HomeMy WebLinkAboutWPO202100033 Calculations WPO VSMP 2021-09-03Albemarle County Virginia Engineering Manual For Troxell Poultry Hosue April 21, 2021 Revised July 06, 2021 Revised August 12, 2021 Revised September 3, 2021 V(>,LTH pF �P f U � NA�PP Lic. No. 4 OF 74 -i 9/3/21 w� o��`_S,,OXAL G BlaCkwell Engineering, PLC 556 East Market St. - Harrisonburg, Virginia 22801 - (540) 432.9555 • www.BlackwellEngineering.com BE # 2888 Table of Contents Description Page ESC Narrative 1 Soils Map 8 Energy Balance Calcs 21 TC Calcs 27 Flow Calcs 27 Ditch Cross sections 33 LD-229 & 347 43 Hydroflow caics 1 Year Storm Event 45 2 Year Storm Event 63 10 Year Storm Event 79 25 Year Storm Event (For Sediment Basin) 95 100 Year Storm Event 104 Level Spreader Sizing 120 V RRM 125 BE 2888 - Troxell Poultry House — ESC Plan Erosion and Sediment Control Narrative Project Description The purpose of this project is the construction of two 63'x704' poultry houses and a litter storage shed on an existing 399.71 acre farm. The site is located off of Dyers Mill Ln, approximately 3 miles Northwest of Scottsville. A total of 8.51 acres will be disturbed during construction. Existing Site Conditions The location of the proposed buildings is an existing cropfield. There is a farm road and barn nearby. The site slopes to the west with the steepest grades at about 9 percent and around 500 feet long. Adjacent Property The site is bounded by woods and farm land on all sides. Offsite Area No site material will need to be exported from the site. If any material needs to be imported to the site, it shall come from a permitted borrow site. In the case that any offsite areas are to be used, the County will be notified and all permit requirements will be met. Soils The soil erodability K factor is .32-.37. See attached soil map for more information. Critical Erosion Areas There are 3:1 slopes on site that should be treated as critical erosion areas. Erosion and Sediment Control Measures Unless otherwise indicated, all vegetative and structural erosion and sediment control practices shall be constructed and maintained according to the minimum standards and specifications of the Virginia Erosion and Sediment Control Regulations, latest edition. The minimum Blackwell Engineering, PLC 566 East Market St Harrisonburg, VA 22801 BE 2888 - Troxell Poultry House — ESC Plan standards of the handbook shall be adhered to unless otherwise waived or approved by a variance. Structural Practices 1. Construction Road Stabilization— 3.03 The temporary stabilization of access roads, subdivision roads, parking areas, and other on -site vehicle transportation routes shall be implemented with stone immediately after grading. 2. Silt Fence — 3.05 A temporary sediment barrier constructed of posts, filter fabric and, in some cases, a wire support fence, placed across or at the toe of a slope or in a minor drainage way to intercept and detain sediment and decrease flow velocities from drainage areas of limited size; applicable where sheet and rill erosion or small concentrated flows may be a problem. Contractor to install silt fence where deemed necessary to avoid sediment runoff. 3. Storm Drain Inlet Protection — 3.07 A sediment filter shall be installed at all curb and drop inlets to storm drains that have become functional to prevent sediment from entering and accumulating in and being transferred by the culvert and associated drainage system prior to permanent stabilization of a disturbed project area. 4. Culvert Inlet Protection — 3.08 A sediment filter shall be constructed on the upstream end of storm drain pipes to reduce sediment laden runoff from entering the pipe. 5. Temporary Diversion Dike — 3.09 A channel and berm shall be installed where shown on the plans to channel runoff to temporary sediment trap or basin. 6. Temporary Sediment Basin — 3.14 A temporary barrier or dam with a controlled storm water release structure formed by constructing an embankment of compacted soil across a drainageway shall be constructed as shown on the plans. 7. Outlet Protection — 3.18 Riprap shall be placed at the outlets of all pipes and storm water structures. 8. Level Spreader — 3.21 An outlet for culverts and diversions consisting of an excavated depression constructed at zero grade across a slope shall be constructed as shown on the plans. Blackwell Engineering, PLC 566 East Market St Harrisonburg, VA 22801 BE 2888 - Troxell Poultry House — ESC Plan 9. Surface Roughening 3.29 Providing a rough soil surface with horizontal depressions created by operating a tillage or other suitable implement on the contour, or by leaving slopes in a roughened condition by not fine -grading them. 10. Tonsoiling — 3.30 Topsoil shall be applied to rough graded areas and fine graded to achieve finished grade before permanent seeding is applied. 11. Temporary Seeding — 3.31 Temporary seeding shall be applied to disturbed areas that will not be brought to final grade for a period of more than 14 days. 12. Permanent Seeding — 3.32 Permanent seeding shall be applied to denuded areas within seven days after final grade is reached on any portion of the site. 13. Mulching — 3 .35 Mulch shall be applied to denuded surfaces at finished grade not otherwise stabilized with vegetative ground cover. 14. Soil Stabilization Blankets and Matting — 3.36 Soil stabilization matting shall be installed on a prepared planting area where shown on the plan. Other practices shall be provided if determined by the Engineer or County E&SC Administrator. Vegetative Practices 1. Ton soiling stockpile) Topsoil shall be reused and uniformly distributed to a minimum compacted depth of 2 inches on 3:1 or steeper slopes and 4 inches on flatter slopes prior to seeding. Any irregularities in the surface, resulting from topsoiling, shall be corrected in order to prevent the formation of depressions. 2. Erosion Control Blankets or Mulch and Seeding Erosion control blankets (VDOT Standard EC-2), if needed, shall be installed over fill slopes greater than 2.5:1 which have been brought to final grade and have been seeded to protect the slopes from rill and gully erosion and to allow seed to germinate properly. Mulch (straw or Blackwell Engineering, PLC 566 East Market St Harrisonburg, VA 22801 BE 2888 - Troxell Poultry House — ESC Plan fiber) shall be used on relatively flat areas and shall be applied as a second step in the seeding operation. 3. Temporary and Permanent Seeding Temporary and permanent seeding shall be installed (appropriate to the time of year) according to Seeding and Mulching Table detail on the plan. 4. Surface Roughening Where possible, provide a rough soil surface with horizontal depressions created by operating a tillage or other suitable implement on the contour, or by leaving slopes in a roughened condition by not fine -grading them. Management Strategies 1. Perimeter sediment trapping measures to be installed prior to any excavation on site. 2. Construction shall be conducted so that existing cover will not be disturbed anymore than necessary. 3. Construction shall be sequenced so that grading operations can begin and end as quickly as possible. 4. Permanent seeding and other stabilization shall follow immediately after grading. 5. Areas that will be disturbed shall be clearly marked by flags, signs, etc. 6. The job superintendent shall be responsible for the installation and maintenance of all erosion and sediment control practices. 7. After achieving adequate stabilization to the satisfaction of the E&SC Administrator, the temporary E&S controls shall be removed. Permanent Stabilization All areas disturbed by construction and not otherwise stabilized, shall be stabilized with permanent seeding within 7 days following finish grading. Seeding shall be done according to standard & specification 3.32, PERMANENT SEEDING, of the handbook. Seeding shall be applied depending on time of the year according to E&SC handbook specifications. In all seeding operations, seed, fertilizer, and lime shall be applied prior to mulching. Erosion control blankets shall be installed over fill slopes which have been brought to final grade and have been seeded to Blackwell Engineering, PLC 566 East Market St Harrisonburg, VA 22801 BE 2888 - Troxell Poultry House — ESC Plan protect the slopes from rill and gully erosion and to allow seed to germinate properly. Mulch (straw or fiber) shall be used on relatively flat areas. Stormwater Management/Water Quality Post development water from the site collects in a dry pond on site. From the pond, the water through an underground pipe and outlets towards the bottom of the hill. A level spreader is located at the bottom of the pipe to disperse the water into sheet flow. The water then sheet flows the remaining distance to a tributary of Totier Creek. Totier Creek drains into Middle James- Buffalo (HUC 20802031103.00) where no known pollutants are at significant levels. Water quality is satisfied by open space as shown on the VRRM spreadsheet. The site is broken into 2 drainage area (41 & #2) and meets channel protection via the energy balance equation in 9VAC25-870-66.B3 at both. For Analysis Point #1, the water from the dry pond is piped down the hill to a level spreader that will convert the channelized flow into sheet flow. The water then flows into the tributary to Totier Creek. The flow was analyzed on the way to the stream at Point B, where the channel is not flooding. Though channel protection is already met through the energy balance equation as mentioned above, velocities for both the 2 & 10 year stone event are reduced from the predeveloped to the post developed condition. Therefore, flood protection is met via 9VAC25- 870-66.D. At the EB analysis Point #2, 2.23 acres of crop land is reduced to 0.47 acres of managed turf, lowering the volume and the peak flow. The water leaves this section of the site as sheet flow as it rolls down the northern side of the poultry house pad. Stormwater was analyzed at Point A (where the water meets the stream). At this point there was no flooding and velocities were slow enough that no erosion will occur. As such this section satisfies the law via 9VAC25-870-66.D. Maintenance In general, all erosion and sediment control measures shall be checked daily and after each significant rainfall. The following items shall be checked in particular: 1. Construction road stabilization may require periodic top dressing with additional stone or the washing and reworking of existing stone shall be required when the stone is covered or has been pushed into the soil and shall be returned to its original minimum depth of 6". 2. Silt fences shall be inspected immediately after each rainfall and at least daily during Blackwell Engineering, PLC 566 East Market St Harrisonburg, VA 22801 BE 2888 - Troxell Poultry House — ESC Plan prolonged rainfall. Any required repairs shall be made immediately. Close attention shall be paid to the repair of damaged silt fence resulting from end runs and undercutting. Should the fabric on a silt fence decompose or become ineffective prior to the end of the expected usable life and the barrier still be necessary, the fabric shall be replaced promptly. Sediment deposits should be removed after each storm event. They must be removed when deposits reach approximately one-half the height of the barrier. Any sediment deposits remaining in place after the silt fence is no longer required shall be dressed to conform with the existing grade, prepared and seeded. 3. The Storm Drain Inlet Protection structures shall be inspected after each rain and repairs made as needed. Sediment shall be removed and the trap restored to its original dimensions when the sediment has accumulated to one half the design depth of the trap. Removed sediment shall be deposited in a suitable area and in such a manner that it will not erode. Structures shall be removed and the area stabilized when the remaining drainage area has been properly stabilized. 4. The culvert inlet protection shall be checked to make sure inlet protection is in place, clean and structurally sound. Allowance for water storage needs shall be checked for sedimentation after each storm and to be cleaned out as needed. 