HomeMy WebLinkAboutWPO201700052 Calculations 2021-09-14DUNLORA OVERLOOK STORMWATER MANAGEMENT CALCULATIONS PACKET (WPO 201700052; VSMP Amendment #4 to WPO 201600058) Date of Amendment #4 Calculations G SCOTT/R. CD•LL1NS7' Lic. No. 035791 a 8/25/21 `44� ZONAL August 25, 2021 PREPARED BY: COLLINS e=NGINEERING 200 GARRETT STREET, SUITE K CHARLOTTESVILLE, VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com Amendment #4 Water Quality Calculations Summary: 1. The proposed VSMP amendment #4 reflects an updated Phase II approved under SDP 202100023. This updated Phase II is less impervious and requires an overall (phases I and 11) phosphorous removal rate of 5.11 Ibs/yr. This can be viewed in the following 'AMENDED Dunlora Park- VSMP Amendment No. 4' VRRM calculations dated 8/25/21. 2. The previously reviewed and approved WPO 201700052 Amendment #3 accounted for a more impervious overall (phases I and 11) development. The approved WPO 201700052 Amendment #3 provided a 5.52 Ibs/yr nutrient credit, and this exceeds the required removal rate associated with this WPO Amendment #4. Please see the following 'APPROVED Dunlora Park- VSMP Amendment No. 3' VRRM calculations dated 2/13/18. APPROVED Impervious Areas for Water Quality (Total Onsite Impervious Areas) Phase I Roadway 29,600 sf Phase II Roadway 9,534 sf Phase I Sidewalks & Driveways 21,188 sf Phase 11 Sidewalks & Driveways 5,964 sf Phase I Buildings 63,700 sf Phase 11 Buildings 10,995 sf 140,981 sf AMENDED Impervious Areas for Water Quality (Total Onsite Impervious Areas) Phase I Roadway 29,600 sf Phase II Roadway 6,974 sf Phase I Sidewalks & Driveways 21,188 sf Phase II Sidewalks & Driveways 1,267 sf Phase I Buildings 63,700 sf Phase II Buildings 7,955 sf Total = 130,684 sf NOTE: This Amendment #4 proposes less impervious areas than the previously approved plans. Therefore the prior nutrient credit purchase and SWM Preservation Easements remain sufficient to meet the minimum water quality requirements. OEO Virginia Runoff Reduction Method New Development Cnmpflanca Spreadsheet - VlrsiOn 3.0 ❑ 2011 BMP St a adarda a nd Specifications 02013 Draft LIMP Standards and Spedficadions Project Name: data input calls AMENDED Dunlora Park- VSMP Amendment No. 4 Date: 8/25/2021 canstantvzlues LIMP Design Specifications List: 2013 Draft Stds & Specs calculation cells Site Information Project (Treatment Volume and Loads) (Aver protected foresuo en space or reforested land 1.09 1.09 Managed to. (.) disturbed, graded for rds or other turf to be auneedlatarused 4.53 4.53 ImpernasoCoverlarrez) 3.00 3.00 'Forest/Oven Spear cancer must In, yrotectedin acrordana with the Vlrglnla Rurml/ Reduction Method 8.62 COnstaMs Runoff Coefficients RV Annual Rainfall(inches) 43 ASoils BSoils CSoils I DSoils Target Rainfall Event (inmes) 1.00 Forert/Open Space 0.02 0.03 0.04 0.05 Total Phosphoros(TP) lZrn RJ 0.26 Managed Turf 0.15 0.20 0.22 0.25 Total Nitrogen (TN) EMCImgA) 1.86 Impewiouz [aver 0.95 0.95 0.95 0.95 argetW Load (lb/acre/yr) 0.41 Pjluni ..'ectionfamor) 0.90 Farest/Open Space Cover (acres) 1.09 Weighted Rv (forest) 0.03 %Forest 13% Managed Tud Cover (acres) 4.53 Weighted Re (turf) 0.20 %Managed Tud 53% Impervious Career (acres) 3.00 Re (impervious) 0.95 %Impervious 35% Site Area(acres) 8.62 Site Rv a." Treatment Volume and Nutrient Loathe Treatment Volume (acre-ft) 0.3157 Treatment Volume (cubic feel) 13,753 TP Load (lb/,) 8.64 ... TN Load Rb/yr) 61.82 DEQ ViMinia RunefJRedu knMa&dNew DevelopmeMComptlanm Spreadsheet-Version3.0 112011 BMP Standards and SpeCiRcatlons O 2013 Draft BMP Standards and Specifications Project Name: data input calls APPROVED Dunlora Park- VSMP Amendment No. 3 Date: 2/13/2018 canstantvzlues BMP Design Specifications List, 2013 Draft Stds & Specs miculation cells Site Information Project (Treatment Volume and Loads) Cover romedforest/open en s r