1. Project Narrative
2. Entrance Spacing
3. Trip Generation
4. Turn Lane Warrant Analysis
5. Conclusion
6. Appendix
10
SHIMP ENGINEERING, P.C.
SECTION 1
PROJECT NARRATIVE
Victorian Properties II, LLC is the owner of tax map parcel 09000-00-00-035DO and James R. Moss is the owner of tax map
parcel 09000-00-00-035H0; Victorian Properties II, LLC is the applicant (the "applicant") for a zoning map amendment
application known as "1805 Avon Street Extended; which pertains to tax parcels 09000-00-00-035DO and 09000-00-00-
035H0 (collectively, the "property"). The applicant seeks to rezone the 3.627-acre property from R-1 Residential to Planned
Residential Development. Currently, each of the parcels has an existing single-family residence and if approved, this rezoning
would allow a maximum of 85 units to be developed. TMP 90-35D has an existing full access driveway off of Avon Street
Extended, while TMP 90-35H shares driveway access with TMP 90-35A, which has full access onto Avon Street Extended.
TMP 90-35H additionallyhas access to private streets Avinity Loop and AvinityDrive which connect to Avon Street Extended.
Upon developing the two properties as one cohesive development, the access easements through TMP 90-35A would be
abandoned and access to the 1805 Avon Street Extended development as a whole would only be provided from Avon Street
Extended. The access easement from the neighboring Avinity Subdivision will be re -purposed for emergency access and will
be available for utilization by pedestrians and cyclists as well. The property is adjacent to Church of God Southside, whose
use lends itself to be designated as a commercial entrance; Innovative Construction Concepts lies just south of Church of
God, and is another commercial entrance in the vicinity of the proposed development. Due to the commercial entrance
designations of TMP 90-35B and 90-35C, any proposed entrance on the 1805 Avon Street Extended property would not meet
Virginia Department of Transportation (VDOT) spacing standards. As a property with only 126' of frontage on Avon Street
Extended, siting an entrance to meet entrance spacing standards is not possible.
This report will analyze the spacing between
entrances (Section 3), and whether there
is a need to install turn tapers or turn lanes
(Section 4). The following analyses indicate
that substandard entrance spacing is not
detrimental to ensuring safe and adequate
movements for 1805 Avon Street Ext.,
Church of God Southside, and Innovative
Construction Concepts, as the circumstances
of this proposal differ from typical mid- or
high -volume commercial entrances that
serve daily traffic needs.
SHIMP ENGINEERING, P.C.
SECTION 2
ENTRANCE SPACING
Route 742 Avon Street Extended is a 45-mph collector road With the presence of Church of God Southside on TMP 90-35B
and Reynovia Drive immediately across from the church, spacing of an unsignalized intersection and a full access entrance
is 335, according to VDOT Appendix F Minimum Spacing Standards for Commercial Entrances (Table 2-2). Similarly, the
presence of Innovative Construction Concepts on the other side of Church of God Southside would require 335' between
Innovative Construction Concepts' and 1805 Avon Street Ext.s proposed full access entrance. The existing entrance to TMP
90-35D that serves one single-family residence, is 132' from the Church of God Southside's entrance and Reynovia Drive.
The entrance is proposed to move approximately 47 towards the northern property line, such that the proposed entrance
would be 179' from the Church of God Southside's entrance and 321' from Innovative Construction Concepts' entrance. Due
to the narrow shape of the parcel, it is not possible for the entrance to achieve a spacing of 335' as the proposed entrance is
positioned as far north as possible on the property.
A partial access entrance to the property would only necessitate an exception from spacing standards between the proposed
entrance and the entrance to the Southside Church of God, as the minimum spacing standard for partial access entrances
is 250' on 45 mph collector roads and therefore spacing requirements between the proposed entrance and Construction
Concepts (TMP 90-35C) entrance could be met. We do not propose a partial access entrance with this development because
it is critical for future residents of this development to be able to make a left -in to the site when traveling from Charlottesville
and a right -out from the development when traveling to Charlottesville; the majority of trips to and from this site will be
making these maneuvers. The left -out maneuver could be restricted therefore reducing spacing standards however, since the
volume of trips potentially making this maneuver will be minimal, we do not see the benefit in restricting this movement.
