HomeMy WebLinkAboutACSA198800001 Other 1987-09-25 1 K.-cr
Ci-
SEP 281987
TRIANGLE TRAILER COURT PLANNING DIVISION
ITIMIZED COST OF WORK FOR BOND AMOUNT:
1. SEWER PIPE AND CONNECTIONS, PUS LABOR $1,200.00
2. MAIN SEWAGE LINE ACROSS HIGHWAY, PLUS MANHOLE 12,000.00
• 3. PAVING COST AS REQUIRED 6,075.00
4. ENGINEERING AND SURVEYING 2,500.00
TOTAL 21,775.00
1.- ,�
C- - 7./' - j �.._ .
G. Benton Patterson �,.
Sept. 25th, 1987