Loading...
HomeMy WebLinkAboutWPO200700104 Checklist - Project Closeout (Administrative) 2021-09-15 -WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form i release; place the completed form in the WPO folder and forward to the ImagingP J p :dig of project completion and/or bond LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff ill forward to Center for digital tt closeout into WPO# D�f— 1 Centralized Filing. PROJECT TITLE FULL NAME.INSPECTOR: FINAL ACTION DATE: �/ CountyView— ��'------ Status/Status Date updated Hardco Ay—File Folder Closeout: items listed shoul be placed in Project folder,in reverse chronological order(latest on top). P Please check each item included in this folder. To indicate that an item is not a lic b1e next to the check box. The Inspector/Management Analyst has the discretion to inc tide any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. to this file,place an"N/A" p vlded. Digital Closeout Instructions: Below each or,if the document is already in digital format can be tem please indicate if gu1�Center is to scan the document; saved to LaserFiche. Please (path/name)of the document in the space.provided. provide the digital location ❑ Preconstruction Meeting Form 0 Scan ❑ Saved location Gradin ermit Scan ❑ Saved location ❑ Inspection Requests ❑ Scan ❑ Saved location ❑ Inspection Results (Include any inspection tickets,memos,photos,etc.) ❑ Scan ❑ Saved location ❑ Bond Reduction/Bond Release Notices from Inspector to Management Analyst ❑ Scan ❑ Saved location ❑ Conservation Checklist ❑ Scan ❑ Saved location ❑ As-built/Construction Plans ❑ Scan Gig Saved location Other(Pl ase expldin / (owes`,U r a',1 I / \ Scan • Saved location ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats maybe lend clarity to the review at a later date. If such plans are included, the should be clearl unapproved and contain a note clarifying placed in the file if they why it was included. — v marked as ❑ Scan. ❑ Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the folio ' g items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened(except plats/plans),and in chronological orde 3) Documents are sufficiently identified as to which need to be scanned or saved to Lase Ficheents on top);If the above items are not complete,Imaging Center staff will circle the incomplete item mid return folder to the County Engineer for corrective action. �1 Draft 12-5-2013