5. The diversion dike shall be inspected and repaired after every rain storm event, flow channel, outlet or sediment trapping facility, as necessary. Once every two weeks, whether a storm event has occurred or not, the measure shall be inspected and repairs made if needed. Damages caused by construction traffic or other activity must be repaired before the end of each working day. 6. The sediment basin embankment shall be checked to ensure that it is structurally sound and has not been damaged by erosion or construction equipment. The emergency spillway should be checked regularly to ensure that its lining is well established and erosion -resistant. The basin should be checked after each runoff -producing rainfall for sediment cleanout. When the sediment reaches the clean -out level, it shall be removed and properly disposed of. 7. Outlet protection once placed shall be checked for sediment deposit and excessive sediment removed. 8. The level spreader shall be inspected after every rainfall and repairs made, if required. The lip must remain at 0% slope to allow proper function of measure. The contractor should avoid the placement of any material on and prevent construction traffic across the structure. If the measure is damaged by construction traffic, it shall be repaired immediately. Blackwell Engineering, PLC 566 East Market St Harrisonburg, VA 22801 BE 2888 - Troxell Poultry House — ESC Plan 9. The seeded area shall be checked regularly to ensure that a good stand is maintained. Areas shall be fertilized and reseeded as needed. Blackwell Engineering, PLC 566 East Market St Harrisonburg, VA 22801 3 W 21' N 3A4 WN 3 Soil Map —Albemarle County, Virginia F IS Ci C C C C: 3 0 m r4ap emle:1:8,99D'fpmledon Alarxwape(11"x6.5")Shea . N MetaS 0 ion 2M 400 am Feet A 0 400 800 16M 26 N1ap prcWcbon: vkb r4eKaW Comer000rdinab�: WaM Edge U6: UT14 zone 17N WGS84 LISDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey I Y i# Y 'a 'a Y 3A 493g N )1m 715 71S 7161W 3 oa m 4/1/2028 Page 1 of 4 MAP LEGEND Area of Interest (AOI) 0 Area of Interest(AOI) Soils 0 Soil Map Unit Polygons ,row Soil Map Unit Lines Soil Map Unit Points Special Point Features wo Blowout ® Borrow Pit Clay Spot O Closed Depression Gravel Pit Gravelly Spot ® Landfill k Lava Flow Marshorswamp �r Mine or Quarry O Miscellaneous Water O Perennial Water y Rock Outcrop + Saline Spot Sandy Spot 40 Severely Eroded Spot C Sinkhole Slide or Slip Sodic Spot Soil Map —Albemarle County, Virginia Spoil Area Q Stony Spot Very Stony Spot Wet Spot Other •� Special Line Features Water Features Streams and Canals Transportation +}r Rails N Interstate Highways N US Routes Major Roads Local Roads Background . Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Albemarle County, Virginia Survey Area Data: Version 14, Jun 3, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 14, 2019--0d 15, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 4/12029 Conservation Service National Cooperative Soil Survey Page 2 of Soil Map -Albemarle County.. Virginia Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI 18B Lackstom loam, 2 to 7 percent 4.4 1.5% slopes 24B Banister silt loam, 2 to 7 7.4 2.4% percent slopes 32C Orenda silt loam, 7 to 15 4.9 1.6% percent slopes 43D Minesville channery silt loam, 4.4 1.4% 15 to 25 percent slopes 46B Grassland silt loam, 2 to 7 15.6 5.1 % percent slopes 51B Bugley channery silt loam, 2 to 6.4 2.1% 7 percent slopes 51C Bugley channery silt loam, 7 to 22.4 7.4% 15 percent slopes 51D Bugley channery silt loam, 15 11.7 3.8% to 25 percent slopes 51E Bugley channery silt loam, 25 0.0 0.0% to 45 percent slopes 62B Bulfstat silt loam, 2 to 7 1.0 0.3% percent slopes 62C Bulfstat silt loam, 7 to 15 7.9 2.6% percent slopes 68B Penn silt loam, 2 to 7 percent 6.5 2.1 % slopes 68C Penn silt loam, 7 to 15 percent 36.6 12.1 % slopes 72B3 Rabun Gay, 2 to 7 percent 16.4 5.4% slopes, severely eroded 74B Rapidan sill loam, 2 to 7 26.7 8.8% percent slopes 74C Rapidan sill loam, 7 to 15 22.6 7.5% percent slopes 74D Rapidan sill loam, 15 to 25 3.9 1.3% percent slopes 75C3 Rapidan silly clay loam, 7 to 15 20.7 6.8% percent slopes, severely eroded 75133 Rapidan silly clay loam, 15 to 28.8 9.5% 25 percent slopes, severely eroded 77 Dan River-Codorus complex, 0 24.4 8.0% to 2 percent slopes, occasionally flooded Natural Resources Web Soil Survey 4/12021 Conservation Service National Cooperative Soil Survey Page 3 of 4 10 Soil Map —Albemarle County, Virginia Map Unit Symbol Map Unit Name Acres in AOI Percent Of AOI 78 Rowland silt loam, 0 to 2 2.2 0.7% percent slopes, occassionaly flooded 79B Meadowville silt loam, 2 to 7 2.6 0.9% percent slopes 80B Littlejoe silt loam, 2 to 7 5.3 1.7% percent slopes 80C Littlejoe silt loam, 7 to 15 4.1 1.4% percent slopes 84B Totier silt loam, 2 to 7 percent 8.3 2.7% slopes 84C Totier silt loam, 7 to 15 percent 8.3 2.7% slopes Totals for Area of Interest 303.3 100.0% PaNatural Resources Web Soil Survey 4/12021 Conservation Service National Cooperative Soil Survey Page 4 of 4 11 3 W 21' N 3A4 WN 3 K Factor, Whole Soil —Albemarle County, Virginia F IS Ci C C: C: C: 3 0 m r4ap emle:1:8,99D'fpmled an Alarxwape(11"x6.5")Shea . N Metas 0 100 2M 400 am Feet A 0 400 800 16M 26 N1ap prolcbon: Web Maoror Comar000rdinab�: ViaM Edge tim: UIM Zoe 17N %NGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey I Y i# Y Y Y 'a Y 3A 493g N n$00 ]i5A0 715 7161W 3 oa m 4/1/2022 Page 1 of 4 Area of Interest (A01) 0 Area of Interest(A01) Solis Soil Rating Polygons . .02 . .05 . .10 0 .15 0 .17 0 .20 0 24 0 28 0 .32 0 .37 Q .43 Q .49 . .55 - .64 0 Not rated or not available Soil Rating Lines ry .02 ~ .05 K Factor, Whole Soil —Albemarle County, Virginia MAPLEGEND . 0 .24 Streams and Canals 0 .28 Transportation 0 32 Mr-r Rails 37 .+/ Interstate Highways 43 US Routes N 49 Major Roads ~ .55 ~ .64 . . Not rated or not available Soil Rating Points 02 Q 05 p 10 13 15 El 17 p 20 24 28 11 32 13 37 0 .43 0 .49 55 64 Not rated or not available Water Features Local Roads MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Background Please rely on the bar scale on each map sheet for map . Aerial Photography measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Albemarle County, Virginia Survey Area Data: Version 14, Jun 3, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 14, 201 "ct 15, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 4/12023 Conservation Service National Cooperative Soil Survey Page 2 of K Factor, Whole Soil -Albemarle County, Virginia K Factor, Whole Soil Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 18B Lackstown loam, 2 to 7 .37 4.4 1.5% percent slopes 24B Banister silt loam, 2 to 7 .49 7.4 2.4% percent slopes 32C Orenda silt loam, 7 to 15 .37 4.9 1.6% percent slopes 43D Minesville channery silt .28 4.4 1.4% loam, 15 to 25 percent slopes 46B Grassland silt loam, 2 to .49 15.6 5.1 % 7 percent slopes 51B Bugley channery silt .20 6.4 2.1% loam, 2 to 7 percent slopes 51C Bugley channery silt .20 22.4 7.4% loam, 7 to 15 percent slopes 51D Bugley channery silt .20 11.7 3.8% loam, 15 to 25 percent slopes 51E Bugley channery silt .20 0.0 0.0% loam, 25 to 45 percent slopes 62B Buffstat silt loam, 2 to 7 .37 1.0 0.3% percent slopes 62C Buffstat silt loam, 7 to 15 .37 7.9 2.6% percent slopes 68B Penn silt loam, 2 to 7 .37 6.5 2.1 % percent slopes 68C Penn silt loam, 7 to 15 .37 36.6 12.1 % percent slopes 72B3 Rabun clay, 2 to 7 .20 16.4 5.4% percent slopes, severely eroded 74B Rapidan silt loam, 2 to 7 .37 26.7 8.8% percent slopes 74C Rapidan silt loam, 7 to .37 22.6 7.5% 15 percent slopes 74D Rapidan silt loam, 15 to .37 3.9 1.3% 25 percent slopes 75C3 Rapidan silty clay loam, .37 20.7 6.8% 7 to 15 percent slopes, severely eroded Natural Resources Web Soil Survey 4/1/2021 Conservation Service National Cooperative Soil Survey Page 3 of 4 14 K Factor, whole Soil —Albemarle County, Virginia Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 75133 Rapidan silty clay loam, .37 28.8 9.5% 15 to 25 percent slopes, severely eroded 77 Dan River-Codorus .32 24.4 8.0% complex, 0 to 2 percent slopes, occasionally flooded 78 Rowland silt loam, 0 to 2 .37 2.2 0.7% percent slopes, occassionally flooded 79B Meadowville silt loam, 2 .37 2.6 0.9% to 7 percent slopes 80B Litflejoe sill loam, 2 to 7 .37 5.3 1.7% percent slopes 80C Litflejoe sill loam, 7 to .37 4.1 1.4% 15 percent slopes 84B Toter silt loam, 2 to 7 .32 8.3 2.7% percent slopes 84C Toter silt loam, 7 to 15 .32 8.3 2.7% percent slopes Totals for Area of Interest 303.3 100.0% Description Erosion factor K indicates the susceptibility of a soil to sheet and rill erosion by water. Factor K is one of six factors used in the Universal Soil Loss Equation (USLE) and the Revised Universal Soil Loss Equation (RUSLE) to predict the average annual rate of soil loss by sheet and rill erosion in tons per acre per year. The estimates are based primarily on percentage of silt, sand, and organic matter and on soil structure and saturated hydraulic conductivity (Ksat). Values of K range from 0.02 to 0.69. Other factors being equal, the higher the value, the more susceptible the soil is to sheet and rill erosion by water. "Erosion factor Kw (whole soil)" indicates the erodibility of the whole soil. The estimates are modified by the presence of rock fragments. Factor K does not apply to organic horizons and is not reported for those layers. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher Layer Options (Horizon Aggregation Method): Surface Layer (Nat applicable) Natural Resources Web Soil Survey 4/1/2021 conservation Service National Cooperative Soil Survey Page 4 of 4 15 3 W 21' N 3A4 WN 3 Hydrologic Soil Group —Albemarle County, Virginia F IS Ci C C C C: 3 0 m r4ap emle:1:8,99D'fpmled an Alarxwape(11"x6.5")Shea . N MetaS 0 im 2M 400 am Feet A 0 400 800 lom 26 N1ap prcWcbon: vkb r4eKaW Comer000rdinab�: WaM Edge U6: UIM Zoe 17N %NGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey I Y i# Y Y Y 'a Y 3A 493g N n$00 ]i5A0 715 7161W 3 oa m 4/1/2026 Page 1 of 5 MAPLEGEND Area of Interest (A01) 0 Area of Interest AOI) Solis Soil Rating Polygons 0 A Q AID o B Q BID o C 0 CID 0 D 0 Not rated or not available Soil Rating Lines . r A ,y AID rV B ram/ B/D N C N CID i D . . Not rated or not available Soil Rating Points A Q AID O B 0 BID Hydrologic Soil Group —Albemarle County, Virginia 0 C CID D 13 Not rated or not available Water Features Streams and Canals Transportation µ� Rails N Interstate Highways �y US Routes Major Roads Local Roads Background . Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Albemarle County, Virginia Survey Area Data: Version 14, Jun 3, 2020 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Oct 14, 201 "ct 15, 2019 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 4/1/2027 Conservation Service National Cooperative Soil Survey Page 2 of 5 Hydrologic Soil Group -Albemarle County, Virginia Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 18B Lackstown loam, 2 to 7 D 4.4 1.5% percent slopes 24B Banister silt loam, 2 to 7 C 7.4 2.4% percent slopes 32C Orenda silt loam, 7 to 15 C 4.9 1.6% percent slopes 43D Minesville channery silt D 4.4 1.4% loam, 15 to 25 percent slopes 46B Grassland silt loam, 2 to D 15.6 5.1 % 7 percent slopes 51B Bugley channery silt D 6.4 2.1% loam, 2 to 7 percent slopes 51C Bugley channery silt D 22.4 7.4% loam, 7 to 15 percent slopes 51D Bugley channery silt D 11.7 3.8% loam, 15 to 25 percent slopes 51E Bugley channery silt D 0.0 0.0% loam, 25 to 45 percent slopes 62B Buffstat silt loam, 2 to 7 B 1.0 0.3% percent slopes 62C Buffstat silt loam, 7 to 15 B 7.9 2.6% percent slopes 68B Penn silt loam, 2 to 7 B 6.5 2.1 % percent slopes 68C Penn silt loam, 7 to 15 B 36.6 12.1 % percent slopes 72B3 Rabun clay, 2 to 7 B 16.4 5.4% percent slopes, severely eroded 74B Rapidan silt loam, 2 to 7 B 26.7 8.8% percent slopes 74C Rapidan silt loam, 7 to B 22.6 7.5% 15 percent slopes 74D Rapidan silt loam, 15 to B 3.9 1.3% 25 percent slopes 75C3 Rapidan silty clay loam, B 20.7 6.8% 7 to 15 percent slopes, severely eroded Natural Resources Web Soil Survey 4/12021 Conservation Service National Cooperative Soil Survey Page 3 of 5 18 Hydrologic Soil Group —Albemarle County, Virginia Map unit symbol Map unit name Rating Acres in AOI Percent of AOI 75133 Rapidan silty clay loam, B 28.8 9.5% 15 to 25 percent slopes, severely eroded 77 Dan River-Codorus B 24.4 8.0% complex, 0 to 2 percent slopes, occasionally flooded 78 Rowland silt loam, 0 to 2 C 2.2 0.7% percent slopes, occassionally flooded 79B Meadowville silt loam, 2 B 2.6 0.9% to 7 percent slopes 80B Litflejoe sill loam, 2 to 7 B 5.3 1.7% percent slopes 80C Litflejoe sill loam, 7 to B 4.1 1.4% 15 percent slopes 84B Toter silt loam, 2 to 7 B 8.3 2.7% percent slopes 84C Toter silt loam, 7 to 15 B 8.3 2.7% percent slopes Totals for Area of Interest 303.3 100.0% PaNatural Resources Web Soil Survey 4/12021 Conservation Service National Cooperative Soil Survey Page 4 of 5 19 Hydrologic Soil Group —Albemarle County, Virginia Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff: None Specified Tie -break Rule: Higher Natural Resources Web Soil Survey 4/12021 Conservation Service National Cooperative Soil Survey Page 5 of 5 20 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Blackwell Engineering PLC 566 East Market Street Harrisonburg, VA 22801 (540)432-9555 Storm Water Quantity Energy Equation Compliance 1 Year Storm Event Project Name Troxell Poultry House Project Number 2888 1 Year Storm Event Energy Equation Compliance POND Energy Balance 1 I.F. (Improvement Factor) equals 0.8 for sites > 1 acre or 0.9 for sites <_ 1 acre. Is site larger than 1 acre? Yes --> 0.8 Qoost= Allowable post -development peak discharge from site (includes offsite run-on) QD= 15.08 CFS QPre, site Pre -development peak discharge from site QPre, site 7.24 CFS RVpre, sire = Pre -development runoff volume from site RVpre, site 16662 cu ft RVPost, sae = Post -development runoff volume from site RVPost, sae= 33082 eu ft Qpost, off site= Post -development peak discharge from off site Qosst, off sae= 14.16 CFS *Qoost < I. F.