Loading...
HomeMy WebLinkAboutSP202100007 Staff Report 2021-06-01Jefferson Mill Hydroelectric Project Appendix C: CONCEPTUAL PLANS 0 1 2 3 4 5 6 Miles 0 1 2 3 4 5 6 T 8 9 Kilometers Prepared by: Department of Community Development Office of Geographic Data Services This Map is for Display Purposes Only. MNPCRETED 011IN2020 County of Albemarle �Tnraa� V1WG65 0 VA Primary Highway L _' RUR AR6 C VA Secondary Highway Roads r i Incorporated Town or L _ City Boundary rr—rns Railroads ------ CountyBoundary Sheama 113 114 115 '+u ,14-70 1/ 22-18A1\` �...t 114-72U�a 115-11G 114-67B 36 j \ / H%ROW4RE 38 R/V ,y. % 35 123-59A 123-59B 1 j 34C aw a 123-59C 34A r: j: wh y. 123-34C2 h � � _ " o \i 123-34C -- 123-34C4 123-34C5 34 % -- 348 122-24 I 24- J i 124 9 12410p 7233,y 33 32 .. 3L.. 28k 124-1 24 3 -- ybe 4 i30 r / 124-r5r 5 40G / /--30i �2j> 40H1 29 ' 40E; �.,.c 40J 40K 40D 278 i 123-50 A 53 27C _` _ 7B \ 40C 1 40A u<.1 24F 123y tp P \' \ / 25 123-0 108 23-04 24 1zsas m 10A 17A/ + N 123-07 s 26B2 r2 3A1 ti ,6Ee�17B '4'FldONmu n, 19B B1 } f 2M 231 nRM,�1L� 17 'j 21 j' 236 11A 16 _ -- 19 _. i = za-z JE 23-2 FE a 123-13 \ r•l. 18A 23 \ �tlpoxl.x 123-19A 123 �e 123-15 16A 123-18C 49A 24B 131-24 �..- 7 2 130 0 800sCeie 1,600 21,2 Albemarle 131 County Tax Map: 123 Feet Not, This map is for display purposes only f and shows pemels as o11"1/2019, 1i See Map Book Introdia lion for additional deteils. 123-40C 1 123-40B 123-40C 123-40A �Z. 123-17A CD A r - \ 123-26 \I ON �� a r---- . - ■ . e lsovv �e 123-17B R ^� 123-19B z` 1�,3 Jefferson Mill Road 123-19 N 123-17 A J v 0 ON EN N E m L r Y + Q C L 0 N O 0-0 0 u Y QJ QJ C C CL V GJ Y VI L Qv U 3 QJ w m T N O L t.QJ 7 aJ D Q to cu O L QJ o 0 i o O m QJ Y 0" 0 Q 3 C Y V o QJ -O L C O a O Q U -0 0 M a QJ O -0 L � CLO E Y i 1A 0 Y Q 60 aJ O y ar C o-0> = N M O O' L QJ 3QJJQ� 0 0 0 y o 0�� 0 =� al Y CL WQJ O t QJ C -O U O C a T p 0 CLM c 0 L N Q V QJ L vo OMt'0C n N m M H QJ v y QJ E Q o (D QJ N m s � L � � m QJ -0 0- 0 w v O C O 0 C 2 QJ y C "O +� QJ CL N iJ V V Q a L CL i , QJ (D L C O Qj QJ n rQ) O QJ Y N _ E E c tto C O 0 y -CQ 0 QJ o QJ o v s Q r o 0 u -o o. mE =�vv E 4 v� �s vi E i + m 3 0 a J 0 Y wa o Y IV Q txI N Q - o L � Y N t0 0 M N v r 0 L 0 x 171 C � o v w Y N SINCE F PROJECT DESCRIPTION In JEFFERSON MILL DAM THESE DRAWINGS AND DESIGN INFORMATION ARE FOR CONSTRUCTION OF THE STRUCTURES NEEDED TO SUPPORT A HYDRAULIC POWER TURBINE INSTALLATION AT JEFFERSON MILL. THE STRUCTURE WILL CONSIST OF ENCLOSING THE EXISTING MILL WHEEL ROOM TO HOUSE THE TURBINE WITH NEW REINFORCED CONCRETE WALLS AND FLOOR ALONG WITH THE PENSTOCK UPSTREAM TO A CONCRETE INLET STRUCTURE LOCATED AT THE EDGE OF THE RIVER. APPLICABLE BUILDING CODE: VA USBC 2012. »_1►111111►117W:4 1. 1.0 Project Information Sheet 2. 2.0 Site Plan 3. 3.0 Turbine Room Details 4. 4.0 Inlet & Penstock Details 5. 5.0 Eel Ladder Details 6. 6.0 E&SC Site Plan 7. 6.1 E&SC Notes and Details DESIGN SCOTTSVILLE, VA - PREPARED FOR - Natel Energy 2401 Monarch St. Alameda, CA 94501 360-949-8554 - BY - Froehling & Robertson, Inc. SUBMITTALS 540-344-7939 1. Pipe 2. Valves 3. Sluice Gate -PROJECT LOCATION- 4. Pipe supports 5. Access Hatch/Ladder 724 Jefferson Mill Ln 6. Trash Rack Scottsville, VA 24590 37050'29" Lat. 78°28'29" Long. GENERAL NOTES 1. THE WORK SHALL INCLUDE THE FURNISHING BY THE CONTRACTOR OF ALL SUPERVISION, TRAINING, LABOR, MATERIALS, TOOLS AND EQUIPMENT, AND THE PERFORMANCE OF ALL OPERATIONS NECESSARY FOR SITE EXCAVATION AND GRADING, INSTALLATION OF THE NEW CONCRETE CUT-OFF WALL, EROSION CONTROL MEASURES, AND WORK INDICATED IN THE CONTRACT DRAWINGS, SPECIFIED HEREIN, AND/OR AS DIRECTED BY THE ENGINEER. 2. THE CONTRACTOR SHALL HAVE ON THE JOB AT ALL TIMES DURING THE WORK AN EXPERIENCED SUPERINTENDENT WHO SHALL HAVE CONTROL OVER ALL ASPECTS OF THE WORK. 3. THE CONTRACTOR SHALL VISIT THE SITE AND INDEPENDENTLY VERIFY ACCESS AND WORK -RELATED RESTRICTIONS. 4. CONTRACTOR SHALL VERIFY ALL DIMENSIONS OF EXISTING CONSTRUCTION AND REPORT ANY DISCREPANCIES FROM THE CONTRACT DRAWINGS TO THE OWNER PRIOR TO COMMENCING WORK. 5. CONTRACTOR SHALL COORDINATE ALL WORK WITH OTHER WORK SHOWN ON ALL OTHER DRAWINGS. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MEANS AND METHODS OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, DEWATERING, SHORING AND TEMPORARY BRACING. CONTRACTOR SHALL UNDERTAKE ALL NECESSARY MEASURES TO ENSURE THE SAFETY OF ALL PERSONS AND STRUCTURES AT THE SITE AND ADJACENT TO THE SITE. 7. ALL PRODUCTS SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' WRITTEN INSTRUCTIONS AND RECOMMENDATIONS, UNLESS NOTED OTHERWISE. 8. IF CERTAIN FEATURES ARE NOT SHOWN OR CALLED FOR ON THE CONTRACT DRAWINGS, THEIR CONSTRUCTION SHALL BE OF THE SAME CHARACTER FOR SIMILAR CONDITIONS THAT ARE SHOWN OR CALLED FOR WITH APPROVAL OF THE ENGINEER 9. THERE ARE NO GUARANTEED QUANTITIES ASSOCIATED WITH THIS WORK. 10. DEMOBILIZATION INCLUDES REMOVAL OF ALL TRASH, DEBRIS, EQUIPMENT, SUPPLIES, AND RESTORATION OF DISTURBED AREAS TO SATISFACTORY CONDITIONS. 11. CONTRACTOR SHALL PROVIDE A RECORD SET OF AS -BUILT DRAWINGS UPON COMPLETION OF CONSTRUCTION. DRAWINGS SHALL BE PROVIDED IN ELECTRONIC FORMAT COMPATIBLE WITH AUTOCAD. SURVEY SHALL PERFORMED BY REGISTERED LAND SURVEYOR LICENSED IN THE STATE OF VIRGINIA. 648 795 cM���R Project Site 2 Jefferson Mill Dam n � al 7 J al 3 20 sa 622 �SV�/7P d Ry fie 726 / ➢a / 6 Irish Rd v� / Scottsville / L7 \ Ra / i ames \ i 6` 20 1 Vicinity Map 0 4000' 8000' 6 E General Notes No.I Revision/Issue I Date r SINCE ` fs� 1881R Froehling & Robertson, Inc. 1734 Seibel Drive, N.E. Roanoke, Virginia @ COPYRIGHT 2012 FROEHLING & ROBERTSON, INC. ALL RIGHTS RESERVED OOoO ZO O� � 0 Jefferson Mill Dam Design Scottsville, VA Proj ect Information Sheet Prepared For: Natel Energy 2401 Monarch St. Alameda, CA 94501 DR KHH CHK DAK REV PROIECI 62Y-0257 SHLIII 1 DAIS March, 2021 .0 SCALE IL NA 1 of 7 J v c ILI EN N E m r r v= I Y N O o-ou EXI Y v 1,, o Q v N U 7 N o t vo-m � L v O MH'"' O N N Qj Y `L O b 3 . a a 0 v c o 0 s m t v�M� a o CL u v M > c y M ._ " M d O E H MbL vim, b ♦ v p 71 O N .� v C --a a O-0'j 7 3 CL (U Y + m O O O m U M L U N 7 M O. I/, ! L 0 (UE o u E C C 3 t 0 U O U Y C N j 0 O CLN C CL uNv, y 0 N O N pp C v y m 0 41 i +t N E CIL x y0 O vO Ql y v N M L O Y N Y C C O t0 O O C 3 0 v O C O Q C O W y a° C O Y v Q ho W v U C y O_ u = m s v CL > N v Coo O O LL Y E Y N � � m EMS to = 0 -0 °voa N 0 > N L 0 O_ -0 H m O O v U K C N N c vI 9 up a vI w �mE Cl 7 L N E LL 0 m u 0 i w N n N O Lo N 0 i v J Y U v 0 LL J Q 0 Y d E N Y CL N Q Ln N CL y O � � Y -0 N N Lo 0 rn N Vx ti 0 t b 2 N � It: C i v, O N w + N �C ]G U General Notes 1. STRUCTURAL FILL: 95% MAX DRY DENSITY ±3%OF OPT. MOISTURE, GREEN AREA: 85% MAX DRY DENSITY ±5% OF OPT. MOISTURE, ALL LIFTS SHALL BE 8" MAX. BEFORE COMPACTION. 2. CONTRACTOR SHALL EXERCISE CARE IN ALL TREE CLEARING EFFORTS TO MINIMIZE CLEARING TO ONLY TREES REQUIRED TO PERFORM WORK AND SATISFY DESIGN REQUIREMENTS. 3. PROVIDE FLOWABLE FILL UNDER PENSTOCK WHEN ON TOP OF BEDROCK. No.I Revision/Issue I Date SINCE 0 1881 Froehling & Robertson, Inc. 1734 Seibel Drive, N.E. Roanoke, Virginia @ COPYRIGHT 2012 FROEHLING & ROBERTSON, INC. ALL RIGHTS RESERVED OOoO O� O �0 Jefferson Mill Dam Design Scottsville, VA Site Plan Prepared For: Natel Energy 2401 Monarch St. Alameda, CA 94501 DR KHH CHK DAK REV PROJECT 62Y-0257 SHILII 290 DAIS March, 2021 L CALL NA 1 2 of 7 J v � v v c -'cin °1—�� E m r Y Y M G p o °� Y N I_ E y @ Y y ova,N u U C Y U M T O L Y N CL @ � v v� � L O bbD ~ Y o H C o ° w Q o 3 C Y >o� t�t=v Mzs v o °- U .5 y C CC '0 ` CLT ,I E Y L vvI @ MG! p v o m — .� Iv w12 0 T C v � v a � v ° m o Y !_'' M O oM U = L u a� Eo 3�y72 "6 U O C N T p O QmCa E 3 '^ -" U v `o M to C N M N _W v v E xCL o ° aM v (b L @ V L Y Q v U 'y N N C c ° m 3o'v O C O C °oa,C ° m c o Y V CL @ U � -M L CL `on O O 1 0 Q; V Y c N = E E U @ E °= to r-0- Y .L C ID v o C t v 0 IV L u CL 9 M O O U '= , °.