Loading...
HomeMy WebLinkAboutACSA198800001 Other 1987-09-25 1 K.-cr Ci- SEP 281987 TRIANGLE TRAILER COURT PLANNING DIVISION ITIMIZED COST OF WORK FOR BOND AMOUNT: 1. SEWER PIPE AND CONNECTIONS, PUS LABOR $1,200.00 2. MAIN SEWAGE LINE ACROSS HIGHWAY, PLUS MANHOLE 12,000.00 • 3. PAVING COST AS REQUIRED 6,075.00 4. ENGINEERING AND SURVEYING 2,500.00 TOTAL 21,775.00 1.- ,� C- - 7./' - j �.._ . G. Benton Patterson �,. Sept. 25th, 1987