BOND INSPECTION REQUEST
APPROVED PLAN#: WPO-2019-00040
PROJECT NAME(including Phase#): Yancey Lumber
(As listed on the approved plan)
This form is used to request a reduction or release of-a bond.A fee is required for each inspection.Please
check the appropriate box below for the requested inspection(s).
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
• VSMPNESCP Erosion Control,Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207& 1'7-208 $250
o Reduction u Release
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance sections 14-435& 14-438 $269
❑Reduction ❑.Release
❑ Water&Sewer bond per Subdivision Ordinance section 14-435 $269
o Reduction o Release
❑ Site Development Performance bond(Incomplete Site Work&Landscaping) $301
o Reduction(site work only) o Release
TOTAL FEES $250.00
Submit requests to:Department of Community Development,401 McIntire Road,North Wing,Charldttesville,
VA 22902,Attention:Management Analyst—Phone 434-296-5832;Fax 434-972-4126.All roads and
stormwater facilities will require construction record drawings,inspection reports,videos/photos,plats/esmts,
certifications,and completion processes through VDOT or DEQ(refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures.A minimum 20%of the original posting is held until
acceptance of all bonded improvements.For Site Development Performance bonds,if landscape installation is
part of the bonded site work,a request for reduction should only be madeonce all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request,this application shall be
deemed incomplete and shall be rejected.If rejected,a new application,supporting documentation and fee will
be required.Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request,the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL:
OR REGULAR MAIL ADDRESS:
Signature of Owner/Developer
Print Name Date
Revised 7/15/2014,7/20/2015,11/3/2015,8/14/2017,1/28/2020
Kenny Thacker
•
From: Kenny Thacker
Sent: Wednesday,April 15, 2020 9:06 AM
To: sarah rayanceylumber.com
Cc: donnie rayanceylumber.com;Ana Kilmer; Frank Pohl
Subject: FW: Message from KM_364e
Attachments: SKM_364e-En20041415100.pdf
Sarah &Donnie
I received your voice mail request on the Yancey Lumber project from Frank Pohl.Attached is the Inspection Request
Form that will need to be completed and returned with payment in order for the project to be released.You will not be
required to submit any construction drawings or stormwater facilities information. My last inspection was on March 12,
2020,with Bobby Vest.The project was complete and the grass was starting to grow on the slopes.After you return the
request form, I will make a final inspection and release the project.
Thanks