPPP.
The SWPPP shall be amended if, during inspections or investigations by the operator's
qualified personnel, or by local, state, or federal officials, it is determined that the existing
control measures are ineffective in minimizing pollutants in discharges from the construction
activity. Revisions to the SWPPP shall include additional or modified control measures
designed and implemented to correct problems identified. If approval by the VESCP authority,
VSMP authority, or department is necessary for the control measure, revisions to the SWPPP
shall be completed no later than seven calendar days following approval. Implementation of
these additional or modified control measures shall be accomplished as described in Part II
H.
Page 12 of 26
3. The SWPPP shall clearly identify the contractors that will implement and maintain each control
measure identified in the SWPPP. The SWPPP shall be amended to identify any new
contractor that will implement and maintain a control measure.
4. The operator shall update the SWPPP as soon as possible but no later than seven days
following any modification to its implementation. All modifications or updates to the SWPPP
shall be noted and shall include the following items:
a. A record of dates when:
(1) Major grading activities occur;
(2) Construction activities temporarily or permanently cease on a portion of the site; and
(3) Stabilization measures are initiated;
b. Documentation of replaced or modified controls where periodic inspections or other
information have indicated that the controls have been used inappropriately or incorrectly
and were modified;
c. Areas that have reached final stabilization and where no further SWPPP or inspection
requirements apply;
d. All properties that are no longer under the legal control of the operator and the dates on
which the operator no longer had legal control over each property;
e. The date of any prohibited discharges, the discharge volume released, and what actions
were taken to minimize the impact of the release;
f. Measures taken to prevent the reoccurrence of any prohibited discharge; and
g. Measures taken to address any evidence identified as a result of an inspection required
under Part II G.
5. Amendments, modifications, or updates to the SWPPP shall be signed in accordance with
Part III K.
D. Public notification. Upon commencement of land disturbance, the operator shall post
conspicuously a copy of the notice of coverage letter near the main entrance of the construction
activity. For linear projects, the operator shall post the notice of coverage letter at a publicly
accessible location near an active part of the construction project (e.g., where a pipeline crosses
a public road). The operator shall maintain the posted information until termination of general
permit coverage as specified in Part I F.
E. SWPPP availability.
1. Operators with day-to-day operational control over SWPPP implementation shall have a copy
of the SWPPP available at a central location on -site for use by those identified as having
responsibilities under the SWPPP whenever they are on the construction site.
Page 13 of 26
The operator shall make the SWPPP and all amendments, modifications, and updates
available upon request to the department, the VSMP authority, the EPA, the VESCP authority,
local government officials, or the operator of a municipal separate storm sewer system
receiving discharges from the construction activity. If an on -site location is unavailable to store
the SWPPP when no personnel are present, notice of the SWPPP's location shall be posted
near the main entrance of the construction site.
The operator shall make the SWPPP available for public review in an electronic format or in
hard copy. Information for public access to the SWPPP shall be posted and maintained in
accordance with Part II D. If not provided electronically, public access to the SWPPP may be
arranged upon request at a time and at a publicly accessible location convenient to the
operator or his designee but shall be no less than once per month and shall be during normal
business hours. Information not required to be contained within the SWPPP by this general
permit is not required to be released.
F. SWPPP implementation. The operator shall implement the SWPPP and subsequent
amendments, modifications, and updates from commencement of land disturbance until
termination of general permit coverage as specified in Part I F.
All control measures shall be properly maintained in effective operating condition in
accordance with good engineering practices and, where applicable, manufacturer
specifications. If a site inspection required by Part II G identifies a control measure that is not
operating effectively, corrective actions shall be completed as soon as practicable, but no later
than seven days after discovery or a longer period as established by the VSMP authority, to
maintain the continued effectiveness of the control measures.
If site inspections required by Part II G identify an existing control measure that needs to be
modified or if an additional or alternative control measure is necessary for any reason,
implementation shall be completed prior to the next anticipated measurable storm event. If
implementation prior to the next anticipated measurable storm event is impracticable, then
additional or alternative control measures shall be implemented as soon as practicable, but
no later than seven days after discovery or a longer period as established by the VSMP
authority.
G. SWPPP Inspections.
1. Personnel responsible for on -site and off -site inspections. Inspections required by this general
permit shall be conducted by the qualified personnel identified by the operator in the SWPPP.
