HomeMy WebLinkAboutSDP202000067 Correspondence 2021-08-09Patricia "Paty" Saternye
From: Nicole Scro <nscro@gallifreyenterprises.com>
Sent: Monday, August 9, 2021 1:45 PM
To: Patricia "Paty" Saternye
Subject: Re: Northside Material Recovery Facility (SDP202000067)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Thank you again, Paty!
On Fri, Aug 6, 2021 at 10:48 AM Patricia "Paty" Saternye <psatemye@albemarle.org> wrote:
Nicole & Justin,
Good morning.
Northside Material Recovery Facility (SDP202000067) Final Site Plan has been approved.
have left your signed/approved set in the pick up box in the Front Lobby of Community Development.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
osaternve@albem arle.ora
434-296-5832 x3250
401 McIntire Road, Suite 228, Charlottesville, VA 22902
From: Patricia "Paty" Saternye <psaternye@albemarle.org>
Sent: Tuesday, July 27, 2021 1:45 PM
To: Nicole Scro <nscro@gallifreyenterprises.com>; Justin Shimp <lustin@shimp-engineering.com>
Cc: Brent Hall <brent@greenstonematerial.com>; Kelly Strickland <kelly@shimp-engineering.com>; Lisa Green
<lgreen2@albemarle.org>
Subject: RE: Northside Material Recovery Facility (SDP202000067)
Nicole & Justin,
Good afternoon.
Sorry for not responding quicker, but I needed to touch base with Charles R..
As Justin likely knows, from his conversation with Charles after I was out of the office, I have been given approval to
accept the digital signature on the seal that Justin has provided.
The plan sets submitted on 7/14 were already signed, they just had the previous submittal date (5/26 — both on the
signed seal and the revision dates) on it, so the seal was not blank for a new signature and date.
However, because of the minor/cosmetic changes that were needed, I chatted with Charles late this morning and he
has also approved that I utilize the set already provided.
So, I will now move forward with getting the final approvals from the other reviewers.
I will let you know once I have received those approvals and the site plan has been signed.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternye@albem arle.org
434-296-5832 x3250
401 McIntire Road, Suite 228, Charlottesville, VA 22902
From: Nicole Scro<nscro@gallifreyenterprises.com>
Sent: Monday, July 26, 2021 3:58 PM
To: Patricia "Paty" Saternye <psaternye@albemarle.org>
Cc: Justin Shimp <lustin@shimp-engineering.com>; Brent Hall <brent@greenstonematerial.com>; Kelly Strickland
<kelly@shimp-engineering.com>; Lisa Green <Igreen2@albemarle.org>
Subject: Re: Northside Material Recovery Facility (SDP202000067)
This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Paty
Can we pick up the copies we dropped off so that Justin can sign them?
On Thu, Jul 15, 2021 at 2:25 PM Patricia "Paty" Saternye <psaternye@albemarle.org> wrote:
Justin,
Please physically sign the signature originals and submit.
Also please scan and send me the scan as specified below.
Thanks
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternyeC@al bemarle.org
434-296-5832 x3250
401 McIntire Road, Suite 228, Charlottesville, VA 22902
From: Justin Shimp <justin@shimp-engineering.com>
Sent: Thursday, July 15, 2021 2:12 PM
To: Patricia "Paty" Saternye <psaternye@albemarle.org>
Cc: Nicole Scro<nscro@gallifreyenterprises.com>; Brent Hall <brent@greenstonematerial.com>; Kelly Strickland
<kellv@shimp-engineering.com>; Lisa Green <Igreen2@albemarle.org>
Subject: Re: Northside Material Recovery Facility (SDP202000067)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Paty,
That does clarify, to be clear though we have been turning in copies of the digitally signed plans for a while now,
especially since Covid. Often our VSMP plans are both digitally signed and digitally stamped approved by the County.
That has been the procedure for us of late. If the plans cannot be approved without a original signature we can
accommodate that. To restate my note from earlier though I am not aware of any such regulation or requirement on
the part of the County or the regulatory agencies for Engineers/surveyors.
Please advise if the plans delivered are NOT acceptable as is. They do incorporate the final changes.
Thanks,
-Justin
On Jul 15, 2021, at 1:34 PM, Patricia Paty Saternye <psaternye@albemarle.org> wrote:
Justin,
Sorry for not wording it better.