` , ML—@ on N lu �mEy 0 Y 7 L N � y LL y M 3 to 3 v 6FTX 8 FT TURBINE ACCESS HATCH COVER MANHOLE SHALL BE FIELD LOCATED /DUB_ J �--�k�_ 1DD -- EXISTING MI - BUILDING 48" 90` ELBOW 30"0 ANW Y ACCESS — — — — _ 36" TURBINE HATC AND ADDER �� \ ROOM NEW CONCRETE — �� PENSTOCK I F CONDUIT DOOR THRESHOLD ELEV. 325.8 325 TOP OF WALL ELEV. 323.0 BASEMENT FFE ELEV. 321.33 320 LINER WALL-3 SI \� (MIN 6"THICK) D V1 1 r �, D D l C ^ 48" ADJUSTABLE COUPLER NATELENERGY T RBINE 3 WITH DRAFT TUBLL _ _ #5 REBA @ 8" O.C. 3 315 3.0 D IPE SUPPORT STAND 48" 0 OUTLET PIPE L — — 3.0 D D DDD�DD DODD-3DODD D�DD D Da 7ToDD oD o D 310 OUTLET 3" SUMP OUTLET WITH CHECK VALVE 2 4 CONCRETE SHALL BE POURED IN (4'-0" ASSUMED) 3.0 3.0 BOTTOM OF SPACE TO ESTABLISH A LEVEL FLOOR AT ELEV. 312.0 — TURBINE ROOM STRUCTURAL PLAN OVERHANG WITH DRIP GROOVE =1I11 1 315 310 1 305 2.0 NEW CONCRETE LINER 00 L 8" DECK SLAB UPSTREAM CONCRETE CLOSURE WALL WALL (MIN 6" THICK) 480" OUTLET PIPE NATEL ENERGY TURBINE #5 REBAR @ 8" O.C. PIPE SUPPORT STAND WITH DRAFT TUBE (TYP VERT & HORIZ) WWF 6x6 D20xD20 48" 0 ADJUSTABLE COUPLER REMOVE EXISTING 48"0 900 ELBOW 4'-0" TOP OF EXISTING OUTLET OPENING - ELEV. 311.0 4' 0" I:N:j I D 3" SUMP OUTLET WITH CHECK VALVE EXCAVATE DOWN 5' 0" MIN TO ELEV. 306. TURBINE ROOM ELEVATION VIEW "N/2" ADDITIONAL BARS EACH FACE (TYP) LENGTH - "W" + 2 SPLICE LENGTHS 3" (TYP) IIWII UPSTEAM STONE WALL CL OF PIPE/TURBINE AT ELEV. 315.0 Scale: 3/8" = P-0" AS REQ'D STEEL LEDGER BEAM 6'-0" HATCH OPENING (SEE DET. 7) ACCESS LADDER RUNGS CAST INTO WALL ANTICIPATED ROCK SURFACE SECTION THROUGH TURBINE ROOM 8" DECK SLAB WWF 6x6 D20xD20 OVERHANG WITH DRIP GROOVE TOP OF WALL ELEV. 321.5 DRIP GROOVE ^HAMFER 1 Scale: 1/4" = P-0" DOOR THRESHOLD STEEL LEDGER BEAM ELEV. 321.33 325 OVERHANG WITH 8" DECK SLAB DRIP GROOVE OVERHANG WITH DRIP TOP OF WALL TOP OF WALL GROOVE ELEV. 323.0 ELEV.321.5 BASEMENT FFE u� ELEV. 321.33 TOP OF DAM 36" (ELEV. 319.7 PENSTOCK � CONDUIT 320 LLL _ \ full- EXTRA FLANGE r FOR CONCRETE D / ENGAGEMENT / 111 /�TTD DAD D POTENTIAL FINISH FLOOR ' ELEV. 312.0 ROCK SURFACE (1% SLOPE TO SUMP) SUSPECTED ROCK TO BE EXCAVATED FOR OUTLET WWF 6x6 D20xD20 MASS CONCRETE SHALL BE CAST AROUND ELBOW FORM AND POUR STRUCTURAL CONCRETE TO SUPPORT DOWNSTREAM END OF THE ELBOW SO THAT CL OF THE UPSTREAM END ALIGNS AT ELEV. 315.0 l� L N = NUMBER OF BARS A CUT-OFF BY OPENING Ts� O�F9 (2) BARS EACH FACE (TYP) @ 6" SIZE TO MATCH MINIMUM REINFORCING LENGTH = 60 BAR DIA. (MINIMUM = 4'-0") WALL PENETRATION REINFORCING DETAIL Not to Scale 48"0 OUTLET WITH ELBOWS 315 BASEMENT OF MILL BUILLING PIPE SUPPORT STAND J� 310 MASS CONCRETE SHALL BE POURED IN BOTTOM OF SPACE TO ESTABLISH A LEVEL FLOOR AT ELEV. 312.0 48"0 900 ELBOW TURBINE ROOM OUTLET DETAIL ROCK TO BE EXCAVATED _ FOR OUTLET THICKENED SLAB TO SUPPORT TURBINE AND HEADWALL 2.0 Scale: 1/4" = P-0" �L EXTERIOR STONEWALL (THICKNESS VARIES) �D WWF 6x6 D20xD20 o FINISH FLOOR \ / o ELEV. 312.0 �o�� TOP OF OPENING IN EXTERIOR WALL AT APPROX ELEV. 311.0 TAIL WATER ELEV. 310± 3" SUMP OUTLET WITH CHECK VALVE 64INVERTOF CONCRETE EXCAVATE DOWN TO ELEV. 30 .0 (MAX) ELEV. 306.0 (MAX) THROUGH OPENING a D MASS CONCRETE MIN 6" THICK Scale: 1/4" = P-0" 315 310 BOTTOM OF SPACE TO ESTABLISH A LEVEL FLOOR AT ELEV. 313.0 TURBINE ROOM UPSTREAM WALL RECONSTRUCTION 1/2" GALV. STEEL PLATE 1 3/4" 1 1/2" GALV. STEEL FRAME 1 / 1 COMPRESSIBLE ELASTOMERIC HATCH SEAL HATCH RECESS DETAIL Scale: 2" = P-0" Scale: 1/4" = P-0" 1 l General Notes %No. Revision/Issue Date SINCE fad 1881 Froehling & Robertson, Inc. 1734 Seibel Drive, N.E. Roanoke, Virginia @ COPYRIGHT 2012 FROEHLING & ROBERTSON, INC. ALL RIGHTS RESERVED 00 U DDDD o �0 DDa DD Jefferson Mill Dam Design Scottsville, VA Turbine Room Details Prepared For: Natel Energy 2401 Monarch St. Alameda, CA 94501 DR KHH CHK DAK REV PROIECI 62Y-0257 SHLIII 3.0 DA IE March, 2021 SCALE NA 3 of 7 J v EH E m r s v= �y Y M G p 0-0 O Y N U m y @ � I,I N O " '^ � CLU vI U C m T O L v CLM � L O b M y o w H C ✓� O m v Y O_ O @ 3 CILI Y >o� m t v�m� y O O- u y � ov ` `o o E M L Iil @ — o v!2o� 3 v d C N O m Ou Y !_'' m O o —-o— Eo U !=' L u Q yl ++ '^ E o v�Nw C C T Y � M y N T p O Q E Uv `o m o`O v y m �v v v E zi x o 1 vI/Iv� V Y y v u 'y N m C c m v- y N O 3o"v o c o a0 �o,C O m c a QC': CL IV v U ._ v CLm t C `m v w o O N O C v V Y Y,CE p = E m " @ E m to = 0 -0 Y L O O v In > IV L vl O 9 m O O ,1 u �2N@ nn E m o c In iv v s m E Y 0 N + � y LLm ? m 3 v 8" 0 STILLING WELL it-oil10'-6" 2'-7" sr. 36" � PENSTOCK g"0 STILLING WELL Rl- 36"� PENSTOCK CONDUIT SLUICE GATE OPERATOR AND STEM 6„ STD PIPE HANDRAIL PVC ENCASED IN CONCRETE FOR STEM (LOCATION AND N 325 SIZE TO BE COORDINATED WITH SLUICE GATE SUPPLIER) o C�l E GATE #5 REBAR @ 8 SPA (TYP) - „'., GROUND SURFACE 1O N — — ELEV.322± m �1�' ,o TOP OF WALL _ - II ELEV. 321.5+ \\ \\ \� \\ \\ 6" BLOCKING \\ \\ \\ \\IF it rl A3 CONCRETE / I I yv�vi��vivivi�v� I I NORMAL POOL/ 4'-2" TOP OF DAM p — \\,\\,\ 1�� ELEV.319.7 CONCRETE CRADLE DETAIL 7rnmrl 320 EXTRA FLANGE3scale: 3/4" = 1'-0"'FOR CONCRETE 36"0 PENSTOCK %�iENGAGEMENT CONDUITvEXPECTED EXISTING GRADE SLUICE GATE TRASH RACK TRASH RACK CL OF PENSTOCKoETE CRADLE ELEV. 315.5 SEE DETAIL 200 — 3/4" CHAMFER ON ALL 315 CONCRETE 2 EXPOSED CORNERS CRADLE #5 REBAR @ - rj- 8" SPA (TYP) O ti EXCAVATEINTAKE AREA DOWN TO 314± LE S. O% 1'-0" 1'-0" 1'-0" 310 PLAN -PENSTOCK INLET STRUCTURE o 1' z' 4' SECTION -PENSTOCK INLET STRUCTURE o 1' z' 4' TRASH RACK NOTCH DETAIL JScale: 1/2" = P-0" �2) Scale: 1/2" = P-0" Scale: 6" = P-0" 8" 0 PVC WITH REMOVABLE CAP 8"0 PVC WITH REMOVABLE CAP WITH 1/4"0 AIR RELEASE VENT WITH 1/4"0 AIR RELEASE VENT j%/ W I NG WALL > \//\\ > // NORMAL POOL//\\ 0 /\\\%\\fie° e NORMAL POOL/ % 00 TOP OF DAM /%\i °° TOP OF DAM ELEV. 319.7 //\\// \/\// ELEV. 319.7 XX V/VA/ V/VA, AA/AA/AA/AA INVERT ELEV. 318.0 AA; OVAAAAA INVERT ELEV. 318.0 VA//\ �//VAS ��/j \//\\ B I0 PVC \/ \/\�' j� 8110 PVC ELBOW 6" VDOT #57 8 0 PVC ELBOW STONE BEDDING 5 STILLING WELLS Scale: 3/4" = 1'-0" General Notes No.I Revision/Issue SINCE fs� 1881R Date Froehling & Robertson, Inc. 1734 Seibel Drive, N.E. Roanoke, Virginia @ COPYRIGHT 2012 FROEHLING & ROBERTSON, INC. ALL RIGHTS RESERVED OOoO O� 0�0 Jefferson Mill Dam Design Scottsville, VA Inlet & Penstock Details Prepared For: Natel Energy 2401 Monarch St. Alameda, CA 94501 DR KHH CHK DAK REV PROIECI 62Y-0257 SHLIII 4l.0 DA IE March, 2021 SCALE NA 4 of 7 J v 0 V c ON fb _N '— •O EN cb L L Y N O O V O u 1= E v o Q v L N u 7 7J �m>,� o t vo-m � L v O MH }, O o m v Y `O_ �O N 3 ara. v o v L M t v�M� 71 o O- U .5Mr� y M QJ " M ` no n Q o Mb E Q) L b ♦ v p voM— m Y v C v N OL'j 7 3 CL (U £ m a o u -M L u N 3 " ,b CL ^! L 0 E o iU u E L C C 3 6 U O C N j Y O CL` N d E u N v a, O N bib C v o QJ E Q)QJ v v E O- O j 7 X V v N cb L O o 3 0 7E v o C o a C O Ol y M c -o Y v Q vho y O_ u = b L CL v > v v m o O O Qi LL V Y E Y N E °= u b=a3v c a c Ln I « ° v 0 t a 0 > N L v d 0 o �o�� W o c r v a :Em E +L (V y 7 L o N i_+ 0 m u C 0 i w N n N O Lo N / C 0 a, J Y U v 0 LL J Q 0 Y a E N Y CL N Q Ln N CL y O � � Y L N a) rn N Vx ti 0 t b 2 N � It: C i in O N �C ]G U USFWS R5 Fish Passage Engineering Design Criteria June 2019 control S/ d section substrate Q HW 5J I crest d h ace - 22b �aA - control section and eelway channel -- control section exit structure v dam crest z2(c . e. HW eelway channel 2 2 ft a2ft 5200 • • dam TW \i entrance structure `- Figure 22: Design parameters for a laterally sloped eel ramp � r 'a„ p 13.1.5 Helical Eel Rama �. A helical eel ramp consists of a water -retaining channel coiled around a central shaft, with climbing substrate installed on the channel bottom. The unit is installed vertically, thereby 1 connecting the headpond to the tailwater at a climbing angle equivalent to the pitch of the helix. Initial tests of this eel pass at a hydropower project on the Saco River (Lakeside Engineering, 2014) demonstrated passage above 90% for some treatments. Engineering recommends the following: • Limit total vertical lift to 12 feet; lift may be extended with inclusion of resting sections; 13-7 USFWS EEL PASSAGE CRITERIA �.,� PRELIMINARY EEL LADDER CONCEPT FOR JEFFERSON MILL 1 \ L General Notes No.I Revision/Issue SINCE fs� 1881R Date Froehling & Robertson, Inc. 1734 Seibel Drive, N.E. Roanoke, Virginia @ COPYRIGHT 2012 FROEHLING & ROBERTSON, INC. ALL RIGHTS RESERVED OOoO O� O �0 Jefferson Mill Dam Design Scottsville, VA Eel Ladder Details Prepared For: Natel Energy 2401 Monarch St. Alameda, CA 94501 DR KHH CHK DAK REV PROJECT 62Y-0257 SHLII 5.0 DATE March, 2021 SCALE NA 5 of 7 J v c EN N � O L t v= � a Y N O o-ou E A Y E a o Q v L U = m7 �>.� O t = Qm � L v O bMH'"' o o m v Y `OQ O b 3 va. v O v s m t v�M� v o CL u .5 y C C O M C 6 O Mb E Q) L b ♦ v p 71 O N vc -0 a O-0'j 7 3 CL Y m `o o-0 m u -M L u M Qom. L 0 E o iU u E c c 3 t 0 "O U � C N j YO O CLN C O � E u vQv a,0 `o m b`o c �vM0 "a v v E x o N (U V v N M L O C O � t N O 3 0 7E v O C O 0 C O W y .2 a° C O Y v CL MID (U U C y CL M m s CL v > N 2 m o O O Qi LL Y E Y m M " m EM =0 (U C v rv0> (U L v fl 9 m O O v U o c N m o .` wE °v c v a s m E +L v = s N i_+ General Notes 1. CONTRACTOR SHALL EXERCISE CARE IN ALL TREE CLEARING EFFORTS TO MINIMIZE CLEARING TO ONLY TREES REQUIRED TO PERFORM WORK AND SATISFY DESIGN SPECIFICATIONS. 