Loading...
HomeMy WebLinkAboutWPO201900033 Bond Reduction 2020-10-05 DocuSign Envelope ID:3CB86F36-CDBA-4FFB-A3DC-0B22A476370A Jnteroal tI c Oak ua'�4k Dale Received:��?� .<`�(►tidy Fet raid:_ OZ'O Lam'®i4•%5 11etNved b1:___ �I OS' Ialakt:a FurNard lu\aanattement Amapa 171 .1V•f BOND INSPECTION REQUEST APPROVED I'LAN.N:WP02019-00033 PROJECT NAME(including Phase 11): C&F Bank(G5),Dionefield Block"G"Maior Site Plan Amendm (As listed on the approved plan) This form is used to request a reduction or release ore bond. A Ice is required for each inspection.Please check the appropriate box below liar the requested inspection(s). Inspections for the purposes of bond reduction or release will require a separate fee for each bond. VSMP/VESCP Erosion Control,Stor ater Management and/or Mitigation per Water Protection Ordinance sections 17-207& 17-208 $250 u Reduction n, Release O Subdivision(roads,drainage-etc.)per Subdivision Ordinance sections 14-435 & 14-438 $u) n Reduction n Release ❑ Water&Sewer bond per Subdivision Ordinance section 14-435 $251 n Reduction o Release O Site Development i'erliln►ance bond(incomplete Site Work & Landscaping) $30' u Reduction(site work only) n Release TOTAL FEES $250 Submit requests to: Department ol'('onnunily Development,401 McIntire Road,North Wing, Charlottes'ille, VA 22902,Attention: Management Analyst-Phone 434-296-5832; Fax 434-972-4126. All roads and I stormwater facilities will require construction record drawings, inspection reports, videos/photos,plats/estr Is, certifications,and completion processes through VDOT or DEQ(refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection dueumentation per the state, requirements and County's published procedures. A minimum 20%of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if lundscape installation is part of the bonded site work,a request for reduction should only be made once all landscaping is complete, If all required documentation is not received within 30 days or receipt of this request,this application shall be deemed incomplete and shall be rejected.If rejected,a new application,supporting documentation and ice will be required.Applications may be withdrawn for a full refund within 30 days of receipt. If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the earner. Please provide contact information. EMAIL: aschwariz@oconnorcp.com OR REGULAR MAIL ADDRESS: C42471".k-/ Signature of Own •/Developer Adam Schwartz 10/05/2020 Print Name Dale • Revised 7/15/21114,7121121115,1113+2015,1111,1/21117,11210.020 *_ : OCT Stonefleld Property Owner LLCM F JP Morgan Chase Bank•* � 3"'y ".` ,`3- .. d s ' New York,New York 4« x, r �` ? „� y . f '� •4 40=�' 1f a! 1�a ' 'Py�' b. i` 7i.,- �.P ,,> i t :Date '�ri.Check No. �., � t `40. .1,,' Check Amount • :,,, ; • °:1t, 10/16/2020 "`" 004598 $250.00 ' ` y ~ Two Hundred Fifty AND 00f100 Dollars Pay to the order of. • b��- . r • „ , r .�i� a : , ,w -mac r ,,, '4� ,c, ,e % TM. Fit, �• �k t'rho!,., „..:,..,,,A, . ....,, '= 4t: County of Albemarle +w *: + , ;tr ' ; e' ,. ._ . _ = Y . K 401 McIntire Road 0... .1. : < v a-' vo, �- 'c Charlottesville, VA 22902r``� .' ° ► v • •. 55� ;. ` s ' a 4. GNATURES REQUIRED!F OVER S10 000 _40,41,, ;,.2,"42i. County of Albemarle 12 2 2 4 0 Department of Community Development PH: (434)296-5832 Datc Jo -a<-2o • RECEIVED FROM: l/G 7 ''c i'e IA Qf0�� O V�1�.� Ci(�C� �7 AMOUNT: -/-u-k: It.,.."C --4` Th -y— - j„c $ , _So. et 341 2E-Q-(5 324 510 check 621O 307 3431t For: Ll )PeAr/1- cash credit card By ---- '=: +t1 . . • i .