The operator is responsible for ensuring that the qualified personnel conduct the inspection.
2. Inspection schedule.
a. For construction activities that discharge to a surface water identified in Part 11 B 5 and B
6 as impaired or having an approved TMDL or Part I B 7 as exceptional, the following
inspection schedule requirements apply:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business
days or (ii) at least once every five business days and no later than 24 hours following
a measurable storm event. In the event that a measurable storm event occurs when
Page 14 of 26
there are more than 24 hours between business days, the inspection shall be
conducted on the next business day; and
(2) Representative inspections as authorized in Part II G 2 d shall not be allowed.
b. Except as specified in Part II G 2 a, inspections shall be conducted at a frequency of:
(1) At least once every five business days; or
(2) At least once every 10 business days and no later than 24 hours following a
measurable storm event. In the event that a measurable storm event occurs when
there are more than 24 hours between business days, the inspection shall be
conducted on the next business day.
c. Where areas have been temporarily stabilized or land -disturbing activities will be
suspended due to continuous frozen ground conditions and stormwater discharges are
unlikely, the inspection frequency described in Part II G 2 a and 2 b may be reduced to
once per month. If weather conditions (such as above freezing temperatures or rain or
snow events) make discharges likely, the operator shall immediately resume the regular
inspection frequency.
d. Except as prohibited in Part II G 2 a (2), representative inspections may be utilized for
utility line installation, pipeline construction, or other similar linear construction activities
provided that:
(1) Temporary or permanent soil stabilization has been installed and vehicle access may
compromise the temporary or permanent soil stabilization and potentially cause
additional land disturbance increasing the potential for erosion;
(2) Inspections occur on the same frequency as other construction activities;
(3) Control measures are inspected along the construction site 0.25 miles above and
below each access point (i.e., where a roadway, undisturbed right-of-way, or other
similar feature intersects the construction activity and access does not compromise
temporary or permanent soil stabilization); and
(4) Inspection locations are provided in the inspection report required by Part II G.
e. If adverse weather causes the safety of the inspection personnel to be in jeopardy, the
inspection may be delayed until the next business day on which it is safe to perform the
inspection. Any time inspections are delayed due to adverse weather conditions, evidence
of the adverse weather conditions shall be included in the SWPPP with the dates of
occurrence.
3. Inspection requirements.
a. As part of the inspection, the qualified personnel shall:
(1) Record the date and time of the inspection and, when applicable, the date and rainfall
amount of the last measurable storm event;
Page 15 of 26
(2) Record the information and a description of any discharges occurring at the time of
the inspection or evidence of discharges occurring prior to the inspection;
(3) Record any land -disturbing activities that have occurred outside of the approved
erosion and sediment control plan;
(4) Inspect the following for installation in accordance with the approved erosion and
sediment control plan, identification of any maintenance needs, and evaluation of
effectiveness in minimizing sediment discharge, including whether the control has
been inappropriately or incorrectly used:
(a) All perimeter erosion and sediment controls, such as silt fence;
(b) Soil stockpiles, when applicable, and borrow areas for stabilization or sediment
trapping measures;
(c) Completed earthen structures, such as dams, dikes, ditches, and diversions for
stabilization and effective impoundment or flow control;
(d) Cut and fill slopes;
(e) Sediment basins and traps, sediment barriers, and other measures installed to
control sediment discharge from stormwater;
(f) Temporary or permanent channels, flumes, or other slope drain structures
installed to convey concentrated runoff down cut and fill slopes;
(g) Storm inlets that have been made operational to ensure that sediment laden
stormwater does not enter without first being filtered or similarly treated; and
(h) Construction vehicle access routes that intersect or access paved or public roads
for minimizing sediment tracking;
(5) Inspect areas that have reached final grade or that will remain dormant for more than
14 days to ensure:
(a) Initiation of stabilization activities have occurred immediately, as defined in
9VAC25-880-1; and
(b) Stabilization activities have been completed within seven days of reaching grade
or stopping work;
(6) Inspect for evidence that the approved erosion and sediment control plan, "agreement
in lieu of a plan," or erosion and sediment control plan prepared in accordance with
department -approved annual standards and specifications has not been properly
implemented. This includes:
Page 16 of 26
(a) Concentrated flows of stormwater in conveyances such as rills, rivulets, or
channels that have not been filtered, settled, or similarly treated prior to discharge,
or evidence thereof;
(b) Sediment laden or turbid flows of stormwater that have not been filtered or settled
to remove sediments prior to discharge;
(c) Sediment deposition in areas that drain to unprotected stormwater inlets or catch
basins that discharge to surface waters. Inlets and catch basins with failing
sediment controls due to improper installation, lack of maintenance, or inadequate
design are considered unprotected;
(d) Sediment deposition on any property (including public and private streets) outside
of the construction activity covered by this general permit;
(e) Required stabilization has not been initiated or completed or is not effective on
portions of the site;
(f) Sediment basins without adequate wet or dry storage volume or sediment basins
that allow the discharge of stormwater from below the surface of the wet storage
portion of the basin;
(g) Sediment traps without adequate wet or dry storage or sediment traps that allow
the discharge of stormwater from below the surface of the wet storage portion of
the trap; and
(h) Land disturbance or sediment deposition outside of the approved area to be
disturbed;
(7) Inspect pollutant generating activities identified in the pollution prevention plan for the
proper implementation, maintenance, and effectiveness of the procedures and
practices;
(8) Identify any pollutant generating activities not identified in the pollution prevention plan;
and
(9) Identify and document the presence of any evidence of the discharge of pollutants
prohibited by this general permit.