2. ALL VEHICLES SHALL BE ADEQUATELY CLEANED PRIOR TO LEAVING THE CONSTRUCTION AREA AND ENTERING ROADWAY. CE CONSTRUCTION ENTRANCE SF SILT FENCE PS PERMANENT SEEDING MU MULCH CW CONCRETE WASHOUT SB SEDIMENT BAG LEGEND (E) = EXISTING, (P) = PROPOSED 0 o SECURITY FENCE (E) TREE LINE —X X— SILT FENCE DIVERSION (E) MAJOR TOPO (E) MINOR TOPO PROPERTY LINE EC-3 BLANKETS i t SOIL MAP LIMITS REGULATORY DISTURBED AREAS: AREA A = 0.26 ACRES No.I Revision/Issue I Date SINCE 18810, Froehling & Robertson, Inc. 1734 Seibel Drive, N.E. Roanoke, Virginia @ COPYRIGHT 2012 FROEHLING & ROBERTSON, INC. ALL RIGHTS RESERVED OOoO O� O �0 Jefferson Mill Dam Design Scottsville, VA E&SC Site Plan Prepared For: Natel Energy 2401 Monarch St. Alameda, CA 94501 DR. KHH CHK. DAK REV. PRO= 62Y-0257 DAM Sill I I 6l.0 March, 2021 SCALE NA 6 of 7 J v 0 v v c E H N M L Y h Y M G O CO -0Qj O C Y M + u o CL U 3 (UM >. o t W o- `3 � L v O 0f0n o o CU v Y CLO M 3 7J OC . "m.r f0 (U C 0-0 L M r v -0 " M 71 O CL U '0 M C C O �M I_ "o o o p ,n M W O U v c = -0 Q) 0-0 j 7 7 CL C O m OU Y + M O O -0 o J U } L M C 7 E O (1)u vt � C C 3 t 0 3 "0 U O C 71 j. ,0 O CL M C CL E U vQ Ili ` N O M pp C v y M M QJ E CL x O O v0 (U M L O Y N Y C c M OJ -0 C 3o v O C O 0 C 2 N = .2 a° c Y IV CL bD W v u y CL W p L CL v >. N W CO 00 O O LL C Q n L V W v Y (Mp E M J C0-00 0�Lo v ' > 71 L v O -0 F- m o c N M m m 00 E m ma c n Ln a, s ro E Y 0 Y y N EnLL y M 3 3 v 0 m u 0 0 i v n N 0 N i 0 u 0 0 v v J u v 0 CL J 0 Y a E N Y CL N Q In N CL - y O � � Y � N N LDO rn N Vx ti 0 x N � It: C i o v w + H v-� �C ]G U i CE STONE CONSTRUCTION ENTRANCE (Adapted from Virginia Erosion and Sediment Control Handbook, Plate 3.02-1) 70' MIN. EXISTING A 3 PAVEMEENT 5:1 Y FILTER CLOTH 6" MIN. A MOUNTABLE BERM (OPTIONAL) SIDE ELEVATION EXISTING GROUND I 12' MIN. * L 2 3" COURSE AGGREGATE * MUST EXTEND FULL WIDTH OF INGRESS AND EGRESS OPERATION FILTER CLOTH REI 70' MIN. B WASHRACKAT DISCRETION OF P WC SITE INSPECTOR POSITIVE DRAINAGE B TO SEDIMENT TRAPPING DEVICE PLAN VIEW SECTION A -A SECTION B-B 10' EXISTING PAVEMENT 10' MIN. 3" MIN. 3" MIN. CW EXCAVATED PIT CONCRETE WASHOUT THE CONTRACTOR SHALL SUBMIT FOR REVIEW TO THE ENGINEER A PROPOSED METHOD FOR CLEANING OUT WASTE FROM CONCRETE TRUCKS DURING THE PROJECT. AT THE COMPLETION OF THE PROJECT THE CURED CONCRETE WASTE SHALL BE DISPOSED OF OFF -SITE. A SUGGESTED METHOD IS SHOWN BELOW. SC-03 GRAVELFILLED BAGS EDGE OF PLASTIC LINER If - TOP OF CUT EARTHEN BERM B / EDGE OF PLASTIC LINER (SEE / NOTE 2) EARTHEN BERM PLASTIC LINER OVER BERM m GRAVEL -FILLED BAG EARTHEN BERM PLASTIC LINER PLACED 11-8.1 UNDER BERM (ENTRY TV TOP OF CUT 5-4)"SIDE ONLY) ORIGINAL GROUND SECTION B-B NOT TO SCALE J 4 N PLASTIC LINER OVER PLASTIC LINER ENTRY SIDE OF WASHOUT hh EARTHEN BERM BERM OVER BERM FACILITY PLASTIC LINER PLACED UNDER BERM EARTHEN BERM EARTHEN BERM PLAN (ENTRY SIDE ONLY) GRAVEL FILLED PLASTIC LINER GRAVEL FILLED BAG BAG TYPE "EXCAVATED PIT" On T�Xl e e ORIGINALGROUND 1:1 4 } 3:1 t NOT TO SCALE LETTERS A MINIMUM OF NOTES: 5" IN HEIGHT 1. ACTUAL LAYOUT DETERMINED IN FIELD. CONCRETE 2. INSTALL CONCRETE WASHOUT SIGN (24"X24", MINIMUM) WITHIN 30' OF THE WASHOUT TEMPORARY CONCRETE WASHOUT FACILITY. 3. TEMPORARY WASHOUT AREA MUST BE AT LEAST 50' FROM A STORM DRAIN, CREEK BANK OR PERIMETER CONTROL. 4. CLEAN OUT CONCRETE WASHOUT AREA WHEN 50% FULL. 5. THE KEY TO FUNCTIONAL CONCRETE WASHOUTS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR CLEAN OUT. CONCRETE WASHOUT SIGN DETAIL 6. SILT FENCE SHALL BE INSTALLED AROUND PERIMETER OF CONCRETE WASHOUT AREA EXCEPT FOR THE SIDE UTILIZED FOR ACCESSING THE WASHOUT. 7. A ROCK CONSTRUCTION ENTRANCE MAY BE NECESSARY ALONG ONE SIDE OF THE WASHOUT TO PROVIDE VEHICLE ACCESS. GENERAL EROSION AND MINIMUM STANDARDS SEDIMENT CONTROL NOTES MS-1 APPLY PERMANENT SOIL STABILIZATION TO DENUDED AREAS WITHIN SEVEN DAYS AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. APPLY TEMPORARY SOIL STABILIZATION WITHIN SEVEN DAYS TO DENUDED AREAS ES-1: UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND THAT MAY NOT BE AT FINAL GRADE BUT WILL REMAIN DORMANT (UNDISTURBED) FOR LONGER THAN 14 DAYS STRUCTURAL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED AND MAINTAINED ACCORDING TO MS-2 STABILIZE OR PROTECT TEMPORARY SOIL STOCKPILES WITH SEDIMENT TRAPPING MEASURES. PROVIDE TEMPORARY MINIMUM STANDARDS AND SPECIFICATIONS OF THE VIRGINIA PROTECTION AND PERMANENT STABILIZATION OF ALL SOIL STOCKPILES ON SITE AS WELL AS SOIL TRANSPORTED EROSION & SEDIMENT CONTROL HANDBOOK THIRD EDITION FROM THE PROJECT SITE. 1992 MS-3 ESTABLISH A PERMANENT VEGETATIVE COVER ON DENUDED AREAS NOT OTHERWISE PERMANENTLY STABILIZED. ES-2: THE LOCAL AUTHORITY HAVING JURISDICTION SHALL BE PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL A GROUND COVER IS ACHIEVED THAT IN NOTIFIED OF THE PRE -CONSTRUCTION CONFERENCE. LOCAL THE OPINION OF THE ENGINEER, IS UNIFORM, MATURE ENOUGH TO SURVIVE AND WILL INHIBIT EROSION. AUTHORITIES HAVING JURISDICTION WILL MAKE A CONTINUING REVIEW AND EFFECTIVENESS OF THE METHODS MS-4 CONSTRUCT SEDIMENT TRAPS AND DIVERSION DIKES, SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO AND EFFECTIVENESS OF THE EROSION CONTROL PLAN. TRAP SEDIMENT AS A FIRST STEP IN ANY LAND -DISTURBING ACTIVITY AND MAKE THESE MEASURES FUNCTIONAL BEFORE UPSLOPE LAND DISTURBANCE OR TIMBERING TAKES PLACE. ES-3: ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE PLACED PRIOR TO OR AS THE FIRST STEP IN CLEARING, MS-5 APPLY STABILIZATION MEASURES TO EARTHEN STRUCTURES SUCH AS DAMS, DIKES AND DIVERSIONS IMMEDIATELY AFTER INSTALLATION. GRADING, OR LAND DISTURBANCE. MS-6 DESIGN AND CONSTRUCT SEDIMENT TRAPS AND SEDIMENT BASINS BASED UPON THE TOTAL DRAINAGE AREA TO BE ES-4: ALL EXISTING EROSION CONTROL MEASURES WHICH SERVE SERVED BY THE TRAP OR BASIN.. THIS SITE SHALL REMAIN IN PLACE AND SHALL BE MAINTAINED UNTIL THE AREAS THEY SERVE HAVE BEEN STABILIZED. MS-7 CONSTRUCT CUT AND FILL SLOPES IN A MANNER THAT WILL MINIMIZE EROSION. PROVIDE SLOPES THAT ARE FOUND TO BE ERODING EXCESSIVELY WITHIN ONE YEAR OF PERMANENT STABILIZATION WITH ADDITIONAL SLOPE ES-5: ALL STREETS AND ROADWAYS SHALL BE MAINTAINED FREE OF STABILIZING MEASURES UNTIL THE PROBLEM IS CORRECTED. MUD AND DIRT, AND CONTROL DUST AS NECESSARY. MS-8 CONCENTRATED RUNOFF SHALL NOT FLOW DOWN CUT OR FILL SLOPES UNLESS CONTAINED WITHIN AN ADEQUATE ES-6: A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL TEMPORARY OR PERMANENT CHANNEL. PLAN SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. MS-9 WHENEVER WATER SEEPS FROM A SLOPE FACE, PROVIDE ADEQUATE DRAINAGE OR OTHER PROTECTION. ES-7: PROVIDE ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT EROSION AND SEDIMENTATION AS MS-10 PROTECT ALL STORM WATER INLETS MADE OPERABLE DURING CONSTRUCTION SO THAT SEDIMENT -LADEN WATER DETERMINED BY THE LOCAL AUTHORITY HAVING CAN BE FILTERED BEFORE ENTERING CONVEYANCE SYSTEM. JURISDICTION. MS-11 PROVIDE ADEQUATE OUTLET PROTECTION BEFORE NEWLY CONSTRUCTED STORMWATER CONVEYANCE CHANNEL ES-8: ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT ARE MADE OPERATIONAL. CONTROL MEASURES AT ALL TIMES DURING LAND -DISTURBING ACTIVITIES AND DURING SITE DEVELOPMENT. MS-12 WHEN WORK IN A LIVE WATERCOURSE IS PERFORMED, TAKE PRECAUTIONS TO MINIMIZE ENCROACHMENT, CONTROL SEDIMENT TRANSPORT AND STABILIZE THE WORK AREA TO THE GREATEST EXTENT POSSIBLE DURING ES-9: DURING DE -WATERING OPERATIONS, WATER SHALL BE CONSTRUCTION PUMPED INTO AN APPROVED FILTERING DEVICE. MS-13 WHEN CROSSING A LIVE WATERCOURSE MORE THAN TWICE IN ANY SIX-MONTH PERIOD, AN ADEQUATE TEMPORARY STREAM CROSSING SHALL BE PROVIDED. ES-10: INSPECT ALL EROSION CONTROL MEASURES DAILY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE EFFECTIVENESS OF MS-14 MEET ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS PERTAINING TO WORKING IN OR CROSSING LIVE WATERCOURSES. THE EROSION CONTROL DEVICES SHALL BE MADE IMMEDIATELY. MS-15 STABILIZE THE BED AND BANKS OF A WATERCOURSE IMMEDIATELY FOLLOWING AFTER WORK IN THE WATERCOURSE IS COMPLETED. ES-11: PRIOR TO ANY LAND DISTURBING ACTIVITIES THE CONTRACTOR SHALL DESIGNATE A RESPONSIBLE LAND DISTURBER (RLD) TO MS-16 UNDERGROUND UTILITY LINES SHALL BE INSTALLED IN ACCORDANCE WITH ALL APPLICABLE STANDARDS AND THE DEPARTMENT OF ENVIRONMENTAL QUALITY (DEQ) IN CRITERIA. ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL ACT SECTION 62.1-44.15:55 B. MS-17 WHERE CONSTRUCTION VEHICLE ACCESS ROUTES INTERSECT PAVED PUBLIC ROADS, MAKE PROVISIONS TO MINIMIZE THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO THE PAVED SURFACE. WHERE SEDIMENT MAINTENANCE IS TRANSPORTED ONTO A PUBLIC ROAD SURFACE, CLEAN THE ROAD THOROUGHLY AT THE END OF EACH DAY. REMOVE SEDIMENT FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORT TO A SEDIMENT CONTROL ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE CHECKED DISPOSAL AREA, STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. DAILY AND AFTER EACH RUN OFF PRODUCING RAINFALL. THE FOLLOWING ITEMS SHALL BE CHECKED IN PARTICULAR: MS-18 REMOVE ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION OR AFTER THE TEMPORARY MEASURES ARE NO LONGER NEEDED, UNLESS OTHERWISE AUTHORIZED BY THE LOCAL AUTHORITY HAVING JURISDICTION. PERMANENTLY STABILIZE TRAPPED SEDIMENT AND THE A R SHALL BE CHECKED FOR UNDER MINING THE SILT FENCE BARRIER DISTURBED SOIL AREAS RESULTING FROM THE DISPOSITION OF TEMPORARY MEASURES TO PREVENT FURTHER OR DETERIORATION OF FABRIC. SEDIMENT SHALL BE EROSION AND SEDIMENTATION. REMOVED WHEN THE LEVEL OF SEDIMENT DEPOSITION REACHES HALF WAY TO THE TOP OF THE BARRIER. MS-19 ALL DOWNSTREAM PROPERTIES AND WATERWAYS SHALL BE ADEQUATELY PROTECTED FROM EROSION AND B. SEEDED AREAS SHALL BE CHECKED TO ENSURE THAT A GOOD SEDIMENT DEPOSITIONS DUE TO INCREASES IN PEAK STORMWATER RUNOFF RESULTING FROM UPSTREAM LAND STAND IS MAINTAINED. AREAS SHALL BE FERTILIZED AND DISTURBING ACTIVITIES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS AND CRITERIA. RESEEDED AS NEEDED. SF CONSTRUCTION OF A SILT FENCE (WITH AND WITHOUT WIRE SUPPORT) (Adapted from Virginia Erosion and Sediment Control Handbook, Plate 3.05-1 and 3.05-2) 1. SET POSTS AND EXCAVATE A 4"X4" 2. ATTACH FILTER MATERIAL TO STAKES 3. BACKFILL AND COMPACT TRENCH UPSLOPE ALONG THE LINE (WITHOUT WIRE SUPPORT), TO WIRE THE EXCAVATED SOIL. OF POSTS. FENCE (WITH WIRE SUPPORT) AND EXTEND IT INTO THE TRENCH. WI _ f 1 / FLOW �- FLOW II �II�� �W. 4" III SURVEY 1. CONTRACTOR SHALL LOCATE AND MARK ALL LOCATING FEATURES BEFORE PROCEEDING WITH SITE CLEARING AND CONSTRUCTION ACTIVITIES. 