Loading...
HomeMy WebLinkAboutSDP202000067 Correspondence 2021-08-09Patricia "Paty" Saternye From: Nicole Scro <nscro@gallifreyenterprises.com> Sent: Monday, August 9, 2021 1:45 PM To: Patricia "Paty" Saternye Subject: Re: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Thank you again, Paty! On Fri, Aug 6, 2021 at 10:48 AM Patricia "Paty" Saternye <psatemye@albemarle.org> wrote: Nicole & Justin, Good morning. Northside Material Recovery Facility (SDP202000067) Final Site Plan has been approved. have left your signed/approved set in the pick up box in the Front Lobby of Community Development. Be well, Paty Saternye Senior Planner Albemarle Coun osaternve@albem arle.ora 434-296-5832 x3250 401 McIntire Road, Suite 228, Charlottesville, VA 22902 From: Patricia "Paty" Saternye <psaternye@albemarle.org> Sent: Tuesday, July 27, 2021 1:45 PM To: Nicole Scro <nscro@gallifreyenterprises.com>; Justin Shimp <lustin@shimp-engineering.com> Cc: Brent Hall <brent@greenstonematerial.com>; Kelly Strickland <kelly@shimp-engineering.com>; Lisa Green <lgreen2@albemarle.org> Subject: RE: Northside Material Recovery Facility (SDP202000067) Nicole & Justin, Good afternoon. Sorry for not responding quicker, but I needed to touch base with Charles R.. As Justin likely knows, from his conversation with Charles after I was out of the office, I have been given approval to accept the digital signature on the seal that Justin has provided. The plan sets submitted on 7/14 were already signed, they just had the previous submittal date (5/26 — both on the signed seal and the revision dates) on it, so the seal was not blank for a new signature and date. However, because of the minor/cosmetic changes that were needed, I chatted with Charles late this morning and he has also approved that I utilize the set already provided. So, I will now move forward with getting the final approvals from the other reviewers. I will let you know once I have received those approvals and the site plan has been signed. Be well, Paty Saternye Senior Planner Albemarle Coun psaternye@albem arle.org 434-296-5832 x3250 401 McIntire Road, Suite 228, Charlottesville, VA 22902 From: Nicole Scro<nscro@gallifreyenterprises.com> Sent: Monday, July 26, 2021 3:58 PM To: Patricia "Paty" Saternye <psaternye@albemarle.org> Cc: Justin Shimp <lustin@shimp-engineering.com>; Brent Hall <brent@greenstonematerial.com>; Kelly Strickland <kelly@shimp-engineering.com>; Lisa Green <Igreen2@albemarle.org> Subject: Re: Northside Material Recovery Facility (SDP202000067) This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Paty Can we pick up the copies we dropped off so that Justin can sign them? On Thu, Jul 15, 2021 at 2:25 PM Patricia "Paty" Saternye <psaternye@albemarle.org> wrote: Justin, Please physically sign the signature originals and submit. Also please scan and send me the scan as specified below. Thanks Be well, Paty Saternye Senior Planner Albemarle Coun psaternyeC@al bemarle.org 434-296-5832 x3250 401 McIntire Road, Suite 228, Charlottesville, VA 22902 From: Justin Shimp <justin@shimp-engineering.com> Sent: Thursday, July 15, 2021 2:12 PM To: Patricia "Paty" Saternye <psaternye@albemarle.org> Cc: Nicole Scro<nscro@gallifreyenterprises.com>; Brent Hall <brent@greenstonematerial.com>; Kelly Strickland <kellv@shimp-engineering.com>; Lisa Green <Igreen2@albemarle.org> Subject: Re: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Paty, That does clarify, to be clear though we have been turning in copies of the digitally signed plans for a while now, especially since Covid. Often our VSMP plans are both digitally signed and digitally stamped approved by the County. That has been the procedure for us of late. If the plans cannot be approved without a original signature we can accommodate that. To restate my note from earlier though I am not aware of any such regulation or requirement on the part of the County or the regulatory agencies for Engineers/surveyors. Please advise if the plans delivered are NOT acceptable as is. They do incorporate the final changes. Thanks, -Justin On Jul 15, 2021, at 1:34 PM, Patricia Paty Saternye <psaternye@albemarle.org> wrote: Justin, Sorry for not wording it better. I didn't mean the seal itself is supposed to be wet, but your signature and the date as is usually done. I hope that clarifies things. Be well, Paty Saternye Senior Planner Albemarle Countv psaternye@al bemarle.org 434-296-5832 x3250 401 McIntire Road, Suite 228, Charlottesville, VA 22902 From: Justin Shimp <justin@shimp-engineering.com> Sent: Thursday, July 15, 2021 12:52 PM To: Patricia "Paty" Saternye <psaternve@albemarle.org> Cc: Nicole Scro<nscro@gallifreyenterprises.com>; Brent Hall <brent@greenstonematerial.com>; Kelly Strickland <kelly@shim p-engineering.com>; Lisa Green <Igreen2@albemarle.0rg> Subject: Re: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Paty, Could you please verify what you mean by wet seal? Do you mean an ink seal? I'm not familiar with that requirement. To save printing cost we affix a digital seal to the plans which is permitted by DPOR. I don't recall ever being required to turn in a final siteplan to the County with an ink stamp. If it's a requirement that I am not aware of just let me know and we will get the plans back and I can stamp the same ones. Thanks, -Justin On Jul 15, 2021, at 11:46 AM, Patricia Paty Saternye <psaternve@albemarle.ore> wrote: Justin and Nicole, Please let me know if you expect to have all the required items, with wet and current seals, to me today or not. Just a reminder of the three items that are to be done once you have the final wet sealed new site plan submittal scanned are: 1. Submit 4 full sets with wet seals for approval signatures. 2. Email me a scan (PDF) of the revised and sealed set so that I can send it to all the reviewers for their final approval for signing. 3. Email me when the 4 full sealed sets are dropped off so that I can start the final approval steps. Be well, Paty Saternye Senior Planner Albemarle Coun psaternyeCc@al bemarle.org 434-296-5832 x3250 401 McIntire Road, Suite 228, Charlottesville, VA 22902 From: Nicole Scro<nscro@gallifreyenterprises.com> Sent: Wednesday, July 14, 20213:07 PM To: Patricia "Paty" Saternye <psaternve@albemarle.org> Cc: Brent Hall <brent@greenstonematerial.com>; Justin Shimp <lustin@shimp- engineering.com>; Kelly Strickland <kelly@shimp-engineering.com>; Lisa Green <Igreen2@albemarle.org> Subject: Re: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Paty, I know Justin is in Louisa until 6 PM. I will circle up with him as soon as he is back. -Nicole On Wed, Jul 14, 2021 at 3:05 PM Patricia "Paty" Saternye <psaternye@albemarle.org> wrote: Justin, Could you please clarify something for me. The scan I just received is supposed to be a scan of wet sealed most recent submission (today) for County approval and with changes made to the plan set since the last submission (in May). At a quick glance I see that changes have been made to the site plan but the seal is for the exact same date as it was with the previous submission. This makes me think this is not a wet sealed set. I just want to ensure that there will be no delays once I get into the office and look at the plan set. Why is todays submission sealed with the exact same date as the last submission in May? Am I missing something? Thanks. Be well, Paty Saternye Senior Planner Albemarle County psaternyeC@al bemarle.org 434-296-5832 x3250 401 McIntire Road, Suite 228. Charlottesville, VA 22902 From: Nicole Scro<nscro@gallifreyenterprises.com> Sent: Wednesday, July 14, 20212:51 PM To: Patricia "Paty" Saternye <psaternve@albemarle.org> Cc: Justin Shimp <justin@shimp-engineering.com>; Kelly Strickland <kelly@shimp- engineering.com>; Brent Hall <brent@greenstonematerial.com>; Lisa Green <Igreen2@a1bemarle.org> Subject: Re: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Paty, Apologies, attached is the scanned resubmission. -Nicole On Wed, Jul 14, 2021 at 2:47 PM Patricia "Paty" Saternye <psaternye@albemarle.org> wrote: Ms. Scro, Good afternoon and thank you. Please ensure all of the following have been done: 9 Submit 4 full sets with wet seals for approval signatures. • Email me a scan (PDF) of the revised and sealed set so that I can send it to all the reviewers for their final approval for signing. • Email me when the 4 full sealed sets are dropped off so that I can start the final approval steps. If you have submitted the 4 full sets with wet seals than the 1" and 3rd have been done. However, I still need the 2"d item in order to complete the final approvals from all of our reviewers. Be well, Paty Saternye Senior Planner Albemarle Coun psaternye@albem arle.org 434-296-5832 x3250 401 McIntire Road. Suite 228, Charlottesville. VA 22902 From: Nicole Scro<nscro@gallifreyenterprises.com> Sent: Wednesday, July 14, 20212:33 PM To: Patricia "Paty" Saternye <psaternve@albemarle.org> Cc: Justin Shimp <Justin@shimp-engineering.com>; Kelly Strickland <kellv@shimp- engineering.com>; Brent Hall <brent@greenstonematerial.com>; Lisa Green <Igreen2@albemarle.org> Subject: Re: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Paty, I just dropped off the resubmission at Community Development. Thank you so much for your help on this! Nicole On Mon, Jul 12, 2021 at 3:21 PM Patricia "Paty" Saternye <psaternye@albemarle.org> wrote: Justin, Good afternoon. I