Loading...
HomeMy WebLinkAboutSUB201600061 Bond Reduction 2018-01-11 1:°� '' COUNTY OF ALBEMARLE 44 '. �' Department of Community Development 401 McIntire Road . s Charlottesville,Virginia 22902 Road Bond Inspection Bond Title: Glenmore K2C-2,Phase 1 Road Plan File Number: SUB201600061 Date of inspection: Jan-18 Original Bond Amount: $877,100 Reviewer: David James Current Bond Amount: $708,950 Phone: (434)296-5832 Updated Bond Amount: $215,970 Your bond inspection request has been processed. This list contains an update on the items received and approved. Please see inspection report with comments below. Received Approved Y N Y N N/A VDOT • ❑ Completed inspection request and fee ■ ❑ ❑ ❑ • ❑ As-built plan,updated, sealed to current date,per As-built policy • 0 0 0 • ❑ Copies of recorded plats for right-of-way, easements ■ ❑ ❑ ❑ ❑ • VDOT approval AM-4.3, or partial completion via punchlist ❑ ❑ • ❑ • ❑ Letter from P.E. certifying improvements are built to plan • ❑ ❑ ❑ ❑ • Current certification form completed by owner/developer ❑ • ❑ ❑ ■ 0 CBR test reports for each road ■ 0 0 0 • ❑ Stone depth and material inspection reports (or core tests) ■ ❑ 0 ❑ • 0 Pavement depth and material inspection reports(or core tests) 0 ■ 0 0 • ❑ Compaction test reports for fill areas under road ■ ❑ ❑ ❑ • 0 Pipe trench inspection reports ■ ❑ ❑ ❑ • 0 Pipe interior inspections reports and video ■ D ❑ 0 ❑ ■ Concrete test reports for structural concrete, curbing, aprons,etc. El ❑ IN 0 ❑ ■ Structural inspection reports for any bridges or box culverts ❑ El ■ ❑ ❑ I County road name signs and posts, or a sign agreement for alt. posts❑ ❑ ■ Please refer to on-line content at http://www.albemarle.ora/deptforms.asp?department=cdengwpo for checklists and procedures. 1) Provide asbuilt drawing information on: -completed -completed -completed -completed (5) EOP -completed (6) Slo f 1 E c p.p pe A G t A F3 to H E 7 to lr4 in Elie profiles-completed �r (7) Sheet C2/C4- -completed ' -completed.Bond can not be released until a new easement plat for those drainage easement outside of ROW. re) Show UOW line-completed (d) Show OP at Fl —Not yet installed/pond not completed. ' -completed 2) Provide signed certification of completion form by owner/developer. -completed 4) Provide surface pavement inspection reports(when the roads are completed). -completed 6) Install all street trees. -completed 8) Video inspection of pipe run E8 to E7 shows pipe deflection, and will need to be corrected&videoed again. Provide PE certification that pipe has been fixed. -completed 10) Parge all brickwork in inlets and manholes. 11)Parge lifting holes on inlet tops. 12)Provide deed book and page numbers for the new ditch easements on the as-built drawings. 13) Complete final surface pavement. f.F. COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 229024596 Phone(434)296-5832 Fax(434)972-4126 January 11,2018 Mr.Jess Achenbach, Re: Glenmore K2C-2, Phase 1 Road Plan Your request for an inspection and bond reduction for Glenmore K2C-2, Phase 1 has been processed. The road bond is currently at$708,950.00. The bond can be reduced to $215,970.00 at this time. Please see attached inspection report with comments. Please review the following information for the Private Road Acceptance Procedure. http://www.albemarle.org/upload/images/forms_center/departments/Community Development/forms/En gineering_and_WPO_Forms/Road Inspections & Acceptance - Private Road Acceptance Procedure 11-01-11.pdf A final inspection will be performed when you submit a bond release request. Sin ly, David James Civil Engineer I