I didn't mean the seal itself is supposed to be wet, but your signature and the date as is usually done.
I hope that clarifies things.
Be well,
Paty Saternye
Senior Planner
Albemarle Countv
psaternye@al bemarle.org
434-296-5832 x3250
401 McIntire Road, Suite 228, Charlottesville, VA 22902
From: Justin Shimp <justin@shimp-engineering.com>
Sent: Thursday, July 15, 2021 12:52 PM
To: Patricia "Paty" Saternye <psaternve@albemarle.org>
Cc: Nicole Scro<nscro@gallifreyenterprises.com>; Brent Hall <brent@greenstonematerial.com>; Kelly
Strickland <kelly@shim p-engineering.com>; Lisa Green <Igreen2@albemarle.0rg>
Subject: Re: Northside Material Recovery Facility (SDP202000067)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hi Paty,
Could you please verify what you mean by wet seal? Do you mean an ink seal? I'm not familiar with
that requirement. To save printing cost we affix a digital seal to the plans which is permitted by DPOR.
I don't recall ever being required to turn in a final siteplan to the County with an ink stamp. If it's a
requirement that I am not aware of just let me know and we will get the plans back and I can stamp
the same ones.
Thanks,
-Justin
On Jul 15, 2021, at 11:46 AM, Patricia Paty Saternye <psaternve@albemarle.ore>
wrote:
Justin and Nicole,
Please let me know if you expect to have all the required items, with wet and current
seals, to me today or not.
Just a reminder of the three items that are to be done once you have the final wet
sealed new site plan submittal scanned are:
1. Submit 4 full sets with wet seals for approval signatures.
2. Email me a scan (PDF) of the revised and sealed set so that I can
send it to all the reviewers for their final approval for signing.
3. Email me when the 4 full sealed sets are dropped off so that I can
start the final approval steps.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternyeCc@al bemarle.org
434-296-5832 x3250
401 McIntire Road, Suite 228, Charlottesville, VA 22902
From: Nicole Scro<nscro@gallifreyenterprises.com>
Sent: Wednesday, July 14, 20213:07 PM
To: Patricia "Paty" Saternye <psaternve@albemarle.org>
Cc: Brent Hall <brent@greenstonematerial.com>; Justin Shimp <lustin@shimp-
engineering.com>; Kelly Strickland <kelly@shimp-engineering.com>; Lisa Green
<Igreen2@albemarle.org>
Subject: Re: Northside Material Recovery Facility (SDP202000067)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Paty,
I know Justin is in Louisa until 6 PM. I will circle up with him as soon as he is back.
-Nicole
On Wed, Jul 14, 2021 at 3:05 PM Patricia "Paty" Saternye <psaternye@albemarle.org>
wrote:
Justin,
Could you please clarify something for me.
The scan I just received is supposed to be a scan of wet sealed most recent
submission (today) for County approval and with changes made to the plan set since
the last submission (in May).
At a quick glance I see that changes have been made to the site plan but the seal is
for the exact same date as it was with the previous submission.
This makes me think this is not a wet sealed set.
I just want to ensure that there will be no delays once I get into the office and look at
the plan set.
Why is todays submission sealed with the exact same date as the last submission in
May?
Am I missing something?
Thanks.
Be well,
Paty Saternye
Senior Planner
Albemarle County
psaternyeC@al bemarle.org
434-296-5832 x3250
401 McIntire Road, Suite 228. Charlottesville, VA 22902
From: Nicole Scro<nscro@gallifreyenterprises.com>
Sent: Wednesday, July 14, 20212:51 PM
To: Patricia "Paty" Saternye <psaternve@albemarle.org>
Cc: Justin Shimp <justin@shimp-engineering.com>; Kelly Strickland <kelly@shimp-
engineering.com>; Brent Hall <brent@greenstonematerial.com>; Lisa Green
<Igreen2@a1bemarle.org>
Subject: Re: Northside Material Recovery Facility (SDP202000067)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Paty,
Apologies, attached is the scanned resubmission.
-Nicole
On Wed, Jul 14, 2021 at 2:47 PM Patricia "Paty" Saternye
<psaternye@albemarle.org> wrote:
Ms. Scro,
Good afternoon and thank you.