reforested land 1.09 1.09 re Managed Tud(aaes) didurbed, gaded for rdz or other turf m be mowed man ed 1 1 4.29 4.29 Impervious Cover lee.) 3.24 3.24 'Fpreso%hem Space ande must be pmeeteal accordance with the Virginia RurwH Reduction Method 8.62 Constants Runoff Coefficients Rv Annual Rainfall(inchez) 43 ASails BSoils CSoils I DSoils Target Rainfall Event (inmes) 1.00 Foreal/Open Space 0.02 0.03 0.04 0.05 Torzl Plhospbores JP) EMC(mg/L) 0.26 Managed Tud 0.15 0.20 0.22 0.25 Total NioNen(TN) EMCImgA) 1.86 Impewiouz [aver 0.95 0.95 0.95 0.95 argetW Lead(lb/acre/yr) 0.41 Pj (unidezz coneclionfector) 0.90 Farest/Open Space Cover (acres) 1.09 Weighted Re (forest) 0.03 %Forest 13% Managed Tud Cover (acres) 4.29 Weighted Re (turf) 0.20 %Managed Tud 509% Impervious Cover(acres) 3.24 Re (impervious) 0.95 1 %Impervious 138%Site Area(acres) Site Rv Treatment Volume and Nutrient Loads Treatment Volume (acre-ft) 0.3307 Treatment Volume (cubic feet) 14,406 TV Load Rb/yr) 9.05 ... TN Load(Ib/yr) fi435 Amendment #4 Water Quantity Calculations (SCS Worksheets 2-4 & Routings for DA'B' ) Summary: This proposed WPO amendment #4 accounts for a less impervious post -development DA'B' and replaces the previously approved amendment #2 underground detention system with a new dry detention basin (SWM Facility V). Please note, this amendment #4's peak post - development outflows exiting the basin are less than the corresponding approved flows, hereby maintaining this development's compliance with water quantity requirements. e N o N 0 0 coo NN Z N N w 2 m m e j N U II � W � y a w n ^ 3 m 0 z o " u x z u 0 D N m u � m O a u m n o Q ¢ o 0 0 z m + n u m m In .. o c - w m W O 6 d C O r O_ C it W n E c o_ o a 0 01 n � � tC C a U > m c « c E E E c o . +- m c :a ` O C C c o c 0 u m u ti a 0 0 Q o 0 > o m 00 w .Z O c c u E w c a E E 3 m 0 4 o x >v L y a n c n m m Q n mE � C o _ m O N � m w c Q 4 o O > w w n O o o` Q 0 K U.S. Department of Agriculture Natural Resources Conservation Service TR 55 Worksheet 3: Time of Concentration (T.) or Travel Time (Tt) Project: Dunlora Overlook VSMP Amendment #4 Location: Dunlora Overlook Subdivision Check One: Present Developed X Check One: T, X T, Segment Sheet Flow: (Applicable to T. only) 1 Surface description (Table 3-1) 2 Manning's roughness coeff., n (Table 3-1) 3 Flow length, L (total L < 100) (ft) 4 Two-year 24-hour rainfall, Pz (in.) 5 Land slope, s (ft/ft) 6 Compute Tt _ [0.007(n*L)08) / Pi _5 s°"* Shallow Concentrated Flow: 7 Surface description (paved or unpaved) 8 Flow Length, L (ft) 9 watercourse slope, s (ft/ft) 10 Average velocity, V (Figure 3-1) (ft/s) 11 T,= L / 3600*V Channel Flow: 12 Cross sectional flow area, a (ft) 13 wetted perimeter, P. (ft) 14 Hydraulic radius, r = a/Pw (ft) 15 Channel Slope, s (ft/ft) 16 Manning's Roughness Coeff, n 17 V= [ 1.49r2S")/n 18 Flow length, L (ft) 19 T,= L/ 3600*V 20 Watershed or subarea Tor Tr (Add T, in steps 6, 11 and 19) Note: The shoretest SCS Tc is 0.10 hrs. Designed By: FGM, PE Date: 8/25/2021 Checked By: SRC, PE Date: 8/25/2021 Through subarea n/a AMENDED DA B D: (Post-Dev.) Dense Grass 0.24 50 3.66 0.08 0.07 Paved 275 0.08 5.7 0.01 0 N N n a ON N `u O omp G � a Y � N N 6 C u � t n n - `u � N d � � LL a L VI �n UI O m m m 3 v v N C Y 0 F L Q CJ 00 Q i m O 0 ' o p o o _ Q w o O � � v 3t C a 'm c N � a v > � o x a N 6 > a a N O N o > In v Y Y 0 O O N U1 OO m m O O yO J J it � 0 d d u v N w c O II a � Y +' m nN II m N II 5 i II U II n a N E z C N w ll N O d Q O am+ m 'O a z c m uv a y O m O m on Q Y V Y 41 U m C W O m m w a 0 m Vi � O u t O ma= E .o OO O D Z v O o N w d 0 3 o a o n m O O o K ry m O v 1� a N o N 0o rl w m O O m O N LL N N i O � s c � w N 0 E N U L y U Y w U C C � N Y a 3 c o n U d L L O V m LU 41 d 0 m m EL a Vu m a m a w 3 V L O T d N Y Q m O' ,gym C n n 0 C CJ N E= C m N ni -i 4 vi kd r-Z ad ai 3 I LL O I� y n n T O e-I i i LL CO N N W A N r U1 T T LL N ei l0 � " O G e-I 00 N O O O O O N n1 M N W O O lD M Vf tp V1 N Ul a Q O rl •-I a a � N N N •^-I T •�-I a Q cr L W Z N O v O y N H O 0 L f6 b o y y Q O = E a ) N � a s N Y a a C� Cd C C Y °iS o o 0 0 > > j O a o_ Y ao a s a p ¢ ao c m c ¢ 3 o a3 a 0 y 1 s 'va-i w w w 6 N O 0 W c U! LL L N a a rl N u1 O1 O >, O 0 ai a N O Q Y � LL N 1� 111 lO a ci 6 m .0 oo 0 O N O N T '0 3 0 w ^ m v m 0 a cc a U! > N T _ a+ 0000'"ano.