4. Inspection report. Each inspection report shall include the following items:
a. The date and time of the inspection and, when applicable, the date and rainfall amount of
the last measurable storm event;
b. Summarized findings of the inspection;
c. The locations of prohibited discharges;
d. The locations of control measures that require maintenance;
Page 17 of 26
e. The locations of control measures that failed to operate as designed or proved inadequate
or inappropriate for a particular location;
f. The locations where any evidence identified under Part II G 3 a (6) exists;
g. The locations where any additional control measure is needed;
h. A list of corrective actions required (including any changes to the SWPPP that are
necessary) as a result of the inspection or to maintain permit compliance;
i. Documentation of any corrective actions required from a previous inspection that have not
been implemented; and
The date and signature of the qualified personnel and the operator or its duly authorized
representative.
5. The inspection report shall be included into the SWPPP no later than four business days after
the inspection is complete.
The inspection report and any actions taken in accordance with Part II shall be retained by
the operator as part of the SWPPP for at least three years from the date that general permit
coverage expires or is terminated. The inspection report shall identify any incidents of
noncompliance. Where an inspection report does not identify any incidents of noncompliance,
the report shall contain a certification that the construction activity is in compliance with the
SWPPP and this general permit. The report shall be signed in accordance with Part III K of
this general permit.
H. Corrective actions.
The operator shall implement the corrective actions identified as a result of an inspection as
soon as practicable but no later than seven days after discovery or a longer period as
approved by the VSMP authority. If approval of a corrective action by a regulatory authority
(e.g., VSMP authority, VESCP authority, or the department) is necessary, additional control
measures shall be implemented to minimize pollutants in stormwater discharges until such
approvals can be obtained.
The operator may be required to remove accumulated sediment deposits located outside of
the construction activity covered by this general permit as soon as practicable in order to
minimize environmental impacts. The operator shall notify the VSMP authority and the
department as well as obtain all applicable federal, state, and local authorizations,
approvals, and permits prior to the removal of sediments accumulated in surface waters
including wetlands.
Page 18 of 26
PART III
CONDITIONS APPLICABLE TO ALL VPDES PERMITS
NOTE: Discharge monitoring is not required for this general permit. If the operator chooses to
monitor stormwater discharges or control measures, the operator shall comply with the
requirements of subsections A, B, and C, as appropriate.
A. Monitoring.
1. Samples and measurements taken for the purpose of monitoring shall be representative of
the monitoring activity.
Monitoring shall be conducted according to procedures approved under 40 CFR Part 136 or
alternative methods approved by the U.S. Environmental Protection Agency, unless other
procedures have been specified in this general permit. Analyses performed according to test
procedures approved under 40 CFR Part 136 shall be performed by an environmental
laboratory certified under regulations adopted by the Department of General Services
(1 VAC30-45 or 1 VAC30-46).
3. The operator shall periodically calibrate and perform maintenance procedures on all
monitoring and analytical instrumentation at intervals that will ensure accuracy of
measurements.
B. Records.
1. Monitoring records and reports shall include
a. The date, exact place, and time of sampling or measurements;
b. The individuals who performed the sampling or measurements;
c. The dates and times analyses were performed;
d. The individuals who performed the analyses;
e. The analytical techniques or methods used; and
f. The results of such analyses.
