Tom,
This morning, I noticed that a revision to the Glenmore S-5 road plans were submitted. While entering this plan into our
tracking system I also noticed that the ESC plan (WPO-2008-0007) was given approval over a year ago (2/6/2009) and is
therefore voided per 17-204.F:
G. An approved erosion and sediment control plan shall be void if the owner fails to obtain a
grading. building or other permit for activities involving land disturbing activities within one (1) year after
the date of the approval.
Please provide a completed WPO application and $300 fee for the review of an ESC plan as soon as you can. Please let
me know if you have any questions.
Thanks,
Phil
296-5832 x3072
x go CO
(ceriCt C\11°114
Ok\ 2C,lik v
of(kf\i,k
)1,4_
1
i
COUNTY OF ALBEMARLE OFA�e� • ng Review Submission Form
Department of Community Developmenta;ia
F
401 McIntire Road,Room 227 ®�:4111 _ '
Charlottesville,Virginia 22902-4596 1 '' '�'* \ . �,
(434)296-5832 °�RcttnP 1� ` 0
Fax(434)972-4126
Project Name: 5 .5-5 CL 10 e N qoo D C�C�LYI 1may t- 5.'-�-bc�,u is I at,
From(Name or Finn): Ra 4oi - .-L i \!� CSC• �JJ�
Date: Dize- v� 2-.43C: � � GU/ _
A I pi.:J Wl_
(Please separate plans for review by different individuals)
.!_�. EROSION&SEDIMENT CONTRO ' - • : 'LAN AMENDMENT
First Submittal Revision Additional copies only
-narrative(2 copies) - narrative(2 copies) (usually after approval)
-plan(2 copies) - plan(2 copies)
-application and fee
STREAM BUFFER MITIGATION PLAN
First Submittal Revision
-plan(2 copies) - plan(2 copies)
-application and fee
STORMWATER MANAGEMENTBMP PLAN
Conceptual Plan First Submittal Revision
-plan(2 copies) - plan(2 copies) -plan(2 copies)
-computations;water quality -computations;water quality, -computations as revised
(2 copies) hydrology,hydraulics,map(2 copies) (2 copies)
• ication and fee
ROAD PLAN(PUBLIC O' PRIVAT - , 2 copies for pnvate roads,5 copies for public)
First Submittal Revision As-built
-plan -plan -plans
-pavement design sheets -pavement sheets -plats
-computations(&maps) computations
FINAL SITE PLAN OR AMEN (First ubmittals are to the Development Process Manager)
Revision
-plans(3 copies,incl.retaining walls if applicable)
-computations as revised(2 copies)
CERTIFIED ENGINEERS REPORT (addressing each performance criteria of the Zoning Ordinance)
First Submission Revision
-letter and documentation
-plans or sketches
CBR REPORTS
Public Roads Private Roads
-pavement design sheets -pavement design sheets
(4 copies) (1 copy)
TRAFFIC STUDIES
Public Roads - Private Roads
(2 copies) (1 copy)
4( SEE litTrac--kte_46) L.c
c .x.11,Ls
f„ I l
J jjtri_a_A
C�
rv►o,
i
PHONE(434)2934251
(434)9770205
ROUDABUSH,GALE&ASSOC.,INC. FAX(434)2965220
FAX
COM
LAND SURVEYING A PROFESSIONAL CORPORATION
ENGINEERING 914 MONTICELLO ROAD
LAND PLANNING CHARLOTTESVILLE VIRGINIA 22902
J THOMAS GALE,L S WILLIAM S ROUDABUSH,L S
MARILYNN R GALE,L S
WILLIAMJ LEDBETTER,LS
EDWARD D CAMPBELL III,LS
December 30, 2008
Phil Custer,Engineering Division
Department of Community Development
Albemarle County, Virginia
RE: Resubmittal of Section S-5 (Livengood), Glenmore Subdivision
Dear Phil:
In an effort to eliminate possible confusion please note the following comments
relative to our resubmittal:
1. The alley on the previous plan was eliminated. This changed the numbering of
the drainage structures slightly. All drainage calculations were revised accordingly and
resubmitted.
2. A separate drainage system was designed to capture the site drainage into the
intermittent stream bordering the project to the east and convey this directly to Carroll
Creek in order to satisfy the water quantity requirement for this project. This is reflected
in Appendix A of the Stormwater Management Plan Narrative, and calculations for the
additional drainage system.
3. In regard to the"Checklist"items previously referenced in your review,the only
items that we are aware that still need to be addressed are:
a) Providing you with a copy of the applicable permits and;
b) Providing you with a completed Stormwater Management Agreement for
recordation.
We will furnish copies of the permits as soon as they are available and will submit the
maintenance agreement along with the final subdivision plat submission.
PIease call me or Nathan Morris if you have questions or need anything further to resume