2. CONTRACTOR SHALL ESTABLISH TEMPORARY BENCHMARKS AS REQUIRED TO ADEQUATELY CONTROL CONSTRUCTION. LAKE LEVEL CONTROL 1. LAKE LEVEL IS CURRENTLY FULL. COFFER DAMS SHALL BE INSTALLED AND WORK AREAS PUMPED EMPTY UNTIL WORK IS COMPLETE. UTILITIES 1. THE CONTRACTOR SHALL CALL MISS UTILITY 8-1-1 AND LOCATE ALL UTILITIES PRIOR TO ANY WORK. STONE 1. STONE USED FOR CONSTRUCTION ENTRANCE SHALL BE 2-3" COURSE AGGREGATE. EARTHWORK 1. CLEARING AND GRUBBING 1.1) THE CONTRACTOR SHALL CLEARLY MARK ALL AREAS TO BE CLEARED IN ADVANCE. 1.2) THE CONTRACTOR SHALL INSTALL ALL EROSION AND SEDIMENT CONTROLS PRIOR TO GRADING THE RESPECTIVE AREAS. 1.3) CLEAR AND GRUB ALL WORK AREAS TO AT LEAST 5 FEET BEYOND THE LIMITS OF CONSTRUCTED WORKS. 2. TOPSOIL 2.1) TOPSOIL FROM ON -SITE SOURCES SHALL BE REMOVED DURING SITE CLEARING AND GRUBBING OPERATION ONLY FROM DISTURBED AREAS, AND PLACED IN TEMPORARY STOCK PILES. 2.2) FINAL 4 INCHES OF NEW FILL SHALL CONSIST OF ON -SITE TOPSOIL PREVIOUSLY STRIPPED FROM THE SITE, FREE OF GRASS, ROOTS, WEEDS, STICKS, ROCKS AND COBBLES. 3. GRADING 3.1) EXCAVATION REQUIRED FOR THIS PROJECT WILL BE UNCLASSIFIED. THERE WILL BE ANTICIPATED ROCK EXCAVATION ON THIS PROJECT. 3.2) EXCAVATED SOILS ARE TO BE USED FOR BACKFILL FOR THE PENSTOCK AND INLET STRUCTURE AS SHOWN ON THE PLANS. 3.3) FILL MATERIAL SHALL BE APPROVED SATISFACTORY SOIL MATERIAL. SUFFICIENT QUANTITIES OF EXISTING SOIL IDENTIFIED ON THE PROPERTY IS EXPECTED TO BE SUITABLE. 3.4) FILL MATERIAL SHALL BE LAID IN MAXIMUM 6 INCH LAYERS AND MECHANICALLY COMPACTED. IF HAND OPERATED EQUIPMENT IS USED, LIFT SHALL BE MAXIMUM OF 4 INCHES. BACKFILL FOR THE PARAPET WALL SHALL BE 4" LIFTS WITH 95% COMPACTION. 3.5) ALL FILL SHALL BE COMPACTED TO AT LEAST 95% OF ITS MAXIMUM DENSITY (ASTM D 698). COMPACTION TESTS SHALL BE PERFORMED ONCE FOR EVERY 2500 S.F. OR FOR EVERY 50 LINEAR FEET OF EXCAVATED TRENCH. 3.6) CONTRACTOR SHALL CONTROL MOISTURE CONTENT OF ALL FILL MATERIAL TO WHITHIN ±3% OF OPTIMUM AS DETERMINED BY ASTM D698, STANDARD PROCTOR. 3.7) EXCAVATION AND TRENCHING PROCEDURES SHALL BE IN ACCORDANCE WITH OSHA STANDARDS. 3.8) ANY EXCESS SOILS SHALL BE PLACED AS DESIGNATED BY THE ENGINEER. 4. DEWATERING 4.1) THE CONTRACTOR IS RESPONSIBLE FOR CONTROLLING SEEPAGE WATER INTO THE SITE EXCAVATIONS AND FOR MAINTAINING THE AREAS IN AN "IN -THE -DRY" CONDITION. 4.2) THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS RELATED TO THE DEWATERING ACTIVITY. 5. INSPECTIONS SOILS:SITE PREPARATIONS, PENSTOCK AND INLET STRUCTURE SUBGRADE, PLACEMENT OF FILL MATERIALS, AND EVALUATION OF IN -PLACE -DENSITY BY TESTING LAB RETAINED BY OWNER. A SHEET FLOW INSTALLATION (PERSPECTIVE VIEW) FLOW 1 FLOW /z, \\\ POINTS A SHOULD BE HIGHER THAN POINT B. DRAINAGEWAY INSTALLATION (FRONT ELEVATION) PROJECT SPECIFICATIONS CONCRETE 1. CONCRETE: 4,000 PSI, 4.5-7.5% AIR, SLUMP 3-5 INCHES. CONTRACTOR SHALL SUBMIT A MIX DESIGN FOR APPROVAL. 2. CONCRETE REFERENCE STANDARDS: (1) ACI 301 "SPECIFICATIONS FOR STRUCTURAL CONCRETE FOR BUILDINGS." (2) ACI 304 "RECOMMENDED PRACTICE FOR MEASURING, MIXING, TRANSPORTING, AND PLACING CONCRETE." (3) ACI 315 "MANUAL OF STANDARD PRACTICE FOR DETAILING CONCRETE STRUCTURES." (4) ACI 318 "BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE.,- (5) ASTM C94 "STANDARD PRACTICE FOR READY -MIX CONCRETE." 3. REINFORCING: 3.1) STEEL BAR REINFORCEMENT SHALL CONFORM TO ASTM A615, GRADE 60 FOR ALL BARS. 3.2) REINFORCEMENT SHALL BE FABRICATED ACCORDING TO PROVISIONS OF ACI 315 "MANUAL OF STANDARD PRACTICES FOR DETAILING REINFORCED CONCRETE STRUCTURES. 3.3 ALL REINFORCEMENT STEEL SHALL BE FREE FROM MUD OIL OR NON-METALIC COATINGS AT TIME OF CONCRETING. 3.4) EMBEDMENT OF LAP SPLICE LENGTHS FOR ALL REINFORCING STEEL BARS SHALL BE 48 BAR DIAMETERS. 3.5) FABRICATED BARS NOT CONFORMING TO DIMENSIONS AND DETAILS SHALL BE REJECTED. 3.6) WELDING OF CROSSING BARS FOR ASSEMBLY OF REINFORCEMENT IS NOT PERMITTED. THE FOLLOWING MINIMUM COVER WILL BE PROVIDED FOR REINFORCING BARS: CAST AGAINST & PERMANENTLY EXPOSED TO EARTH MIN COVER EXPOSED TO EARTH OR WEATHER: #6 BARS AND LARGER 3" #5 BARS AND SMALLER 1 1/2" 4. TESTING REQUIREMENTS: 4.1) ONE SET OF COMPRESSION TEST CYLINDERS IS REQUIRED FOR EACH POUR OF MORE THAN 5 CY AND FOR EACH 50 CY OF EACH CONCRETE MIX. 4.2) ONE SET OF FIVE COMPRESSION CYLINDERS SHALL BE CAST FROM THE SAME TRUCKLOAD OF CONCRETE. TWO CYLINDERS SHALL BE BROKEN AT 7 DAYS AND TWO CYLINDERS SHALL BE BROKEN AT 28 DAYS. THE FIFTH CYLINDER SHALL BE HELD FOR RE -TESTING, OR FOR A 56 DAY STRENGTH TEST, SHOULD THE 28 DAY TEST FAIL TO MEET THE REQUIREMENTS. TESTS SHALL BE MADE BY AN INDEPENDENT LABORATORY RETAINED BY OWNER. 4.3) SLUMP TEST SHALL BE MADE WHENEVER CYLINDERS ARE MADE. 4.4) CYLINDERS SHALL BE PLACED IN A FIELD STORAGE BOX CONTAINING A THERMOMETER. THE TEMPURATURE IN THE BOX SHALL BE KEPT BETWEEN 70*F TO 75'F WHEN POSSIBLE. IN NO EVENT SHALL THE STORAGE BOX TEMPERATURE BE ALLOWED TO FALL BELOW 40*F OR RISE ABOVE 90°F CONTRACTOR SHALL PROVIDE THE BOX. 5. NOTES TO CONCRETE PLACEMENT SCHEDULE: 5.1) AIR -ENTRAINED CONCRETE MIX THAT DOES NOT MEET THE MINIMUM AIR -CONTENT REQUIREMENTS SHALL BE REJECTED. 5.2) CONCRETE DISPATCHED MORE THAN 90 MINUTES BEFORE PLACEMENT SHALL BE REJECTED. 5.3) CONCRETE MORE THAN 5" SLUMP SHALL BE REJECTED. VEGETATIVE PRACTICES 1. TOPSOILING (TEMPORARY STOCKPILE) TOPSOIL SHALL BE STRIPPED FROM AREAS TO BE GRADED AND STOCKPILED FOR LATER SPREADING ON DAM EMBANKMENT, BERM, EMERGENCY SPILLWAY OR OTHER DISTURBED AREA. STOCKPILE LOCATIONS SHALL BE LOCATED ONSITE AND SHALL BE STABILIZED WITH TEMPORARY VEGETATION. 2. TEMPORARY SEEDING EXTENSION OF FDAKIC INTO THE TRENCH. ALL DENUDED AREAS WHICH WILL BE LEFT DORMANT FOR EXTENDED PERIODS OF TIME SHALL BE SEEDED WITH FAST GERMINATING TEMPORARY VEGETATION IMMEDIATELY FOLLOWING GRADING OF THOSE AREAS. SELECTION OF THE SEED MIXTURE SHALL DEPEND ON THE TIME OF YEAR IT IS APPLIED. 3. MAINTENANCE RE -FERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, RE -FERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. 4. FINAL SEEDING 4.1) REMOVE ALL ROOTS, LIMBS, ROCKS GREATER THAN 6 INCHES, AND OTHER DELETERIOUS MATERIALS FROM THE SEEDBED. REMOVED MATERIALS MAY BE DISPOSED OF IN DESIGNATED ON -SITE WASTE ARES. 4.2) SEEDING MIX, APPLICATION RATE, AND PLANTING TIMES: ALL AREAS KENTUCKY 31 FESCUE 108 POUNDS PER ACRE RED TOP GRASS 2 POUNDS PER ACRE SEASONAL NURSE CROP* 20 POUNDS PER ACRE CROWNVETCH 20 POUNDS PER ACRE *VARIES MARCH THROUGH MAY 15 USE ANNUAL RYE MAY 16 THROUGH AUGUST 15 USE FOXTAIL MILLET AUGUST 16 THROUGH OCTOBER USE ANNUAL RYE NOVEMBER THROUGH FEBRUARY USE WINTER RYE 4.3) ALL SEED SHALL BE CERTIFIED IN CONFORMANCE WITH CURRENT RULES AND REGULATIONS OF VIRGINIA CROP IMPROVEMENT ASSOCIATION AND SHALL BE THE LATEST CROP AVAILABLE. SEED SHALL BEAR AN OFFICIAL "CERTIFIED SEED" LABEL. 4.4) SEEDING APPLICATION SHALL INCLUDE: a. FERTILIZER AT THE FOLLOWING RATES: N-50 Ibs/ACRE; P/20/2 - 120 Ibs/ACRE; K/20 - 90 Ibs/ACRE. THE NITROGEN SHALL BE 50 PERCENT SLOWLY AVAILABLE NITROGEN (SAN). THE WATER INSOLUBLE NITROGEN (WIN) OF 50 PERCENT SHALL BE STATED ON THE CONTAINER OR BAG LABELS. b. FIBER MULCH COMMONLY USED IN HYDROSEEDING APPLICATIONS AT A MINIMUM OF 0.75 TONS PER ACRE. c. GUAR BASED TACKIFIERS AT A RATE APPROPRIATE FOR THE SLOPE AND WATERING CONDITIONS EXPECTED AT THE TIME OF APPLICATION. 4.1) INSTALL SEED OVER ALL DISTURBED AREAS. 