2. The operator shall retain records of all monitoring information, including all calibration and
maintenance records and all original strip chart recordings for continuous monitoring
instrumentation, copies of all reports required by this general permit, and records of all data
used to complete the registration statement for this general permit, for a period of at least
three years from the date of the sample, measurement, report or request for coverage. This
period of retention shall be extended automatically during the course of any unresolved
litigation regarding the regulated activity or regarding control standards applicable to the
operator, or as requested by the board.
C. Reporting monitoring results.
Page 19 of 26
1. The operator shall update the SWPPP to include the results of the monitoring as may be
performed in accordance with this general permit, unless another reporting schedule is
specified elsewhere in this general permit.
2. Monitoring results shall be reported on a discharge monitoring report (DMR); on forms
provided, approved or specified by the department; or in any format provided that the date,
location, parameter, method, and result of the monitoring activity are included.
If the operator monitors any pollutant specifically addressed by this general permit more
frequently than required by this general permit using test procedures approved under 40 CFR
Part 136 or using other test procedures approved by the U.S. Environmental Protection
Agency or using procedures specified in this general permit, the results of this monitoring shall
be included in the calculation and reporting of the data submitted in the DMR or reporting form
specified by the department.
4. Calculations for all limitations which require averaging of measurements shall utilize an
arithmetic mean unless otherwise specified in this general permit.
D. Duty to provide information. The operator shall furnish, within a reasonable time, any
information which the board may request to determine whether cause exists for terminating this
general permit coverage or to determine compliance with this general permit. The board,
department, EPA, or VSMP authority may require the operator to furnish, upon request, such
plans, specifications, and other pertinent information as may be necessary to determine the effect
of the wastes from his discharge on the quality of surface waters, or such other information as
may be necessary to accomplish the purposes of the CWA and the Virginia Stormwater
Management Act. The operator shall also furnish to the board, department, EPA, or VSMP
authority, upon request, copies of records required to be kept by this general permit.
E. Compliance schedule reports. Reports of compliance or noncompliance with, or any progress
reports on, interim and final requirements contained in any compliance schedule of this general
permit shall be submitted no later than 14 days following each schedule date.
F. Unauthorized stormwater discharges. Pursuant to § 62.1-44.5 of the Code of Virginia, except
in compliance with a state permit issued by the department, it shall be unlawful to cause a
stormwater discharge from a construction activity.
G. Reports of unauthorized discharges. Any operator who discharges or causes or allows a
discharge of sewage, industrial waste, other wastes or any noxious or deleterious substance or a
hazardous substance or oil in an amount equal to or in excess of a reportable quantity established
under either 40 CFR Part 110, 40 CFR Part 117, 40 CFR Part 302, or § 62.1-44.34:19 of the Code
of Virginia that occurs during a 24-hour period into or upon surface waters or who discharges or
causes or allows a discharge that may reasonably be expected to enter surface waters, shall
notify the Department of Environmental Quality of the discharge immediately upon discovery of
the discharge, but in no case later than within 24 hours after said discovery. A written report of
the unauthorized discharge shall be submitted to the department and the VSMP authority within
five days of discovery of the discharge. The written report shall contain:
1. A description of the nature and location of the discharge;
2. The cause of the discharge;
Page 20 of 26
3. The date on which the discharge occurred;
4. The length of time that the discharge continued;
5. The volume of the discharge;
6. If the discharge is continuing, how long it is expected to continue;
7. If the discharge is continuing, what the expected total volume of the discharge will be; and
Any steps planned or taken to reduce, eliminate and prevent a recurrence of the present
discharge or any future discharges not authorized by this general permit.
Discharges reportable to the department and the VSMP authority under the immediate reporting
requirements of other regulations are exempted from this requirement.
H. Reports of unusual or extraordinary discharges. If any unusual or extraordinary discharge
including a "bypass" or "upset," as defined in this general permit, should occur from a facility and
the discharge enters or could be expected to enter surface waters, the operator shall promptly
notify, in no case later than within 24 hours, the department and the VSMP authority by telephone
after the discovery of the discharge. This notification shall provide all available details of the
incident, including any adverse effects on aquatic life and the known number of fish killed. The
operator shall reduce the report to writing and shall submit it to the department and the VSMP
authority within five days of discovery of the discharge in accordance with Part III 12. Unusual
and extraordinary discharges include any discharge resulting from:
1. Unusual spillage of materials resulting directly or indirectly from processing operations;
2. Breakdown of processing or accessory equipment;
3. Failure or taking out of service of some or all of the facilities; and
4. Flooding or other acts of nature.
I. Reports of noncompliance. The operator shall report any noncompliance which may adversely
affect surface waters or may endanger public health.
