Loading...
HomeMy WebLinkAboutWPO201900008 Checklist - Project Closeout (Administrative) 2020-02-19 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form , , of project completion release;place the completed form in the WPO folder and forward to the Imaging Center for digital LaserFiche. Once items have been placed in LaserFiche,Imaging p and/or bond WPO# 2-e) 19 -0 0 053' gang Center staff will forward to Centralized Filing. PROJECT TITLE W J�Q,AZ & FULL NAME INSPECTOR: Jo�,.� -----_______ _ FINAL ACTION DATE:_ —( 5 d Cou ty ------- ----- n View— — Status/Status Date updated - � ^- Hardcopy—File FolderC loseout: All items yw- ��`��---'----—�-------- --� chronological order(latest on top), listed should be placed in project folder,in reverse 1 Please check each item included in this folder. To indicate that an item is not applic ble to this file, next to the check box. The Inspector/Management Analyst has the discretion to inc to anyit place an"N/ r provide clarity to the file,please indicate that item on the"Other"lines provided. em deemed necessary to Digital Closeout Instructions: Below each item please indicate if Imagin Center is to scan the document; or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital loc (path/name)of the document in the space provided. atlon ❑ Preconstruction Meeting Form ❑ Scan i Saved location ❑ Grading Permit ❑ Scan 0 Saved location ❑ Inspection Requests ❑ Scan 0 Saved location ❑ Inspection Results( clude any inspection tickets,memos,photos,etc.) ❑ Scan 0 Saved location ❑ Bond Reductio 1 and Release Notices from Inspector to Management Analyst 1 ❑ Sc.u. 0 Saved location I ❑ Conservatio a Checklist ❑ Scan 0 Saved location ❑ As-built Construction Plans ((Please Scan ❑ Saved location ❑ Oth i�(Please explain) 0 Scan 0 Saved location ❑ ther Plans - At the Inspector's discretion, copies of unapproved plans/plats maybe end clarity to the review at a later date. If such plans are included, they should be dearl placed in the file if they unapproved and contain a note clarifying why it was included. v marked as 0 Scan 0 Saved location __ __ NOTES: WPO project folders will be accepted by the Imaging Center when the followin -~�e ^� ~� 1) Checklist is completed and included in folder; g items are complete: 2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete,Imaging Center staff will circle the incomplete item a d return folder to the County Engineer for corrective action. 1 Draft 12-5-2013