5. MAINTENANCE PLAN: THE CONTRACTOR SHALL REVISIT THE PROJECT TO CHECK ON THE EFFECTIVENESS OF THE VEGETATIVE GROWTH AT 30 DAY INTERVALS. ANY AREAS THAT DO NOT SHOW SUFFICIENT VEGETATIVE PROGRESS SHALL BE PREPARED AND RESEEDED ACCORDING TO THESE SPECIFICATIONS. E&S CONTROLS EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED IN ACCORDANCE WITH THE VIRGINIA EROSION AND SEDIMENT CONTROL HANDBOOK AND THESE PLANS AND SPECIFICATIONS. IN General Notes No.I Revision/Issue I Date SINCE f 1881R Froehling & Robertson, Inc. 1734 Seibel Drive, N.E. Roanoke, Virginia g COPYRIGHT 2012 FROEHLING & ROBERTSON, INC. ALL RIGHTS RESERVED Jefferson Mill Dam Design Scottsville, VA E&SC Notes and Details Prepared For: Natel Energy 2401 Monarch St. Alameda, CA 94501 DR KHH CHK DAK REV PROIECI 62Y-0257 DA IE SHLIII 6al March, 2021 SCALE NA 7 of 7 E Jefferson Mill Hydroelectric Project_Special Use Permit Application Let It Go, LLC Jefferson Mill Hydroelectric Project Table of Contents List of Appendices 11 PROJECT PROPOSAL 12 Introduction 12 Existing facilities 12 Proposed facilities 13 Construction 19 PUBLIC NEED OR BENEFIT OF THE PROJECT 20 1011:1:I:7ev'lUXi1Oti721:I:MaX41/_\ILIA lle] CONSISTENCY WITH THE COMPREHENSIVE PLAN 21 IMPACTS ON PUBLIC FACILITIES & PUBLIC INFRASTRUCTURE 22 11519_C40IP1111111!141!1v/18.1971!15141!1V_1IaA_N01.1:P 0% MEASURES/ CONDITIONS PROPOSED TO ADDRESS IMPACTS FROM THE PROPOSED PROJECT 23 CONCEPTUAL STORMWATER DETENTION FACILITY CK01►[41:1iILOl_1Ire1:L1C110410 23 Appendix A: Confirmation of Performance Standards of the Proposed Equipment 27 Appendix B: List of other permits 29 Jefferson Mill Hydroelectric Project -Special Use Permit Application List of Appendices Appendix A: Confirmation of Performance Standards of the Proposed Equipment Appendix B: List of other permits Appendix C: Conceptual Plan Appendix D: Environmental Assessment Appendix E: Draft Study Plan Appendix F: Floodplain Development Permit Application Appendix: G: No -rise Certificate Appendix H: Section 106 Application Appendix I: Dam Inspection Report Appendices C to I are submitted separately as supplemental documents to the application. 11 Jefferson Mill Hydroelectric Project_Special Use Permit Application PROJECT PROPOSAL A. Introduction The proposed Jefferson Mill Hydroelectric Project is a 20 kW repowering of a historic mill on the Hardware River in Scottsville, VA. The original structure was built in 1800 as a flour mill. The proposed project will be constructed by Natel Energy, Inc., on behalf of the property owners. B. Existing facilities The Jefferson Mill building was built around 1800 and is a brick structure supported by wooden beams. The mill was a working mill until 1945. The original water wheel was set in a chamber adjacent to the mill. It was later replaced by three small vertical turbines. Those turbines were later removed. Fig. 1: The historic mill building with the dam on the bottom right corner. 12 Jefferson Mill Hydroelectric Project -Special Use Permit Application The existing dam is a 140 ft long and 9 ft high masonry structure, with a crest width between 4 and 5 feet. The powerhouse consists of a single, narrow chamber, built against the outer wall of the Mill building. The millrace has been filled in and is no longer in use. Based on survey data, the dam controls a 0.7 mile long section of the Hardware River, the primary source of water for the project. The impoundment has a surface area of 4.53 acres, storage capacity of 16.3 acre-feet and a normal water surface elevation of 320 feet above mean sea level (MSL). All entrance conductors serving the buildings on the property are underground. The project will electrically connect to the existing 120/240VAC load centers at the mill building. There is an existing Appalachian Power Company pad -mounted service transformer on the site. The only electrical modification planned for the interconnection of this project is a new utility metering pedestal with meter and 120/240VAC circuit breaker, which will be located next to the service transformer. The access to the electrical system is exterior to the physical structures on the property. C. Proposed facilities The proposed project will operate strictly in "run -of -the -river" mode on the Hardware River. The hydraulic head needed for power generation is provided by the existing dam. No additional water impoundment is proposed. The new turbine will be located in the water room, a sunken chamber attached to the river side of the mill. A single D062 Restoration Hydro Turbine, engineered by Natel Energy, is proposed for installation with a capacity of 20 kW. The proposed turbine is a fish -friendly propeller turbine ,with 8.5 feet of design head. The estimated average annual generation of the proposed project is 111,000 kWh. Please see Appendix C, submitted with the application, which illustrates the Conceptual Plan with detailed drawings and maps of the project structure and related components. Intake The project proposes to construct a reinforced concrete intake structure, upstream of the dam, on the west side of the river. The structure will be approximately 14' long x 12' wide x 10' tall. Most of the intake will be below grade, with only the top couple of feet extending above the existing ground surface. Water will be diverted through a debris rack and into a penstock. The penstock will be 3 feet in diameter and 70 feet long. Median headwater elevation is 320 feet. The top of the penstock will be 317.5 feet. The 2.5 feet of submergence will provide sufficient depth to prevent vortex formation. 13 Jefferson Mill Hydroelectric Project -Special Use Permit Application A 12.5-foot wide by 4-foot tal I rack, angled at approximately 70 degrees from horizontal, will prevent river debris from entering the intake. There will be a 0.75-inch wide clear gap between the vertical bars. The approach velocity will be less than 1 fps (ft per second) across the face of the rack. Debris will be manually cleared from the intake rack as needed. Flow into the penstock will be controlled by a slide gate equipped with an electric actuator. Conduits carrying power and control circuits will run back to the powerhouse alongside the penstock. The penstock will enter the powerhouse through the same opening used by the old mill race. Penstock A 3-foot diameter penstock will run from the intake to the water room. The pipe will extend away from the river for 50 feet, then turn 90 degrees and run another 20 feet to the headwall of the water room. The elevation of the pipe centerline, at the intake, will be 315.5 feet. It will slope down at 1%, ending at elevation 315.0 feet. The trench for the penstock will vary from 8 to 10 feet deep. The trench will be excavated in ground that has been disturbed multiple times. It was used as a staging area when the water wheel was removed and the first generation of turbines were installed. Later the original mill race channel was filled in with soil and a raised path built to access the house deck. Water Room The original milling operation was driven by an overshot water wheel. The wheel was mounted in the water room. A mill race channel led from the pond, above the dam, to the top of the wheel. After spinning the wheel, the water exited through a slot at the far end of the room. The chamber is 33' long x 8.5' wide. The outer masonry wal I varies from 2.5' to 5' thick and is 15' tal I. The overshot wheel was replaced with a set of three vertical turbines. The turbines were later removed and the mill race opening filled with cinder blocks. The chamber currently sits empty. The project proposes to construct a concrete box inside the water room, with the goal of providing a clean, dry and protected location for the new turbine. The new 6 inches thick walls will provide additional support to the older masonry walls. Vertical and thrust forces, generated by the turbine, will be transmitted through the reinforced concrete to the bedrock floor. The original opening in the headwall has been filled in with a combination of cinder blocks and concrete. This material will be removed to accommodate the 3 foot diameter 14 Jefferson Mill Hydroelectric Project -Special Use Permit Application penstock. A new concrete headwall will be built, with a web of reinforcing bar surrounding the penstock opening. Draft Tube Water will exit the turbine through a draft tube. The tube has an expansion section and an elbow section. The elbow is pointed downward into a water filled trough. The end of the draft tube will be below the water surface. The entire length of the draft tube will be located in the water room. The 4 ft deep trough will be excavated down into the bedrock. The trough exits out beneath the water room wall and then turns downstream. The floor of the trough will slope upwards at a 6:1 H:V ratio to match the natural river bed. The trough and enlarged opening will be below water level, so the outward appearance of the structure will remain mostly unaltered. Upstream Fish Passage - Eel & Sea Lamprey Ramp Upstream passage for eels and sea lamprey will be improved by a new ramp, located on the left bank of the river. It will be a "Laterally Sloped Eel Ramp" as described by the U.S. Fish and Wildlife Service (USFWS) in their 2019 Fish Passage Engineering Design Criteria in section 132.1.4. The ramp will be approximately 2 feet wide x 25 feet long. The ramp will start at an existing notch in the dam and run parallel to the river, following the natural dip slope of the sedimentary rocks. At its base, the ramp will angle back to the river, extending below the water's surface to elevation 309.5'. The ramp will be a concrete structure with an exposed