HomeMy WebLinkAboutWPO201900062-25526-Full Inspection ReportSTOP WORK ORDER Hand delivered COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 434 296-5832 Project: AT0201900062 Southwood Redevelopment - Village 1 - VSMP - Digital Operator/Contractor: Bryan Riekmann w/Faulconer Construction Company SOUTHWOOD CHARLOTTESVILLE LLC Issued Date: 9/8/2021 Under § 17-902 of the Albemarle County Code, you are hereby notified to immediately cease all land disturbing activities on the above referenced property except for work to address any necessary corrections as given in writing by the County Erosion Control Inspector. This Stop Work Order is being issued because of the following deficiencies: Deficiency: Could not locate Corrective Action: Deficiency: Could not locate Corrective Action: Deficiency: Corrective Action: Deficiency: Seed and straw mulch applied, but much does not meet minimum standards. Not tacked or applied to correct depth, weight per acre Corrective Action: Deficiency: Over seed as needed Corrective Action: Deficiency: Missing trap, diversion ditches, inlet protection Corrective Action: Deficiency: Missing trap Corrective Action: Deficiency: Need.improved stabilizing per minimum standards Corrective Action: Deficiency: Missing or damaged inlet protection Corrective Action: Deficiency: Diversions meet stabilizing and outfall needs protection Corrective Action: Deficiency: Improve construction entrance and include a wash facility Corrective Action: Deficiency: Sediment loss at removed trap location and missing inlet and outlet protection Corrective Action: A sworn complaint has been made by the Albemarle County Erosion Control Inspector below. This STOP WORK ORDER shall remain in effect for seven (7) days. If satisfactory repairs have not been made within seven (7) days, the County may elect to issue another Stop Work Order, and/or petition the Circuit Court for penalties and relief with regard to this violation. Reinspections as a result of this notice to verify corrective measures will incur a $170 fee for the first reinspection and $270 for each subsequent reinspection for single-family dwelling units (§ 17-207). Reinspections as a result of this notice to verify corrective measures will incur a $283 fee for the first reinspection and $383 for each subsequent reinspection for VESCP and VSMP permits (§ 17-207 and § 17-208). A 4% technology fee is due with each payment. County Inspector Name: Geoff Elsie County Inspector Phone Number: 434 296-5832 orA1.4 Inspection Result: Stop Work Order Ljk GI'.�ti� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 VSMP/VESCP PERMIT SITE INSPECTION REPORT Project Name: Southwood Redevelopment - Village 1 - VSMP - Digital project/WPO Number: WP0201900062 TMP: 090A10000001EO DEQ Permit Number (if applicable): VARlOP133 Project Operator: Bryan Riekmann w/Faulconer Construction Company Operator Telephone #: (434) 964-6589 Project Contact: SOUTHWOOD CHARLOTTESVILLE LLC Contact Telephone #: (434) 296-9066 Contact E-Mail: DROSENSWEIG@CVILLEHABITAT.ORG Qualified Personnel (QP): William "Bill" Thiessen Inspector: Geoff Elsie Weather (Wet/Dry/Rain): Disturbed Acreage: Inspection Date & Time: 9/8/2021 Single -Family: Stage of Construction: Grading Re -Inspection: No COVERAGE & POSTING REQUIREMENTS Compliant? Reviewed during re -inspection? Yes Comments/Description 1 Construction site has permit coverage? (Va. Code §62.1- 44.15:34.A) Yes (9VAC25-870-31 0)(Al b. Co. Code §17-300, 17-302) 2 A copy of the notice of coverage letter is posted conspicuously near the No Could not locate main entrance of the construction activity? (CGP Part II.C) Notice of the location of the SWPPP is posted near the site's entrance, if No Could not locate 3 applicable, and information for public access is provided? (9VAC25-870- 54.G)(CGP Part II D.2 & 3) SWPPP AVAILABILITY AND CONTENTS Compliant? Reviewed during re -inspection? No Comments/Description 4 The SWPPP is on -site or made available during the inspection? (CGP Part II D.1 & 2)(9VAC25-870-54.G) 5 The SWPPP contains a signed copy of the registration statement? (CGP Part II A.1.a) 6 The SWPPP includes, upon receipt, a copy of the notice of coverage letter and the CGP? (CGP Part II A.1.b & c) The SWPPP includes a narrative description of the nature of the 7 construction activity, including the function of the project? (CGP Part II A.1.d) The SWPPP includes a legible site plan identifying all appropriate 8 measures and that includes the locations