Loading...
HomeMy WebLinkAboutWPO201900040 Bond Reduction 2019-07-02 Internal Use Only VS MI ! OF /A 4 Z6/� Date Received: g�,,.,�� Fee Paid: fin ICI Received by: r7�v1 ). Intake:Forward to Management Analyst BOND INSPECTION REQUEST APPROVED PLAN#: WPO-2019-00040 PROJECT NAME(including Phase#): Yancey Lumber (As listed on the approved plan) This form is used to request a reduction or release of-a bond.A fee is required for each inspection.Please check the appropriate box below for the requested inspection(s). Inspections for the purposes of bond reduction or release will require a separate fee for each bond. • VSMPNESCP Erosion Control,Stormwater Management and/or Mitigation per Water Protection Ordinance sections 17-207& 1'7-208 $250 o Reduction u Release ❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance sections 14-435& 14-438 $269 ❑Reduction ❑.Release ❑ Water&Sewer bond per Subdivision Ordinance section 14-435 $269 o Reduction o Release ❑ Site Development Performance bond(Incomplete Site Work&Landscaping) $301 o Reduction(site work only) o Release TOTAL FEES $250.00 Submit requests to:Department of Community Development,401 McIntire Road,North Wing,Charldttesville, VA 22902,Attention:Management Analyst—Phone 434-296-5832;Fax 434-972-4126.All roads and stormwater facilities will require construction record drawings,inspection reports,videos/photos,plats/esmts, certifications,and completion processes through VDOT or DEQ(refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and County's published procedures.A minimum 20%of the original posting is held until acceptance of all bonded improvements.For Site Development Performance bonds,if landscape installation is part of the bonded site work,a request for reduction should only be madeonce all landscaping is complete. If all required documentation is not received within 30 days of receipt of this request,this application shall be deemed incomplete and shall be rejected.If rejected,a new application,supporting documentation and fee will be required.Applications may be withdrawn for a full refund within 30 days of receipt. If this is a reduction request,the revised estimate will be prepared by the plan reviewer and sent to the owner. Please provide contact information. EMAIL: OR REGULAR MAIL ADDRESS: Signature of Owner/Developer Print Name Date Revised 7/15/2014,7/20/2015,11/3/2015,8/14/2017,1/28/2020 Kenny Thacker • From: Kenny Thacker Sent: Wednesday,April 15, 2020 9:06 AM To: sarah rayanceylumber.com Cc: donnie rayanceylumber.com;Ana Kilmer; Frank Pohl Subject: FW: Message from KM_364e Attachments: SKM_364e-En20041415100.pdf Sarah &Donnie I received your voice mail request on the Yancey Lumber project from Frank Pohl.Attached is the Inspection Request Form that will need to be completed and returned with payment in order for the project to be released.You will not be required to submit any construction drawings or stormwater facilities information. My last inspection was on March 12, 2020,with Bobby Vest.The project was complete and the grass was starting to grow on the slopes.After you return the request form, I will make a final inspection and release the project. Thanks From: BizHubEngineering@albemarle.org<BizHubEngineering@albemarle.org> Sent:Tuesday,April 14,2020 4:11 PM To: Kenny Thacker<kthacker3@albemarle.org> Subject: Message from KM_364e 1