*(QPre, Sae*(RVPre, Sae/RVPost, sae)+QPre, off sae 15.08 <_ 17.08 *Equation from DEC's Plan Reviewer for Stormwater Management; Module 5; p.36 & 37 Qdeveloped < or = QPre-Developed YES Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 21 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Blackwell Engineering PLC 566 East Market Street Harrisonburg, VA22801 (540)432-9555 Storm Water Quantity Energy Equation Compliance 1 Year Storm Event Project Name Troxell Poultry House Project Number 2888 1 Year Storm Event Energy Equation Compliance Energy Balance 2 I.F. (Improvement Factor) equals 0.8 for sites > 1 acre or 0.9 for sites <_ 1 acre. Is site larger than 1 acre? Yes 4 0.8 QDweloWd = The peak flow rate of runoff from the developed site. QD= 0.08 CFS RVDeveloped = The volume of runoff from the site in the developed condition. RVD= 381 cu ft QPre-Developed = The peak flow rate of runoff from the site in the pre -developed condition. QP= 3.57 CFS RVPre-Developed = The volume of runoff from the site in pre -developed condition. RVp= 8,162 tuft QD.loped :5 I.F -*(QPre-devebped* RVPre-Developed)IRVDeveloped 0.08 <_ 61.10 Qdeveloped < or = QPre-Developed YES Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 P% File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = TC Calculations - Rational Method Existing Site 0.00 ac 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) a. Overland: (200' max) L = 100 ft. Height = 4 ft. VDOT Drainage Manual Appendix 6D-1: T� = 8.2 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 238 ft. Height = 16 ft. Average velocity = 4.2 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: T, = 0.9 min. T, = U60V Subtotal T. = 0.9 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: T� = 0.0 min. Subtotal T, = 0.0 min. d. Total T,: T, = 9.1 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 4.0% 6.7% 23 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = TC Calculations - Rational Method Existing Site Area to Energy Balance Point 2 0.00 ac 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T� = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ L = 286.5 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ T, = U60V Subtotal TC _ 0 ft. 0.0 fps (paved) 0.0 min. 16 ft. 3.8 fps(unpaved) 1.3 min. 1.3 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. Subtotal T, = 0.0 min. d. Total T,: T, = 8.8 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 6.0% 5.6% 24 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = TC Calculations - Rational Method Site to Pond 0.00 ac 3.) Time of Concentration Project Name: Project # IDF: Troxell Poultry House 2888 Albemarle (Zone 2) a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T� = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 176 ft. Height = 19 ft. Average velocity = 5.3 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: T, = 0.6 min. T, = U60V Subtotal T. = 0.6 min. Slope 6.0% 10.8% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 281 ft. Height = 2.7 ft.(unpaved; 1.0% VDOT Drainage Manual Appendix 6D-5: T� = 3.8 min. Subtotal T, = 3.8 min. d. Total T,: TC = 11.9 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 25 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Runoff Calculations - Rational Method Additional Area to Point B 3.) Time of Concentration a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T� = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 1000 ft. Height = 86 ft. Average velocity = 4.7 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: T, = 3.5 min. T, = U60V Subtotal TC = 3.5 min. Slope 6.0% 8.6% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 608 ft. Height = 30 ft.(unpaved; 4.9% VDOT Drainage Manual Appendix 6D-5: Tc = 3.6 min. Subtotal T, = 3.6 min. d. Total TC: T, = 14.8 min. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 26 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = Runoff Calculations - Rational Method DI #1-4 0.50 ac 2.) C = 0.71 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.17 ac @ 0.35 Grass 0.33 ac @ 0.90 Impervious 0.00 ac @ 0.00 Other a. Overland: (200' max) L = 43 ft. Height = 2 ft. VDOT Drainage Manual Appendix 6D-1: T� = 2.8 min. b. Shallow: (1000' max) L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ T, = U60V Subtotal TC _ 0 ft. 0.0 fps (paved) 0.0 min. 0 ft. 0.0 fps(unpaved) 0.0 min. 0.0 min. Slope 4.7% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 151 ft. Height = 1.5 ft.(unpaved; 1.0% VDOT Drainage Manual Appendix 6D-5: Tc = 2.4 min. Subtotal T, = 2.4 min. d. Total TC: T, = 5.2 min. 4.) Rainfall Intensities: For TC = 5 min. 12 = 5.04 iph Ito = 6.54 iph 5.) Proposed Flows: Q=ACI Q2 = 1.80 cfs Q,o = 2.33 cfs 125 = 7.48 iph I100 = 8.59 iph Q25 = 2.66 cfs Q100 = 3.06 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 PrA File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = Runoff Calculations - Rational Method Culvert #1 0.85 ac 2.) C = 0.56 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.52 ac @ 0.35 Grass 0.33 ac @ 0.90 Impervious 0.00 ac @ 0.00 Other a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T� = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ T, = U60V Subtotal TC _ 0 ft. 0.0 fps (paved) 0.0 min. 0 ft. 0.0 fps(unpaved) 0.0 min. 0.0 min. Slope 6.0% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 170 ft. Height = 3.8 ft.(unpaved; 2.2% VDOT Drainage Manual Appendix 6D-5: Tc = 1.9 min. Subtotal T, = 1.9 min. d. Total TC: TC = 9.5 min. 4.) Rainfall Intensities: For TC = 9 min. 12 = 4.19 iph 110 = 5.47 iph 5.) Proposed Flows: Q=ACI Q2 = 2.01 cfs Q,o = 2.62 cfs 125 = 6.28 iph 1100 = 7.23 iph Q25 = 3.01 cfs Q100 = 3.46 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 28 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = Runoff Calculations - Rational Method Culvert #2 0.62 ac 2.) C = 0.58 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.36 ac @ 0.35 Grass 0.26 ac @ 0.90 Impervious 0.00 ac @ 0.00 Other a. Overland: (200' max) L = 47 ft. Height = 3 ft. VDOT Drainage Manual Appendix 6D-1: T� = 5.5 min. b. Shallow: (1000' max) L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ L = 0 ft. Height = Average velocity = VDOT Drainage Manual Appendix 6D-6: T, _ T, = U60V Subtotal TC _ 0 ft. 0.0 fps (paved) 0.0 min. 0 ft. 0.0 fps(unpaved) 0.0 min. 0.0 min. Slope 6.4% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 151 ft. Height = 4.8 ft.(unpaved; 3.2% VDOT Drainage Manual Appendix 6D-5: Tc = 1.5 min. Subtotal T, = 1.5 min. Total TC: TC = 7.0 min. 4.) Rainfall Intensities: For TC = 7 min. 12 = 4.57 iph 110 = 5.95 iph 5.) Proposed Flows: Q=ACI Q2 = 1.65 cfs Q10 = 2.14 cfs 125 = 6.81 iph 1100 = 7.84 iph Q25 = 2.45 cfs Q100 = 2.82 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 29 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = Runoff Calculations - Rational Method Ditch #1 1.63 ac 2.) C = 0.52 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.51 ac @ 0.35 Grass 0.37 ac @ 0.90 Impervious 0.75 ac @ 0.45 Agriculture a. Overland: (200' max) L = 100 ft. Height = 6 ft. VDOT Drainage Manual Appendix 6D-1: T� = 7.6 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 176 ft. Height = 19 ft. Average velocity = 5.3 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: T, = 0.6 min. T, = U60V Subtotal TC = 0.6 min. Slope 6.0% 10.8% c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 247 ft. Height = 2.7 ft.(unpaved; 1.1% VDOT Drainage Manual Appendix 6D-5: Tc = 3.3 min. Subtotal T, = 3.3 min. d. Total TC: T, = 11.4 min. 4.) Rainfall Intensities: For TC = 11 min. 12 = 3.87 iph 110 = 5.07 iph 5.) Proposed Flows: Q=ACI Q2 = 3.28 cfs Q,o = 4.31 cfs 125 = 5.83 iph 1100 = 6.73 iph Q25 = 4.95 cfs Q100 = 5.71 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 30 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = Runoff Calculations - Rational Method Ex Area to Point A 14.97 ac 2.) C = 0.40 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.00 ac @ 0.35 Grass 0.00 ac @ 0.90 Impervious 14.97 ac @ 0.40 Other a. Overland: (200' max) L = 100 ft. Height = 15 ft. VDOT Drainage Manual Appendix 6D-1: T� = 6.4 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 984 ft. Height = 80 ft. Average velocity = 4.6 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: T� = 3.6 min. T, = U60V Subtotal T. = 3.6 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: T, = 0.0 min. Subtotal T, = 0.0 min. d. Total TC: TC = 9.9 min. 4.) Rainfall Intensities: For TC = 10 min. IZ = 4.02 iph lip = 5.26 iph 5.) Proposed Flows: Q=ACI Q2 = 24.07 cfs Q,o = 31.51 cfs 125 = 6.05 iph lion = 6.97 iph Q25 = 36.20 cfs Qioo = 41.71 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 15.0% 8.1 % 31 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 1.) Area = Runoff Calculations - Rational Method Pro Area to Point A 13.88 ac 2.) C = 0.40 3.) Time of Concentration Project Name: Troxell Poultry House Project # : 2888 IDF: Albemarle (Zone 2) 0.47 ac @ 0.35 Grass 0.00 ac @ 0.90 Impervious 13.41 ac @ 0.40 Crops a. Overland: (200' max) L = 100 ft. Height = 15 ft. VDOT Drainage Manual Appendix 6D-1: T� = 6.4 min. b. Shallow: (1000' max) L = 0 ft. Height = 0 ft. Average velocity = 0.0 fps (paved) VDOT Drainage Manual Appendix 6D-6: T, = 0.0 min. L = 974 ft. Height = 80 ft. Average velocity = 4.6 fps (unpaved) VDOT Drainage Manual Appendix 6D-6: T� = 3.5 min. T, = U60V Subtotal TC = 3.5 min. c. Channel: L = 0 ft. Height = 0 ft.(paved) VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. L = 0 ft. Height = 0 ft.(unpaved; VDOT Drainage Manual Appendix 6D-5: Tc = 0.0 min. Subtotal T, = 0.0 min. d. Total TC: TC = 9.9 min. 4.) Rainfall Intensities: For TC = 10 min. 12 = 4.02 iph lip = 5.26 iph 5.) Proposed Flows: Q=ACI Q2 = 22.23 cfs Clio = 29.09 cfs 125 = 6.05 iph lion = 6.97 iph Q25 = 33.42 cfs Qioo = 38.51 cfs Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Slope 15.0% 8.2% 32 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 DI #1-4 -Velocity and Depth Calculations 2 Year 10 Year Discharge (Q) = 1.80 cfs 2.33 cfs Channel Slope (S) = 1.00 % 1.00 % Retardance Level = D (Mowed Grass) D (Mowed Grass) Left side slope = 3 : 1 3 : 1 Right side slope = 3 : 1 3 : 1 Bottom width = 0 ft 0 ft Total Depth = 1.3 ft 1.3 ft 2 Year 10 Year Flow Depth d = 0.94 0.87 Flow Area A = 2.68 sf 2.26 sf Hydraulic radius R = 0.45 ft 0.41 ft V x R = 0.301 0.425 Manning's n = 0.130 0.080 Flowrate = 1.80 cfs 2.33 cfs Manning's Equation Velocity = 0.67 fps 1.03 fps Freeboard = 0.36 ft 0.43 ft DITCH CROSS-SECTION F] L2 14 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 � Ditch —2Yr ---10 Yr 33 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Culvert #1 - Velocity and Depth Calculations 2 Year Discharge (Q) = 2.01 cfs Channel Slope (S) = 1.00 % Retardance Level = D (Mowed Grass) Left side slope = 3 :1 Right side slope = 3 : 1 Bottom width = 0 ft Total Depth = 1.5 ft 2 Year Flow Depth d = 0.98 Flow Area A = 2.91 sf Hydraulic radius R = 0.47 ft VxR= 0.322 Manning's n = 0.130 Flowrate = 2.01 cfs Manning's Equation Velocity = 0.69 fps Freeboard = 0.52 ft I 1.4 1.2 1 L Y w 8 0. 