of support activities and the onsite rain gauge, when applicable? (CGP Part II A.1.e(1-7)) Page 1 of 4 9 The SWPPP contains the name, phone number and qualifications of "Qualified Personnel" conducting inspections? (CGP Part II A.6) 10 The SWPPP contains an approved erosion and sediment control plan? (9VAC25-870-54.B)(CGP Part II.A.2) The SWPPP contains an approved stormwater management plan or an 11 existing construction site has a stormwater management plan that ensures compliance with the water quality and quantity requirements? (9VAC25-870-54.C)(CGP Part II.A.3) Technical Criteria 11.113 ❑ II.0 ❑ 12 The SWPPP contains an adequate pollution prevention plan? (9VAC25- 870-54.D)(CGP Part II.A.4) The SWPPP identifies impaired water(s), approved TMDL, pollutant(s) of 13 concern, exceptional waters and the additional controls measures applicable? (9VAC 25-870-54.E)(CGP Part IIA.5 (a-b)) 14 Delegation of Authority is provided and signed in accordance with Part III K? (CGP Part 11 A.7) 15 The SWPPP is signed and dated in accordance with Part III K? (CGP Part 11 A.8) SWPPP AMENDMENTS, MODIFICATIONS AND UPDATES Compliant? Reviewed during inspection? No Comments/Description Is the SWPPP being amended whenever there is a change in the design, 16 construction, operation, or maintenance that has a significant effect on the discharge of pollutants to surface waters? (CGP Part 11 B(1))(9VAC25-870- 54.G) Has the SWPPP been amended if inspections or investigations by the 17 operator's qualified personnel, or by local, state or federal officials find that existing control measures are ineffective in minimizing pollutants in discharges? (CGP Part II B(2))(9VAC25-870-54.G) 18 Contractor(s) that will implement and maintain each control measure are identified? (CGP Part 11 B(3))(9VAC25-870-54.G) Have there been updates to the SWPPP when any modifications to its implementation have occurred, including a record of dates when major 19 grading activities occur, construction activities temporarily or permanently cease on a portion of the site or stabilization measures are initiated? (CGP Part 11 B.4(a))(9VAC25-870-54.G) 20 Is there documentation in the SWPPP of replaced or modified controls? (CGP Part 11 B.4(b))(9VAC25-870-54.G) 21 Is the SWPPP updated to indicate areas that have reached final stabilization? (CGP Part 11 B.4(c))(9VAC25-870-54.G) Is the SWPPP updated to indicate properties that are no longer under the 22 legal control of the operator and the dates on which the operator no longer had legal control over each property? (CGP Part II B.4(d))(9VAC25-870- 54.G) Does the SWPPP identify the date of any prohibited discharges, the 23 volume released, actions taken to minimize the impact of the release and measures taken to prevent the recurrence of any prohibited discharge? (CGP Part 11 B.4(e-f)) (9VAC25-870-54.G) 24 mendments, modifications, or updates to the SWPPP are signed in accordance with Part III K? (CGP Part II B(5))(9VAC25-870-54.G) INSPECTIONS AND CORRECTIVE ACTIONS Compliant? Reviewed during inspection? No Comments/Description Inspections required by the SWPPP are conducted at the required 25 frequency, including a modified frequency for impaired water(s), approved TMDL(s), and exceptional waters when applicable? (CGP Part II F (2)) (CGP Part II A.5.b.3) 26 Inspection reports are completed and signed in accordance with CGP Part 11 F (3-4)? (CGP Part 11 F (3-4)) Page 2 of 4 27 Corrective actions are taken consistent with the requirements of the CGP? (CGP Part II G(1-2)) ESC AND SWM PLAN IMPLEMENTATION Compliant? Reviewed during inspection? Yes Comments/Description 28 Have stream buffers and steep slopes been protected as shown on the N/A plan? Sequencing of the project is implemented in accordance with the No Trap removed prior to completion of upstream 29 approved erosion and sediment control plan and stormwater management stormwater management plans? (9VAC25-870-54.B and C) Have all denuded areas requiring temporary or permanent stabilization Seed and straw mulch applied, but much does not been stabilized, and have stabilization requirements for impaired waters, meet minimum standards. Not tacked or applied to 30 approved TMDL(s), pollutants of concern and exceptional waters, when Yes correct depth, weight per acre applicable, been met? (9VAC 25-840-40.1) (9VAC25-870-54.B) (9VAC25- 880-60) (CGP Part I F.1(a)) (CGP Part II A.5.b(1)) (CGP Part II A.2.c (8)) (CGP II E(1-2)) Are soil stockpiles adequately stabilized with