Loading...
HomeMy WebLinkAboutWPO201900016 Checklist - Project Closeout (Administrative) 2020-05-14 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form gfeala of project completion release;place the completed form in the WPO folder and forward to the Imaging LaserFiche. Once items have been placed in LaserFiche,Imaging Center for digital closeout into p and/or bond ��,,� gmg Center staff ill forward to Centralized Filing. WPO# /9—`Ca 1t � .f PROJECT TITLE FULL NAME INSPECTOR: NA FINAL ACTION DATE: 5 2__ CountyView— Status/Status Date updated Hardcopy—File Folder —'___---_-------_.__ �_i _y_----------------------------_-_--- Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). I r Please check each item included in this folder. To indicate that an item is not applic ble to this next to the check box. The Inspector/Management Analyst has the discretion to inc de file,place an essay provide clarity to the file,please indicate that item on the"Other"lines provided. any item deemed necessary to Digital Closeout Instructions: Below each item please indicate if Imagin Center is to scan the document; or,if the document is already in digital format,can be saved to LaserFiche. Please provide the digital (path/name)of the document in the space provided. In location ❑ Preconstruction Meeting Form ❑ Scan 0 Saved location ❑ Grading Permit ❑ Scan 0 Saved location ❑ Inspection Requests ❑ Scan 0 Savedlo • ion ❑ Inspection Results(Include any ins. -ction tickets,memos,photos,etc.) ❑ Scan 0 :aved location ❑ Bond Reduction/Bond Rel>:se Notices from Inspector to Management Analyst ❑ Scan 0 Saved location ❑ Conservation Che A ist ❑ S '"' ❑ Saved location ❑ As-built 'onstruction Plans if Scan ❑ Saved location 531Other(Please explain) ❑ Scan ❑ Saved location ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats may be lend clarity to the review at a later date. If such plans are included, they should be dead placed in the file if they unapproved and contain a note clarifying why it was included. y marked as ❑ Scan 0 Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened(except plats/plans),and in chronological orde 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserF cheents on top)• If the above items are not complete,Imaging Center staff will circle to the County Engineer for corrective action. the incomplete item and return folder Draft 12-5-2013