0.6 0.4 0.2 0 0 DITCH CROSS-SECTION 2 4 6 8 10 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 10 Year 2.62 cfs 1.00 % D (Mowed Grass) 3:1 3:1 Oft 1.5 ft 10 Year 0.91 2.47 sf 0.43 ft 0.456 0.080 2.62 cfs 1.06 fps 0.59 ft 12 Ditch —2 Yr ---10 Yr U File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Culvert #2 - Velocity and Depth Calculations 2 Year Discharge (Q) = 1.65 cfs Channel Slope (S) = 1.00 % Retardance Level = D (Mowed Grass) Left side slope = 3 : 1 Right side slope = 3 : 1 Bottom width = 0 ft Total Depth = 1.5 ft 2 Year Flow Depth d = 0.91 Flow Area A = 2.50 sf Hydraulic radius R = 0.43 ft VxR= 0.284 Manning's n = 0.130 Flowrate = 1.64 cfs Manning's Equation Velocity = 0.66 fps Freeboard = 0.59 ft I 1.4 1.2 1 L Y v 0.8 0.6 0.4 0.2 0 0 DITCH CROSS-SECTION 2 4 6 8 10 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 10 Year 2.14 cfs 1.00 % D (Mowed Grass) 3:1 3:1 Oft 1.5 ft 10 Year 1.01 3.05 sf 0.48 ft 0.335 0.130 2.14 cfs 0.70 fps 0.49 ft 12 Ditch —2Yr ---10 Yr 35 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Ditch #1 - Velocity and Depth Calculations 2 Year Discharge (Q) = 3.28 cfs Channel Slope (S) = 1.00 % Retardance Level = D (Mowed Grass) Left side slope = 3 :1 Right side slope = 10 : 1 Bottom width = 0 ft Total Depth = 1.25 ft 2 Year Flow Depth d = 0.88 ft Flow Area A = 5.02 sf Hydraulic radius R = 0.43 ft VxR= 0.283 Manning's n = 0.130 Flowrate = 3.29 cfs Manning's Equation Velocity = 0.66 fps Freeboard = 0.37 ft 1.4 1.2 1 r 0.8 a 0 0.6 0.4 0.2 0 0 DITCH CROSS-SECTION 5 10 15 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 10 Year 4.31 cfs 1.00 % D (Mowed Grass) 3:1 10 :1 Oft 1.25 ft 10 Year 0.81 ft 4.27 sf 0.40 ft 0.402 0.080 4.31 cfs 1.01 fps 0.44 ft 4 20 Ditch —2 Yr ---10 Yr 36 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Existing Conditions at Energy Balance Point #1 - Velocity and Depth Calculations 2 Year 10 Year Discharge (Q) = cfs cfs Channel Slope (S) = 32.00 % 32.00 % Retardance Level = Hay Hay Left side slope = 3 : 1 3 : 1 Right side slope = 3 : 1 3 : 1 Bottom width = 164 ft 164 ft Total Depth = 0.1 ft 0.1 ft Flow Depth d = Flow Area A = Hydraulic radius R = VxR= Manning's n = Flowrate = Manning's Equation Velocity = Freeboard = 0.12 0.1 0.08 L Y m 0.06 0.04 0.02 0 0 2 Year 10 Year 0.05 ft 0.08 ft 8.29 sf 13.22 sf 0.05 ft 0.08 ft 0.166 0.360 0.035 0.035 27.26 cfs 59.30 cfs 3.29 fps 4.48 fps 0.05 ft 0.02 ft DITCH CROSS-SECTION 50 100 150 200 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Ditch —2 Yr ---10 Yr 37 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Proposed Conditions at Energy Balance Point #1 - Velocity and Depth Calculations 2 Year 10 Year Discharge (Q) = 18.12 cfs 36.47 cfs Channel Slope (S) = 32.00 % 32.00 % Retardance Level = Hay Hay Left side slope = 3 : 1 3 : 1 Right side slope = 3 : 1 3 : 1 Bottom width = 164 ft 164 ft Total Depth = 0.1 ft 0.1 ft Flow Depth d = Flow Area A = Hydraulic radius R = VxR= Manning's n = Flowrate = Manning's Equation Velocity = Freeboard = 0.12 0.1 0.08 L Y m 0.06 0.04 0.02 0 0 2 Year 10 Year 0.04 ft 0.06 ft 6.48 sf 9.93 sf 0.04 ft 0.06 ft 0.110 0.224 0.035 0.035 18.10 cfs 36.83 cfs 2.79 fps 3.71 fps 0.06 ft 0.04 ft DITCH CROSS-SECTION 50 100 150 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 200 Ditch —2 Yr ---10 Yr 38 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Ex Area to Point A - Velocity and Depth Calculations 2 Year 10 Year Discharge (Q) = 24.07 cfs 31.51 cfs Channel Slope (S) = 10.00 % 10.00 % Retardance Level = D (Mowed Grass) D (Mowed Grass) Left side slope = 50 :1 50 :1 Right side slope = 50 :1 50 :1 Bottom width = 5 ft 5 ft Total Depth = 1 ft 1 ft Flow Depth d = Flow Area A = Hydraulic radius R = VxR= Manning's n = Flowrate = Manning's Equation Velocity = Freeboard = 1.2 1 0.8 s v 0.6 0.4 0.2 0 0 2 Year 10 Year 0.42 0.44 10.85 sf 12.00 sf 0.23 ft 0.24 ft 0.514 0.640 0.080 0.070 24.10 cfs 31.52 cfs 2.22 fps 2.63 fps 0.58 ft 0.56 ft DITCH CROSS-SECTION 20 40 60 s0 100 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 120 Ditch —2Yr ---10 Yr 39 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Pro Area to Point A - Velocity and Depth Calculations 2 Year 10 Year Discharge (Q) = 22.23 cfs 29.09 cfs Channel Slope (S) = 10.00 % 10.00 % Retardance Level = D (Mowed Grass) D (Mowed Grass) Left side slope = 50 :1 50 :1 Right side slope = 50 :1 50 :1 Bottom width = 5 ft 5 ft Total Depth = 1 ft 1 ft Flow Depth d = Flow Area A = Hydraulic radius R = VxR= Manning's n = Flowrate = Manning's Equation Velocity = Freeboard = 1.2 1 0.8 s v 0.6 0.4 0.2 0 0 2 Year 10 Year 0.40 0.43 10.20 sf 11.32 sf 0.22 ft 0.24 ft 0.488 0.609 0.080 0.070 22.20 cfs 29.16 cfs 2.18 fps 2.57 fps 0.60 ft 0.57 ft DITCH CROSS-SECTION 20 40 60 s0 100 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 120 Ditch —2Yr ---10 Yr 40 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Existing to Point B - Velocity and Depth Calculations" 2 Year 10 Year Discharge (Q) = 47.19 cfs 99.70 cfs Channel Slope (S) = 7.00 % 7.00 % Retardance Level = Hay Hay Left side slope = 4.75 : 1 4.75 : 1 Right side slope = 4.75 : 1 4.75 : 1 Bottom width = 2 ft 2 ft Total Depth = 4 ft 4 ft 2 Year 10 Year Flow Depth d = 0.95 ft 1.32 ft Flow Area A = 6.23 sf 10.87 sf Hydraulic radius R = 0.55 ft 0.74 ft V x R = 4.197 6.744 Manning's n = 0.035 0.035 Flowrate = 47.24 cfs 99.68 cfs Manning's Equation Velocity = 7.59 fps 9.17 fps Freeboard = 3.05 ft 2.68 ft a.s a 3.5 3 2.5 a w 2 1.5 1 0.5 0 0 DITCH CROSS-SECTION 10 20 30 40 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 50 Ditch —2 Yr ---10 Yr (From Hydroflov 41 File: 2888-TC 8 FLOW CALCS.xlsm Printed: 9/8/2021 Project Name: Troxell Poultry House Project # : 2888 Proposed to Poitn B - Velocity and Depth Calculations" 2 Year 10 Year Discharge (Q) = 35.03 cfs 71.15 cfs Channel Slope (S) = 7.00 % 7.00 % Retardance Level = Hay Hay Left side slope = 4.75 : 1 4.75 : 1 Right side slope = 4.75 : 1 4.75 : 1 Bottom width = 2 ft 2 ft Total Depth = 4 ft 4 ft 2 Year 10 Year Flow Depth d = 0.84 ft 1.14 ft Flow Area A = 4.99 sf 8.45 sf Hydraulic radius R = 0.49 ft 0.65 ft V x R = 3.468 5.446 Manning's n = 0.035 0.035 Flowrate = 35.06 cfs 71.14 cfs Manning's Equation Velocity = 7.03 fps 8.42 fps Freeboard = 3.16 ft 2.86 ft a.s a 3.5 3 2.5 a w 2 1.5 1 0.5 0 0 DITCH CROSS-SECTION 10 20 30 40 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 50 Ditch —2 Yr ---10 Yr (From Hydroflov E,K File: 2888 LD-229.x1sm Printed: 4/19/2021 STORM SEWER DESIGN COMPUTATIONS LD-229 Troxell Pou try House BE #2888 FROM POINT TO POINT AREA DRAIN ACRES RUNOFF COEF C C A INLET TIME RAIN FALL RUNOFF Q INVERT ELEVATIONS LENGTH SLOPE I DAM CAPA- I CITY VEL FLOW TIME INCRE MENT ACCUM ULATED T, min IN/HR CFS UPPER LOWER FT FT/FT IN CFS FPS SEC 4 3 0.85 0.53 0.45 0.45 9.50 5.26 2.37 497.20 496.20 90.50' 0.0110 15" 6.80 4.83 18.8 3 2 0.50 0.71 0.36 0.81 9.81 5.26 4.24 496.10 495.70 37.00' 0.0108 15" 6.73 5.87 6.3 2 1 0.50 0.71 0.36 1.16 9.92 5.26 6.11 495.60 494.50 96.50' 0.0114 15" 6.91 6.48 14.9 4.1 3.1 0.62 0.58 0.36 0.36 7.00 5.95 2.14 497.20 496.10 90.50' 0.0122 15" 7.13 4.71 19.2 3.1 2.1 0.50 0.71 0.36 0.71 7.32 5.95 4.25 496.00 495.50 37.00' 0.0135 15" 7.52 6.44 5.7 2.1 1.1 0.50 0.71 0.36 1.07 7.42 5.95 6.36 495.40 494.00 103.00' 0.0136 15" 7.52 7.01 14.7 Note: Mannin 's "n" ad'usted for pipe type and diameter. Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 43 File: 2888 LD-229.xlsm HYDRAULIC GRADE LINE LD-347 Printed: 4/19/2021 Troxell Poultry House (BE #28881 INLET # Outlet WSE Do Qo Lo Sro % Ht JUNCTION LOSS Final H Inlet WSE Rim Elev. Va Ha QI Vi Q,Vi VZ 2 H, Angle K HD Hit 1.3 Ht 0.5 Hit 2 495.50 15" 6.11 97' 0.90 0.87 6.48 0.16 4.24 5.87 24.88 0.54 0.19 0.00 0.00 0.16 0.21 0.11 0.98 496.48 500.30 3 496.70 15" 4.24 37' 0.44 0.16 5.87 0.13 2.37 4.83 11.44 0.36 0.13 0.35 0.13 0.13 0.17 0.09 0.25 496.95 500.30 4 497.20 15" 2.37 91' 0.14 0.12 4.83 0.09 - - - - 0.00 - 0.00 0.09 0.12 0.06 0.18 497.38 501.00 2.1 495.00 15" 6.36 103' 0.98 1.01 7.01 0.19 4.25 6.44 27.38 0.64 0.23 0.00 0.00 0.19 0.25 0.12 1.14 496.14 500.30 3.1 496.50 15" 4.25 37' 0.44 0.16 6.44 0.16 2.14 4.71 10.08 0.34 0.12 0.52 0.18 0.16 0.21 0.10 0.27 496.77 500.30 4.1 497.10 15" 2.14 91' 0.11 0.10 4.71 0.09 0.00 0.00 0.09 0.11 0.0610.161 497.26 501.00 Mannings "n" = 0.013 90'K=0.70 70'K=0.61 50'K=0.50 30'K=0.35 20'K=0.25 10'K=0.13 80'K=0.66 60'K=0.56 40'K=0.43 25'K=0.30 15'K=0.19 5°K=0.06 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 44 Hydrograph Summary Report Hydreflow Hydrographs Extension for Autodesk®Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow We) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (fl) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 7.237 1 720 16,662 Existing Site 2 SCS Runoff 14.16 1 721 35,152 Existing Offsite to EB 1 3 Reach 10.55 1 726 35,147 2 Ex Site to EB 1 4 Combine 22.99 1 722 70,299 2,3 Total Existing at EB 1 6 SCS Runoff 13.05 1 721 33,082 Site to Pond 7 Reservoir 1.617 1 751 33,080 6 493.43 12,986 Sediment Basin/Pond 8 Reach 1.581 1 777 33,060 7 Pond to EB 1 9 Combine 15.08 1 721 68,212 2,8 Total Proposed Volume to EB 1 11 SCS Runoff 3.565 1 720 8,162 Existing Site Area to EB 2 12 SCS Runoff 0.080 1 721 381 Pro Site to EB 2 14 SCS Runoff 22.89 1 721 61,807 1 Inch Storm 15 Reservoir 3.583 1 737 61,805 14 494.48 25,665 Level Spreader Sizing 17 Reach 22.10 1 725 70,298 4 Ex EB#1 to Point B 18 Reach 14.24 1 723 68,211 9 Pro EB#1 to Point B 19 SCS Runoff 9.649 1 723 26,576 -- Additional Area to Point B 20 Combine 31.31 1 724 96,873 17,19 Ex Total at Point B 21 Combine 23.89 1 723 94,787 18, 19, Pro Total at Point B Ponds.gpw Retum Period: 1 Year Friday, 09 / 3 / 2021 45 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3170 by Autodesk, Inc. v2020 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 4.810 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Composite (Area/CN) = [(0.070 x 98) + (4.740 x 75)] 14.810 Q (cfs) 8.00 RIM 4.00 r 11 0.00 0 120 240 Hyd No. 1 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Hyd. No. 1 -- 1 Year 360 480 600 720 840 Friday, 09 / 3 / 2021 = 7.237 cfs = 720 min = 16,662 cult = 75` = 0 ft = 9.10 min = Type II = 484 Q (cfs) 8.00 4.00 2.00 ' ' - 0.00 960 1080 1200 1320 1440 1560 Time (min) 46 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3170 by Autodesk, Inc. v2020 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 9.970 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Q (cfs) 15.00 12.00 • 11 . 11 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 7 Hyd. No. 2 -- 1 Year Friday, 09 / 3 / 2021 = 14.16 cfs = 721 min = 35,152 cult = 75 = loft = 10.30 min = Type II = 484 Q (cfs) 15.00 12.00 lllll• 11 . 11 0111181 0.00 ' Tom• - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 47 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Storm frequency = 1 yrs Time interval = 1 min Inflow hyd. No. = 2 - Existing Offsite to EB 1 Reach length = 898.0 ft Manning's n = 0.025 Side slope = 3.0:1 Rating curve x = 0.586 Ave. velocity = 0.00 ft/s Modified Aft -Kin routing method used. Q (cfs) 15.00 12.00 . 11 0.00 0 120 240 Hyd No. 3 360 480 600 — Hyd No. 2 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Ex Site to EB 1 Hyd. No. 3 -- 1 Year Friday, 09 / 3 / 2021 = 10.55 cfs = 726 min = 35,147 cuft = Trapezoidal = 8.7 % = 164.0 ft = 0.1 ft = 1.392 = 0.1253 Q (cfs) 15.00 12.00 . 11 0111181 720 840 960 1080 1200 1320 1440 1560 Time (min) 48 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 22.99 cfs Storm frequency = 1 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 70,299 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 9.970 ac Q (cfs) 24.00 20.00 16.00 12.00 4.00 Total Existing at EB 7 Hyd. No. 4 -- 1 Year Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) 49 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 7.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs ` Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] / 7.090 Q (cfs 14.00 12.00 10.00 EM of 4.00 2.