Loading...
HomeMy WebLinkAboutWPO201900006 Bond Estimates 2019-05-22 The Covenant School - Major Amendment WPO file number: WP0201900006 TMP(s): 090A0-00-00-00200 Date Estimate Completed: 5/22/19 Erosion and Sediment Control Bond Estimate Item Item No Unit Unit Cost Cost Number (installed) stablization(PS,TS) 0 5 acres $5,000 00 $2,500 00 silt fence(SF) 315 0 ft $5 00 $1,575 00 safety fence(SAF) 4000 ft $5 00 $2,000.00 diversion(DD,FD,RWD) Mill.ft $13 00 $0 00 temporary slope drain(TSD) pipe length 0 ft pipe diameter _in $0 00 $0 00 earthwork for trap/basin height of dam at toe • 0 ft cut at high side ft height of fill at face 0 ft cut at face ft length of dam 0 ft length of cut ft top width 0 ft width of cut ft • (area above transition 0 sf (area below transite 0 sf (total width of dam) 0 ft (total width of cut) 0 ft (height below transitio 0 ft (depth below transit 0 ft (area below transition; 0 sf (area above transitii 0 sf (total fill volume) 0 0 cy (total fill volume) 0 0 cy length of spillway _ft (TOAL CY estimate 0 cy $13 00 $0 00 width of spillway ft (spillway stone tons 0 tons $50 00 $0 00 structures for basin riser height ft riser diameter in (riser unit price) SO 00 $0 00 barrel length ft base plate or fdn $200 00 $0 barrel diameter in (barrel unit price) SO 00 $0 00 barrel collars $200 00 $0 baffle length ft $50 00 $0 silt fence inlet protection(IP) $100 00 $400 00 stone inlet protection(IP) $200 00 $400 00 outlet protection(OP) length ft width ■ft $607 50 $607 50 channel(SCC,matted) length ft width ft $0 00 check dam depth in channel ft channel width ft $0 00 $0 00 construction entrance(CE) $2 500 00 $2,500.00 wash rack $2 000 00 $2,000 00 paved construction entrance $3,500 00 $0 00 rip-rap,placed depth ME ft length RIM ft width $60 00 $0 00 survey and layout(price per 0 1 mi) acres Mill traps and basins — $250.00 mobilization $2,500 00 stream crossing(computed independently) $0 00 cost sum $14,732 50 contingency $1,473 25 5/22/2019 The Covenant School - Major Amendment WPO file number:WPO201900006 T M P(s): 090A0-00-00-00200 Date Estimate Completed: 5/22/19 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) Total $16,210 5/22/2019