Please ensure all of the following have been done:
9 Submit 4 full sets with wet seals for approval signatures.
• Email me a scan (PDF) of the revised and sealed set so that I can send it to
all the reviewers for their final approval for signing.
• Email me when the 4 full sealed sets are dropped off so that I can start
the final approval steps.
If you have submitted the 4 full sets with wet seals than the 1" and 3rd have been
done.
However, I still need the 2"d item in order to complete the final approvals from all of
our reviewers.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternye@albem arle.org
434-296-5832 x3250
401 McIntire Road. Suite 228, Charlottesville. VA 22902
From: Nicole Scro<nscro@gallifreyenterprises.com>
Sent: Wednesday, July 14, 20212:33 PM
To: Patricia "Paty" Saternye <psaternve@albemarle.org>
Cc: Justin Shimp <Justin@shimp-engineering.com>; Kelly Strickland <kellv@shimp-
engineering.com>; Brent Hall <brent@greenstonematerial.com>; Lisa Green
<Igreen2@albemarle.org>
Subject: Re: Northside Material Recovery Facility (SDP202000067)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK on
links or open attachments unless you are sure the content is safe.
Hi Paty,
I just dropped off the resubmission at Community Development.
Thank you so much for your help on this!
Nicole
On Mon, Jul 12, 2021 at 3:21 PM Patricia "Paty" Saternye
<psaternye@albemarle.org> wrote:
Justin,
Good afternoon.
I have not yet received the resubmission for Northside Material Recovery Facility
(SDP202000067).
Please note that I will be out of the office from 7/16 through 7/23.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternyeC@al bemarle.org
434-296-5832 x3250
1 401 McIntire Road. Suite 228. Charlottesville. VA 22902
From: Patricia "Paty" Saternye <psaternye@albemarle.org>
Sent: Friday, July 2, 20213:15 PM
To: Justin Shimp <justin@shimp-engineering.com>
Cc: Kelly Strickland <kelly@shimp-engineering.com>; Brent Hall
<brent@greenstonematerial.com>; Nicole Scro<nscro@gallifreyenterprises.com>;
Lisa Green <Igreen2@albemarle.org>
Subject: RE: Northside Material Recovery Facility (SDP202000067)
10
Great. Thanks
Be well,
Paty Saternye
Senior Planner
Albemarle Countv
psaternyeCcDal bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228, Charlottesville. VA 22902
From: Justin Shimp <justin@shimp-engineering.com>
Sent: Friday, July 2, 20213:14 PM
To: Patricia "Paty" Saternye <psaternve@albemarle.org>
Cc: Kelly Strickland <kelly@shimp-engineering.com>; Brent Hall
<brent@greenstonematerial.com>; Nicole Scro<nscro@gallifreyenterprises.com>;
Lisa Green <lgreen2@albemarle.org>
Subject: Re: Northside Material Recovery Facility (SCIP202000067)
CAUTION: This message originated outside the County of Albemarle email system. DO NOT CLICK
on links or open attachments unless you are sure the content is safe.
Hi Paty,
Thanks for the follow up. I've been out of the office a bit recently but can take care
of this first of next week.
-Justin
11
On Jul 2, 2021, at 3:13 PM, Patricia Paty Saternye
<psaternye@albemarle.orR> wrote:
Justin & Kelly,
Just a reminder that you are extremely close to getting Northside
Material Recovery Facility (SDP202000067) approved.
There were no objects in the last review emailed to you below on
6/9, and you only had to follow those 4 steps.
As stated, once you do that I will still have to send out the PDF to
all the reviewers, as has been the norm with our COVID proticols,
which can take some days.
But other than that the approval should be very quick.
We look forward to you following the 4 steps below.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternyeCc@al bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228. Charlottesville. VA 22902
From: Patricia "Paty" Saternye <psaternye@albemarle.orR>
Sent: Wednesday, June 9, 20217:53 AM
To: Kelly Strickland <kelly@shimp-eneineering.com>; Justin Shimp
<j ust i n @shimp-e ngi nee ri nR.co m>
Cc: Brent Hall <brent@areenstonematerial.com>; Nicole Scro
12
<nscro @ ga I I ifreyenterprises.com>
Subject: RE: Northside Material Recovery Facility (SDP202000067)
Justin & Kelly,
Good morning.