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Site to Pond Hyd. No. 6 -- 1 Year Friday, 09 13 12021 = 13.05 cfs = 721 min = 33,082 cuft = 81* = 0 ft = 11.90 min = Type II = 484 Q (cfs) 14.00 12.00 10.00 MA "Oil] 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) .7u Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3170 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge = 1.617 cfs Storm frequency = 1 yrs Time to peak = 751 min Time interval = 1 min Hyd. volume = 33,080 cult Inflow hyd. No. = 6 - Site to Pond Max. Elevation = 493.43 ft Reservoir name = Sediment Basin/Pond Max. Storage = 12,986 cuft Storage Indication method used. Q (cfs) 14.00 12.00 10.00 4.00 2.00 Sediment Basin/Pond Hyd. No. 7 -- 1 Year Q (cfs) 14.00 12.00 10.00 l Ill 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Hyd No. 6 Time (min) y ®Total storage used = 12,986 cuff 51 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 091312021 Pond No. 1 - Sediment Basin/Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 490.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 490.00 00 0 0 2.00 492.00 3,190 2,126 2,126 4.00 494.00 13,117 15,182 17,309 6.00 496.00 22,111 34,835 52,144 8.00 498.00 31,646 53,468 105,612 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 6.00 6.00 Inactive Crest Len (ft) = 7.85 20.00 0.00 0.00 Span (in) = 18.00 6.00 6.00 0.00 Crest El. (ft) = 494.40 495.70 0.00 0.00 No. Barrels = 1 1 1 1 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 490.00 490.00 493.40 0.00 Weir Type = 1 Ciplti -- --- Length (ft) = 52.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope I%) = 2.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes Yes TW Elev. (ft) = 0.00 Note: Cul"rt/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a). Stage (it) Stage / Discharge Elev (ft) 8.00 498.00 6.00 496.00 4.00 494.00 2.00 492.00 0.00 490.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 Total 0 Discharge (cfs) 52 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge = 1.581 cfs Storm frequency = 1 yrs Time to peak = 777 min Time interval = 1 min Hyd. volume = 33,060 cuft Inflow hyd. No. = 7 - Sediment Basin/Pond Section type = Circular Reach length = 943.0 ft Channel slope = 7.4 % Manning's n = 0.025 Bottom width = 1.5 ft Side slope = 0.0:1 Max. depth = 0.0 ft Rating curve x = 9.379 Rating curve m = 1.250 Ave. velocity = 0.00 ft/s Routing coeff. = 0.0702 Modified Aft -Kin routing method used Q (cfs) 2.00 1.00 Pond to EB 1 Hyd. No. 8 -- 1 Year 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 — Hyd No. 7 Q (cfs) 2.00 1.00 � 0.00 1440 1560 Time (min) 53 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 9 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 15.08 cfs Storm frequency = 1 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 68,212 cult Inflow hyds. = 2, 8 Contrib. drain. area = 9.970 ac Q (cfs) 18.00 15.00 12.00 • 11 AM G 11 Total Proposed Volume to EB 7 Hyd. No. 9-- 1 Year Q (cfs) 18.00 15.00 12.00 3.00 0.00 1 1 1 1 1 1 1 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 —Hyd No. 2 —Hyd No. 8 Time (min) 54 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 11 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs ' Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)] 12.230 Q (cfs) 4.00 3.00 2.00 1.00 120 240 Hyd No. 11 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Area to EB 2 Hyd. No. 11 -- 1 Year 360 480 600 720 840 Friday, 09 / 3 / 2021 = 3.565 cfs = 720 min = 8,162 cuft = 76` = 0 ft = 8.80 min = Type II = 484 Q (cfs) 4.00 3.00 2.00 1.00 ' — - 0.00 960 1080 1200 1320 1440 1560 Time (min) 55 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 12 Pro Site to EB 2 Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 0.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs Composite (Area/CN) = [(0.470 x 56)110.470 Friday, 09 / 3 / 2021 Peak discharge = 0.080 cfs Time to peak = 721 min Hyd. volume = 381 cuft Curve number = 56" Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Pro Site to EB 2 � � titititi� tititititititi � r • titititiri tititiritititi . 0.08 0.07 � t titititititi tititititititi � � � t � titititititi i �titititititi ' ' � � fifififififi I fififififififi � � titititititi t rititititititi titititititi ta�titititititi titititititi ■�titititititi titititititi ta�titititititi titititititi ti�ta �tititititi titititititi 56 Pond Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 091312021 Pond No. 1 - Sediment Basin/Pond Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 490.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (tuft) Total storage (cult) 0.00 490.00 00 0 0 2.00 492.00 3,190 2,126 2,126 4.00 494.00 13,117 15,182 17,309 6.00 496.00 22,111 34,835 52,144 8.00 498.00 31,646 53,468 105,612 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 18.00 6.00 6.00 Inactive Crest Len (ft) = 7.85 20.00 0.00 0.00 Span (in) = 18.00 6.00 6.00 0.00 Crest El. (ft) = 494.40 495.70 0.00 0.00 No. Barrels = 1 1 1 1 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 490.00 490.00 493.40 0.00 Weir Type = 1 Ciplti -- --- Length (ft) = 52.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope I%) = 2.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a Yes Yes Yes TW Elev. (ft) = 0.00 Note: Cul"rt/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (a). Stage (it) Stage / Discharge Elev (ft) 8.00 498.00 6.00 496.00 4.00 494.00 2.00 492.00 0.00 490.00 0.0 30.0 60.0 90.0 120.0 150.0 180.0 210.0 240.0 270.0 Total 0 Discharge (cfs) 57 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 17 Ex EB#1 to Point B Hydrograph type = Reach Peak discharge = 22.10 cfs Storm frequency = 1 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 70,298 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 368.0 ft Channel slope = 4.2 % Manning's n = 0.080 Bottom width = 2.0 ft Side slope = 35.0:1 Max. depth = 2.0 ft Rating curve x = 2.404 Rating curve m = 1.042 Ave. velocity = 0.00 ft/s Routing coeff. = 0.3659 Modified Aft -Kin routing method used Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 0 120 240 Hyd No. 17 Ex E13#1 to Point B Hyd. No. 17 -- 1 Year 360 480 600 — Hyd No. 4 720 840 Q (cfs) 24.00 20.00 16.00 12.00 4.00 ' 0.00 960 1080 1200 1320 1440 1560 Time (min) 58 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 18 Pro EB#1 to Point B Hydrograph type = Storm frequency = Time interval = Inflow hyd. No. = Reach length = Manning's n = Side slope = Rating curve x = Ave. velocity = Modified Aft -Kin routing method used. Q (cfS) Reach Peak discharge 1 yrs Time to peak 1 min Hyd. volume 9 - Total Proposed Volume to Si�dtion type 368.0 ft Channel slope 0.080 Bottom width 35.0:1 Max. depth 2.404 Rating curve m 0.00 ft/s Routing coeff. Pro EB#1 to Point B Hyd. No. 18 -- 1 Year = 14.24 cfs = 723 min = 68,211 cuft = Trapezoidal = 4.2 % = 2.0 ft = 2.0 ft = 1.042 = 0.3608 Q (Cfs) 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 Hyd No. 18 —Hyd No. 9 3.00 0.00 1320 1440 1560 Time (min) 59 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 19 Additional Area to Point B Hydrograph type = SCS Runoff Storm frequency = 1 yrs Time interval = 1 min Drainage area = 6.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 2.99 in Storm duration = 24 hrs ` Composite (Area/CN) = [(3.200 x 75) + (3.680 x 79)116.880 Q (cfs) 10.00 . M 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Area to Point B Hyd. No. 19 -- 1 Year Friday, 09 13 12021 = 9.649 cfs = 723 min = 26,576 cuft = 77* = 0 ft = 14.80 min = Type II = 484 Q (cfs) 10.00 M 4.00 2.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Time (min) au Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 20 Ex Total at Point B Hydrograph type = Combine Peak discharge = 31.31 cfs Storm frequency = 1 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 96,873 cult Inflow hyds. = 17, 19 Contrib. drain. area = 6.880 ac Q (cfs 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 1- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 20 —Hyd No. 17 —Hyd No. 19 Time (min) 61 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 21 Pro Total at Point B Hydrograph type = Combine Peak discharge = 23.89 cfs Storm frequency = 1 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 94,787 cult Inflow hyds. = 18, 19 Contrib. drain. area = 6.880 ac Q (cfs) 24.00 20.00 16.00 12.00 4.00 Pro Total at Point B Hyd. No. 21 -- 1 Year Q (cfs) 24.00 20.00 16.00 12.00 4.00 'I - 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 —Hyd No. 18 —Hyd No. 19 Time (min) :Y1 Hydrograph Summary Report Hydreflow Hydrographs Extension for Autodesk®Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow We) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation M Total strge used (cuft) Hydrograph Description 1 SCS Runoff 10.67 1 720 24,225 Existing Site 2 SCS Runoff 20.95 1 721 51,108 Existing Offsite to EB 1 3 Reach 16.32 1 726 51,105 2 Ex Site to EB 1 4 Combine 35.09 1 722 102,213 2,3 Total Existing at EB 1 6 SCS Runoff 18.12 1 721 45,760 Site to Pond 7 Reservoir 2.348 1 749 45,757 6 494.08 18,625 Sediment Basin/Pond 8 Reach 2.320 1 767 45,737 7 Pond to EB 1 9 Combine 22.14 1 721 96,846 2,8 Total Proposed Volume to EB 1 11 SCS Runoff 5.191 1 720 11,762 Existing Site Area to EB 2 12 SCS Runoff 0.262 1 719 745 Pro Site to EB 2 14 SCS Runoff 28.28 1 721 77,447 1 Inch Storm 15 Reservoir 8.290 1 733 77,445 14 494.76 30,463 Level Spreader Sizing 17 Reach 33.74 1 725 102,212 4 Ex EB#1 to Point B 18 Reach 21.06 1 723 96,845 9 Pro EB#1 to Point B 19 SCS Runoff 14.00 1 722 37,967 -- Additional Area to Point B 20 Combine 47.19 1 724 140,179 17,19 Ex Total at Point B 21 Combine 35.03 1 723 134,812 18, 19, Pro Total at Point B Ponds.gpw Retum Period: 2 Year Friday, 09 / 3 / 2021 63 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Friday, 09 13 12021 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Peak discharge = 10.67 cfs Storm frequency = 2 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 24,225 cuft Drainage area = 4.810 ac Curve number = 75* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 9.10 min Total precip. = 3.62 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 ` Composite (Area/CN) = [(0.070 x 98) + (4.740 x 75)114.810 Q (cfs) 12.00 10.00 . M 4.00 "To in Existing Site Hyd. No. 1 -- 2 Year Q (cfs) 12.00 10.00 -�l M 4.00 2.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 64 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 9.970 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs Q (cfs) 21.00 ie 15.00 12.00 . M 3.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Mite to EB 1 Hyd. No. 2 -- 2 Year Friday, 0913 12021 = 20.95 cfs = 721 min = 51,108 cuft = 75 = loft = 10.30 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 W6x11u M 3.00 0.00 ' ' ' ' 1 11 10.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Storm frequency = 2 yrs Time interval = 1 min Inflow hyd. No. = 2 - Existing Offsite to EB 1 Reach length = 898.0 ft Manning's n = 0.025 Side slope = 3.0:1 Rating curve x = 0.586 Ave. velocity = 0.00 ft/s Modified Att-Kin routing method used. Q (cfs) 21.00 ie 15.00 12.00 . m 3.00 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Ex Site to EB 1 Hyd. No. 3 -- 2 Year Friday, 0913 12021 = 16.32 cfs = 726 min = 51,105 cuft = Trapezoidal = 8.7 % = 164.0 ft = 0.1 ft = 1.392 = 0.1389 Q (cfs) 21.00 18.00 15.00 12.00 W:x11u 3.00 0.00 ' ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 —Hyd No. 2 Time (min) �y Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 35.09 cfs Storm frequency = 2 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 102,213 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 9.970 ac Q (Cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 4 Total Existing at EB 7 Hyd. No. 4 -- 2 Year 360 480 600 — Hyd NO. 2 720 Q (cfs) 40.00 30.00 20.00 10.00 0.00 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 Time (min) 67 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 7.090 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 3.62 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] / 7.090 Q (Cfs) 21.00 111 15.00 1PAIIIIIIl am 3.00 Site to Pond Hyd. No. 6 -- 2 Year Friday, 09 / 3 / 2021 = 18.12 cfs = 721 min = 45,760 cult = 81` = 0 ft = 11.90 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 • I1 M 3.00 0.00 1 1 1-1 1 ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) :1a Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge = 2.348 cfs Storm frequency = 2 yrs Time to peak = 749 min Time interval = 1 min Hyd. volume = 45,757 cult Inflow hyd. No. = 6 - Site to Pond Max. Elevation = 494.08 ft Reservoir name = Sediment Basin/Pond Max. Storage = 18,625 cult Storage Indication method used. Q (cfs) 21.00 18.00 15.00 12.00 . 