Loading...
HomeMy WebLinkAboutWPO201100024 Bond Release 2014-03-10 df Date Rectivedt3l/� Pee'ttdt 4A•o '{ Y. Received by: ill« tnukeI Po mud to Mettegemmt Analyst �,,� fen LOD- Oil- e INSPECTION REQUEST PROJECT NAME: C'j PY14rY1QY6 e (non bond estimate request foam and approved plan) This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for each inspection. Please cheek the inspections requested. O Erosion&Sediment Control per Water Protection Ordinance section 17-207 11 DN.( 300 Stormwater Management per Water.Protection Ordinance section 17-306 $60 O Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14.435 and 14-438; $250 ❑ Water&Sewer per Subdivision Ordinance section 14-435 $250 O Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $280 Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville, VA 22902,Attention: Management Analyst-Phone 434-296.5832;Fax 434.972-4126. The County will try to make inspections within thirty days of receipt of this request and the required fee. Bonds will not be reduced below 20%of the original amount. This amount is held until acceptance of the bonded improvements. If this inspection is fora public or private street which is not bonded,the$250 fee applies and if will be processed as m:inspection per the Subdivision Ordinance. For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a request for reduction should only be made once all site work is complete and the project is ready to start the one-year landscape maintenance period, Bonds for landscape maintenance are 33.3%of the total landscaping value and are maintained at that amount for the one-year maintenance period. The revised estimate should be sent to; EMAIL: SW�'Yl k � / � KLle�m 'tt\ (.OVl'1 OR REOULAR MAIL ADDRESS: l l t l l SU V7 Sep' tfll 1 S °."OO stivi I VA aotav S nature of Owner/Developer a(.to e' 'zA'-'H 3'7'1`1 Print Home Date Ravi:WI/lbt20t2 Jonney Otto From: Jonney Otto Sent: Monday, March 17, 2014 1 20 PM To: 'swinkjw@stanleymartin corn' Cc: Ana Kilmer; 'jakyells@aol.com' Subject: Stormwater Bond Inspection WPO2011-00024 Mr Holzwarth, After receiving a Stormwater Inspection request form for the Glenmore Phase 2 sec S-5 (WPO2011-00024) I performed the inspection and it was determined that there are stabilization failures in the drainage areas leading to Biofilters #2&3 that will have to be graded out and re-stabilized. I also cannot make an accurate determination on the surviving landscaping until the growing cycle begins in April. While doing my inspection I had the opportunity to discuss my observations with John Kessler and point out my areas of concern. Until the areas of erosion are corrected and I can verify the surviving landscaping of the Biofilters I cannot release the Stormwater Bond. Please e-mail me or I can meet with you on site if you have any questions. Jonney Jonney Otto Albemarle County Engineer Inspector II Office 434.296.5832-Ext 3245 Cell 434.981.5154 1 Jonney Otto From: Jonney Otto Sent: Friday, March 21, 2014 9'35 AM To: 'swinkjw@stanleymartin corn' Cc: 'jakyells@aol corn'; Ana Kilmer Subject: Stormwater Bond reduction WP0201100024 Mr Holzwarth, In regards to the Glenmore Phase II Sec S-5 (WP0201100024) Stormwater Management bond inspection that was received on March 10, 2014, while I found that I cannot release the bond in full, I can apply a reduction to the work that has been shown to be completed After a careful review of the individual items on the bond I can apply a 36 5% reduction to the current amount(282,300) being held reducing it to 179,300. This will be turned in to Ana Kilmer today. Jonney Jonney Otto Albemarle County Engineer Inspector II Office 434.296.5832-Ext 3245 Cell 434.981.5154 1