An oral report to the department and the VSMP authority shall be provided within 24 hours
from the time the operator becomes aware of the circumstances. The following shall be
included as information that shall be reported within 24 hours under this subdivision:
a. Any unanticipated bypass; and
b. Any upset that causes a discharge to surface waters.
2. A written report shall be submitted within five days and shall contain:
a. A description of the noncompliance and its cause;
Page 21 of 26
b. The period of noncompliance, including exact dates and times, and if the noncompliance
has not been corrected, the anticipated time it is expected to continue; and
c. Steps taken or planned to reduce, eliminate, and prevent reoccurrence of the
noncompliance.
The department may waive the written report on a case -by -case basis for reports of
noncompliance under Part III I if the oral report has been received within 24 hours and no
adverse impact on surface waters has been reported.
3. The operator shall report all instances of noncompliance not reported under Part III 1 1 or 2 in
writing as part of the SWPPP. The reports shall contain the information listed in Part 111 1 2.
NOTE: The reports required in Part III G, H and I shall be made to the department and the VSMP
authority. Reports may be made by telephone, email, or by fax. For reports outside normal working
hours, leaving a recorded message shall fulfill the immediate reporting requirement. For
emergencies, the Virginia Department of Emergency Management maintains a 24-hour telephone
service at 1-800-468-8892.
4. Where the operator becomes aware of a failure to submit any relevant facts, or submittal of
incorrect information in any report, including a registration statement, to the department or the
VSMP authority, the operator shall promptly submit such facts or correct information.
J. Notice of planned changes.
1. The operator shall give notice to the department and the VSMP authority as soon as possible
of any planned physical alterations or additions to the permitted facility or activity. Notice is
required only when:
a. The operator plans an alteration or addition to any building, structure, facility, or installation
that may meet one of the criteria for determining whether a facility is a new source in
9VAC25-870-420;
b. The operator plans an alteration or addition that would significantly change the nature or
increase the quantity of pollutants discharged. This notification applies to pollutants that
are not subject to effluent limitations in this general permit; or
2. The operator shall give advance notice to the department and VSMP authority of any planned
changes in the permitted facility or activity, which may result in noncompliance with state
permit requirements.
K. Signatory requirements.
1. Registration statement. All registration statements shall be signed as follows:
a. For a corporation: by a responsible corporate officer. For the purpose of this chapter, a
responsible corporate officer means: (i) a president, secretary, treasurer, or vice-president
of the corporation in charge of a principal business function, or any other person who
performs similar policy -making or decision -making functions for the corporation; or (ii) the
manager of one or more manufacturing, production, or operating facilities, provided the
Page 22 of 26
manager is authorized to make management decisions that govern the operation of the
regulated facility including having the explicit or implicit duty of making major capital
investment recommendations, and initiating and directing other comprehensive measures
to assure long-term compliance with environmental laws and regulations; the manager
can ensure that the necessary systems are established or actions taken to gather
complete and accurate information for state permit application requirements; and where
authority to sign documents has been assigned or delegated to the manager in
accordance with corporate procedures;
b. For a partnership or sole proprietorship: by a general partner or the proprietor,
respectively; or
c. For a municipality, state, federal, or other public agency: by either a principal executive
officer or ranking elected official. For purposes of this chapter, a principal executive officer
of a public agency includes (i) the chief executive officer of the agency or (ii) a senior
executive officer having responsibility for the overall operations of a principal geographic
unit of the agency.
2. Reports and other information. All reports required by this general permit, including SWPPPs,
and other information requested by the board or the department shall be signed by a person
described in Part III K 1 or by a duly authorized representative of that person. A person is a
duly authorized representative only if:
a. The authorization is made in writing by a person described in Part III K 1;
b. The authorization specifies either an individual or a position having responsibility for the
overall operation of the regulated facility or activity such as the position of plant manager,
operator of a well or a well field, superintendent, position of equivalent responsibility, or
an individual or position having overall responsibility for environmental matters for the
operator. (A duly authorized representative may thus be either a named individual or any
individual occupying a named position); and
c. The signed and dated written authorization is included in the SWPPP. A copy shall be
provided to the department and VSMP authority, if requested.