seeding and/or protected Yes Over seed as needed 31 with sediment trapping measures? (9VAC 25-840-40.2) (CGP Part II A.2(c)) (9VAC25-870-54.B) A permanent vegetative cover has been established that is uniform, N/A 32 mature enough to survive and will inhibit erosion? (9VAC 25-840-40.3) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have sediment trapping facilities been constructed as the first step in land No Missing trap, diversion ditches, inlet protection 33 disturbance activities? (9VAC 25-840-40.4) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Have earthen structures been stabilized immediately after installation? Yes 34 (9VAC 25-840-40.5) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.6) Are sediment traps and basins installed in accordance with MS-6 and the No Missing trap 35 approved plan? (9VAC 25-840-40.6) (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Are finished cut and fill slopes adequately stabilized to prevent or correct No Need.improved stabilizing per minimum standards 36 excessive erosion? (9VAC 25-840-40.7) (CGP Part II A.2(c)) (CGP II E(1- 2)) (9VAC25-870-54.B) Is concentrated runoff down cut or fill slopes contained in an adequate Yes 37 permanent or temporary structure? (9VAC 25-840-40.8) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) Is adequate drainage or other protection provided for water seeps? N/A 38 (9VAC 25-840-40.9) (CGP Part 11 A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Do all operational storm sewer inlets have adequate inlet protection? No Missing or damaged inlet protection 39 (9VAC 25-840-40.10) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870- 54.13) Are stormwater conveyance channels adequately stabilized with channel No Diversions meet stabilizing and outfall needs 40 lining and/or outlet protection? (9VAC 25-840-40.11) (CGP Part II A.2(c)) protection (CGP II E(1-2)) (9VAC25-870-54.B) Is in -stream construction conducted using measures to minimize channel N/A 41 damage? (9VAC 25-840-40.12) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are temporary stream crossings of non -erodible material installed where N/A 42 applicable? (9VAC 25-840-40.13) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) 43 Is necessary restabilization of in -stream construction complete? (9VAC N/A 25-840-40.15) (CGP II E(1-2)) (9VAC25-870-54.B) Are utility trench operations conducted and stabilized in accordance with Yes 44 MS-16? (9VAC 25-840-40.16) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are soil and mud kept off paved or public roads to minimize the transport Yes Improve construction entrance and include a wash 45 of sediment? (9VAC 25-840-40.17) (CGP Part II A.2(c)) (CGP II E(1-2))facility (9VAC25-870-54. B ) 46 Have all temporary control structures that are no longer needed been N/A removed and disturbed soil resulting from their removal permanently Page 3 of 4 stabilized? (9VAC 25-840-40.18) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54. B ) Are properties and waterways downstream from development adequately Sediment loss at removed trap location and missing 47 protected from erosion, sediment and damage in accordance with the No inlet and outlet protection standards and criteria specified by 9VAC25-840.19(a-n)? (9VAC 25-840- 40.19(a-n)) 48 Permanent control measures included in the SWPPP are in place? N/A (9VAC25-870-54.C) (9VAC25-880-60) (CGP Part II F.1(a)) POLLUTION PREVENTION PLAN IMPLEMENTATION Compliant? Reviewed during inspection? No Comments/Description Practices are in place to prevent and respond to leaks, spills, and other releases including (i) procedures for expeditiously stopping, containing, 49 and cleaning up spills, leaks, and other releases; and (ii) procedures for reporting leaks, spills, and other releases in accordance with Part III G? (CGP Part II A.4.e(1))(9VAC25-870-56) Practices are in place to prevent the discharge of spilled and leaked fuels 50 and chemicals from vehicle fueling and maintenance activities? (CGP Part II A.4.e(2))(9VAC25-870-56) Practices are in place to prevent the discharge of soaps, solvents, 51 detergents, and wash water from construction materials, including the clean-up of stucco, paint, form release oils, and curing compounds? (CGP Part II A.4.e(3))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from vehicle 52 and equipment washing, wheel wash water, and other types of washing? (CGP Part II A.4.e(4))(9VAC25-870-56) 53 Concrete wash water is directed into a leak -proof container or leak -proof settling basin? (CGP Part II A.4.e(5))(9VAC25-870-56) Practices are in place to minimize the discharge of pollutants from 54 storage, handling, and disposal of construction products, materials, and wastes? (CGP Part II A.4.e(6))(9VAC25-870-56) Practices are in place to prevent the discharge of fuels, oils, and other 55 petroleum products, hazardous or toxic wastes, and sanitary wastes? (CGP Part II A.4.e(7)(9VAC25-870-56) Practices are in place to minimize any other discharge from the potential 56 pollutant -generating activities not addressed above, when applicable? (CGP Part II A.4.e(8))(9VAC25-870-56) Page 4 of 4 Construction General Permit Site Inspection Report Request for Correction Action Check Regulatory Citation/Legal Occur. Observation Recommended Corrective List # Requirement* Action 2 (CGP Part II.C) Could not locate 3 (9VAC25-870-54.G) Could not locate (CGP Part II D.2 & 3) 30 (9VAC 25-840-40.1) Seed and straw mulch (9VAC25-870-54.B) applied, but much does not (9VAC25-880-60) (CGP meet minimum standards. Not Part I F.1(a)) (CGP Part tacked or applied to correct II A.5.b(1)) (CGP Part II depth, weight per acre A.2.c (8)) (CGP II E(1-2)) 31 (9VAC 25-840-40.2) Over seed as needed (CGP Part II A.2(c)) (9VAC25-870-54.B) 33 (9VAC 25-840-40.4) Missing trap, diversion (CGP Part II A.2(c)) ditches, inlet protection (CGP II E(1-2)) (9VAC25-870-54.B) 35 (9VAC 25-840-40.6) Missing trap (CGP Part II A.2.c (9)) (CGP Part II A.2(c)) (CGP II E(1-2)) (9VAC25-870-54.B) 36 (9VAC 25-840-40.7) Need.improved stabilizing per (CGP Part II A.2(c)) minimum standards (CGP II E(1-2)) (9VAC25-870-54.B) 39 (9VAC 25-840-40.10) Missing or damaged inlet (CGP Part II A.2(c)) protection (CGP II E(1-2)) (9VAC25-870-54.B) 40 (9VAC 25-840-40.11) Diversions meet stabilizing (CGP Part II A.2(c)) and outfall needs protection (CGP II E(1-2)) (9VAC25-870-54.B) 45 (9VAC 25-840-40.17) Improve construction entrance (CGP Part II A.2(c)) and include a wash facility (CGP II E(1-2)) (9VAC25-870-54.B) 47 (9VAC 25-840-40.19(a- Sediment loss at removed n)) trap location and missing inlet and outlet protection Recommended 9/20/2021 Corrective Action Deadline: Targeted Re- 9/20/2021 Inspection Date: Comments: Site is in need of general repair since large storm of last week of August. Large rills, damaged controls,etc. Sediment Basin 2 needs to be cleared of silt, at or near 50 percent capacity. Areas of dorment ground needs to be stabilized per VESCH minimum standards for seed and straw mulch. Sediment trap 2 needs to be reinstalled until all storm sewer lines and structures are completed and able to take on stormwater. Diversion ditch feeding into ST1 needs to be installed and continue to OP5. Proper outlet protection for OP5 needs o be installed to protect while stabilizing occurs around. Install tempory controls at new entry from Old Lynchburg to protect. Maintain good filter volume at silt fence, remove any sediment build up. *Refers to applicable regulation found in the most recent publication of the State Water Control Law (Va. Code § 62.1-44.2 et seq.), Virginia Erosion and Sediment Control Regulations (9VAC25-840), the Virginia Stormwater Management Program (VSMP) Regulations (9VAC25-870), or the General Permit for Discharges of Stormwater from Construction Activities (9VAC25-880). Construction General Permit Site Inspection Photo Log Photos for Item 2 Photos for Item 4 Photo Description: Photos for Item 10 Photo Description: Photos for Item 29 Time Photo_20210907_124306.jpg.jpg 606.99KB Photo Description: Location of removed trap, possible debris in protected space. Photos for Item 30 TimePhoto_20210907_124829.jpg.jpg 1.54MB Photo Description: Mulch does not meet minimum standards requirement Sep 7, 2021 12:50:37 PM 1638 Bitternut Lane Charlottesville Albemarle County Virginia Sep 7, 2021 12:51:18 PM 1638 Bitternut Lane Charlottesville Albemarle County Virginia Photo Description: Damaged inlet protection Photos for Item 35 TimePhoto_20210907_124306.jpg.jpg 606.99KB Photo Description: Removed trap with signs of sediment loss outside of containment Photos for Item 39 Time Photo_20210907_124928.jpg.jpg 1.01 MB Photo Description: Damaged inlet protection Photos for Item 40 TimePhoto_20210907_124829.jpg.jpg 1.54MB Photo Description: Diversion not stable and filled with silt. X G—qe-oop County Inspector COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Inspection Date: 9/9/2021 Charlottesville, Virginia 22902 434 296-5832