aggregate finish. Natural rock will be used to disguise the concrete where possible. The notch will be given a rectangular cross section, with provision for stop logs to regulate flow. The substrate will be designed to accommodate eels between 0.5 to 3.0 feet in length. The design is passive, requiring no active pumping. Impact on the dam will be minimal. The existing notch will be modified for stop logs and the upper end of the ramp will be attached to the dam face. Neither of these activities will impact the dam's structural integrity. The ramp will have a minimum visual impact, as seen from the deck of the Mill Building. The area is currently exposed bedrock. Downstream Fish Passage - Plunge Pool The project has been designed to ensure that 100% of river flows are not diverted to the turbine and that there will always be flow available for downstream fish passage. The downstream fish passage will be located at the existing notch toward the west end of the spillway and falls into a naturally -occurring 4-foot deep plunge pool located at the base of the dam. Design will be in accordance with USFWS 2019 Fish Passage Engineering Design Criteria - Section 9, and in consultation with USFWS and VA DWR. 15 Jefferson Mill Hydroelectric Project_Special Use Permit Application Table 1: Features of the proposed project Proposed Turbine Type D062 Restoration Hydro Turbine Number of Turbines Proposed 1 Proposed Generator Type Synchronous PMG with Variable -Frequency AC Drive Estimated Total Installed Capacity (kW) 20 Estimated Average Annual Generation(kWh) 111,000 Gross Head (ft) 9 Design Head (ft) 8.5 Minimum Hydraulic Capacity (cfs) 20 Maximum Hydraulic Capacity (cfs) 45 Water Source Hardware River 326 324 322 $ 320 p 318 m y 316 w 314 312 310 308 - 0 Jefferson Mill Rating Curves Dam Crest Elevation +Forebay Curve • Observed Tailwater Elevations —Tailwater Curve Tailwater channel bottom Soo 1,000 1,500 2,000 2,500 3,000 3,500 4,000 4,500 5,000 Streamflow (cfs) Fig. 2: Estimated tailwater rating curve based on scaling from representative photographs and video clips. 16 Jefferson Mill Hydroelectric Project_Special Use Permit Application 322 321.5 321 c 320.5 m a W 320 319.5 319 0 326 325 324 323 c 322 w w 321 320 319 318 0 Jefferson Mill Forebay Low Flow Rating Curve 50 too 150 200 250 300 350 400 450 500 Streamflow (cfs) Jefferson Mill Forebay Rating Curve 2,000 4,000 6,000 8,000 10,000 12,000 14,000 Streamflow (cfs) Fig. 3: Estimated forebay rating curve based on broad crested weir equation for flows less than 500 cfs (top curve) and flood flows upto 13,000 cfs (bottom curve). 17 Jefferson Mill Hydroelectric Project -Special Use Permit Application D. Construction Pending receipt of all permits, the project is planned to begin construction in August 2021 with a duration of four months. No in -stream construction will occur between Feb 15 and June 30 for protection of anadromous species and from May 15 through July 31 for protection of James Spinymussel per Virginia Department of Game and Inland Fisheries regulations. Cofferdams Temporary cofferdams will be constructed to isolate the intake and outlet areas from the river. Cofferdams are used to reduce construction -related water quality impacts, protect aquatic life, and to provide a safe construction area. The upstream cofferdam will extend from the riverbank to the spillway. This will block off a third of the spillway length, allowing the intake, wing walls, buoy line supports and downstream passage to be built in the dry. Water depths are expected to be from 5 to 6 ft. The dam will be 25-ft long x 9-ft tall. It will be constructed with large bags packed with gravel, called Super Sacks. A 3-ft x 3-ft x 3.5-ft bag will hold 1 ton of gravel. The bags are made from woven polypropylene with reinforcing straps and hoisting loops. The cofferdam will be built up in a pyramid fashion. A 9-ft tall cofferdam would require three layers of sacks. It would have a 9 ft wide base and a 3 ft wide crest. Sacks can be placed with an excavator or crane. Gravel to fill the bags will be sourced locally and will be cleaned. When it comes time to remove the construction cofferdam, the sacks can be hoisted out of the water, leaving minimal trace. The downstream cofferdam will extend from the base of the dam to a small island that forms a channel along the right side of the river. A second segment of dam will block off the lower end of the side channel. The upper segment will be 30-ft long x 9-ft tall. The lower segment will be 12-long x 6-ft tall. Water depths will vary from 2 to 5 ft. Once the cofferdams are complete, the water behind the dams will be pumped out. Fisheries biologists experienced with isolation of ESA listed species in the construction area will provide industry approved direction on ways to safely manage the dewatering. All cofferdams will be removed using techniques to minimize turbidity releases. This includes allowing for the slow reintroduction of water into the work area and utilizing dirty water treatment systems for turbid water. If James spinymussel are identified in the construction area during the pre -construction survey, all mussels will be relocated per federal and state guidelines. IE Jefferson Mill Hydroelectric Project -Special Use Permit Application To avoid damaging any unidentified archeological deposits on the project area, the designated laydown areas will be covered with 6" of crushed rock over geotextile fabric. Silt fences will be installed around the downslope perimeters of the construction zone and the laydown areas to prevent soil erosion, as detailed in the State of Virginia handbook as best management practices. The bottom of the silt fence fabric will be buried in a shallow 6" wide x 6" deep trench. Fence, geotextile and crushed rock will be removed once the construction is complete. A monitor will be present to document archeological resources that may be exposed during excavation activities, including removal of the gravel and fabric. In accordance with Federal regulations, should unexpected archaeological resources be encountered during project implementation, all work in the immediate area will cease and the Virginia Department of Historic Resources will be contacted to provide guidance on the treatment of the discovery. Natel Energy plans to contract with a local environmental firm to provide a qualified archeologist to monitor all construction activities that might impact historical artifacts.' The monitor will be empowered to stop work and preserve artifacts until they can be properly examined. Iall :31let .IAAll 0.4a:121ladIll r 1a1:1:11111a.1031x41 The Jefferson Mill Hydroelectric Project is the vision of the owners to revitalize a historic use of their property, while contributing to the conservation of resources through clean energy. The proposed hydropower project does not alter the Hardware River flows or water quality. The project will generate power year-round to produce 100% carbon -free electricity for the residents and any excess generation will be distributed on the grid to provide clean energy to the community. OTHER ASPECTS OF THE SPECIAL USE The Jefferson Mill Hydroelectric Project special use causes no detriment to adjacent lots, as it is located entirely within private property owned by the applicant. As stated in the no -rise certificate attached as Appendix G, the project will not result in an increase in flood elevations for any adjacent property owners along the Hardware River. As noted in Appendix A, neither noise nor vibrations from the project will be detectable on adjacent lots. There will be no visual impact to adjacent lots, as the project is in the center of a large ' Natel has received a proposal from Cox McLain Environmental Consulting Inc. for such monitoring services. 