11 3.00 Sediment Basin/Pond Hyd. No. 7 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 l l 3.00 0.00 ' I I- ' I I I 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Hyd No. 6 Time (min) y ®Total storage used = 18,625 cuff 69 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge = 2.320 cfs Storm frequency = 2 yrs Time to peak = 767 min Time interval = 1 min Hyd. volume = 45,737 cuft Inflow hyd. No. = 7 - Sediment Basin/Pond Section type = Circular Reach length = 943.0 ft Channel slope = 7.4 % Manning's n = 0.025 Bottom width = 1.5 ft Side slope = 0.0:1 Max. depth = 0.0 ft Rating curve x = 9.379 Rating curve m = 1.250 Ave. velocity = 0.00 ft/s Routing coeff. = 0.1004 Modified Aft -Kin routing method used Q (cfs) 3.00 r 11 1.00 Pond to EB 1 Hyd. No. 8 -- 2 Year 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 8 — Hyd No. 7 Q (cfs) 3.00 2.00 1.00 mftwi 0.00 1440 1560 Time (min) 70 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 9 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 22.14 cfs Storm frequency = 2 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 96,846 cult Inflow hyds. = 2, 8 Contrib. drain. area = 9.970 ac Q (cfs 24.00 20.00 16.00 12.00 : 11 4.00 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 —Hyd No. 2 —Hyd No. 8 Time (min) 71 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 11 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)] 12.230 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Area to EB 2 Friday, 09 / 3 / 2021 = 5.191 cfs = 720 min = 11,762 cult = 76` = 0 ft = 8.80 min = Type II = 484 Q (GrS) Hyd. No. 11 -- 2 Year Q (Cfs) 6.00 6.00 5.00 5.00 4.00 4.00 3.00 3.00 2.00 2.00 1.00 111 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) 72 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Hyd. No. 12 Pro Site to EB 2 Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 0.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs Composite (Area/CN) = [(0.470 x 56)110.470 Friday, 09 / 3 / 2021 Peak discharge = 0.262 cfs Time to peak = 719 min Hyd. volume = 745 cuft Curve number = 56` Hydraulic length = 0 ft Time of conc. (Tc) = 5.00 min Distribution = Type II Shape factor = 484 Pro Site to EB 2 Q (Cfs) Hyd. No. 12 -- 2 Year Q (Cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 000 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 12 Time (min) 73 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 17 Ex EB#1 to Point B Hydrograph type = Reach Peak discharge = 33.74 cfs Storm frequency = 2 yrs Time to peak = 725 min Time interval = 1 min Hyd. volume = 102,212 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 368.0 ft Channel slope = 4.2 % Manning's n = 0.080 Bottom width = 2.0 ft Side slope = 35.0:1 Max. depth = 2.0 ft Rating curve x = 2.404 Rating curve m = 1.042 Ave. velocity = 0.00 ft/s Routing coeff. = 0.3710 Modified Aft -Kin routing method used Q (Cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 17 Ex E13#1 to Point B Hyd. No. 17 -- 2 Year 360 480 600 — Hyd No. 4 720 840 Q (cfs) 40.00 30.00 20.00 10.00 ' 1 0.00 960 1080 1200 1320 1440 1560 Time (min) 74 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Hyd. No. 18 Pro EB#1 to Point B Hydrograph type = Reach Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 9 - Total Proposed Volume to Si�dtion type Reach length = 368.0 ft Channel slope Manning's n = 0.080 Bottom width Side slope = 35.0:1 Max. depth Rating curve x = 2.404 Rating curve m Ave. velocity = 0.00 ft/s Routing coeff. Modified Aft -Kin routing method used. Q (cfs) 24.00 20.00 16.00 12.00 4.00 Pro EB#1 to Point B Hyd. No. 18 -- 2 Year 120 240 360 480 600 Hyd No. 18 — Hyd No. 9 720 840 960 Friday, 09 / 3 / 2021 = 21.06 cfs = 723 min = 96,845 cuft = Trapezoidal = 4.2 % = 2.0 ft = 2.0 ft = 1.042 = 0.3654 Q (cfs) 24.00 20.00 16.00 12.00 4.00 ' 0.00 1080 1200 1320 1440 1560 Time (min) 75 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 19 Additional Area to Point B Hydrograph type = SCS Runoff Storm frequency = 2 yrs Time interval = 1 min Drainage area = 6.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 3.62 in Storm duration = 24 hrs ` Composite (Area/CN) = [(3.200 x 75) + (3.680 x 79)116.880 Q (cfs 15.00 12.00 • I I M11 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Area to Point B Hyd. No. 19 -- 2 Year Friday, 09 / 3 / 2021 = 14.00 cfs = 722 min = 37,967 cult = 77" = 0 ft = 14.80 min = Type II = 484 Q (cfs) 15.00 12.00 . II 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 19 Time (min) 76 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 20 Ex Total at Point B Hydrograph type = Combine Peak discharge = 47.19 cfs Storm frequency = 2 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 140,179 cuft Inflow hyds. = 17, 19 Contrib. drain. area = 6.880 ac Q (Cfs) 50.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 20 Ex Total at Point B Hyd. No. 20 -- 2 Year 360 480 600 — Hyd No. 17 720 Q (cfs) 50.00 40.00 30.00 20.00 10.00 - 0.00 840 960 1080 1200 1320 1440 1560 — Hyd No. 19 Time (min) 77 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 21 Pro Total at Point B Hydrograph type = Combine Peak discharge = 35.03 cfs Storm frequency = 2 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 134,812 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 6.880 ac Pro Total at Point B Q (Cfs) Hyd. No. 21 -- 2 Year Q (Cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 —Hyd No. 18 —Hyd No. 19 Time (min) 78 Hydrograph Summary Report Hydreflow Hydrographs Extension for Autodesk®Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow We) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (fl) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 21.87 1 719 49,510 Existing Site 2 SCS Runoff 43.19 1 720 104,455 Existing Offsite to EB 1 3 Reach 35.93 1 725 104,451 2 Ex Site to EB 1 4 Combine 75.43 1 722 208,906 2,3 Total Existing at EB 1 6 SCS Runoff 33.82 1 721 86,242 Site to Pond 7 Reservoir 11.77 1 732 86,240 6 494.90 32,966 Sediment Basin/Pond 8 Reach 11.45 1 734 86,220 7 Pond to EB 1 9 Combine 45.31 1 720 190,675 2,8 Total Proposed Volume to EB 1 11 SCS Runoff 10.46 1 719 23,699 Existing Site Area to EB 2 12 SCS Runoff 1.075 1 718 2,275 Pro Site to EB 2 14 SCS Runoff 43.96 1 721 123,771 1 Inch Storm 15 Reservoir 18.15 1 730 123,768 14 495.50 43,376 Level Spreader Sizing 17 Reach 72.73 1 724 208,905 4 Ex EB#1 to Point B 18 Reach 43.34 1 723 190,674 9 Pro EB#1 to Point B 19 SCS Runoff 28.05 1 722 75,442 -- Additional Area to Point B 20 Combine 99.70 1 724 284,347 17,19 Ex Total at Point B 21 Combine 71.15 1 723 266,116 18, 19, Pro Total at Point B Ponds.gpw Retum Period: 10 Year Friday, 09 / 3 / 2021 79 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3170 by Autodesk, Inc. v2020 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 4.810 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Composite (Area/CN) = [(0.070 x 98) + (4.740 x 75)] 14.810 Q (cfs) 24.00 20.00 16.00 12.00 4.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Hyd. No. 1 -- 10 Year Friday, 09 / 3 / 2021 = 21.87 cfs = 719 min = 49,510 cult = 75" = 0 ft = 9.10 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 llllll�1 4.00 0.00 ' 1 1-1 1 ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Mill Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 9.970 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs Q (cfs) 50.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 10 Year Friday, 09 / 3 / 2021 = 43.19 cfs = 720 min = 104,455 tuft = 75 = loft = 10.30 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 -I I ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 81 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 2 - Existing Offsite to EB 1 Section type Reach length = 898.0 ft Channel slope Manning's n = 0.025 Bottom width Side slope = 3.0:1 Max. depth Rating curve x = 0.586 Rating curve m Ave. velocity = 0.00 ft/s Routing coeff. Modified Aft -Kin routing method used Q (cfs) 50.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 3 Ex Site to EB 1 Hyd. No. 3 -- 10 Year 360 480 600 — Hyd No. 2 720 840 Friday, 09 / 3 / 2021 = 35.93 cfs = 725 min = 104,451 tuft = Trapezoidal = 8.7 % = 164.0 ft = 0.1 ft = 1.392 = 0.1677 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' 0.00 960 1080 1200 1320 1440 1560 Time (min) 00A Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 7 5.4 3 cfs Storm frequency = 10 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 208,906 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 9.970 ac Q (Cfs) 80.00 70.00 .1 �1 50.00 40.00 30.00 20.00 10.00 Total Existing at EB 1 Hyd. No. 4 -- 10 Year Q (cfs) 80.00 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 0.00 —' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd NO. 4 —Hyd NO. 2 —Hyd No. 3 Time (min) 83 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 7.090 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.47 in Distribution Storm duration = 24 hrs Shape factor Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] / 7.090 Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Site to Pond Hyd. No. 6 -- 10 Year Friday, 09 / 3 / 2021 = 33.82 cfs = 721 min = 86,242 cult = 81` = 0 ft = 11.90 min = Type II = 484 Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) - 84 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge = 11.77 cfs Storm frequency = 10 yrs Time to peak = 732 min Time interval = 1 min Hyd. volume = 86,240 cult Inflow hyd. No. = 6 - Site to Pond Max. Elevation = 494.90 ft Reservoir name = Sediment Basin/Pond Max. Storage = 32,966 cuft Storage Indication method used. Q (Cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 Sediment Basin/Pond Hyd. No. 7 -- 10 Year Q (cfs) 35.00 30.00 25.00 20.00 15.00 10.00 5.00 0.00 — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Hyd No. 6 Time (min) y ®Total storage used = 32,966 cuff 85 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Storm frequency = 10 yrs Time interval = 1 min Inflow hyd. No. = 7 - Sediment Basin/Pond Reach length = 943.0 ft Manning's n = 0.025 Side slope = 0.0:1 Rating curve x = 9.379 Ave. velocity = 0.00 ft/s Modified Aft -Kin routing method used. Q (cfs 12.00 10.00 . 11 4.00 r 11 Peak discharge Time to peak Hyd. volume Section type Channel slope Bottom width Max. depth Rating curve m Routing coeff. Pond to EB 1 Hyd. No. 8 -- 10 Year n nn 0 120 240 Hyd No. 8 360 480 600 — Hyd No. 7 Friday, 09 / 3 / 2021 = 11.45 cfs = 734 min = 86,220 cuft = Circular = 7.4 % = 1.5ft = 0.0 ft = 1.250 = 0.4188 Q (cfs) 12.00 10.00 F-1 14 � 4.00 2.00 tmu 720 840 960 1080 1200 1320 1440 1560 Time (min) Mil Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 9 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 45.31 cfs Storm frequency = 10 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 190,675 cuft Inflow hyds. = 2, 8 Contrib. drain. area = 9.970 ac Q (cfs 50.00 30.00 20.00 10.00 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 1 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 —Hyd No. 2 —Hyd No. 8 Time (min) 87 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO by Autodesk, Inc. v2020 Hyd. No. 11 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs ` Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)112.230 Q (cfs) 12.00 10.00 . M 4.00 "To in Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Area to EB 2 Hyd. No. 11 -- 10 Year Friday, 09 13 12021 = 10.46 cfs = 719 min = 23,699 cuft = 76* = 0 ft = 8.80 min = Type II = 484 Q (cfs) 12.00 10.00 -�l M 4.00 2.00 0.00 ' ' ' ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 11 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 12 Pro Site to EB 2 Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 0.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs ' Composite (Area/CN) = [(0.470 x 56)110.470 Q (cfs) 2.00 1.