HomeMy WebLinkAboutWPO201100024 Preconstruction Form 2012-03-01 ri! oe A
(-4,4%ce
46,14
Erosion & Sediment Control
Preconstruction Conference Checklist.
Name of Plan: auu,3Anotac SEczto#3 S"S
Plan No.. IaPO 2011--O0o29
Date: ;3' I-1 Z
1) Copies of approved plan given to: Owner or Authorized Agent 3,- Contractor /
2) Have all the conditions been met? `KS
3) Responsible Land Disturber SC_or`c RP-A
Cert./Lic.No.. 12g8 C7 Type. RLr7
Address/Phone/Mobil Phone: z,q 64JAA(2
T 2 )H , 1/r4 z-z-G)"7`-( 4/3Y.e/60- 95a
4) Name of Prime Contractor: ('r ivt onpr 'PLA-L'r`I 44ot.6 t' 6 S jL (-LC
Address/Phone/Mobil Phone: (53.5 •WooDBoLl2A)C. eA-oe
I", ze, v4 029��
Name of Subcontractor: i4 . 0 v
5) Persons in Attendance:
Name Firm
DastA.0 oL pra-r $ 91VD►+^- T
P A-u L Co(-t-a..,J P 1*D r--,)✓T
Corr cA-R-Lso,-) trark0 Air
0-0,40 assirfL G LAdu^'LO( /asSo
�cpr7 Q-N r�s 1441- ' 46. fl I 1-1fi•2D
OA btu-AP-0
(6) Date Permit Issued:
(7) Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit
from DCR. DCR has requested the County to check for the site posting.
(8)Article II,section 17-207
B. Each permit shall also be subject to the following.
1. The permitted land disturbing activity shall be deemed to have commenced on the
date the permit was issued, provided that the program authority may establish another date of commencement
1 of 2
Revised 11/29/2011
1•\nRPT Cnmmnn itv nP..PInn.nenAFnrmc\Inenectinnc\Prncinn Preconstructinn Conf Checklist 11 29 20I 1.doc r
based on documentation submitted' by the owner that clearly demonstrates that the land
disturbing activity commenced on that date.
2. Permanent vegetation shall be installed on all denuded areas within nine (9)
months after the date the land disturbing activity commenced, except for areas that the program authority
finds are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface"
includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete,
trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such
other surfaces that the program authority determines would adequately provide a permanent barrier to erosion.
3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may
be extended by either the program authority or the board of supervisors, or both, as follows:
a. The program authority may extend the time limit for installing permanent
vegetation up to an additional six (6) months, provided the owner submits a written request to the program
authority no less than one (1) month prior to the deadline for installing the permanent vegetation The program
authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the
control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner
has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In
granting an extension, the program authority may impose reasonable conditions.
b. The board of supervisors may extend the time limit for installing permanent
vegetation for duration it determines to be appropriate, provided the owner submits a written request to the
clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent
vegetation. The program authority shall provide its opinion to the board as to the condition of the property with
respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and
install permanent vegetation for the land disturbance covered by this permit. The board may grant the
extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii)
the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively
control or has effectively controlled erosion and sedimentation on the property during the land disturbing
activity In granting an extension, the board shall set a time limit and may impose other reasonable conditions.
Notes:
14. 4) - Pt, tr
Jr- (I,C
2 of 2
Revised 11/29/201I
I:\DEPT\Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist II29 2011.doc
Ana Kilmer
From: Ana Kilmer
Sent: Wednesday, February 29, 2012 8:27 AM
To: 'Paul Cohen'; Kenny Thacker; Ray Lilly; Max Greene; Joanne Tu Purtsezova;-David Benish
Cc: Drew Holzwarth; John Kessler; Esther Grace
Subject: Glenmore phase 2, section S-5 bonds
The following bonds have been posted and approved:
Water protection performance bond—WPO-2011-00024-$394,900(erosion$ 112,600; stormwater$282,300)
Subdivision/road performance bond—Roads-$307,490
Subdivision/road performance bond—Water&Sewer-$485,000
Stormwater agreement was recorded on 2/2/2009
The permit and first year inspection fee of$2,300 has not been paid. You cannot set up a pre-construction meeting
until this fee has been paid. Please make check payable to the County of Albemarle and submit to my attention. Once
this fee has been paid, please contact Ray Lilly to set up your pre-construction meeting.
Thank you
Ana D. Kilmer
County of Albemarle
Community Development Department
401 McIntire Road
Charlottesville,VA 22902
434-296-583 2
akilmerPalbemarle.org
1