3. Changes to authorization. If an authorization under Part III K 2 is no longer accurate because
a different individual or position has responsibility for the overall operation of the construction
activity, a new authorization satisfying the requirements of Part III K 2 shall be submitted to
the VSMP authority as the administering entity for the board prior to or together with any
reports or information to be signed by an authorized representative.
4. Certification. Any person signing a document under Part III K 1 or 2 shall make the following
certification:
"I certify under penalty of law that I have read and understand this document and that this
document and all attachments were prepared in accordance with a system designed to assure
that qualified personnel properly gathered and evaluated the information submitted. Based on
my inquiry of the person or persons who manage the system, or those persons directly
responsible for gathering the information, the information submitted is, to the best of my
knowledge and belief, true, accurate, and complete. I am aware that there are significant
Page 23 of 26
penalties for submitting false information, including the possibility of fine and imprisonment for
knowing violations."
L. Duty to comply. The operator shall comply with all conditions of this general permit. Any state
permit noncompliance constitutes a violation of the Virginia Stormwater Management Act and the
Clean Water Act, except that noncompliance with certain provisions of this general permit may
constitute a violation of the Virginia Stormwater Management Act but not the Clean Water Act.
Permit noncompliance is grounds for enforcement action; for state permit coverage, termination,
revocation and reissuance, or modification; or denial of a state permit renewal application.
The operator shall comply with effluent standards or prohibitions established under § 307(a)
of the Clean Water Act for toxic pollutants within the time provided in the regulations that establish
these standards or prohibitions or standards for sewage sludge use or disposal, even if this
general permit has not yet been modified to incorporate the requirement.
M. Duty to reapply. If the operator wishes to continue an activity regulated by this general permit
after the expiration date of this general permit, the operator shall submit a new registration
statement at least 60 days before the expiration date of the existing general permit, unless
permission for a later date has been granted by the board. The board shall not grant permission
for registration statements to be submitted later than the expiration date of the existing general
permit.
N. Effect of a state permit. This general permit does not convey any property rights in either real
or personal property or any exclusive privileges, nor does it authorize any injury to private property
or invasion of personal rights, or any infringement of federal, state or local law or regulations.
O. State law. Nothing in this general permit shall be construed to preclude the institution of any
legal action under, or relieve the operator from any responsibilities, liabilities, or penalties
established pursuant to any other state law or regulation or under authority preserved by § 510 of
the Clean Water Act. Except as provided in general permit conditions on "bypassing" (Part III U)
and "upset' (Part III V), nothing in this general permit shall be construed to relieve the operator
from civil and criminal penalties for noncompliance.
P. Oil and hazardous substance liability. Nothing in this general permit shall be construed to
preclude the institution of any legal action or relieve the operator from any responsibilities,
liabilities, or penalties to which the operator is or may be subject under §§ 62.1-44.34:14 through
62.1-44.34:23 of the State Water Control Law or § 311 of the Clean Water Act.
Q. Proper operation and maintenance. The operator shall at all times properly operate and
maintain all facilities and systems of treatment and control (and related appurtenances), which
are installed or used by the operator to achieve compliance with the conditions of this general
permit. Proper operation and maintenance also includes effective plant performance, adequate
funding, adequate staffing, and adequate laboratory and process controls, including appropriate
quality assurance procedures. This provision requires the operation of back-up or auxiliary
facilities or similar systems, which are installed by the operator only when the operation is
necessary to achieve compliance with the conditions of this general permit.
R. Disposal of solids or sludges. Solids, sludges or other pollutants removed in the course of
treatment or management of pollutants shall be disposed of in a manner so as to prevent any
pollutant from such materials from entering surface waters and in compliance with all applicable
state and federal laws and regulations.
Page 24 of 26
S. Duty to mitigate. The operator shall take all steps to minimize or prevent any discharge in
violation of this general permit that has a reasonable likelihood of adversely affecting human
health or the environment.
T. Need to halt or reduce activity not a defense. It shall not be a defense for an operator in an
enforcement action that it would have been necessary to halt or reduce the permitted activity in
order to maintain compliance with the conditions of this general permit.
