Loading...
HomeMy WebLinkAboutWPO202100021 Preconstruction Form 2021-07-20 v rryt Request for Pre-construction Meeting and Grading Y Permit from Albemarle County -VESCP f v- Approved Plan Number: WPO- Z OZ I - Approved Plan Name: _Jod r1 (Plans must be approved prior to a pre- onstruction meeting.) (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: JD A1 Gyl State Certification Number: , �.L t g 0 ' Address �� 2—() /✓(,/D G n Ld- / Q City sa'l �5VG ��2 State VA- Zip Daytime Phone( gg 5/E-mail f h'J I�j j I q F.55'10 /— Primary Contractor: l Llr'51Y7�, C-D/"YL Print Name 1:2)tC� Address S9 cz:4/9 f'1 City )_e/.L I J� "y.e7'�" Zip 2 ] 3 Daytime Pho, L ail Permit Issuance and First Year Maintenance Fees: (Request must include payment) Total acres proposed to be disturbed is contained on the approved plan and application: VESCP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $200.00 flat fee 1+Acres(rounded up) $100.00 per disturbed act'e(or portion) Section 17-207 Fees for land disturbing activity solely to the VESCP. Annual Maintenance Fees[Section 17-207 of the Albemarle County Code]—Annual maintenance fees will be assessed in March of every year this permit is active.Fees cannot be prorated after the first year of permit issuance. 9/11/2017,8/29/19 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email FOR OFFICE USE ONLY W PO# Fee Amount$ Date Paid By who? Receipt# Ck# By 9/11/2017,8/29/19 Page 2 of 3 Information for Permit applicants; 9-Month Permanent Stabilization Deadline: Code Sec. 17-808 Duty to stabilize denuded areas with permanent vegetation within nine months after commencing land disturbing activity A. When permanent vegetation required.The owner shall install on all denuded areas on the site within nine(9) months after the date the land disturbing activity commenced,except for areas that the administrator determines are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface, including,but not limited to,the following surfaces: (i) roadways and sidewalks covered by gravel,asphalt pavement,or concrete;(ii)trails or paths covered by gravel,stone dust,or mulch;(iii)buildings and other permanent structures;and such other surfaces that the administrator determines would adequately provide a permanent barrier to erosion. (See code 17-808 for information about possible extensions) Notice to Comply and Permit Revoked for Overdue Fees Late fees will incur interest,and enforcement actions per code section 17-210. (1) Owners with late payments of fees required by 17-207C6 will be issued a Notice to Comply(NTC).The notice gives 7 days to make payments. (2) At the end of the NTC time period,the permit will be revoked, and a Stop Work Order will be issued for working without a current permit. Disturbed Area Reductions Acreage for the purpose of fee computations will be the entire permitted acreage.This is the disturbed acreage on approved plans.If fees are to be reduced,an application for plan amendment must be made,and areas reduced by changes in limits of disturbance and appropriate plan changes. Such amendments must be approved prior to the fee due date.Amendments to remove disturbed areas can only be approved when such areas are completely stabilized and all erosion control measures(including traps and basins)removed. Refunds The County does not have a refund program. Fees will not be refunded based on completion within the year. Fees will not be pro-rated at payment,other than the first year VSMP fee as indicated in code section 17-209B. Re-inspection Fees Re-Inspection Fees will be charged for inspections following a Notice to Comply or a Stop Work Order.Fees are$250 per inspection,or as given in code sections 17-207 and 17-208. 