SHIMP ENGINEERING, P.C. ACCESS MANAGEMENT EXCEPTION REQUEST:TMPs 9035D&9035H 1 4
SECTION 3
TRIP GENERATION: CHURCH OF GOD SOUTHSIDE
Entrance spacing between Church of God Southside and the proposed multifamily development does not meet VDOT
minimum spacing standards for commercial entrances, however, the nature of trips generated by religious institutions are
dissimilar to other commercial uses that would necessitate appropriate entrance spacing. Furthermore, peak hour timeframes
differ between that of a church and a multifamily neighborhood. The following trip generation was provided by ITE Trip
Generation, loth Edition. A 3,200 square foot church could generate one trip during the weekday morning peak hour and
two trips during the weekday evening peak hour. Due to the very low volume of weekday trips of the church and overall low
trips generated by the proposed multifamily units, there is no anticipation of conflicts to occur between these two entrances
that do not meet minimum entrance spacing.
pdap Plot and Equal
w.X so�XCE
Tnd Den nrna lmn Ea
Hery Ctla w.w.avallame. f�y5$JyLm:q¢aw. V
O oonnE
(illi IntEWO%®I
iW"Du.dl
u. ad
xwe6:FOv1:
1M09p.RliF
aE RRCO.
l YMNby. PoW.HWfaIAUp®X80PoITtr[ v
soewalumr dan
Exz ..70CA.U.
Tro m+a. m a.na.a mt amt. a.tm n. N+a
IlgaFe reaee
an—
Tly(in XYIW. <T Ed v
.-dmeeuon.aa. towatede
O 0
(SW59B)Im10fvW
YOu0AY1N
Malletw wl
.utut."
1W050 FL GFR
Y, Paadl.idmoaaX9treNTu vl
Daa9 UNw9WXNn
OCebDl[
SHIMP ENGINEERING, P.C.
so
ad
]0
Out
%tq VMe
Data Plot and Equation
I�
10
%
so 100
1000 sq. A, RP
RgetIDmm O
Ftted Cw
M
3-1
nip T�-
wmwaselaln:
8
000 By. Ft GM
11
SunEerE'pev:ellan:
0`a
200 FMM Cune EquaOan:
T-B ,X,-oa.
171
11 T1 i X—1
Fmnp111I1 l,E
a.exol A�allaele
landUn:
mm (w0:_c onoee_oe
xi R ors e.
m:
:oia�eeaaee dPnz
General joN ,N:Ean
Munba W Rudin:
U
Xv01. au, R GEX.
RwnPo X.I.:
0<B
Fendmo dmwmn:
Ow
F Kure Eo,at n:
R➢0 (q.3%
Ohs
G UabLulbn:
JS%elvmdnn Eadr
% End,. iittN Cu— --- PvnnPo Xxte .....0 EMn
Avenge PM B Rulll . (EnlylN 1.11
Fnletl Gurve sRdal4RlEalyaflEHq
mouse
ee Mnl to Zoom out w a—Y:.
Moverane oin eronEM ptiYaorlenXMTvel:m
ACCESS MANAGEMENT EXCEPTION REQUEST: TMPS 9035D&9035H 1 5
0� _.. _. _..._.
t4o..-... to,
x. load to. R. GH
Pup20om
SECTION 3
TRIP GENERATION: INNOVATIVE CONSTRUCTION CONCEPTS
Entrance spacing between Innovative Construction Concepts and the proposed multifamily development nearly meets
VDOT minimum spacing standards for commercial entrances, with a discrepancy of 14' However, as a commercial concrete
contractor service, overall trips are anticipated to be fairly low. The following trip generation was provided by ITE Trip
Generation, loth Edition. A 2,300 square foot office could generate four trips during the weekday morning peak hour and
five trips during the weekday evening peak hour. Due to the very low volume of weekday trips of the commercial contractor
and overall low trips generated by the proposed multifamily units, there is no anticipation of conflicts to occur between these
two entrances that do not meet minimum entrance spacing by 14'.
wul%E:
` TIP Dlxl Mxlni, IM Ed
..., wuaa.... a,.... 2,JhadN,ldgd.. V
.t� xx.I.wD oaoE.
(t06tm11Muplal
130u 9pe W q' TIEM Cmtradm
NSlea�
n
—Sq. Ft GFA v
CWEEkW NaFHwlglAdtannl SRMk
Ind—E
E3.3 rvgwEmO
lk
J— J
Tfip(Mial Iona
st� Eruxo ®ccEF
LAND
(1gg1�YNehIN
USA ISoSowaR, rna( v
t AND
INDEPENDENT SARSABLE no
IOW So FI GFAA
NE IENP.
IWcekday- Peak HDUI dAddoand 3dalt Tfadit v
CubNSUWMn v
PaPqNDPE
Data Plot and Equation
DATA ATATISmS
IhND
EDADd, 1. Conyctortt W) I- 1. m.1
GO
...."DID.:
I000 Sa.N DFA
x
sa m .
mNL.7..e
s DE-
x
w� ,b,.w
X
TIpIN!