have not yet received the resubmission for Northside Material Recovery Facility (SDP202000067). Please note that I will be out of the office from 7/16 through 7/23. Be well, Paty Saternye Senior Planner Albemarle Coun psaternyeC@al bemarle.org 434-296-5832 x3250 1 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Patricia "Paty" Saternye <psaternye@albemarle.org> Sent: Friday, July 2, 20213:15 PM To: Justin Shimp <justin@shimp-engineering.com> Cc: Kelly Strickland <kelly@shimp-engineering.com>; Brent Hall <brent@greenstonematerial.com>; Nicole Scro<nscro@gallifreyenterprises.com>; Lisa Green <Igreen2@albemarle.org> Subject: RE: Northside Material Recovery Facility (SDP202000067) 10 Great. Thanks Be well, Paty Saternye Senior Planner Albemarle Countv psaternyeCcDal bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228, Charlottesville. VA 22902 From: Justin Shimp <justin@shimp-engineering.com> Sent: Friday, July 2, 20213:14 PM To: Patricia "Paty" Saternye <psaternve@albemarle.org> Cc: Kelly Strickland <kelly@shimp-engineering.com>; Brent Hall <brent@greenstonematerial.com>; Nicole Scro<nscro@gallifreyenterprises.com>; Lisa Green <lgreen2@albemarle.org> Subject: Re: Northside Material Recovery Facility (SCIP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Paty, Thanks for the follow up. I've been out of the office a bit recently but can take care of this first of next week. -Justin 11 On Jul 2, 2021, at 3:13 PM, Patricia Paty Saternye <psaternye@albemarle.orR> wrote: Justin & Kelly, Just a reminder that you are extremely close to getting Northside Material Recovery Facility (SDP202000067) approved. There were no objects in the last review emailed to you below on 6/9, and you only had to follow those 4 steps. As stated, once you do that I will still have to send out the PDF to all the reviewers, as has been the norm with our COVID proticols, which can take some days. But other than that the approval should be very quick. We look forward to you following the 4 steps below. Be well, Paty Saternye Senior Planner Albemarle Coun psaternyeCc@al bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Patricia "Paty" Saternye <psaternye@albemarle.orR> Sent: Wednesday, June 9, 20217:53 AM To: Kelly Strickland <kelly@shimp-eneineering.com>; Justin Shimp <j ust i n @shimp-e ngi nee ri nR.co m> Cc: Brent Hall <brent@areenstonematerial.com>; Nicole Scro 12 <nscro @ ga I I ifreyenterprises.com> Subject: RE: Northside Material Recovery Facility (SDP202000067) Justin & Kelly, Good morning. The last revisions made on Northside Material Recovery Facility (SDP202000067) addressed the last comments. Please: . Remove the clouding around the last changes on sheets 4 and 6. • Submit 4 full sets with wet seals for approval signatures. . Email me a scan (PDF) of the revised and sealed set so that I can send it to all the reviewers for their final approval for signing. . Email me when the 4 full sealed sets are dropped off so that I can start the final approval steps. Be well, Paty Saternye Senior Planner Albemarle Countv psaternyeCc@al bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Patricia "Paty" Saternye <psaternye@albemarle.org> Sent: Monday, May 3, 2021 10:46 AM To: Kelly Strickland <kelly@shimp-engineering.com>; Justin Shimp 13 <I ust i n@ s h i m p-e ngi nee ri ng.co m> Cc: Brent Hall <brent@greenstonematerial.com>; Nicole Scro <nscro@gallifreventerprises.com>; Charles Rapp <rappc@albemarle.org>; Lisa Green <Igreen2@albemarle.org>; Rebecca Ragsdale <ragsdale@albemarle.org> Subject: RE: Northside Material Recovery Facility (SDP202000067) Justin and Kelly, Good morning. Attached please find the 2"" round comments for SDP2020-67 Northside Material Recovery FSP. Please note that the planning comment on the labels for the fencing was discussed with Charles Rapp prior to the comments being finalized. Be well, Paty Saternye Senior Planner Albemarle Coun psaternyeCc@aI bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Kelly Strickland <kelly@shimp-engineering.com> Sent: Wednesday, March 31, 202112:09 PM To: Patricia "Paty" Saternye <psaternye@albemarle.org>; Justin Shimp <]ustin@shimp-engineering.com> Cc: Brent Hall <brent@greenstonematerial.com>; Nicole Scro <nscro@ga I I ifreyente rprises.com> Subject: RE: Northside Material Recovery Facility (SDP202000067) 14 This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hello Paty, The attached PDF's were submitted online a few minutes ago. Let us know if you have any questions or concerns. Thanks, Kelly Strickland 434.981.6029 From: Patricia "Paty" Satemye[mailto:psatemyeCcbalbemarle.oral Sent: Monday, March 15, 2021 11:27 AM To: Justin Shimp Cc: Kelly Strickland; Brent Hall Subject: RE: Northside Material Recovery Facility (SDP202000067) Justin, Good morning. I just wanted to reach out to remind you that the comments for Northside Material Recovery Facility (SDP202000067) were sent on 11/30/2020. Please ensure you and your client keep in mind the timeline for resubmittal after comments were provided (6 months). Be well, Paty Satemye Senior Planner Albemarle Coun 15 psaternyeCc@aI bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Patricia "Paty" Saternye <psaternye@albemarle.org> Sent: Tuesday, January 12, 2021 10:33 AM To: Justin Shimp <justin@shimp-engineering.com> Cc: Kelly Strickland <kelly@shimp-engineering.com>; Brent Hall <brent@greenstonematerial.com> Subject: RE: Northside Material Recovery Facility (SDP202000067) Justin, Good morning. Yes it has to be rerecorded. Please note I got Andy H: s input on this prior to writing that comment. However, it is not just the SDP number is now different. As mentioned in the comments, it appears that when the document was recorded Exhibit A (reference in the document as being attached) was not attached. So, it is both of the items that need to be addressed. Be well, Paty Saternye Senior Planner Albemarle Coun psaternyeCc@aI bemarle.org 434-296-5832 x3250 16 401 McIntire Road. Suite 228, Charlottesville, VA 22902 From: Justin Shimp <justin@shimp-engineerine.com> Sent: Tuesday, January 12, 2021 10:02 AM To: Patricia "Paty" Saternye <psaternve@albemarle.ore> Cc: Kelly Strickland <kelly@shimp-engineerine.com>; Brent Hall <brent@ereenstonematerial.com> Subject: Re: Northside Material Recovery Facility (SDP202000067) This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hi Paty, Thanks for following up, we did get these and Kelly addressed most all of them. I think he was waiting to hear back from the building official but we also had a question for you. We read the comments to mean that we needed to re-record the shared parking easement because the SDP # has changed - are we reading that correctly? Is that really needed? Thanks, -Justin On Jan 12, 2021, at 9:49 AM, Patricia Paty Saternye <psaternve@albemarle.ore> wrote: Sorry, the set I sent you moments ago were not complete. Please see the complete 1'round comments attached to this email. 17 Be well, Paty Saternye Senior Planner Albemarle Coun psaternyeCc@al bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Patricia "Paty" Saternye <psaternye @a I bema rle.org> Sent: Tuesday, January 12, 20219:48 AM To: Justin Shimp, P.E. <lustin@shimp- engineering.com>; Kelly Strickland <kelly@shimp- engineering.com> Cc: Brent Hall <brent@greenstonematerial.com> Subject: FW: Northside Material Recovery Facility (SDP202000067) Justin & Kelly, Good morning. Just a reminder that comments were sent to you on 11/30/2020. There were just a few outstanding comments. Comments must be addressed prior to final site plan approval. Be well, Paty Saternye is Senior Planner Albemarle County psaternyeC@al bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228, Charlottesville. VA 22902 From: Patricia Saternye <psaternve@a I bema rle.org> Sent: Monday, November 30, 2020 1:S3 PM To: Kelly Strickland <kelly@shimp- engineering.com>; Justin@shimp-engineering.com Cc: Brent Hall <brent@greenstonematerial.com> Subject: RE: Northside Material Recovery Facility (SDP202000067) Justin & Kelly, Attached please find the 1'round comments for Northside Material Recovery Facility (SDP202000067). Please let me know if you have any questions. Be well, Paty Saternye Senior Planner Community Development <image001.gif> Albemarle County 401 McIntire Road Charlottesville, VA 22902 19 434-296-5832 ext.3250 psaternye@aIbemarie.org www.albemarle.org From: Patricia Saternye <psaternye @a I bema rle.org> Sent: Friday, October 16, 2020 2:04 PM To: Kelly Strickland <kellv@shimp- engineering.com> Cc: Justin@shimp-engineering.com Subject: RE: Northside Material Recovery Facility (SDP202000067) Kelly, Good afternoon. I just wanted to touch base on two things. Since you were not part of the original emails about this new submission of Northside Material Recovery I just wanted to ensure that you or someone with Shimp Engineering has already reached out to Margaret to find out if a new submission is also required for the ARB review. I had suggested that in an email on 10/7. Also, do you have a version of the checklist that is filled out? The version I received only has the last page filled out. Be well, Paty Saternye 20 Senior Planner Albemarle County psaternyeCcDal bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228, Charlottesville. VA 22902 From: Kelly Strickland <kelly@shimp- engineering.com> Sent: Tuesday, October 13, 2020 6:26 PM To: Patricia Saternye <psaternye@albemarle.org> Cc: Justin@shimp-engineering.com; Jennifer Smith - CDD - Planning <Ismith2@albemarle.org> Subject: RE: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Paty and Jen, The whole packet is now resubmitted. Thanks, Kelly From: Patricia Satemye [mailto: psaternyeCcbalbemarle.orol Sent: Tuesday, October 13, 2020 4:57 PM To: Kelly Strickland Cc: iustin(cbshimp-engineering.com; Jennifer Smith - CDD - Planning Subject: RE: Northside Material Recovery Facility (SDP202000067) Kelly, 21 I've communicated with Jen Smith in Intake. What you should do is resubmit, as you stated. Now that Jen is aware of the circumstances she will removed the submittal from yesterday and await the new submittal. She will keep it under the same number, and apply the fees you should have already paid. Be well, Paty Saternye Senior Planner Albemarle County psaternyeC@al bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Patricia Saternye <psaternye @a I bema rle.org> Sent: Tuesday, October 13, 2020 4:41 PM To: Kelly Strickland <kellv@shimp- engineering.com> Cc: Justin@shimp-engineering.com; Jennifer Smith - CDD -Planning <Ismith2@albemarle.org> Subject: RE: Northside Material Recovery Facility (SDP202000067) Kelly, The Final Site Plan comments were provided on 11/22/2019. You date may have must been a typo. Since this is a new Final Site Plan submission (because of withdrawal for inactivity of the 22 previous project) I've copying Jen Smith in CDD's Intake on this email. She hopefully will be able to iron our the submission problem you have. She may be able to hold the submittal until she receives the correct version of the site plan and the comment response letter. Be well, Paty Saternye Senior Planner Albemarle Court psaternyeCcDal bemarle.org 434-296-5832 x3250 401 McIntire Road. Suite 228. Charlottesville. VA 22902 From: Kelly Strickland <kelly@shimp- engineering.com> Sent: Tuesday, October 13, 2020 4:15 PM To: Patricia Saternye <psaternye@albemarle.org> Cc: Justin@shimp-engineering.com Subject: Northside Material Recovery Facility (SDP202000067) CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open attachments unless you are sure the content is safe. Hello Paty, I'm picking up the resubmittal for this project that was sidetracked early this year. It is my understanding that you requested a brand new 23 submittal and fee, which we did yesterday. However, in looking through County View and our files, it appears that the plan we submitted does not fully address your comments from November 12, 2019. Are these the most recent comments you had for SDP201900033? If so, we have a comment response drafted that addresses these comments and I'd like to swap out the site plan we submitted fixing the submittal dates, removing the revision dates, swapping out the SDP201900033 references, and adding back a tree preservation area on the adjoining parcel. Let me know if the November 12, 2019 round of comments are the most current and if I can swap out a new site plan with a response to these comments to be included in our new application submittal. Thanks, Kelly Strickland Shimp Engineering PC 434-227-5140 <SDP2020-67 1st round comments 11-30- 2020.pdf> Nicole M. Scro Gallifrey, LLC www.gallifreybuilds.com 434-218-0513 NOTICE: This electronic mail transmission may constitute an attorney -client communication that is privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without copying it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you. 24 Nicole M. Scro Gallifrey, LLC Nicole M. Scro Gallifrey, LLC www.gaIIifreybuilds.com 434-218-0513 NOTICE: This electronic mail transmission may constitute an attorney -client communication that is privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without copying it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you. Nicole M. Scro Gallifrey, LLC www.gailifreybuilds.com 434-218-0513 NOTICE: This electronic mail transmission may constitute an attorney -client communication that is privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without copying it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you. 25 www.gailifreybuilds.com 434-218-0513 NOTICE: This electronic mail transmission may constitute an attorney -client communication that is privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without copying it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you. Nicole M. Scro Gallifrey, LLC www.gailifreybuilds.com 434-218-0513 NOTICE: This electronic mail transmission may constitute an attorney -client communication that is privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without copying it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you. 26