19 Jefferson Mill Hydroelectric Project -Special Use Permit Application private parcel. The project is 380 feet from the closest adjacent lot and 580 feet from the closest public road. During construction there will be occasional trucks with concrete and equipment on local roads between 8 AM and 5 PM. The project will have a construction entrance so that vehicles do not track mud onto the public road. There will be no increase in dust during construction that will be detectable on neighboring parcels. As noted in the section below, "Consistency with the Comprehensive Plan", the Jefferson Mill Hydroelectric project does not change the rural character of the zoning district; rather the special use enhances the historic nature of the zoning district and further protects natural resources. The project complies with the purpose and intent of the zoning ordinance and is permitted by right in Section 5.1.26 - Hydroelectric Power Generation. As noted elsewhere in this application, the special use will be in harmony with the public health, safety and general welfare. CONSISTENCY WITH THE COMPREHENSIVE PLAN The Comprehensive Plan emphasizes the importance of the intelligent use of local resources. This project supports using land to produce local, clean energy while reinvigorating a historical use of the mill and maintaining the rural landscape. As stated in Objective 1 of the Natural Resources section of the Comprehensive Plan, the project supports the conservation of clean water and safe waterways. The mill is located on Rural Area private property and will contribute to the conservation of natural resources by producing 100% renewable energy and improving fish passage in the Hardware River. Natel Energy, the project developer, is working with Froehling & Roberts and R2 Resource Consultants (now part of Kleinschmidt Group) to improve fish passage along this stretch of the river. Froehling and Roberts, based in Roanoke, VA, is a civil and geotechnical engineering firm. R2 Resource Consultants is an environmental and engineering firm that specializes in fisheries biology, riparian ecology and hydrology. The Jefferson Mill Hydroelectric Project helps fulfill Objective 4 of the Comprehensive Plan's Natural Resources section: Protect the biological diversity and ecological integrity of the County in both the Rural Area and Development Areas. As described in Section C - Proposed Facilities above, the Jefferson Mill Hydroelectric Project has been carefully designed to improve both upstream and downstream passage for eel and sea lamprey and other species at the project dam. At the entrance to the hydro penstock, an extra wide grate was designed to lower the intake velocity, making it easier for fish to swim past. The grate's bar spacing was narrowed to % inch, to prevent ingress by most species of fish. 20 Jefferson Mill Hydroelectric Project -Special Use Permit Application By providing clean, renewable energy to the electric grid in Albemarle County, the Project also helps fulfill Objective 8 of the Comprehensive Plan's Natural Resources section: Recognize changes occurring to the earth's climate to anticipate and mitigate impacts to the County. IMPACTS ON PUBLIC FACILITIES & PUBLIC INFRASTRUCTURE The project will be entirely located on private property. There will be no impact to public facilities or public infrastructure. IMPACTS ON ENVIRONMENTAL FEATURES The two structures associated with the project purchase their electric power thru the local grid. That power is produced from a combination of coal, natural gas, pumped storage, wind and hydro. Electricity generated by burning coal or gas makes up approximately 84 % of the total. Burning fossil fuels produces carbon dioxide, a greenhouse gas. Assuming that mix, 0.94 tons of CO2 would be produced for every 1 MWh of generation. The Jefferson Mill Hydroelectric Project is designed to produce 111 MWh/year of carbon free electricity. This will offset production of 104.34 tons/year of CO2. The proposed turbine and generator use biodegradable lubricants and the mechanical parts of the project are enclosed in a casing that is separated from the water. The bearings are lubricated using non -toxic, biodegradable, food -grade grease and the bearings have three seals (an air gap separates two lip seals from the mechanical seal) to prevent grease from ever reaching the water. The project will not change the flow of water in the river. It will take water from just above the dam and discharge it just below the dam. No bypass reach will be created. Most of the year, the turbine flow will be minor compared to the overall river flow. In the late summer, when river flows are low, a minimum flow will be dedicated to the eel ramp and downstream passage. If sensors detect a drop in water level behind the dam, the turbine will be automatically throttled back or shut off completely. To prevent erosion around the intake, the riverbank will be protected by a wing walls made from a combination of concrete and natural stone. The area disturbed by construction will be reseeded. Silt fences will remain in place until the new grasses have gotten established. 21 Jefferson Mill Hydroelectric Project -Special Use Permit Application R2 Resource Consultants produced a report which expands on the environmental impact of the project. Please see appendix D to read the full assessment and recommended measures to minimize the impact of the project works. In addition, the project owner's family members are stewards of the watershed and have sponsored educational programs for local farmers to understand fertilizer application and runoff impacts on the watershed. This project is funded on the understanding that daily actions lead to meeting environmental goals. MEASURES/ CONDITIONS PROPOSED TO ADDRESS IMPACTS FROM THE PROPOSED PROJECT None proposed. CotsP►[y:12r9L1�01C07:7u1Ti%V1a:7•]:0ra2r1WZI VAT4111IIIVA There will be no stormwater detention facilities, as the project will only create a minor increase in impervious surface areas: Impervious surfaces: Intake and wingwalls Concrete 152 sf Control room Concrete 192 sf Gravel roads no new roads Total 344sf (0.008ac) Based on NOAA point precipitation frequency estimates, the 100-yr storm would drop 8.57 inches of rain over a 24 hr period on the project area. The Hardware River normally flows between 50 and 400 cfs. During the 100-yr storm event, its flows would increase to an estimated 31,530 cfs. The Intake will be built on previously disturbed ground, immediately adjacent to the river. The top of the structure will be 2 feet above normal water level in the river. Currently rainfall is partially absorbed by the silty clay soil, while the remainder travels a few feet before entering the Hardware river. The 100-year storm would result in 109 cf of water flowing off the intake's impervious surface over a 24 hour period. However, flooding caused by the 100-year storm would raise the level of the river by a minimum of 5 feet, 22 Jefferson Mill Hydroelectric Project -Special Use Permit Application completely inundating the intake. The rain would fall directly into the river, making the nature of the intake's surface composition moot. The Control Room will be located 120 feet from the Hardware River and 20 feet from the intake to a drainage culvert. The control room floor will be located 10 feet higher than the dam crest, keeping the electronic equipment above the river's flood level. The 100-year storm would result in 137 cf of water flowing off the impervious roof over 24 hours, at an average flow rate of 0.002 cfs. This is a negligible amount. There is the potential for the culvert to get clogged by debris, causing local flooding. The berm around the culvert intake is 2 feet tall. If a blockage causes water to overflow the berm, it will flow downhill towards the river, away from the Control room. The Control room floor is 4 feet higher than the culvert intake. CONCEPTUAL GRADING The project will require 0.07 acres of excavation. To seal the work areas off from the river, a string of cofferdams will be set along the edge of the river. Once the temporary dams are in place, the areas behind them will be dewatered. The intake cut will be excavated into the riverbank. The soil is a silty clay with layers of sand. The cut will have a surface footprint of 700 sf (square feet), an average depth of 6.4 feet and a max depth of 10 feet. The penstock cut will run from the intake to the turbine room. It will have a surface footprint of 1500 sf, an average depth of 6.4 feet and a max depth of 12 feet. At its west end, the cut will encounter bedrock 9 feet below the surface. The outlet trench starts at the end of the turbine room, exits under the wall and then turns downstream (see Figure 4 below) . Most of the trench will be excavated into bedrock. It will be 5 feet wide x 4 feet deep x 37 feet long. The downstream portion will slope up to meet the natural riverbed at a 6:1 slope. The 54' long cable trench will run around the southside of the Mill building and across the yard to the new Control Room building. Three sets of conduit will be placed in the trench. Per code for buried electrical lines, the trench will be 3' deep. It will be 2' wide to maintain a minimum of 12 inch horizontal separation between power and sensor cables. Care will be taken where the new trench crosses over the existing 15-inch diameter rigid concrete culvert. 23 Jefferson Mill Hydroelectric Project_Special Use Permit Application The Control Room excavation will be just deep enough to pour a foundation slab. It will be 15' wide x 23' long x 2' deep. Fig. 4: Project Layout showing location of Control Room and conduit trench Once the new structures, conduits and penstock are complete, the excavations will be filled in with either native soil or engineered fill. The native soil is currently being tested to see if its mechanical properties will qualify it as backfill. Fill will be compacted to 90% or better of its maximum density, as determined by modified Proctor tests. Fill areas will be graded to match surrounding terrain. Excavated ground that will remain exposed for more than two weeks, will be covered by straw or other erosion control measures. The outlet trench will remain open. It will flood once the cofferdams are removed. After grading, the inlet and penstock areas will be seeded with species suitable for poorly drained soils. The conduit trench and control room areas will be seeded with traditional lawn grasses like Kentucky bluegrass, per Virginia DEQ guidelines below. 