U. Bypass.
1. 'Bypass," as defined in 9VAC25-870-10, means the intentional diversion of waste streams
from any portion of a treatment facility. The operator may allow any bypass to occur that does
not cause effluent limitations to be exceeded, but only if it also is for essential maintenance to
ensure efficient operation. These bypasses are not subject to the provisions of Part III U 2 and
3.
2. Notice.
a. Anticipated bypass. If the operator knows in advance of the need for a bypass, the
operator shall submit prior notice to the department, if possible at least 10 days before the
date of the bypass.
b. Unanticipated bypass. The operator shall submit notice of an unanticipated bypass as
required in Part III I.
3. Prohibition of bypass.
a. Except as provided in Part III U 1, bypass is prohibited, and the board or department may
take enforcement action against an operator for bypass unless:
(1) Bypass was unavoidable to prevent loss of life, personal injury, or severe property
damage. Severe property damage means substantial physical damage to property,
damage to the treatment facilities that causes them to become inoperable, or
substantial and permanent loss of natural resources that can reasonably be expected
to occur in the absence of a bypass. Severe property damage does not mean
economic loss caused by delays in production;
(2) There were no feasible alternatives to the bypass, such as the use of auxiliary
treatment facilities, retention of untreated wastes, or maintenance during normal
periods of equipment downtime. This condition is not satisfied if adequate back-up
equipment should have been installed in the exercise of reasonable engineering
judgment to prevent a bypass that occurred during normal periods of equipment
downtime or preventive maintenance; and
(3) The operator submitted notices as required under Part III U 2.
b. The department may approve an anticipated bypass, after considering its adverse effects,
if the department determines that it will meet the three conditions listed in Part III U 3 a.
Page 25 of 26
V. Upset.
1. An "upset," as defined in 9VAC25-870-10, means an exceptional incident in which there is
unintentional and temporary noncompliance with technology -based state permit effluent
limitations because of factors beyond the reasonable control of the operator. An upset does
not include noncompliance to the extent caused by operational error, improperly designed
treatment facilities, inadequate treatment facilities, lack of preventive maintenance, or
careless or improper operation.
2. An upset constitutes an affirmative defense to an action brought for noncompliance with
technology -based state permit effluent limitations if the requirements of Part III V 4 are met.
A determination made during administrative review of claims that noncompliance was caused
by upset, and before an action for noncompliance, is not a final administrative action subject
to judicial review.
3. An upset does not include noncompliance to the extent caused by operational error,
improperly designed treatment facilities, inadequate treatment facilities, lack of preventative
maintenance, or careless or improper operation.
4. An operator who wishes to establish the affirmative defense of upset shall demonstrate,
through properly signed, contemporaneous operating logs or other relevant evidence that:
a. An upset occurred and that the operator can identify the cause of the upset;
b. The permitted facility was at the time being properly operated;
c. The operator submitted notice of the upset as required in Part III I; and
d. The operator complied with any remedial measures required under Part III S.
5. In any enforcement proceeding, the operator seeking to establish the occurrence of an upset
has the burden of proof.
W. Inspection and entry. The operator shall allow the department as the board's designee, the
VSMP authority, EPA, or an authorized representative of either entity (including an authorized
contractor), upon presentation of credentials and other documents as may be required by law to:
1. Enter upon the operator's premises where a regulated facility or activity is located or
conducted, or where records shall be kept under the conditions of this general permit;
2. Have access to and copy, at reasonable times, any records that shall be kept under the
conditions of this general permit;
3. Inspect and photograph at reasonable times any facilities, equipment (including monitoring
and control equipment), practices, or operations regulated or required under this general
permit; and
4. Sample or monitor at reasonable times, for the purposes of ensuring state permit compliance
or as otherwise authorized by the Clean Water Act or the Virginia Stormwater Management
Act, any substances or parameters at any location.
Page 26 of 26
For purposes of this section, the time for inspection shall be deemed reasonable during regular
business hours, and whenever the facility is discharging. Nothing contained herein shall make an
inspection unreasonable during an emergency.
X. State permit actions. State permit coverage may be modified, revoked and reissued, or
terminated for cause. The filing of a request by the operator for a state permit modification,
revocation and reissuance, or termination, or a notification of planned changes or anticipated
noncompliance does not stay any state permit condition.