9/11/2017,8/29/19 Page 3 of 3 County of Albemarle 1231657 . Department of Community Development I2-0(2—'J PH: (434)296 5832 Dat ., RECEIVED F O {OVA"' 1 ' "1\��� Q J� AMOUNT: 41 . \ C $ qJ 8 i 9D 307 308 J 2 5' i• O D 510 1 /j check 4 e3-3 For: 2 ( 0 VO 2_( cash 4 credits card �,/� �� �/JI 1• By c1:� 1 Matthew Wentland From: Matthew Wentland Sent: Tuesday, May 11, 2021 11:07 AM To: Kenny Thacker Cc: Frank Pohl Subject: Missig WP0202100021 Kenny, We're going to change this to a VSMP submittal, since the land cover did technically change with the removal of the trees. However, we are waiving the requirements(other than the ESC portion) as the runoff is not being concentrated and no impervious was added. This is a $145 fee, so there will be a $5 credit.There is a fee required for the pre-con meeting. This is$63.80 for a VSMP grading permit (versus$200 for the VESCP grading permit), so the fee would be $58.80 with the credit. https://www.albemarle.org/home/showpublisheddocument/314/637203134522500000 Matt Wentland, PE Civil Engineer ll Community Development Department County of Albemarle (434) 296-5832 401 McIntire Road Charlottesville, VA 22902 RECEIVED COMMUNITY DEVELOPMENT i Request for Pre-construction Meeting and Grading Permit tigAt from Albemarle County — VSMP �\f ''., � '` °1‘\j\v" Approved Plan Number: WPO- 2d Z/ —4Da Z./ Approved Plan Name: ,--1:0#A/ /Y%sS", (Plans must be approved prior to a pre-construction meeting.) (Bonds must be approved and posted prior to a pre-construction meeting or permit.) Responsible Land Disturber: Print Name: JO/ l v t YY I SS 1 State Certification Number: P.L �i j ` 9 / Cal\ Address 9 026 M u—/ 16-4 U City C-G V/ V I /Li State VA Zip CV/ 2(Q Daytime Phone(`13 lb 7 - p S / E-mail ( SS 19 prae'5Sronaz 1— Primary Contractor: V1UYS I v7 , (Okti Print Name 0 G j1 v l(.QA)../' Address O ci • daye......t_ City (./UU a., State Val Zip a 3093 3 Daytime Phone-5-( ) E-mail Permit Issuance and First Year Maintenance Fees (Request must include payment): Total acres proposed to be disturbed is contained on the approved plan and application: VSMP: Acres to be disturbed Fee Due at Grading Permit Less than 1 $63.80 1 and less than 5 $594.00 5 and less than 10 ' $748.00 10 and less than 50 $990.00 50 and less than 100 $1,342.00 100 and more $2,112.00 Annual Maintenance Fees[Section 17-208 of the Albemarle County Code]—Annual maintenance fees will be assessed in March of every year this permit is active.Fees cannot be prorated after the first year of permit issuance. 7/1/14,Revised: 8/29/14,8/28/19 Page 1 of 3 Person(s)to attend the Pre-construction Meeting: Names(type or print) Firm Contact Number or email The second part of the application fee is required to be paid with this request. This fee amount is; FOR OFFICE USE ONLY Permit Issued Date By who? 1N3 NdO13/13G u l Iflf a3ni3O3 d • r r 7/1/14,Revised: 8/29/14,8/28/19 Page 2 of r • COMMONWEALTH OF VIRGINIA State Water Control Board ill East Main Street, Richmond, Virginia 23219 Responsible Land Disturber John Missig Cat CERTIFICATE NUMBER ?i ' RLD 18091 DE( , •. EXPIRATION DATE VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY _ • 4/19/2024 This certificate is for your records and should be kept in a safe location. Please detach the above certificate and the two wallet size cards below. It is your responsibility to ensure that your certification is kept current and that you meet the requirements for re-certification before the expiration date. • COMMONWEALTH OF VIRGINIA COMMONWEALTH OF VIRGINIA State Water Control Board State Water Control Board 1111 East Main Street,Richmond,Virginia 23219 1111 East Main Street,Richmond,Virginia 23219 Responsible Land Disturber Responsible Land Disturber John Missig John Missig Certificate Number 1 �1 Expiration Date Certificate Number * Expiration Date RLD18091 ' = 4/19/2024 RLD18091 ''ti(- 4/19/2024 ' "`- . • Q, 11571Z6 ?q'7 vIq/zI z rw r � o ul CCUW '