+ d v ry ry m N m cc O wN Q N 3 A m v 3 E O ao i ¢ 0 Z °.n° 0 U 0 H o ? > o m L (CC O N O p W O Y N G E 3 m m a 0 N Q a m C� (A m p p Q n C o N E 3 a v a a Diu o a p p a p>> p 0 z d L %> > N p T y N Z Q O p OD bD W O m f0 OD W C aC Z C c c Z 3 c �ii a O Q Q < Q •x •x o P 3 Q Z • N Q • W W Q C N (L Dunlora Overvlook VSMP Amendment No. 4- DA B NOTE: This VSMP Amendment #4's peak outflows are less than the previously approved peak outflows. BasinFlow printout INPUT: Basin: Dunlora Overvlook VSMP Amendment No. 4- DA B 4 Contour Areas Elevation(ft) 434.00 436.00 438.00 440.00 Start_Elevation(ft) 4 Outlet Structures Outlet structure 0 Orifice Area(sf) Computed Vol.(cy) 45.00 0.0 495.00 17.0 1058.00 73.2 1726.00 175.3 434.00 Vol.(cy) 0.00 name: Barrel area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 432.000 multiple 1 discharge out of riser Page 1 Dunlora Overvlook VSMP Amendment No. 4- DA B Outlet structure 1 Orifice name: Low -Flow Orifice area (sf) 0.049 diameter or depth (in) 3.000 width for rect. (in) 0.000 coefficient 0.500 invert (ft) 434.000 multiple 1 discharge into riser Outlet structure 2 Weir name: Riser diameter (in) 24.000 side angle 0.000 coefficient 3.300 invert (ft) 437.500 multiple 1 discharge into riser transition at (ft) 0.608 orifice coef. 0.500 orifice area (sf) 3.142 Outlet structure 3 Weir name: Emergency Spillway length (ft) 15.000 side angle 75.960 coefficient 3.300 invert (ft) 438.500 multiple 1 discharge through dam 4 Inflow Hydrographs Hydrograph 0 SCS name: 1-yr 24-hr SCS TR-55 Design Storm Area (acres) 1.050 CN 73.000 Type 2 rainfall, P (in) 3.030 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 1.167 peak time (hrs) 11.917 volume (cy) 123.533 Page 2 Dunlora Overvlook VSMP Amendment No. 4- DA B Hydrograph 1 SCS name: 2-yr 24-hr SCS TR-55 Design Storm Area (acres) 1.050 CN 73.000 Type 2 rainfall, P (in) 3.660 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 1.717 peak time (hrs) 11.917 volume (cy) 181.743 Hydrograph 2 SCS name: 10-yr 24-hr SCS TR-55 Design Storm Area (acres) 1.050 CN 73.000 Type 2 rainfall, P (in) 5.530 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 3.602 peak time (hrs) 11.917 volume (cy) 381.298 Hydrograph 3 SCS name: 100-yr 24-hr SCS TR-55 Design Storm Area (acres) 1.050 CN 73.000 Type 2 rainfall, P (in) 9.090 time of conc. (hrs) 0.1000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 7.710 peak time (hrs) 11.917 volume (cy) 816.297 Page 3 Dunlora Overvlook VSMP Amendment No. 4- DA B OUTPUT: Routing Method: storage -indication Hydrograph 0 Routing Summary of Peaks: 1-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 1.161 at 11.92 (hrs) discharge (cfs) 0.317 at 12.08 (hrs) water level (ft) 436.723 at 12.10 (hrs) storage (cy) 32.609 Hydrograph 1 Routing Summary of Peaks: 2-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 1.709 at 11.92 (hrs) discharge (cfs) 0.359 at 12.12 (hrs) water level (ft) 437.441 at 12.12 (hrs) storage (cy) 53.202 Hydrograph 2 Routing Summary of Peaks: 10-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 3.585 at 11.92 (hrs) discharge (cfs) 1.945 at 12.04 (hrs) water level (ft) 438.351 at 12.04 (hrs) storage (cy) 87.657 Hydrograph 3 Routing Summary of Peaks: 100-yr 24-hr SCS TR-55 Design Storm inflow (cfs) 7.674 at 11.92 (hrs) discharge (cfs) 7.614 at 11.92 (hrs) water level (ft) 438.727 at 11.92 (hrs) storage (cy) 104.685 Thu Sep 09 09:47:30 EDT 2021 Page 4