The last revisions made on Northside Material Recovery Facility
(SDP202000067) addressed the last comments.
Please:
. Remove the clouding around the last changes on sheets
4 and 6.
• Submit 4 full sets with wet seals for approval signatures.
. Email me a scan (PDF) of the revised and sealed set so
that I can send it to all the reviewers for their final
approval for signing.
. Email me when the 4 full sealed sets are dropped off so
that I can start the final approval steps.
Be well,
Paty Saternye
Senior Planner
Albemarle Countv
psaternyeCc@al bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228. Charlottesville. VA 22902
From: Patricia "Paty" Saternye <psaternye@albemarle.org>
Sent: Monday, May 3, 2021 10:46 AM
To: Kelly Strickland <kelly@shimp-engineering.com>; Justin Shimp
13
<I ust i n@ s h i m p-e ngi nee ri ng.co m>
Cc: Brent Hall <brent@greenstonematerial.com>; Nicole Scro
<nscro@gallifreventerprises.com>; Charles Rapp
<rappc@albemarle.org>; Lisa Green <Igreen2@albemarle.org>;
Rebecca Ragsdale <ragsdale@albemarle.org>
Subject: RE: Northside Material Recovery Facility (SDP202000067)
Justin and Kelly,
Good morning.
Attached please find the 2"" round comments for SDP2020-67
Northside Material Recovery FSP.
Please note that the planning comment on the labels for the
fencing was discussed with Charles Rapp prior to the comments
being finalized.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternyeCc@aI bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228. Charlottesville. VA 22902
From: Kelly Strickland <kelly@shimp-engineering.com>
Sent: Wednesday, March 31, 202112:09 PM
To: Patricia "Paty" Saternye <psaternye@albemarle.org>; Justin
Shimp <]ustin@shimp-engineering.com>
Cc: Brent Hall <brent@greenstonematerial.com>; Nicole Scro
<nscro@ga I I ifreyente rprises.com>
Subject: RE: Northside Material Recovery Facility (SDP202000067)
14
This message originated outside the County of Albemarle email
system. DO NOT CLICK on links or open attachments unless you are sure the
content is safe.
Hello Paty,
The attached PDF's were submitted online a few minutes ago.
Let us know if you have any questions or concerns.
Thanks,
Kelly Strickland
434.981.6029
From: Patricia "Paty" Satemye[mailto:psatemyeCcbalbemarle.oral
Sent: Monday, March 15, 2021 11:27 AM
To: Justin Shimp
Cc: Kelly Strickland; Brent Hall
Subject: RE: Northside Material Recovery Facility (SDP202000067)
Justin,
Good morning.
I just wanted to reach out to remind you that the comments for
Northside Material Recovery Facility (SDP202000067) were sent on
11/30/2020.
Please ensure you and your client keep in mind the timeline for
resubmittal after comments were provided (6 months).
Be well,
Paty Satemye
Senior Planner
Albemarle Coun
15
psaternyeCc@aI bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228. Charlottesville. VA 22902
From: Patricia "Paty" Saternye <psaternye@albemarle.org>
Sent: Tuesday, January 12, 2021 10:33 AM
To: Justin Shimp <justin@shimp-engineering.com>
Cc: Kelly Strickland <kelly@shimp-engineering.com>; Brent Hall
<brent@greenstonematerial.com>
Subject: RE: Northside Material Recovery Facility (SDP202000067)
Justin,
Good morning.
Yes it has to be rerecorded.
Please note I got Andy H: s input on this prior to writing that
comment.
However, it is not just the SDP number is now different.
As mentioned in the comments, it appears that when the
document was recorded Exhibit A (reference in the document as
being attached) was not attached.
So, it is both of the items that need to be addressed.
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternyeCc@aI bemarle.org
434-296-5832 x3250
16
401 McIntire Road. Suite 228, Charlottesville, VA 22902
From: Justin Shimp <justin@shimp-engineerine.com>
Sent: Tuesday, January 12, 2021 10:02 AM
To: Patricia "Paty" Saternye <psaternve@albemarle.ore>
Cc: Kelly Strickland <kelly@shimp-engineerine.com>; Brent Hall
<brent@ereenstonematerial.com>
Subject: Re: Northside Material Recovery Facility (SDP202000067)
This message originated outside the County of Albemarle email
system. DO NOT CLICK on links or open attachments unless you are sure the
content is safe.