O
U.
urWSMlx11
AE Iwo S. Ft GEA.
X
D
x
NE.
X
X
vv
%
x
wre
X
DII 117
X %
..d o.vld.
%
00 - -
%
IUS
5
10 ]5
ao EARO Curve P'Nay.:
= ISOU Sq. R. GEA
O
%Slutiv 4R
--
AS —,,lute III AUS,P ]%,tinq
CLUSI. no EUS.
A—.. Pale 1(Tala9.] IEnry411EaU
Data Plot and Equation
MEA STATIA cS
U,. DID
speanly DID. E.NUI. ('a014LLCk Ys
So
St
IASPqUAUqo
SgFlc�KK
T.— PUIAAI
a0
ENIPH IS DMlaant SPIP Tama
One xS11... a a., a am
AD
GNU IT LNU.I.SA..0
x
X
venide
Mu�dar al add-:
d
x
x
A,.. 1. as n. GFA.
A aae.
to x
%
9INce
%
Pan..dwu.
.'%
X
%
OI Sa
' '^x x
x
Stard"d De..
x
3ni
_
DO _ -
S
TD 15
]➢1.
n4 EpAd1oe:
%10005q. R 6P
Ed S—
PMlllonl ®
W
....
. ..'n EN q...
%SIWyS.
---
Ave2ge0.ate 321enlen .exM
Average Pa&. 5 �TAAL I(ENU),4 P,P,
SHIMP ENGINEERING, P.C.
IS,w�dvNINx Ind bmtl U. NEe eem a . I
ACCESS MANAGEMENT EXCEPTION REQUEST: TMPS 9035D&9035H 6
SECTION 4
TURN LANE WARRANT ANALYSIS
Right and left turn lane warrant analyses are provided to indicate low volume of peak hour trips for the proposed multifamily
development. Right and left turn lanes are not required, indicating minimal conflicts between new trips and existing
background traffic on Avon Street Extended. As the new peak hour trips would not require additional infrastructure for safe
and adequate movement on Avon Street Extended, in addition to the existing one to two peak hour trips generated by the
church, entrance spacing of 179' would not diminish public access and safety on Avon Street Extended; because turn tapers
and turn lanes are not required by the proposed use, minimum entrance spacing would not be needed to minimize conflicts
between turn tapers, turn lanes, and the existing commercial entrance of the church. The following 2020 traffic data specific
to this portion of Avon Street Extended is provided by EPR, P.C.
Figure 1. 1805 Avon Street Extended Trip Generation
ITE
Independent
AM
PM
Daily
Code
Variable
In
Out
Total
In
Out
Total
Total
Low -Rise
Multifamily
220
41 Units
4
16
20
17
10
27
269
Mid -Rise
Multifamily
221
42 Units
4
11
15
11
7
18
227
Turns In
8
28
Figure 2. Avon Street Extended Weekday Traffic Counts
Avon Street Extended
Station ID: At 1821 Avon Street Extended
Just south of Reynovia Drive
Week Average
Southbound
Northbound
AM Peak
142
268
PM Peak
325
185
Figure 3. AM & PM Peak Hour Turns
1805 Avon Street Extended
Turns In
Advancing
Opposing
% of Left Turns
Morning Right
6
274
-
-
Morning Left
2
144
274
2%
Evening Right
8
193
-
-
Evening Left
20
345
1 193
1 6%
Note: 60/40 turn split assumed in the mornings and 70/30 split assumed in the evenings per the
AM/PM SB/NB distribution of Figure 2 trip counts
SHIMP ENGINEERING, P.C. ACCESS MANAGEMENT EXCEPTION REQUEST: TMPS 9035D&9035H 1 7
Figure 4. Right Turn Lane Unwarranted
120
100
cr
O
x
c[
W
a 80
h
W
J
U_
x
W
N 60
z
cr
40
x
a
20
E�]
PHV APPROACH TOTAL, VEHICLES PER HOUR
IN
FIGURE 3-26 WARRANTS FOR RIGHT TURN TREATMENT (2-LANE HIGHWAY)
Appropriate Radius required at all Intersections and Entrances (Commercial or Private).
LEGEND
PHV - Peak Hour Volume (also Design Hourly Volume equivalent)
Adiustment for Riaht Turns
For posted speeds at or under 45 mph, PHV right turns > 40, and
PHV total < 300.