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pro Site to EB 2 Hyd. No. 12 -- 10 Year Friday, 09 / 3 / 2021 = 1.075 cfs = 718 min = 2,275 cuft = 56` = 0 ft = 5.00 min = Type II = 484 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 12 Q (cfs) 2.00 1.00 - 0.00 1560 Time (min) 89 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 17 Ex EB#1 to Point B Hydrograph type = Reach Peak discharge = 72.73 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 208,905 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 368.0 ft Channel slope = 4.2 % Manning's n = 0.080 Bottom width = 2.0 ft Side slope = 35.0:1 Max. depth = 2.0 ft Rating curve x = 2.404 Rating curve m = 1.042 Ave. velocity = 0.00 ft/s Routing coeff. = 0.3805 Modified Aft -Kin routing method used Q (Cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 Ex E13#1 to Point B Hyd. No. 17 -- 10 Year Q (cfs) 80.00 70.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 17 —Hyd No. 4 Time (min) 441 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 18 Pro EB#1 to Point B Hydrograph type = Reach Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 9 - Total Proposed Volume to Si�dtion type Reach length = 368.0 ft Channel slope Manning's n = 0.080 Bottom width Side slope = 35.0:1 Max. depth Rating curve x = 2.404 Rating curve m Ave. velocity = 0.00 ft/s Routing coeff. Modified Aft -Kin routing method used. Q (cfs) 50.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 18 Pro E13#1 to Point B Hyd. No. 18 -- 10 Year 360 480 600 — Hyd No. 9 720 840 Friday, 09 / 3 / 2021 = 43.34 cfs = 723 min = 190,674 cult = Trapezoidal = 4.2 % = 2.0 ft = 2.0 ft = 1.042 = 0.3742 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' ' ' ' 0.00 960 1080 1200 1320 1440 1560 Time (min) a Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 19 Additional Area to Point B Hydrograph type = SCS Runoff Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 5.47 in Storm duration = 24 hrs ` Composite (Area/CN) = [(3.200 x 75) + (3.680 x 79)116.880 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Additional Area to Point B Hyd. No. 19 -- 10 Year Friday, 09 / 3 / 2021 = 28.05 cfs = 722 min = 75,442 cult = 77" = 0 ft = 14.80 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 ' - 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Time (min) 00A Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 20 Ex Total at Point B Hydrograph type = Combine Peak discharge = 99.70 cfs Storm frequency = 10 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 284,347 cuft Inflow hyds. = 17, 19 Contrib. drain. area = 6.880 ac Q (cfs 100.00 1.11111611 .1 ,1 40.00 20.00 Q (cfs) 100.00 :1 11 .1 11 40.00 20.00 ffMOT., 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 17 —Hyd No. 19 Time (min) a] Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 21 Pro Total at Point B Hydrograph type = Combine Peak discharge = 71.15 cfs Storm frequency = 10 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 266,116 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 6.880 ac Q (Cfs) 80.00 70.00 .1 �1 50.00 40.00 30.00 20.00 10.00 Pro Total at Point B Hyd. No. 21 -- 10 Year Q (cfs) 80.00 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 0.00 ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 —Hyd No. 18 —Hyd No. 19 Time (min) F)7 Hydrograph Summary Report Hydreflow Hydrographs Extension for Autodesk®Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow We) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (fl) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 29.87 1 719 68,007 Existing Site 2 SCS Runoff 59.07 1 720 143,481 Existing Offsite to EB 1 3 Reach 50.31 1 724 143,478 2 Ex Site to EB 1 4 Combine 104.58 1 722 286,958 2,3 Total Existing at EB 1 6 SCS Runoff 44.60 1 721 114,917 Site to Pond 7 Reservoir 17.78 1 731 114,915 6 495.37 41,208 Sediment Basin/Pond 8 Reach 17.75 1 733 114,895 7 Pond to EB 1 9 Combine 63.94 1 722 258,376 2,8 Total Proposed Volume to EB 1 11 SCS Runoff 14.19 1 719 32,381 Existing Site Area to EB 2 12 SCS Runoff 1.754 1 718 3,575 Pro Site to EB 2 14 SCS Runoff 54.38 1 721 154,978 1 Inch Storm 15 Reservoir 29.42 1 728 154,976 14 495.98 51,816 Level Spreader Sizing 17 Reach 101.12 1 724 286,957 4 Ex EB#1 to Point B 18 Reach 62.22 1 724 258,375 9 Pro EB#1 to Point B 19 SCS Runoff 37.93 1 722 102,547 -- Additional Area to Point B 20 Combine 137.58 1 723 389,504 17,19 Ex Total at Point B 21 Combine 99.06 1 723 360,922 18, 19, Pro Total at Point B Ponds.gpw Retum Period: 25 Year Friday, 09 / 3 / 2021 95 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3170 by Autodesk, Inc. v2020 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 4.810 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.71 in Storm duration = 24 hrs Composite (Area/CN) = [(0.070 x 98) + (4.740 x 75)] 14.810 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Hyd. No. 1 -- 25 Year Friday, 09 / 3 / 2021 = 29.87 cfs = 719 min = 68,007 cult = 75" = 0 ft = 9.10 min = Type II = 484 Q (cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 03 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 9.970 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.71 in Storm duration = 24 hrs Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Offsite to EB 1 Hyd. No. 2 -- 25 Year Friday, 09 / 3 / 2021 = 59.07 cfs = 720 min = 143,481 cuft = 75 = loft = 10.30 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) M Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 2 - Existing Offsite to EB 1 Section type Reach length = 898.0 ft Channel slope Manning's n = 0.025 Bottom width Side slope = 3.0:1 Max. depth Rating curve x = 0.586 Rating curve m Ave. velocity = 0.00 ft/s Routing coeff. Modified Aft -Kin routing method used Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 3 Ex Site to EB 1 Hyd. No. 3 -- 25 Year 360 480 600 — Hyd No. 2 720 840 Friday, 09 / 3 / 2021 = 50.31 cfs = 724 min = 143,478 cuft = Trapezoidal = 8.7 % = 164.0 ft = 0.1 ft = 1.392 = 0.1818 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 'I i0.00 960 1080 1200 1320 1440 1560 Time (min) 0] Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 104.58 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 286,958 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 9.970 ac Q (cfs 120.00 11111XIIIIIIIII :1 11 .1 �1 40.00 20.00 Q (cfs) 120.00 100.00 :1 11 .1 11 40.00 20.00 0.00 r 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) 01 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Storm frequency = 25 yrs Time interval = 1 min Drainage area = 7.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 6.71 in Storm duration = 24 hrs Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] / 7.090 Q (Cfs) 50.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Site to Pond Hyd. No. 6 -- 25 Year Friday, 09 / 3 / 2021 = 44.60 cfs = 721 min = 114,917 cuft = 81` = 0 ft = 11.90 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Will Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 6 - Site to Pond Max. Elevation Reservoir name = Sediment Basin/Pond Max. Storage Storage Indication method used Q (cfs) 50.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 7 Sediment Basin/Pond Hyd. No. 7 -- 25 Year 360 480 600 — Hyd No. 6 720 Friday, 09 / 3 / 2021 = 17.78 cfs = 731 min = 114,915 cuft = 495.37 ft = 41,208 tuft Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' -' 0.00 840 960 1080 1200 1320 1440 1560 ® Total storage used = 41,208 cuff Time (min) Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge Storm frequency = 25 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 7 - Sediment Basin/Pond Section type Reach length = 943.0 ft Channel slope Manning's n = 0.025 Bottom width Side slope = 0.0:1 Max. depth Rating curve x = 9.379 Rating curve m Ave. velocity = 0.00 ft/s Routing coeff. Modified Aft -Kin routing method used Q (cfs) 18.00 15.00 12.00 • 11 AM G 11 0.00 0 120 240 Hyd No. 8 Pond to EB 1 Hyd. No. 8 -- 25 Year 360 480 600 — Hyd No. 7 720 840 960 Friday, 09 / 3 / 2021 = 17.75 cfs = 733 min = 114,895 cuft = Circular = 7.4 % = 1.5ft = 0.0 ft = 1.250 = 0.5714 Q (cfs) 18.00 15.00 12.00 3.00 ' 'Mm--L--0.00 1080 1200 1320 1440 1560 Time (min) Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 9 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 63.94 cfs Storm frequency = 25 yrs Time to peak = 722 min Time interval = 1 min Hyd. volume = 258,376 cuft Inflow hyds. = 2, 8 Contrib. drain. area = 9.970 ac Q (cfs 70.00 .1 11 50.00 H1111111 30.00 20.00 10.00 Q (cfs) 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 —Hyd No. 2 —Hyd No. 8 Time (min) Hydrograph Summary Report Hydreflow Hydrographs Extension for Autodesk®Civil 3DO by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow We) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (fl) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 44.71 1 719 103,289 Existing Site 2 SCS Runoff 88.56 1 720 217,917 Existing Offsite to EB 1 3 Reach 77.39 1 724 217,914 2 Ex Site to EB 1 4 Combine 159.67 1 721 435,832 2,3 Total Existing at EB 1 6 SCS Runoff 64.22 1 721 168,549 ---- --- Site to Pond 7 Reservoir 37.91 1 728 168,547 6 496.12 55,275 Sediment Basin/Pond 8 Reach 37.87 1 729 168,527 7 Pond to EB 1 9 Combine 106.02 1 720 386,444 2,8 Total Proposed Volume to EB 1 11 SCS Runoff 21.09 1 719 48,883 -- Existing Site Area to EB 2 12 SCS Runoff 3.137 1 718 6,300 Pro Site to EB 2 14 SCS Runoff 73.19 1 721 211,745 1 Inch Storm 15 Reservoir 53.44 1 726 211,743 14 496.33 60,915 Level Spreader Sizing 17 Reach 154.43 1 724 435,831 4 Ex EB#1 to Point B 18 Reach 101.43 1 723 386,444 9 Pro EB#1 to Point B 19 SCS Runoff 56.16 1 722 153,885 -- Additional Area to Point B 20 Combine 208.86 1 723 589,716 17,19 Ex Total at Point B 21 Combine 156.84 1 723 540,328 18, 19, Pro Total at Point B Ponds.gpw Retum Period: 100 Year Friday, 09 / 3 / 2021 104 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Hyd. No. 1 Existing Site Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 4.810 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Composite (Area/CN) = [(0.070 x 98) + (4.740 x 75)] 14.810 Q (Cfs) 50.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Hyd. No. 1 -- 100 Year Friday, 09 / 3 / 2021 = 44.71 cfs = 719 min = 103,289 cuft = 75" = 0 ft = 9.10 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 1 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Hyd. No. 2 Existing Offsite to EB 1 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 9.970 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Q (cfs) 90.00 :9 ce 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 Friday, 09 / 3 / 2021 Peak discharge = 88.56 cfs Time to peak = 720 min Hyd. volume = 217,917 cuft Curve number = 75 Hydraulic length = loft Time of conc. (Tc) = 10.30 min Distribution = Type II Shape factor = 484 Existing Offsite to EB 1 Hyd. No. 2 -- 100 Year Q (cfs) 90.00 :1 11 70.00 .1 11 50.00 40.00 30.00 `zef1i11 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 3 Ex Site to EB 1 Hydrograph type = Reach Peak discharge = 77.39 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 217,914 cuft Inflow hyd. No. = 2 - Existing Offsite to EB 1 Section type = Trapezoidal Reach length = 898.0 ft Channel slope = 8.7 % Manning's n = 0.025 Bottom width = 164.0 ft Side slope = 3.0:1 Max. depth = 0.1 ft Rating curve x = 0.586 Rating curve m = 1.392 Ave. velocity = 0.00 ft/s Routing coeff. = 0.2016 Modified Aft -Kin routing method used Q (Cfs) 90.00 70.00 50.00 40.00 30.00 20.00 10.00 Ex Site to EB 1 Hyd. No. 3 -- 100 Year Q (cfs) 90.00 70.00 50.00 40.00 30.00 IP401IH11 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 3 — Hyd No. 2 Time (min) fnnr Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 4 Total Existing at EB 1 Hydrograph type = Combine Peak discharge = 159.67 cfs Storm frequency = 100 yrs Time to peak = 721 min Time interval = 1 min Hyd. volume = 435,832 cuft Inflow hyds. = 2, 3 Contrib. drain. area = 9.970 ac Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Total Existing at EB 1 Hyd. No. 4 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 —' 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 4 —Hyd No. 2 —Hyd No. 3 Time (min) f[IF.3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 6 Site to Pond Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 7.090 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] / 7.090 Q (Cfs 70.00 .� 1I 50.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 09 / 3 / 2021 = 64.22 cfs = 721 min = 168,549 cuft = 81` = 0 ft = 11.90 min = Type II = 484 Q (Cfs) 70.00 .1 11 50.00 40.00 30.00 20.00 10.