Hi Paty,
Thanks for following up, we did get these and Kelly addressed
most all of them. I think he was waiting to hear back from the
building official but we also had a question for you. We read the
comments to mean that we needed to re-record the shared
parking easement because the SDP # has changed - are we reading
that correctly? Is that really needed?
Thanks,
-Justin
On Jan 12, 2021, at 9:49 AM, Patricia Paty
Saternye <psaternve@albemarle.ore> wrote:
Sorry, the set I sent you moments ago were not
complete.
Please see the complete 1'round comments
attached to this email.
17
Be well,
Paty Saternye
Senior Planner
Albemarle Coun
psaternyeCc@al bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228. Charlottesville. VA
22902
From: Patricia "Paty" Saternye
<psaternye @a I bema rle.org>
Sent: Tuesday, January 12, 20219:48 AM
To: Justin Shimp, P.E. <lustin@shimp-
engineering.com>; Kelly Strickland <kelly@shimp-
engineering.com>
Cc: Brent Hall <brent@greenstonematerial.com>
Subject: FW: Northside Material Recovery Facility
(SDP202000067)
Justin & Kelly,
Good morning.
Just a reminder that comments were sent to you
on 11/30/2020.
There were just a few outstanding comments.
Comments must be addressed prior to final site
plan approval.
Be well,
Paty Saternye
is
Senior Planner
Albemarle County
psaternyeC@al bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228, Charlottesville. VA
22902
From: Patricia Saternye
<psaternve@a I bema rle.org>
Sent: Monday, November 30, 2020 1:S3 PM
To: Kelly Strickland <kelly@shimp-
engineering.com>; Justin@shimp-engineering.com
Cc: Brent Hall <brent@greenstonematerial.com>
Subject: RE: Northside Material Recovery Facility
(SDP202000067)
Justin & Kelly,
Attached please find the 1'round comments for
Northside Material Recovery Facility
(SDP202000067).
Please let me know if you have any questions.
Be well,
Paty Saternye
Senior Planner
Community Development
<image001.gif>
Albemarle County
401 McIntire Road
Charlottesville, VA 22902
19
434-296-5832 ext.3250
psaternye@aIbemarie.org
www.albemarle.org
From: Patricia Saternye
<psaternye @a I bema rle.org>
Sent: Friday, October 16, 2020 2:04 PM
To: Kelly Strickland <kellv@shimp-
engineering.com>
Cc: Justin@shimp-engineering.com
Subject: RE: Northside Material Recovery Facility
(SDP202000067)
Kelly,
Good afternoon.
I just wanted to touch base on two things.
Since you were not part of the original emails
about this new submission of Northside Material
Recovery I just wanted to ensure that you or
someone with Shimp Engineering has already
reached out to Margaret to find out if a new
submission is also required for the ARB review.
I had suggested that in an email on 10/7.
Also, do you have a version of the checklist that is
filled out?
The version I received only has the last page filled
out.
Be well,
Paty Saternye
20
Senior Planner
Albemarle County
psaternyeCcDal bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228, Charlottesville. VA
22902
From: Kelly Strickland <kelly@shimp-
engineering.com>
Sent: Tuesday, October 13, 2020 6:26 PM
To: Patricia Saternye <psaternye@albemarle.org>
Cc: Justin@shimp-engineering.com; Jennifer Smith
- CDD - Planning <Ismith2@albemarle.org>
Subject: RE: Northside Material Recovery Facility
(SDP202000067)
CAUTION: This message originated outside the County of
Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Paty and Jen,
The whole packet is now resubmitted.
Thanks,
Kelly
From: Patricia Satemye
[mailto: psaternyeCcbalbemarle.orol
Sent: Tuesday, October 13, 2020 4:57 PM
To: Kelly Strickland
Cc: iustin(cbshimp-engineering.com; Jennifer Smith
- CDD - Planning
Subject: RE: Northside Material Recovery Facility
(SDP202000067)
Kelly,
21
I've communicated with Jen Smith in Intake.
