HomeMy WebLinkAboutARB200200148AS Correspondence 2002-12-23 it AiretvMaliszewski_
From: M Kirk Train [train-mk@trainarchitects corn]
Monday, December 23,.2002 9.43 AM
To: Margaret M Maliszewski
Subject: Tip Top
Margaret,
Tip Top does not have to come before the Board. If the alterations are of similar material, and
complimentary to the existing structure'they should be handled administratively. Merry Christmas.
Kirk
Facsimile
TRANSMITTAL
to: Kirk Train
Fax 295-5122
re: Tip Top Restaurant Vestibule
date: December 19, 2002
pages: 4, including this cover sheet
Kirk,
The customers in the Tip Top Restaurant (250 East) freeze when the front door opens.
The owner wants to construct a new vestibule — quickly. The new vestibule would be
small (see attached) and would use materials that match the existing ones. It would
have a hipped roof and side entry doors.
An addition is also proposed for the northwest corner of the building. An application for
ARB review has been submitted, but the owner wants to move forward "immediately"
with the vestibule, if possible.
Would you be comfortable with administrative approval of the vestibule as it is
proposed, or would you prefer to wait and have the Board review it with the other
addition?
Thanks for your help.
From the desk of.
Margaret Maliszewksi
Design Planner
Albemarle County Planning Department
401 McIntire Road,Room 218
Charlottesville,VA 22902-4596
434-296-5823 x 3276
Fax:434-972-4012