HomeMy WebLinkAboutACSA199100003 Minutes 1991-10-10 Memo To: Robert W. Tucker, Jr.
V. Wayne Cilimberg
Date: October 10, 1991
Page 2
APPROVED a request to increase the daily rate of pay for election officials and
chief officers as recommended by the Albemarle County Electoral Board.
Agenda Item No. 7a. Highway Matters: Status Report on Commonwealth Drive/
Peyton Drive Project. RECEIVED, no action.
Agenda Item No. 7b. Other Highway Matters.
The Chairman is to write a letter to Ms. Constance Kincheloe to find out
what steps the Board needs to take to get gravel roads paved, but not to com-
plete State standards, and to require landowners to dedicate the necessary
right-of-way so that the road is upgraded when the traffic count reaches a
certain number.
Mr. Roosevelt will provide monthly fact sheets on the Route 250 project.
Mr. Bowerman asked Mr. Roosevelt to see what can be done about he area
along Route 29 North near the Carrsbrook entrance where people are uing the
property to park and congregate.
Agenda Item No. 8. Fire Hydrants Along Existing Water Lines Outside of
Service Area Boundaries (deferred from September 18, 1991). ADOPTED the at-
tached policy to allow fire hydrants on existing water lines in rural areas that
are outside of the Albemarle County Service Authority's service area boundaries.
Agenda Item No. 9. Request from A. S. Ward to have property in Scottsville
included in the Service Area Boundaries for water service - Tax Map 130, Parcel
15B. Heard, took no action on the request.
Agenda Item No. 10. Local Land Use Management Powers, Statement concerning
(deferred from October 2, 1991). APPROVED the statement with corrections. Mr.
Bain is to make the presentation.
Agenda Item No. 11. Public Hearing: To amend the service area boundaries
of the Albemarle County Service Authority in Scottsville to include TM130A(1),
Parcel 64B on the southwest corner of Route 6 and Route 726 across from the
Scottsville shopping center for water and sewer service. DEFERRED to Novem-
ber 13.
Agenda Item No. 12. FY 1992-93 Preliminary Revenue Estimate. The Board
requested the staff to recheck the figures for debt service, provide cash flow
projections through 1995, and prepare a cost estimate for opening the Agnor-Hurt
Elementary School.