What you should do is resubmit, as you stated.
Now that Jen is aware of the circumstances she
will removed the submittal from yesterday and
await the new submittal.
She will keep it under the same number, and apply
the fees you should have already paid.
Be well,
Paty Saternye
Senior Planner
Albemarle County
psaternyeC@al bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228. Charlottesville. VA
22902
From: Patricia Saternye
<psaternye @a I bema rle.org>
Sent: Tuesday, October 13, 2020 4:41 PM
To: Kelly Strickland <kellv@shimp-
engineering.com>
Cc: Justin@shimp-engineering.com; Jennifer Smith
- CDD -Planning <Ismith2@albemarle.org>
Subject: RE: Northside Material Recovery Facility
(SDP202000067)
Kelly,
The Final Site Plan comments were provided on
11/22/2019. You date may have must been a typo.
Since this is a new Final Site Plan submission
(because of withdrawal for inactivity of the
22
previous project) I've copying Jen Smith in CDD's
Intake on this email.
She hopefully will be able to iron our the
submission problem you have.
She may be able to hold the submittal until she
receives the correct version of the site plan and
the comment response letter.
Be well,
Paty Saternye
Senior Planner
Albemarle Court
psaternyeCcDal bemarle.org
434-296-5832 x3250
401 McIntire Road. Suite 228. Charlottesville. VA
22902
From: Kelly Strickland <kelly@shimp-
engineering.com>
Sent: Tuesday, October 13, 2020 4:15 PM
To: Patricia Saternye <psaternye@albemarle.org>
Cc: Justin@shimp-engineering.com
Subject: Northside Material Recovery Facility
(SDP202000067)
CAUTION: This message originated outside the County of
Albemarle email system. DO NOT CLICK on links or open
attachments unless you are sure the content is safe.
Hello Paty,
I'm picking up the resubmittal for this project that
was sidetracked early this year. It is my
understanding that you requested a brand new
23
submittal and fee, which we did yesterday.
However, in looking through County View and our
files, it appears that the plan we submitted does
not fully address your comments from November
12, 2019. Are these the most recent comments
you had for SDP201900033? If so, we have a
comment response drafted that addresses these
comments and I'd like to swap out the site plan we
submitted fixing the submittal dates, removing the
revision dates, swapping out the SDP201900033
references, and adding back a tree preservation
area on the adjoining parcel. Let me know if the
November 12, 2019 round of comments are the
most current and if I can swap out a new site plan
with a response to these comments to be included
in our new application submittal.
Thanks,
Kelly Strickland
Shimp Engineering PC
434-227-5140
<SDP2020-67 1st round comments 11-30-
2020.pdf>
Nicole M. Scro
Gallifrey, LLC
www.gallifreybuilds.com
434-218-0513
NOTICE: This electronic mail transmission may constitute an attorney -client communication that is
privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you
have received this electronic mail transmission in error, please delete it from your system without copying
it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you.
24
Nicole M. Scro
Gallifrey, LLC
Nicole M. Scro
Gallifrey, LLC
www.gaIIifreybuilds.com
434-218-0513
NOTICE: This electronic mail transmission may constitute an attorney -client communication that is
privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you
have received this electronic mail transmission in error, please delete it from your system without copying
it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you.
Nicole M. Scro
Gallifrey, LLC
www.gailifreybuilds.com
434-218-0513
NOTICE: This electronic mail transmission may constitute an attorney -client communication that is
privileged at law. It is not intended for transmission to, or receipt by, any unauthorized persons. If you have
received this electronic mail transmission in error, please delete it from your system without copying it, and
notify the sender by reply e-mail, so that our address records can be corrected. Thank you.
25
www.gailifreybuilds.com
434-218-0513
NOTICE: This electronic mail transmission may constitute an attorney -client communication that is privileged at law. It is not intended for
transmission to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your
system without copying it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you.
Nicole M. Scro
Gallifrey, LLC
www.gailifreybuilds.com
434-218-0513
NOTICE: This electronic mail transmission may constitute an attorney -client communication that is privileged at law. It is not intended for transmission
to, or receipt by, any unauthorized persons. If you have received this electronic mail transmission in error, please delete it from your system without
copying it, and notify the sender by reply e-mail, so that our address records can be corrected. Thank you.
26