HomeMy WebLinkAboutARB202100111 Plan - Submittal (First) 2021-09-21HEMNA012-11103
Inn Code: CHORR
1250 Richmond Rd
Charlottesville, VA 22911
NOT PRODUCTION READY
THIS DOCUMENT IS FOR VISUAL PURPOSES ONLY
SITE DOCUMENT
August 11, 2021
colne lu9
+1.W 9267926 P +1.Bo392&NV F
w Coliw..
WALL REPAIR GUIDELINES
Exterior
Corrugated
To be discussed with client. End result should ensure holes are filled or patched
prior to installing new sign.
Brick
Holes to be filled with QUICKRETE mortar repair sealant or paintable caulk.
Pressure wash wall.
Concrete
Holes to be filled with QUICKRETEconcrete repair sealant. Pressure wash wall
Sidings
Patch holes with pre -approved painted aluminum.
Stucco and EIFS
Patch holes or re -mediate wall with DAPALEXPLUS all-purpose acrylic latex caulk.
Prep and paint wall with approved paint color (SHERWIN WILLIAMS or BENJAMIN
MOORE).
Interior
Drywall
Patch holes or re -mediate wall with DAPALEX PLUS all-purpose acrylic latex
caulk. Prep and paint wall to a Level 4 finish with approved paint color (SHERWIN
WILLIAMS or BENJAMIN MOORE).
Wood, Marble, Glass, and Granite
To be discussed with client prior to budget presentation.
Wallpaper
Wallpaper to be removed and reapplied. PM to consult with client as they may
have access to matching wallpaper.
*Paint must cure for a minimum of 48 hours prior to graphics installation. Gassing and/or peeling of graphic can occur otherwise-
* Electrical is to be brought to signage area prior to sign installation by GC or owner.
August 11, 2021 HEXS-VA012-R03 Page 2 of 6
SITE PLAN
I .
o.
p..F1' eeul
ERER
J — LE4-39, 41 .\
Po�FIMP
PROAK O 4
wr k
w ' wlI oo. AM
A «o_ R.x.W,O.
o[(PURxl� {l P1
REL. 0xn0E AND S9 in0u. 1 NUPaaMM
/
LE2-0 /
/
LEz-1 o,i2'
LE2-24.6
4
w0
1 sSITcuF/1s'E PLAN
Surveyor: -
•
SIGN INVENTORY
L#
EXISTING
1
None
2
None
3
None
RECOMMENDATION QTY
Letterset 1
Letterset 1
Monument 1
August 11, 2021 HEXS-VA012-R03 Page 3 of 6
LOCATION 1
Recommendation: Letterset
EQ EQ
m
`o`.. _
SURVEY NOTES:
Front elevation.
RECOMMENDATION DETAILS:
Quantity Sign Sq.Ft. Illumination Estimated Paint Sq.Ft.
1 120.76 Face Lit -
Mounting Fabrication
Studs XLS-SM-5W
INSTALLATION/REPAIR NOTES:
Install new sign. Per site plan, wall color is Dryvit #142 Spectrum Brown, client to confirm prior to
production. Location of stairwells needs to be determined prior to production. Sign location is
being Viewed at an angle, width of wall needs to be determined prior to production.
DO NOT SHEETROCK THE WALLS WHERE SIGNS ARE LOCATED. Access inside of interior walls where
signs will hang is required at the time of installation. Contact your project manager if you are interested
in a pre -wire.
PART #:
H EXS-LTR-611-I L-EX-166H-PK
H EXS-LTR-611-I L-EX-166H-PW
SIGN DETAIL
5.
I�"�ml inmml
I�mm�
pryo f'A95�
I�ml
FROMNEW 1Z9� LOE NEW
August 11, 2021 HEXS-VA012-R03 Page 4 of 6
LOCATION 2
Recommendation: Letterset
SURVEY NOTES:
Left elevation.
RECOMMENDATION DETAILS:
Quantity Sign Sq.Ft. Illumination Estimated Paint Sq.Ft.
1 120.76 Face Lit -
Mounting Fabrication
Studs XLS-SM-5W
INSTALLATION/REPAIR NOTES:
Install new sign. Per site plan, wall color is Dryvit #142 Spectrum Brown, client to confirm prior to
production. Location of stairwells needs to be determined prior to production.
DO NOT SHEETROCK THE WALLS WHERE SIGNS ARE LOCATED. Access inside of interior walls where
signs will hang is required at the time of installation. Contact your project manager if you are interested
in a pre -wire.
PART #:
H EXS-LTR-611-I L-EX-166H-PK
H EXS-LTR-611-I L-EX-166H-PW
SIGN DETAIL:
5.
I�"+mml inmml
I�Emm�
pryo f'A95�
I�ml
FROMNEW 1Z9 SIDE NEW
August 11, 2021 HEXS-VA012-R03 Page 5 of 6
LOCATION 3
Recommendation: Monument
SURVEY NOTES:
No survey information forthis location.
RECOMMENDATION DETAILS
Quantity Sign Sq.Ft.
1 32
Mounting
Stub Outs
INSTALLATION/REPAIR NOTES
Illumination Face Estimated Paint Sq.Ft.
Face/Side Lit Double -
Fabrication
XPS-32-8
Install new sign. New foundation required.
Sign is custom due to 2'-0" radius footer needed for site conditions.
PART #:
H EXS-MON-028-IL-DF-096H-X
SIGN DETAIL:
s".
FPOM VIEW
atU(VIEW
August 11, 2021 HEXS-VA012-R03 Page 6 of 6