Adjusted right turns = PHV Right Turns - 20
If PHV is not known use formula: PHV = ADT x K x D
K = the percent of AADT occurring in the peak hour
D = the percent of traffic in the peak direction of flow
Note: An average of 11 % for K x D will suffice.
When right turn facilities are warranted, see Figure 3-1 for design criteria
Rev. 1115
SHIMP ENGINEERING, P.C. ACCESS MANAGEMENT EXCEPTION REQUEST: TMPs 9035D&9035H 1 8
Figure 5. Left Turn Lane Unwarranted
m
_ 700
0-
> 600
w
2
D 500
J
O
> 400
Z
U) 300
O
0-
a. z0p
O
0
> too
S=20Y
Lane
..EN.�.....�..............................�.
� �� 00 .00 800 1000
VOLUMEVA ADVANCING
FIGURE 3-11 WARRANT FOR LEFT TURN STORAGE LANES ON TWO LANE
HIGHWAY
SHIMP ENGINEERING, P.C. ACCESS MANAGEMENT EXCEPTION REQUEST: TMPs 9035D&9035H 1 9
SECTION 5
CONCLUSION
1805 Avon Street is a property designated as "Urban Density Residential" by Albemarle County. Urban Density Residential
uses recommend a density of 6-34 dwelling units per acre of all housing types. The proposed rezoning from R-1 Residential
to Planned Residential Development for the development of 85 units maximum would bring the density to 24 DUA, aligning
with County Comprehensive Plan goals and contributing to overall housing supply in Albemarle. This request for exception
from the minimum spacing standards is due to the presence of the Church of God Southside and Innovative Construction
Concepts south of the property. However, as a church use, there may be one to two trips occurring during the weekday
morning and evening peak hour, with the majority of overall trips occurring on the weekends; as a specialty contractor
use, there may be up to five trips during the weekday morning and evening peak hour, with relatively low trip generated
overall. Moreover, the proposed 85 maximum multifamily units do not generate high volumes of peak hour traffic, as right
and left turn lanes are not warranted with this development. Because turn tapers and turn lanes are not needed with the
proposed use, minimum entrance spacing does not have to be established to minimize possible conflicts with new turn lane
infrastructure and existing commercial entrances. Due to the low -volume of trips generated by these commercial entrances
during typical peak hours of the adjacent residential development, meeting half of the required entrance spacing for Church
of God Southside and being 14' short of the required entrance spacing for Innovative Construction Concepts would not
impede on daily safe facilitation of traffic in and around 1805 Avon Street Extended.
SHIMP ENGINEERING, P.C. ACCESS MANAGEMENT EXCEPTION REQUEST: TMPs 9035D&9035H 1 10
SECTION 6
APPENDIXO
^ —a
0-'
-�o
U o W
mz
WNW N 7
j
c 0
00 p
Y
N
a5_
3v�
N h �
N N
ME
J
m
c
J
m
m
co
m
Z
m
rn
m
co
m
Z
.c
LL
co
m
Z
a
o
m
N
a
�
W
U
m
Z
3
co
m
Z
N
J
F
m
co
m
Z
O
N
U
()
m
N m
co
r9A
/1 F-
SHIMP ENGINEERING,
P.C.
�nmma�nn minm�am�nmmvmrnoNonmo
N m N N m- m m-- m- m O n O N
M 01' ���m��v OlN O)�rmCI CI
. . . . . . . . . . . . . . . • . . . . . . • .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . • . . . . • . • • . . . .
NN �NmON�m0 tN0 mmm-vNi V N V -- mOmOe���
o inmmm�nmmn�� mrnvnm�mnmmw
yy ��pp�yy N Nli��
m V rmN�0l trOA hth ONOm mI� W O aro�^�Nmm
N C'lNm��N O r N01m V N m mm rim Nm
. . . . . . . . . . . . . . . • . . . . . . • .
. . . . . . . . . . . • . . . . . . • . . . .
. . . . . . . . . . . . • . . . . . . • . . .
. . . . . . . . . . . . • . . . • . . . . . . .
Q 00000000000a00000000000
�
omom
th
OmOm
0
m
m
o
O O
O N
y�rCl
N
0
O
0
0
0
0
0
0
0
0
0
O
O
m
Om001
01
OmOm
o
�O
m
rn
o�io�
Of'00
N
O
m
n
M
m 1Oorcin
O
OOOCI
O
O
O
O
O
O
O
O
N
O
Y—Y
S]l0
O
J
IL
d
F
a
U
a
ACCESS MANAGEMENT EXCEPTION REQUEST: TMPs 9035D&9035H I 11