HomeMy WebLinkAboutWPO201100024 Bond Release 2014-03-10 df
Date Rectivedt3l/� Pee'ttdt 4A•o '{ Y.
Received by: ill«
tnukeI Po mud to Mettegemmt Analyst �,,�
fen LOD- Oil- e
INSPECTION REQUEST
PROJECT NAME: C'j PY14rY1QY6 e
(non bond estimate request foam and approved plan)
This is to request that an inspection be performed by the County. Where fees are assessed,a fee is required for
each inspection. Please cheek the inspections requested.
O Erosion&Sediment Control per Water Protection Ordinance section 17-207
11 DN.( 300 Stormwater Management per Water.Protection Ordinance section 17-306 $60
O Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14.435 and 14-438; $250
❑ Water&Sewer per Subdivision Ordinance section 14-435 $250
O Site Development Performance bond(Incomplete Site Work&Landscape Maintenance) $280
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
Submit requests to: Department of Community Development,401 McIntire Road,North Wing,Charlottesville,
VA 22902,Attention: Management Analyst-Phone 434-296.5832;Fax 434.972-4126. The County will try to
make inspections within thirty days of receipt of this request and the required fee. Bonds will not be reduced
below 20%of the original amount. This amount is held until acceptance of the bonded improvements.
If this inspection is fora public or private street which is not bonded,the$250 fee applies and if will be
processed as m:inspection per the Subdivision Ordinance.
For Site Development Performance bonds,if landscape installation is part of the bonded incomplete site work,a
request for reduction should only be made once all site work is complete and the project is ready to start the
one-year landscape maintenance period, Bonds for landscape maintenance are 33.3%of the total landscaping
value and are maintained at that amount for the one-year maintenance period.
The revised estimate should be sent to;
EMAIL: SW�'Yl k � / � KLle�m 'tt\ (.OVl'1
OR REOULAR MAIL ADDRESS: l l t l l SU V7 Sep' tfll 1 S °."OO
stivi I VA aotav
S nature of Owner/Developer
a(.to e' 'zA'-'H 3'7'1`1
Print Home Date
Ravi:WI/lbt20t2
Jonney Otto
From: Jonney Otto
Sent: Monday, March 17, 2014 1 20 PM
To: 'swinkjw@stanleymartin corn'
Cc: Ana Kilmer; 'jakyells@aol.com'
Subject: Stormwater Bond Inspection WPO2011-00024
Mr Holzwarth,
After receiving a Stormwater Inspection request form for the Glenmore Phase 2 sec S-5 (WPO2011-00024) I
performed the inspection and it was determined that there are stabilization failures in the drainage areas
leading to Biofilters #2&3 that will have to be graded out and re-stabilized. I also cannot make an accurate
determination on the surviving landscaping until the growing cycle begins in April. While doing my inspection I
had the opportunity to discuss my observations with John Kessler and point out my areas of concern. Until the
areas of erosion are corrected and I can verify the surviving landscaping of the Biofilters I cannot release the
Stormwater Bond. Please e-mail me or I can meet with you on site if you have any questions.
Jonney
Jonney Otto
Albemarle County
Engineer Inspector II
Office 434.296.5832-Ext 3245
Cell 434.981.5154
1
Jonney Otto
From: Jonney Otto
Sent: Friday, March 21, 2014 9'35 AM
To: 'swinkjw@stanleymartin corn'
Cc: 'jakyells@aol corn'; Ana Kilmer
Subject: Stormwater Bond reduction WP0201100024
Mr Holzwarth,
In regards to the Glenmore Phase II Sec S-5 (WP0201100024) Stormwater Management bond inspection that
was received on March 10, 2014, while I found that I cannot release the bond in full, I can apply a reduction to
the work that has been shown to be completed After a careful review of the individual items on the bond I can
apply a 36 5% reduction to the current amount(282,300) being held reducing it to 179,300. This will be turned
in to Ana Kilmer today.
Jonney
Jonney Otto
Albemarle County
Engineer Inspector II
Office 434.296.5832-Ext 3245
Cell 434.981.5154
1