HomeMy WebLinkAboutWPO201100024 Preconstruction Form 2012-03-01 ri! oe A (-4,4%ce 46,14 Erosion & Sediment Control Preconstruction Conference Checklist. Name of Plan: auu,3Anotac SEczto#3 S"S Plan No.. IaPO 2011--O0o29 Date: ;3' I-1 Z 1) Copies of approved plan given to: Owner or Authorized Agent 3,- Contractor / 2) Have all the conditions been met? `KS 3) Responsible Land Disturber SC_or`c RP-A Cert./Lic.No.. 12g8 C7 Type. RLr7 Address/Phone/Mobil Phone: z,q 64JAA(2 T 2 )H , 1/r4 z-z-G)"7`-( 4/3Y.e/60- 95a 4) Name of Prime Contractor: ('r ivt onpr 'PLA-L'r`I 44ot.6 t' 6 S jL (-LC Address/Phone/Mobil Phone: (53.5 •WooDBoLl2A)C. eA-oe I", ze, v4 029�� Name of Subcontractor: i4 . 0 v 5) Persons in Attendance: Name Firm DastA.0 oL pra-r $ 91VD►+^- T P A-u L Co(-t-a..,J P 1*D r--,)✓T Corr cA-R-Lso,-) trark0 Air 0-0,40 assirfL G LAdu^'LO( /asSo �cpr7 Q-N r�s 1441- ' 46. fl I 1-1fi•2D OA btu-AP-0 (6) Date Permit Issued: (7) Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8)Article II,section 17-207 B. Each permit shall also be subject to the following. 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement 1 of 2 Revised 11/29/2011 1•\nRPT Cnmmnn itv nP..PInn.nenAFnrmc\Inenectinnc\Prncinn Preconstructinn Conf Checklist 11 29 20I 1.doc r based on documentation submitted' by the owner that clearly demonstrates that the land disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete, trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may be extended by either the program authority or the board of supervisors, or both, as follows: a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impose reasonable conditions. b. The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the land disturbing activity In granting an extension, the board shall set a time limit and may impose other reasonable conditions. Notes: 14. 4) - Pt, tr Jr- (I,C 2 of 2 Revised 11/29/201I I:\DEPT\Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist II29 2011.doc Ana Kilmer From: Ana Kilmer Sent: Wednesday, February 29, 2012 8:27 AM To: 'Paul Cohen'; Kenny Thacker; Ray Lilly; Max Greene; Joanne Tu Purtsezova;-David Benish Cc: Drew Holzwarth; John Kessler; Esther Grace Subject: Glenmore phase 2, section S-5 bonds The following bonds have been posted and approved: Water protection performance bond—WPO-2011-00024-$394,900(erosion$ 112,600; stormwater$282,300) Subdivision/road performance bond—Roads-$307,490 Subdivision/road performance bond—Water&Sewer-$485,000 Stormwater agreement was recorded on 2/2/2009 The permit and first year inspection fee of$2,300 has not been paid. You cannot set up a pre-construction meeting until this fee has been paid. Please make check payable to the County of Albemarle and submit to my attention. Once this fee has been paid, please contact Ray Lilly to set up your pre-construction meeting. Thank you Ana D. Kilmer County of Albemarle Community Development Department 401 McIntire Road Charlottesville,VA 22902 434-296-583 2 akilmerPalbemarle.org 1