Loading...
HomeMy WebLinkAboutWPO202000007 Bond Estimates 2021-09-01Project Name: Hark Vineyards Tasting Room WPO file number: WP02020-00007 TM P(s): 00800-00-00-05000 Date Estimate Completed: 9/1/2021 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 1 permanent diversion or ditch 0 . $13.00 $0.00 2 standard manhole frame top (not inlet) 1 ea $500.00 $500.00 3 drop inlet or grate 0 ea $3,500.00 $0.00 4 manhole structure (per ft. rise) 8.0 ft $450.00 $3,600.00 5 pipe, rep, cmp (15 to 48")&24 in 1 ES-1,2 0 EC-1 321.0 ft $35.00 $11,735.00 6 in 0 ES-1,2 0 EC-1 0.0 ft $40.00 $0.00 7 in 0 ES-1,2 0 EC-1 0.0 ft $50.00 $0.00 8 in 0 ES-1,2 0 EC-1 0.0 ft $65.00 $0.00 9 aggregate base or drainage stonein d 0.0 ft L 0.0 ft W 0.0 ton $35.00 $0.00 10 11 earthwork for underground systems covered with Mfr. estimate 12 height of dam at toe 0 ft cut at high side ft 13 included with Mfr. estimate height of fill at faceaft ft cut at face ft 14 length of damft length of cutoft ft 15 top width width of cut 16 above transition) C nsition Oat 17 (total width of dam) 0 ft (total width of cut) 0 ft 18 (height below transitioi 0 ft (depth below transitioi 0 ft 19 (area below transition) 0 sf (area above transition 0 at 20 (total fill volume) 0.0 cy (total cut volume) 0.0 cy 21 length of spillway ft JOAL CY estimate) 0 cy $13.00 $0.00 22 width of spillway =ft (spillway stone tons) 0 tons $50.00 $0.00 23 24 trees 0 ea $275.00 $0.00 25 shrubs 0 ea $50.00 $0.00 26 seedlings 0 ea $5.00 $0.00 27 underdrain (LF) 0 ft $5.00 $0.00 28 bioflter soil mix (CY) 0 cy $45.00 $0.00 29 trash rack/ anti vortex devices 0 ft $1,500.00 $0.00 30 maintenance access road (LF) 0 ft $50.00 $0.00 9/1/2021 Project Name: Hark Vineyards Tasting Room WPO file number: WP02020-00007 TM P(s): 00800-00-00-05000 Date Estimate Completed: 9/1/2021 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number installed 31 rip -rap, placed depth 2 ft length 14.0 ft 32 (only Outfall Rip -Rap from BMP incl width 3.8 (tons) 7.875 $60.00 $472.50 33 survey and layout (price per 0.1 mi.) acres 0 basins $0.00 34 mobilization $2,500.00 35 as -built drawings (per facility) ea $2,000.00 $2,000.00 36 materials testing (per facility) ea $2,000.00 $2,000.00 37 compaction testing (per dam) ea ILS $3,000.00 $3,000.00 38 Survey and platting of Open Space ea $2,500.00 $0.00 39 Mfr. underground detention system: estimate: Timmons Group email, 4/15/2021 2:53 PM $129,000.00 $129,000.00 this lane T Storm Storage system installed expense estimate based on similar design, @ $200k: WPO2020-00051 (5/1321, Timmons) estimate for SWMI - 48" (65'); SWM2 - 96" (180') WPO Estimate, as follows: $200k - $28k [— cost 48"SWMI), then x 0.75 [6' = 0.75 of T; resultant estimate, $129k, assumed relatively accurate. cost sum $154,807.50 J. Anderson, 9/l21 contingency $15,480.75 WP0202000007_Hark Yneyard_SWM Bond_090121ja Total $170,290 9/1/2021