Y. Transfer of state permit coverage.
1. State permits are not transferable to any person except after notice to the department. Except
as provided in Part III Y 2, a state permit may be transferred by the operator to a new operator
only if the state permit has been modified or revoked and reissued, or a minor modification
made, to identify the new operator and incorporate such other requirements as may be
necessary under the Virginia Stormwater Management Act and the Clean Water Act.
As an alternative to transfers under Part III Y 1, this state permit may be automatically
transferred to a new operator if:
a. The current operator notifies the department at least 30 days in advance of the proposed
transfer of the title to the facility or property;
b. The notice includes a written agreement between the existing and new operators
containing a specific date for transfer of state permit responsibility, coverage, and liability
between them; and
c. The department does not notify the existing operator and the proposed new operator of
its intent to modify or revoke and reissue the state permit. If this notice is not received, the
transfer is effective on the date specified in the agreement mentioned in Part III Y 2 b.
3. For ongoing construction activity involving a change of operator, the new operator shall accept
and maintain the existing SWPPP, or prepare and implement a new SWPPP prior to taking
over operations at the site.
Z. Severability. The provisions of this general permit are severable, and if any provision of this
general permit or the application of any provision of this state permit to any circumstance, is held
invalid, the application of such provision to other circumstances and the remainder of this general
permit shall not be affected thereby.
Section 12. Inspection logs
INSPECTION FREQUENCY:
(1) Inspections shall be conducted at a frequency of (i) at least once every four business days or (ii) at
least once every five business days and no later than 48 hours following a measurable storm event. In
the event that a measurable storm event occurs when there are more than 48 hours between business
days, the inspection shall be conducted on the next business day; and
(2) Representative inspections used by utility line installation, pipeline construction, or other similar
linear construction activities shall inspect all outfalls discharging to surface waters identified as impaired
or for which a TMDL wasteload allocation has been established and approved prior to the term of this
general permit.
Issued — 10/2014 Stormwater Pollution Prevention Plan (SWPPP) Albemarle County
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount Inches Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(YIN)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT
OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SW PP and
general permit.
Qualified Personnel
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Otherobvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leavingthe
site?(Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describemeasurestakento
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount Inches Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(YIN)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT
OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SW PP and
general permit.
Qualified Personnel
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Otherobvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leavingthe
site?(Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describemeasurestakento
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?
STORM WATER INSPECTIONS FOR VSMP GENERAL PERMIT LAND DISTRIBUTING ACTIVITIES Page I
PROJECT:
MONITORING FOR THE WEEK BEGINNING:
DATE AND TIME OF INSPECTION:
RAINFALL:
Date of Rain Amount Inches Initials
EROSION AND SEDIMENT CONTROL FACILITIES INSPECTED:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
Facility Identification
Date and Time of
Inspection
Operating Properly
(YIN)
Description of
inspection
observations
OBSERVATION OF RUNOFF AT
OUTFALLS:
(Inspections shall be conducted according to Part IIF2 of the
Permit. However, if the discharges of stormwater from
construction activities are to surface waters identified as
imparied, inspections shall be conducted according to Part
IB4d.)
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Qualified Personnel
By this signature, I certify that the contruction
activity is in compliance with the SW PP and
general permit.
Qualified Personnel
ceritication statement on page 3 shall be signed.
By this signature, I certify that this report is
accurate and complete to the best of my
knowledge:
Operator/Duly Authorized Representative
By this signature, I certify that the contruction
activity is in compliance with the SWPP and
general permit.
Operator/Duly Authorized Representative
Stormwater Discharge
Outfall Identification
Date
Clarity
Floating Solids
Suspended
Solids
Oil Sheen
Otherobvious
indicators of
stormwater
pollution (list
and describe)
Visible
sediment
leavingthe
site?(Y/N)
If yes, describe actions
taken to prevent future
releases (may need to
attach additional
information)
Describemeasurestakento
clean up sediment outside
of disturbed limits (may
need to attach additional
information)
Clarity: Choose the number which best describes the clarity of the discharge where I is clear and 10 is very cloudy
Floating Solids: Choose the number which best describes the amount of floating solids in the discharge where 1 is no solids and 10 the surface us covered in floating solids
Suspended Solids: Choose the number which best describes the amount of suspended solids in the discharge where 1 is no solids and 10 is extremely muddy.
Oil Sheen: Is there an oil sheen in the stormwater discharge (Y or N)?