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) — Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 7 Sediment Basin/Pond Hydrograph type = Reservoir Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 6 - Site to Pond Max. Elevation Reservoir name = Sediment Basin/Pond Max. Storage Storage Indication method used Q (cfs) 70.00 50.00 30.00 20.00 10.00 Sediment Basin/Pond Hyd. No. 7 -- 100 Year Friday, 09 / 3 / 2021 = 37.91 cfs = 728 min = 168,547 cuft = 496.12 ft = 55,275 tuft Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 -I I 1 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 7 Hyd No. 6 Time (min) y ®Total storage used = 55,275 cuff fora Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 8 Pond to EB 1 Hydrograph type = Reach Peak discharge = 37.87 cfs Storm frequency = 100 yrs Time to peak = 729 min Time interval = 1 min Hyd. volume = 168,527 cuft Inflow hyd. No. = 7 - Sediment Basin/Pond Section type = Circular Reach length = 943.0 ft Channel slope = 7.4 % Manning's n = 0.025 Bottom width = 1.5 ft Side slope = 0.0:1 Max. depth = 0.0 ft Rating curve x = 9.379 Rating curve m = 1.250 Ave. velocity = 0.00 ft/s Routing coeff. = 0.9207 Modified Aft -Kin routing method used Q (Cfs) 40.00 30.00 20.00 10.00 0.00 0 120 240 Hyd No. 8 Pond to EB 1 Hyd. No. 8 -- 100 Year 360 480 600 — Hyd No. 7 720 840 Q (cfs) 40.00 30.00 20.00 10.00 '1 0.00 960 1080 1200 1320 1440 1560 Time (min) iff Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 9 Total Proposed Volume to EB 1 Hydrograph type = Combine Peak discharge = 106.02 cfs Storm frequency = 100 yrs Time to peak = 720 min Time interval = 1 min Hyd. volume = 386,444 cuft Inflow hyds. = 2, 8 Contrib. drain. area = 9.970 ac Q (cfs) 120.00 40.00 20.00 Total Proposed Volume to EB 1 Hyd. No. 9 -- 100 Year Q (cfs) 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 9 —Hyd No. 2 —Hyd No. 8 Time (min) 1111t%a Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 11 Existing Site Area to EB 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 2.230 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Composite (Area/CN) = [(0.090 x 98) + (2.140 x 75)] 12.230 Q (cfs) 24.00 20.00 16.00 12.00 4.00 0.00 -' 0 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Existing Site Area to EB 2 Hyd. No. 11 -- 100 Year Friday, 09 / 3 / 2021 = 21.09 cfs = 719 min = 48,883 cult = 76` = 0 ft = 8.80 min = Type II = 484 Q (cfs) 24.00 20.00 16.00 12.00 llllll�1 4.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Hyd No. 11 Time (min) 113 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 12 Pro Site to EB 2 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 0.470 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs Composite (Area/CN) = [(0.470 x 56)110.470 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Pro Site to EB 2 Friday, 09 / 3 / 2021 = 3.137 cfs = 718 min = 6,300 cuft = 56` = 0 ft = 5.00 min = Type II = 484 Q (cfs) Q (cfs) Hyd. No. 12 -- 100 Year 4.00 4.00 3.00 3.00 2.00 2.00 1.00 1.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 12 Time (min) ifCl Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 17 Ex EB#1 to Point B Hydrograph type = Reach Peak discharge = 154.43 cfs Storm frequency = 100 yrs Time to peak = 724 min Time interval = 1 min Hyd. volume = 435,831 cuft Inflow hyd. No. = 4 - Total Existing at EB 1 Section type = Trapezoidal Reach length = 368.0 ft Channel slope = 4.2 % Manning's n = 0.080 Bottom width = 2.0 ft Side slope = 35.0:1 Max. depth = 2.0 ft Rating curve x = 2.404 Rating curve m = 1.042 Ave. velocity = 0.00 ft/s Routing coeff. = 0.3900 Modified Aft -Kin routing method used Q (Cfs) 160.00 140.00 120.00 100.00 40.00 20.00 Ex E13#1 to Point B Hyd. No. 17 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 40.00 20.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 17 —Hyd No. 4 Time (min) ifb7 Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3138 by Autodesk, Inc. v2020 Hyd. No. 18 Pro EB#1 to Point B Hydrograph type = Reach Peak discharge Storm frequency = 100 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 9 - Total Proposed Volume to Si�dtion type Reach length = 368.0 ft Channel slope Manning's n = 0.080 Bottom width Side slope = 35.0:1 Max. depth Rating curve x = 2.404 Rating curve m Ave. velocity = 0.00 ft/s Routing coeff. Modified Aft -Kin routing method used. Q (cfs) 120.00 40.00 20.00 Pro E13#1 to Point B Hyd. No. 18 -- 100 Year 120 240 360 480 600 Hyd No. 18 — Hyd No. 9 720 840 Friday, 09 / 3 / 2021 = 101.43 cfs = 723 min = 386,444 tuft = Trapezoidal = 4.2 % = 2.0 ft = 2.0 ft = 1.042 = 0.3848 Q (cfs) 120.00 100.00 40.00 20.00 'I I- 0.00 960 1080 1200 1320 1440 1560 Time (min) fora] Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 19 Additional Area to Point B Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 1 min Drainage area = 6.880 ac Basin Slope = 0.0 % Tc method = User Total precip. = 8.96 in Storm duration = 24 hrs ` Composite (Area/CN) = [(3.200 x 75) + (3.680 x 79)116.880 Q (Cfs 60.00 50.00 40.00 30.00 20.00 10.00 Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Friday, 09 / 3 / 2021 = 56.16 cfs = 722 min = 153,885 cuft = 77" = 0 ft = 14.80 min = Type II = 484 Q (Cfs) 60.00 50.00 40.00 30.00 20.00 10.00 III! MT11 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 19 Time (min) tow Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 20 Ex Total at Point B Hydrograph type = Combine Peak discharge = 208.86 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 589,716 cuft Inflow hyds. = 17, 19 Contrib. drain. area = 6.880 ac Q (cfs) 210.00 180.00 150.00 120.00 30.00 Ex Total at Point B Hyd. No. 20 -- 100 Year Q (cfs) 210.00 180.00 150.00 120.00 30.00 0.00 ' I I— ' - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 — Hyd No. 20 —Hyd No. 17 —Hyd No. 19 Time (min) lot.] Hydrograph Report Hydragow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Friday, 09 / 3 / 2021 Hyd. No. 21 Pro Total at Point B Hydrograph type = Combine Peak discharge = 156.84 cfs Storm frequency = 100 yrs Time to peak = 723 min Time interval = 1 min Hyd. volume = 540,328 cuft Inflow hyds. = 18, 19 Contrib. drain. area = 6.880 ac Q (cfs) 160.00 140.00 120.00 100.00 :1 �1 .1 �1 40.00 20.00 Pro Total at Point B Hyd. No. 21 -- 100 Year Q (cfs) 160.00 140.00 120.00 100.00 :1 11 .1 11 40.00 20.00 0.00 - 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 21 —Hyd No. 18 —Hyd No. 19 Time (min) IND] File: Level Spreader Sizing.Ax Printed: 8111 2021 Level Spreader Size/Design Project Name: Troxell Poultry House Job #: 2888 Sprader Onsite Area TvLevel Managed Impervious Turf (Acres) (Acres) (cu.ft.) #1 3.57 3.52 14,731 Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 120 File: Level Spreader Sizinpda Pnnted: 8/11/2021 Level Spreader BMP Sizing Calculations Modified Curve Number Method DA 7.09 Acres TVBMP 14,731 cult Qa 0.57 watershed inches P 1 in CN 95 1 inch storm 1.52 ds 4.06 in Equation: Derivation ofNRCS Curve Number and Runoff Equation 1000 CN = [10 + 5P + JOQa — 1O(Q2a + 1.25QaP)0s] Where: CN = modified curve number P = rainfall (inches), equal to 1.0 inch in Virginia Q. = runoff volume (watershed inches), equal to Tvaia, = BMP drainage area Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 121 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 14 1 Inch Storm Hydrograph type = SCS Runoff Peak discharge Storm frequency = 3 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 7.090 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 1.00 in Distribution Storm duration = 24 hrs Shape factor ' Composite (Area/CN) = [(2.820 x 61) + (3.520 x 98) + (0.750 x 75)] / 7.090 Q (Cfs) 6.00 5.00 4.00 3.00 2.00 1.00 1 Inch Storm Hyd. No. 14 -- 3 Year Friday, 09 / 3 / 2021 = 5.638 cfs = 721 min = 14,272 cult = 95` = 0 ft = 11.90 min = Type II = 484 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 ' - 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 14 Time (min) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3130 by Autodesk, Inc. v2020 Hyd. No. 15 Level Spreader Sizing Hydrograph type = Reservoir Peak discharge Storm frequency = 3 yrs Time to peak Time interval = 1 min Hyd. volume Inflow hyd. No. = 14 - 1 Inch Storm Max. Elevation Reservoir name = Sediment Basin/Pond Max. Storage Storage Indication method used Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 Level Spreader Sizing Hyd. No. 15 -- 3 Year Friday, 09 / 3 / 2021 = 1.286 cfs = 735 min = 14,270 cult = 492.36 ft = 4,823 CA Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 ' 0.00 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 15 —Hyd No. 14 ®Total storage used = 4,823 cuff Time (min) 123 File: Level Spreader Sizinpda Pnnled: 8/11/2021 Level Spreaders Weir Calculation - 1 Inch Storm Project Name: Troxell Poultry House Project # : 2888 Level Spreader at Pond Ditch 1 Inputs 1.) (Q) Storm Event 2.) (L) Level Spreader Length 3.) nA Side Slopes 4.) (Cw) Weir Coefficient Outputs (H) Head (V) Velocity 1.29 cfs 20.00 ft 3.37 0.07 ft 0.89 ftis Blackwell Engineering, PLC 566 East Market Street Harrisonburg, VA 22801 Governing Equations: Weir Equation: Q = Cw • L' HA1.5 Continuity Equation: Q = V . A 124 o[q wrynm aunob aeeu[aon mRnoeanoeveropmem mmpuonrespreoa3neR-verslon3o a sot2 aYP.asi nw v-di.YNna 0 ani omn aYP.aYma.aa nw iie vYa Pwle Tmellisada Nouee _ uYpnaL U 9 2a21 .— Ueeelopmen[ Ponied, Xp Site Information Post -Development Project (Treatment Volume and Loads) Entertotal lAstu lsed Area (a[res) a 51 Pn-R[Oeueb xttlaM luw[ a[ 1 Ged: pe[irimfian. .11L.a uxeo[o,ole[[] mnd.—recarorered mm[tryy V V 11.1dr Ymmnren eami ]PLWDMURION REM1 z.yace•sPffi I�1-mem.mm, 6Yresannla�l �. .sisram. ESHB ADWI, aTwre. m.rel�l POR-gPNppmem land! rPvni rrea/o�Pwel�l-�[.amel. vs5 6ereNMl�l�ma 4o+emly mmv Wnanaw SS3 u..re l�la. a.. GYi Yr O% oc •wm/ae..wa.re...Gaad, m+n.®e.....vnere w.wvMnxemu...rwm t..d [3 anma(nnflpa,da' 9) nummzvl srerealum•.1 rrem/rymscere nxliel[s,rvq l uaymiuR renlnir'- NWI :e I�eG=Nnl rsr elNminsmzmmmun r� miermwwPmrlsNal .-summand I I oe�eup�rem w:.wveonmem xevi PeN�o�v rom/oeens u..Ee31 313 watlmm n.n•RI .1. .R z3% ri 0.1 m Vdume and Nurient Load w.6,aaona� nfB] ov19 re �N mre rea e..mwla�re-xl um loa•kN eetlis m e 6Su m'. 6w�e NP1 1 tf0 MII fa] M oa.r la,d rre. aeoeaap�an� nyunm' imrAn� rvm/gmsceremerd�resl �/W`nslaM 6]d5 waged Yt6.m1 waaemmlbml q a% n u..Eennmp�l sseB "d'alni-r, s n'APm+Mam wApnmwlam irad 63areQe..R 99% Y,�..R zo% in re[wel�l .13 oi3 K P^eelA, nt% ma ii oa3 % % are.lml areal -a X3a .1 adW Treatment Volume and Nutrient Load muiy.rem e..rrcva rea la,mnl mre a391E Ta%almnt va e p.re-nl rn oasa6 o3me [rckonavpnaniream�anvdune M oN 196i] 3]A13T.—V.- re -Asp rem e.s-a Ireb IaP1YnrM 1i33 a1.9i PmentR `Ilan/rl I� a WWnI.1 al.]1 IiVWM nm4WM N.anYe•Yepc�uperwewgnvaveveweYma+'a ampgmee�vn�enpem,vmvl 9. WeyNee M yreR �rreny .RPaurebvvem .—ssauexeavm tl�n/w�*mas^�ma Mlw�xwv�RMrenrvruvmmer. • lI W/aeYWn YrM]s YMMPea Yea wan .5.38 1PW _ YWMbIM MMda.,®nalm 536 ,mmre.,rdx.x�..w,am,..lY.nare. Post Development Requirement for 11. a.enaama.am 1.911 l Nltroaen loads llMarmatlonal Purposes Site Area adz only) .rere9,,,ree �3x-(w 1 eazz 1 re irsv�axe.mpn.auvl aaYn ]a39 125 Site Results (Water Quality Compliance) Area Checks DA A DA. B O.A. C O.A. O D.A E AREA CHECK FOREST/OPEN SPACE Jac) DOD DOD DOD DOD DOD IMPFFMOUS COVER Jac) DOD DOD DOD DOD DOD IMPERVIOUSCOVERTRFATED(a[) DOD DOD DOD DOD DOD MM bNHAGED TURF ARFAJac) DOD DOD DOD DOD O.m rMHAGEDTURFARFATRMTED(at) DOD am am am am ARFACHECK OR. ON. OR. OR. OR. Site Treatment Vdume(fta) 17,0" Runoff Reduction Volume and TP By Drainage Area DA A DA. B DA. C DA. D DA E TOTAL RUNOFFREDUMNVOLUMEA HEVEDN 0 0 0 0 0 0 TP MAD AVARRBIE MR REMOVAL(Ib/yr) am DOD DOD DOD DOD O.CU IP UNUI RFWCTION ACHIEVED (Ib/yr) am O.m OW am OW 0.M TPU REMAINING (Ib/yr) 0.m aw aw aw aw am NRROGw UMDREDULTIONACHIEVED(Ib/yr) am aw aw aw aw am Total Phosphorus RmUP-DEVEUIPRIENTTPUMD(Ib/V) 10.71 TP ULID REDUCTION REQUIRED(Ib/yr) QM TPU REDCRON ACNIEVED(Ib/yr) am TP LOAD REMAINING Bb/yr): 10.71 REMAINING TP LOAD REDUCTON REQUIRED(Ib/Vo: MOD "TARGET TP REDUCRON EXCEEDED BY O.M IB/YEAR" Total Nitrogen (For Information Purposes) POST-DEVDOPMEWMRD(mhr) 76M NMOGMUMDREDUrnONAMIEVED(Ib/yr) aw REMAINING POST-0EVEu1PMwrNITROGw I.0AD 11b/r0 76M 126