24 Jefferson Mill Hydroelectric Project_Special Use Permit Application TABLE 3.32-D SITE SPECIFIC SEEDING MIXTURES FOR PIEDMONT AREA Total Lbs. Per Acre "inimum Care Lawn - Commercial or Residential 175-200 lbs. - Kentucky 31 or Turf -Type Tall Fescue 95-100% - Improved Perennial Ryegrass 0-5% - Kentucky Bluegrass 0-5% High -Maintenance Lawn 200-250 lbs. Kentucky 31 or Turf -Type "Fall Fescue 100% Gcneral Slope (3:1 or less) Kentucky 31 Fescue 128 lbs. - Red Top Grass 2 lbs. - Seasonal Nurse Crop ' 20 lbs. 150 lbs. IFIM3 �.� .. �•_t Kentucky 31 Fescue 108 lbs. - Red Top Grass 2 lbs. Seasonal Nurse Crop ' 20 lbs. - Crownvetch '" 20 lbs. 150 lbs. ' Use seasonal nurse crop in accordance with seeding dates as stated below: February 16th through April ...................... Annual Rye May 1st through August 15th ..................... Foxtail Millet August 16th through October ...................... Annual Rye November through February 15th ................... Winter Rye " Substitute Sericea lespedeza for Crownvetch east of Farmville, Va. (May through September use hulled Sericea, all other periods, use unhulled Sericea). If Flatpea is used in lieu of Crownvetch, increase rate to 30 lbs./acre. All legume seed must be properly inoculated. Weeping Lovegrass may be added to any slope or low -maintenance mix during warmer seeding periods; add 10-20 lbs./acre in mixes. Table 2: Virginia DEQ Permanent Seeding Guidelines h ttps://www.deq.virgini a.gov/homelshowpu blisheddocumen t?id=2436 25 Jefferson Mill Hydroelectric Project_Special Use Permit Application Appendix A: Confirmation of Performance Standards of the Proposed Equipment March 10,2021 Frank Pohl County Engineer Albemarle County, VA 401 McIntire Road Charlottesville, VA 22902 Re: Confirmation of performance standards of the proposed equipment for Jefferson Mill Dam Hydroelectric Project. Dear Mr. Pohl, Let It Go, LLC is applying for a Special Use Permit for Hydroelectric Power Generation under Albemarle County Code of Ordinance Chapter 18. This letter is produced in lieu of a certified engineer's report to address the concerns stated under Chapter 18 Section 5.1.26 of the Albemarle County Code of Ordinance. zr= Section 4.18.04 sets the maximum sound levels in Rural Areas and Residential at 60 dBA during the daytime and 55 dBA during nighttime. The project will have two devices that produce sound: the turbine / generator and the variable frequency drive (VFD). The turbine/generator will produce approximately 55 dBA, equivalent to a dishwasher. It will run both night and day. The turbine /generator will be fully encapsulated in a concrete room. The concrete will be surrounded by masonry walls up to 3 feet thick. The double walls should attenuate the turbine noise. The turbine room is immediately adjacent to the dam, where the Hardware River pours over the spillway. The ambient noise level can be fairly high. The VFD uses fans for cooling, which can produce up to 62 dB. The VFD and other electronic equipment will be located in a control room, a separate structure located approximately 40 feet away from the closest residence. Sound levels outside the control room will be below the County's nighttime maximum. Electrical Disturbance The electrical equipment will connect to the existing Appalachian Power Co. service. The installation will comply with all applicable Appalachian Power, federal, state and local standards and regulations. This compliance will ensure no adverse impacts to other Appalachian Power customers. 26 Jefferson Mill Hydroelectric Projec Special Use Permit Application Vibration The turbine generates a vibration with a peak velocity < 2mm/s (0.079 in/s), as measured at the surface of the equipment. To calculate the attenuation with distance, the U.S. Federal Transit Administration's Noise and Vibration Manual uses the formula: P(lot line) = P(equip) x (25/D)^1.5 P = peak vibration in inches/s. D = distance in feet The County code lists the maximum allowable peak velocity for continuous operation as 0.015 in/s at the closest lot boundary. The closest lot boundary is the NW corner of Lot 123-19B. The distance from the turbine is 377 ft. The turbine vibration would be attenuated to 0.0013 in/s. This is an order of magnitude lower than the County standard. Jefferson Mill Road is 579 feet from the turbine. Vibration there would be 0.0007 in/s. Glare and heat All project equipment will be completely enclosed within buildings and will neither create glare that would adversely affect the navigation or control of aircraft, nor cause public nuisance or hazard to abutting parcels. The heat produced by the turbine and generator should be contained within the concrete room. From the description stated above, Let It Go, LLC believes that the proposed equipment complies with the performance standards outlined by the county ordinance and will be of low impact. If you have any questions regarding this submission, please do not hesitate to contact Tatiana Marzan, JeffersonMiII@natelenergy.com. Sincerely, Aaron Van Duyen Let It Go, LLC %Van Duyne, Bruno & Co, P.A. 18 Hook Mountain Road, Suite 202 P.O. Box 896 Pine Brook, NJ 07058 27 Jefferson Mill Hydroelectric Project_Special Use Permit Application Appendix B: List of other permits Along with the Special Use Permit application for hydroelectric power generation under Albemarle County Code of Ordinance Chapter 18 Section 10.2.2 and Section 30.3.11, below is the list of permits the project has applied for and is required to apply for: Table B-1: List of permits required for Jefferson Mill Hydroelectric Project Permit Authorizing Submission Completion Comments Agencies Date Date FERC 10MW FERC 10/20/2020 8/30/2021 The Initial Consultation Document Exemption (ICD) was submitted to FERC under Docket #P-15038. Agency comments were received on the ICD by 1/25/2021; draft study plans were submitted in response on 03/01/2021. Please see Appendix E for the study plan. The applicant anticipates filing the final exemption application with FERC by April 23, 2021,with FERC issuing the exemption in August 2021. FERC requires issuance of the Joint Permit under Sections 401 and 404 of the Clean Water Act before it can issue the exemption. Section 106 VADHR 2/26/2021 5/10/2021 Application submitted for review, (National awaiting comments within 30 days of Historic submission. Please see Appendix H Preservation for the Section 106 application. Act) Joint Permit USACE, 4/14/2021 7/16/2021 Awaiting proof of compliance with Section 401 and VMRC, Section 106 of the National Historic 404 (Clean VADEQ Preservation Act and Section 7 of the Water Act) Endangered Species Act, and other study results required by the Agencies County Building Albemarle 7/1/2021 7/30/2021 Receipt of the building permit is Permit County VA conditioned upon receipt of the County Special Use Permit. Application for the building permit will be submitted upon completion of the construction drawing set. SP202100007 and SP202100008 Jefferson Mill Hydroelectric Project Attachment C Sec. 5.1.26 - Hydroelectric power generation a. These provisions are intended to encourage the use of water power as a natural and replenishable resource for the generation of electrical power. While serving energy conservation and natural resource goals, these provisions are also intended to limit such use so as: not to be objectionable in the area in which it is located; not to unreasonably interfere with the passage of boats, canoes, fish and other aquatic life; not to unreasonably degrade the riverine and aquatic habitat or water quality, in general; b. The applicant shall submit with his application for special use permit, plans, profiles, studies and other supporting information addressing the issues in (a) above. No such application shall be approved until comment and recommendation has been received from the State Water Control Board, the Commission of Game and Inland Fisheries, and other appropriate federal, state and local agencies; c. Whether or not a site development plan is required, the applicant shall submit to the county engineer a certified engineer's report as described in section 4.14.8. In review of such report, the county engineer shall be particularly mindful of the requirements of section 4.14.1, noise, and section 4.14.7, electrical interference; d. Except as specifically permitted in a particular case, no auxiliary or accessory method of power generation shall be permitted nor shall any pump storage or rechannelization be permitted.